The document provides details on Tanvir Shahrier Mahmud's career objective, summary, qualifications, projects, and employment history. It summarizes his experience in structural analysis and design, construction supervision, and preparation of method statements, inspection reports, and rate analyses for various railway construction projects in Bangladesh totaling approximately $75.91 billion USD. His roles have included planning, implementation, supervision, material estimation, and liaising with consultants and clients on projects funded by the Government of Bangladesh, ADB, JICA, and other organizations.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
Project Execution Plan for Bridge ConstructionDavid H Moloney
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct an insitu concrete bridge.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
This Presentation is innovative and has many beneficial uses.
11 years experience in Residential Villa , Precast structures, Petrol compact stations, Water pipe line project, Industrial projects like ( Thermal power plant, Oil & refinery plant). And Material coordinator & procurement, SAP, Piling, sheet piling,
Project Execution Plan for Bridge ConstructionDavid H Moloney
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct an insitu concrete bridge.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
This Presentation is innovative and has many beneficial uses.
Dear Sir
I have worked in projects of Qatar rail, Dubai parks, Delhi metro in design of metro stations, Viaducts, Steel Structures, Buildings etc.
I have worked in design engineering, form consultant's end as well as contractors end and have been exposed to variety of aspects related to Structural Engineering.
It would be a great learning experience for me to work your organization and hence sharpen my technical skills further.
Presently I am in Qatar and have worked in Qatar,UAE and India .
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
In India constructions of cable stayed bridge are far less than the construction of such bridges in advanced countries. The concept and technical know how in India is relatively new but after execution over busy yard Barddhaman- a very busy station and yard, the construction of cable stayed bridges is going to play important role in time to come specially at stations where there is a need to use the yard and land mass for future yard remodeling and passenger amenities.This hand book cum coffee table book has been made by Rajesh Prasad to share his construction experience for education purpose. An interesting and amazing stuff....by Rajesh Prasad, Chief Project Manager(M) cum Group General Manager RVNL
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
1. CAREER OBJECTIVE
To excel at the diversified field of civil engineering through proper
implementation of my highest earned technical skills and professional
experience as well as monitoring every aspect of construction in a dynamic
and challenging work environment where there is an opportunity of self-
assessment and self-improvement. I am capable of working independently
with minimum supervision and committed to providing high-quality service
to every project.
TANVIR SHAHRIER
MAHMUD CAREER SUMMARY
B.Sc. in Civil Engineering, KUET
PROFILE
Dynamic and Dedicated Civil Engineer with
hands-on extensive experience in Structural
Analysis and Design, Preparation of As-Built,
I started working with reputed construction firms in Bangladesh
immediately after graduation and have been associated with the
implementation and tendering works of eight (08) major Railway Projects
funded by GOB, ADB and JICA.
Construction & Shop Drawings, Preparation
of Rate Analysis and Method Statements for
Tendering Purpose, Preparation of Progress
Reports, Preparation of Inspection Reports,
PROJECT HIGHLIGHTS
Construction Supervision, Estimation of
RCC & Steel Frame Structures, Steel Girder
& PSC Girder Bridges, RCC Pipe and RCC
Box Culverts, Temporary Shoring, Staging
& Temporary Site Accommodation Facilities,
Retaining Structures, etc.
CONTACT
CELL:
+8801820236446
+8801726136304
EMAIL:
shahriermahmud14@gmail.com
shahriermahmud15@gmail.com
MAILING ADDRESS:
House: #26, Eskaton Garder Road, Ramna,
Dhaka 1000.
Construction of New Dual Gauge Single Railway Line
from Dohazari to Cox’s Bazar. (Lot-01).
26.88 (billion)
BDT approx.
Construction of New Broad-Gauge Track on Gopalganj
– Gobra Section.
2.55 (billion)
BDT approx.
Construction of Dual Gauge Double Rail Line and
Conversion of Existing Rail Line into Dual Gauge
between Akhaura and Laksam. (Lot-01 & Lot-02)
34.73 (billion)
BDT approx.
Construction of New Broad-Gauge Track on Kashiani
– Gopalganj Section.
7.23 (billion)
BDT approx.
Construction of Station Building at Kaliakoir in between
Mirzapur Mouchak Station in connection with Hi-Tech
Park Project.
4.52 (billion)
BDT approx.
TOTAL VALUE OF PROJECTS 75.91 (billion)
BDT approx.
2. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
TOMA CONSTRUCTION & CO. LTD.
ASSISTANT MANAGER (ENGINEERING)
01. PROJECT
Construction of New Dual Gauge Single Railway Line from Dohazari to
Cox’s Bazar LOT-01
- Funded by Asian Development Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 52.4 km
RESPONSIBILTIES
- Planning & Implementation.
- Supervision of construction work.
- Estimation of construction material requirement.
- Preparation of Method Statements and Inspection Reports.
- Supervision of Drawing Preparation.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Waiting period for surcharge has been cut down by three (03) months
considering negative skin friction in pile foundations of 19 nos. steel girder
bridges.
- Design Review and Construction Drawing Preparation process has been
escalated by 1.5 times the usual pace of submission.
- Compiled three (03) Method Statements.
- Compiled TCCL Safety Handbook.
02. PROJECT
Construction of Dual Gauge Double Rail Line and Conversion of Existing
Rail Line into Dual Gauge between Akhaura and Laksam.
- Funded by Government of Bangladesh, Asian Development Bank and
European Investment Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 36.00 km
RESPONSIBILTIES
- Structural analysis and Design of single cell, double cell, triple cell and
quadruple cell RCC Box Culverts as per IS.
- Structural analysis and Design of Station Buildings as per ACI.
- Structural analysis and Design of Staging, Scaffolding work.
- Structural analysis and Design of Temporary Shoring System as per
AREMA.
- Structural analysis and Design of Braced Cofferdams as per AREMA.
3. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of Temporary Shoring, Staging,
RCC Retaining Wall (150.0 linear meter), Multibarrel RCC Box Culverts and
saved approximately 1.8 Million BDT in consultancy fees.
- Adapted alternative analysis approach towards foundation design for RCC
Buildings to yield an additional profit of 10.0 Million BDT.
03. PROJECT
Construction of New Broad-Gauge Track on Gopalganj – Gobra Section.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 11.315 km
RESPONSIBILTIES
- Structural analysis and Design of single cell, double cell and triple cell RCC
Box Culverts as per IS.
- Structural analysis and Design of Steel Plate Girder Bridges as per IS.
- Structural analysis and Design of Underpass and Overpass for local access
roads as per IS.
- Structural analysis and Design of Station Buildings and Industrial Sheds as
per ACI and AISC.
- Preparation of construction drawings of buildings, bridges and culverts.
- Supervision of construction work (i.e. concreting work, shuttering work,
rebar binding work, excavation work etc.).
- Preparation of As-built drawings.
- Preparation of Bar Bending Schedule.
- Estimation of civil works.
- Preparation of budget.
- Inspection of trial assembly of steel girder bridges.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of eight (08) nos. Multibarrel Skew
RCC Box Culverts and saved approximately 1.2 Million BDT in consultancy
fees.
- Rectified an error in As-Built drawings of River Training Works saving 30.0
Million BDT.
- Compiled four (04) Inspection Reports.
04. PROJECT
Tendering for Bangabandhu Sheikh Mujib Railway Bridge Construction
Project.
- Funded by Japan International Cooperation Agency
- Client: Bangladesh Railway
4. EMPLOYMENT RECORD
(Sept. 2018 – continuing)
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 400+ items of work.
- Compiled five (05) Method Statements.
05. PROJECT
Tendering for Expansion of Osmani Int’l Airport, Sylhet (1st Phase).
- Funded by Government of Bangladesh
- Client: Civil Aviation Authority of Bangladesh
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 300+ items of work.
- Compiled two (02) Method Statements.
06. PROJECT
Tendering for Construction of Padma Bridge Rail Link Project.
- Funded by Government of Bangladesh and Export-Import Bank of
China
- Client: Bangladesh Railway
MY ACHIEVEMENTS
- Compiled Unit Rate Analysis for 100+ items of work.
- Compiled three (03) Method Statements.
(Dec. 2015 – Sept. 2018)
MAX INFRASTRUCTURE LTD.
JUNIOR STRUCTURAL ENGINEER
01. PROJECT
Construction of New Broad-Gauge Track on Kashiani – Gopalganj Section.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 32.365 km
RESPONSIBILITIES
- Structural analysis and Design of single cell, double cell and triple cell RCC
Box Culverts as per IS.
- Structural analysis and Design of Steel Plate Girder Bridges as per IS.
- Structural analysis and Design of Underpass and Overpass for local access
roads as per IS.
- Structural analysis and Design of 40.0-meter-long PSC Girder as per
AASHTO LRFD and IRC.
- Structural analysis and Design of Station Buildings and Industrial Sheds as
per ACI and AISC.
5. EMPLOYMENT RECORD
(Dec. 2015 – Sept. 2018)
- Preparation of construction drawings of bridges and culverts.
- Supervision of construction work (i.e. concreting work, shuttering work,
rebar binding work, excavation work etc.).
- Preparation of Bar Bending Schedule.
- Preparation of Method Statements and Inspection Reports.
- Estimation of civil works.
- Inspection of trial assembly of steel girder bridges.
- Keeping liaison with the Consultants and Clients.
MY ACHIEVEMENTS
- Man month for Design Review was cut down from fourteen (14) months to
eight (08) months.
- Adapted alternative analysis approach towards foundation design for RCC
Buildings, Bridges and Culverts to increase contractor’s profit margin by
8.0% (480 Million BDT).
- Implemented local fabrication of steel girders and reduced incidental costs
related to production by 10.0% (1.5 Million BDT).
- Conducted in-house Analysis and Design of various civil infrastructures and
saved approximately 3.0 Million BDT in consultancy fees.
- Reviewed Revised Development Project Proposal (RDPP) and rectified an
error in estimation saving 20.0 Million BDT.
- Compiled two (02) Method Statements.
- Compiled two (02) Inspection Reports.
02. PROJECT
Construction of Dual Gauge Double Rail Line and Conversion of Existing
Rail Line into Dual Gauge between Akhaura and Laksam.
- Funded by Government of Bangladesh, Asian Development Bank and
European Investment Bank
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 36.00 km
RESPONSIBILITIES
- Structural analysis and Design of single cell and double cell RCC Box
Culverts as per IS.
- Structural analysis and Design of Temporary Shoring System as per
AREMA.
- Structural analysis and Design of Braced Cofferdams as per AREMA.
- Structural analysis and Design of Steel Trestle Bridges as per IS.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of Temporary Shoring, Staging
and Track Lifting Arrangement and saved approximately 1.2 Million BDT in
consultancy fees.
6. EMPLOYMENT RECORD
(Dec. 2015 – Sept. 2018)
- Adapted alternative analysis approach towards foundation design for RCC
Buildings to yield an additional profit of 12.8 Million BDT.
- Conducted in-house simulation to assess bearing capacity of founding soil
strata and reduced waiting period for surcharge by three (03) months for five
(05) nos. RCC Box Culverts.
03. PROJECT
Construction of Station Building at Kaliakoir in between Mirzapur-
Mouchak Station in connection with Hi-Tech Park Project.
- Funded by Government of Bangladesh
- Client: Bangladesh Railway
PROJECT OVERVIEW
- Route Length: 1.07 km
RESPONSIBILITIES
- Structural analysis and Design of Earth Retention System.
- Structural analysis and Design of Pile Foundation for RCC Buildings.
MY ACHIEVEMENTS
- Conducted in-house Analysis and Design of RCC Retaining Wall (100 linear
meter) and pile foundation for RCC Buildings and saved approximately 0.6
Million BDT in consultancy fees.
ACADEMIC QUALIFICATION
Bachelor of Science in Civil Engineering
Khulna University of Engineering & Technology (KUET)
Undergraduate Thesis: Determination of Shear Strength Characteristics and Load-Settlement Behavior of Fiber
Reinforced Soil using Finite Element Method and Experimental Models.
LANGUAGE PROFICIENCY
1. ENGLISH (Professional Working Proficiency)
2. BENGALI (Native Proficiency) Listening: 8.5
Reading: 9.0
Writing: 7.0
Overall: 8.0
3. HINDI (Verbal Proficiency) Speaking: 7.0
7. COMPUTER SKILLS
ENGINEERING SOFTWARE
- Midas Civil
- STAAD.Pro
- Bentley LEAP Bridge
- Bentley RAM Connection
- ASDIP Foundation
- ASDIP Concrete
- All Pile
- Lpile
- GeoStudio
- Dlubal Crane Way
- AutoCAD
- PLAXIS
- GS AFES
- RCM ACI Builder
- PROKON
- Shoring Suite
- CSI Etabs
- CSI Bridge
MICROSOFT OFFICE PACKAGE
- Microsoft Word
- Microsoft Excel
- Microsoft PowerPoint
- Microsoft Project
TRAINING SUMMARY
Training Title: Training Workshop on Midas Civil Software – Intermediate Level.
Training Contents: Modelling and Design of PSC Box, PSC I, Steel Composite, Culverts,
Sub Structure, Railway Loadings and Rail Structure Interaction.
Venue: MIDAS-IT, Navi Mumbai, India.
Training Title: Workshop on ETABS & Arc-GIS
Training Contents: Development and Analysis of Structural Models and
Preparation of Hydrological Models.
Venue: Khulna University of Engineering & Technology (KUET), Khulna,
Bangladesh.
8. PERSONAL DETAIL
Marital Status Married
Nationality Bangladeshi
National Identification Number 19921594314000554
Passport Number BQ0114994
REFERENCE (S)
Name Engr. Udayan Chakraborty Dr. Muhammad Harunur Rashid
Organization TOMA Construction & Co. Ltd. Khulna University of Engineering & Technology
(KUET)
Designation General Manager (Bridge) Professor
Address Toma Tower, 77/1 Kakrail Ramna, Dhaka,
Bangladesh.
Dept. of Civil Engineering,
Khulna University of Engineering & Technology
Cell +8801718265032 +8801711933230
Email udayan.chakraborty.br@gmail.com hafin02@gmail.com
I do hereby declare that the particulars provided in the curriculum vitae are true to the best of my knowledge and belief. I
authorize your organization to verify the information provided above.
Any necessary documentation related to institutional verification & authorization will be provided upon request.
Sincerely,
Tanvir Shahrier Mahmud