SlideShare a Scribd company logo
ARSHAD JAN
arshadjanpk@yahoo.com
Mob- 00923350020071 (Pakistan)
EDUCATION
 Diploma of Associate Engineer
in Civil Technology, Board of
Technical Education
Peshawar. 1992.
 Bachelor of Technology Civil
Preston University Peshawar
July 2011
REGISTRATIONS/
CERTIFICATIONS
 Registration with Board of
Technical Education KPK
ADDITIONAL COURSEWORK AND
TRAINING
 Primavera Project Planning
 Project Management
COMPUTER/SOFTWARE SKILLS
Primavera Project Planning
MS Office
3D Home Designing
Auto Cad
LANGUAGES
Pashto
Urdu
English
Punjabi
OBJECTIVES:
To seek a secure and responsible position in a
dynamic and reputed organization in order to achieve a sustained
growth and recognition and to be a contributing member where my
capabilities and experience can be a significant factor to help in
achieving the targeted goals of organization.
PROJECT EXPERIENCE
SHAZ Consultants Peshawar
September, 15Th 2014 to date.
Project: Construction of Jalozai Housing Scheme District Nowshera
Client: Provincial Housing Authority (PHA) KPK
Project Role: Resident Engineer
Duties and responsibilities:
 Inspecting the construction of road such including the formation ,earthwork,
sub grade, sub base and Aggregate base, curbs stone and asphalt
pavement
 Inspection and supervision of all construction activities at site.
 Conduction of different technical tests that required for Roads and structure.
 Supervision of Roads, Bridges, culverts etc.
 Preparation and checking of Vernation orders (V.O) and Technical
Sanction.(TS)
 Checking of Contractor IPCs and tracking the progress with the submitted
work schedule.
Shazaman (Pvt.) Limited
March,1st 2013 to August, 20Th 2014
Project: Construction of RCC Bridge Over River Swat (13 span 450 Meters)
Client: Khyber Pukhtunkhwa Highways Authority (KPHA) KPK
Project Role: Project Manager
Duties performed
 Construction, Supervision and Inspection of overall project.
 Casting of 42 Nos. of 1 meter dia. Piles.
 Casting, Stressing/Grouting and launching of 52 nos. pre-stressed concrete
girders having 30 meter length each.
 Casting of 1 meter dia. concrete columns of 14 nos.
 Casting of 14 nos. transoms, 14 nos. of deck slabs and 3kms approach
road.
 Coordination with the concerned authorities in relation to the relocation of
existing utilities and ensuring the traffic flow and necessary diversions.
 Correspondence with the Client and dealing with the sub-contractors.
 Tracking the project schedule submitted to the client.
DATE OF BIRTH
March 19Th 1973.
National Engineering Services of Pakistan (Nespak)
May, 20Th 2012 To February 2013
Project: Construction of Qulangi Bridge at District Malakind
Client: Communication and Works Department KPK
Project Role: Assistant Resident Engineer.
Duties included the following:
 Supervision of Pilling, columns, transoms, girders, deck slabs, railings etc.
 Inspection of approach roads.
 Inspecting of road works and RCC structural activities at site.
 Inspecting lay out for retaining walls, toe walls, water drainage lines and
marking the ROW as per drawing and road alignment.
 Conducting concrete cube testing in the laboratory and preparing material
test reports for the management team.
M/S Shahzaman (Pvt. )Limited
February, 22nd 2009 To April, 25Th 2012
Project: Infrastructural Works University of Engineering and Technology
Campus Jalozai
Client: University of Engineering and Technology Peshawar.
Project Role: Project Manager
Duties included the following:
 Detail supervision of different constructional activities at site.
 Construction of Roads, Culverts, Bridges and Flood Channels
 Checking and monitoring day to day work and manage the material
resources.
 Utilizing and encouraging the skill of the subordinates on site.
 Conducting meetings and correspondence with the department.
 Preparing and tracking the work schedule of the site progress.
M/S Sarwar Construction Company
May 21st 2008 to February 21St 2009
Project: Construction of Palai Dam at District Charsadda
Client: Irrigation Small Dams Department
Project Role: Project Manager
Duties performed.
 Inspection and site supervision of all earthwork including cut and
and fill ,embankment, aggregate base course, protection works, bituminous
Base course, wearing course and different tests at site.
 Construction of RCC structural works including culverts, retaining walls.
 Construction of Dam structure including RCC spillways.
 Construction of 10 Kms. Of water channel.
 Inspecting the removal and relocation of utilities in compliance with
department approved route plan and specifications.
 Recording daily, weekly and monthly progress reporting to the management.
M/S Zahir and Brother (ZKB)
March, 1997 to April, 2000
Project: Islamabad-Peshawar Motorway (M1)
Client: National Highway Authority.(NHA)
Project Role: Section Manager
Duties included the following:
 Construction of 4 Nos. Underpasses, 2 Nos. Bridges.
 Construction of 2 Nos. Cattle Creeps and 24 Nos. RCC culverts
 Preparing of day to day and monthly progress on site.
 Laboratory work for material testing and reporting to the seniors.
 Taking samples from material borrows and concrete batching.
 Preparing of IPCs and sub-contractor bills.
 Meetings and Correspondence with the Client and consultants.
Pakistan Motorway Contractors Joint Venture (PMC Jv.)
September 14Th 2004 To July 13Th 2005
Project: Islamabad-Peshawar Motorway (M1)
Client: National Highway Authority (NHA)
Project Role: Structural Engineer
Duties included the following:
 Work as Structural Engineer
 Construction of Underpasses, Cattle Creeps, Bridges and RCC Culverts
 Preparing and Checking Steel Bar bending Schedules
 Taking samples from material borrows and concrete batching.
 Dealing with the client and consultants.
 Checking of formwork, steel and poring of different classes concrete
STFA Turkish Construction Company
May 11Th 2004 To August 27Th 2004
Project: Construction of Sur to Quryat Road Sultanate e Oman
Client: Ministry of Commination Sultanate Oman
Project Role: Structural Engineer
Duties included the following:
 Construction of Multi spans RCC bridges.
 Construction of Single and multi-span RCC culvers
 Preparing of Steel bar bending schedules
 Laboratory work for material testing and reporting to the seniors.
 Taking samples from material borrows and concrete batching.
 Casting, stressing and launching of pre stressed concrete girders
 Casting of Concrete piles, columns, transoms and deck slabs.
Pakistan Motorway Contractors Joint Venture (PMC Jv.)
May 12Th 2003 To May 1St 2004
Project: Islamabad-Peshawar Motorway (M1)
Client: National Highway Authority (NHA)
Project Role: Structural Engineer
Duties included the following:
 Work as Structural Engineer
 Construction of Underpasses, Cattle Creeps, Bridges and RCC Culverts
 Preparing and Checking Steel Bar bending Schedules
 Taking samples from material borrows and concrete batching.
 Dealing with the client and consultants.
 Checking of formwork, steel and poring of different classes concrete
M/S KAKSAW Concrete and Construction
April 15Th 2002 to April 11Th , 2003
Project: Dason Bridge and Irrigation Cana Lining
Client: Irrigation Department
Project Role: Senior Engineer (Structure)
Duties included the following:
 Piling Works of three Nos. of bridges
 Casting, stressing and launching of pre-stressed concrete girders
 15 Kms. Canal Concrete lining.
Construction of RCC Culverts and causeways.
Rana Construction Company (RCC)
April 15Th 2002 to April 11Th , 2003
Project: Extension of Saif Textile Mills
Client: Sarhad Development Authority
Project Role: Project Engineer
Duties included the following:
 Work as Finishing Engineer for Industrial Building
 Scheduling for the project activities physical and financial.
 Correspondence with the client and consultants
 Arrangements for materials and other resources for the project
Bayindir Construction Insaat (Turkish Construction Company)
October 5Th 1998 to May 7Th 2001
Project: Islamabad-Peshawar Motorway (M1) Sec III
Client: National Highway Authority (NHA)
Project Role: Site Engineer (Structure)
Duties included the following:
 Piling Works of three Nos. of bridges including one flyover.
 Casting, stressing and launching of pre-stressed concrete girders
 Construction of 17 nos. of underpasses of size 5.5 X 4.5 meters and 120
meters long.
 Construction of 12 nos. of Cattle creeps of size3.5 x 4.5 meters and 120
meters long.
 Construction of 42 nos. of RCC multi cell culverts of different sizes.
 Construction of RCC Culverts and causeways.
 Controlling the work according to line and grids, specification and drawing.
 Dealing with client and consultants and correspondence.
Dir Construction Company
August 15Th 1997 To September 10Th 1998
Project: Rural Road Construction Project (RRCP)
Client: Commination and works Department
Project Role: Project/Quantity Engineer
Duties included the following:
 Construction of FMR (Form to Markets Roads) Project.
 Construction of Minor Bridges and culverts.
 Relocation of water courses and reconstruction.
 Preparation of IPCs.
China Petroleum Engineering Construction Corporation (CPECC)
November 27Th1995 To July 7Th May 7Th 1997
Project: Indus Highway (From Kohat Lachi to Karak Section.)
Client: National Highway Authority (NHA)
Project Role: Structure Engineer
Duties included the following:
 Piling Works of 2 Nos. of bridges.
 Casting, stressing and launching of pre-stressed concrete girders.
 Layout of multi span bridges
 Load Test of 1 meter dia. Pile.
 Scheduling and tracking of work progress of site.
Mark International (Pvt.) Ltd
November 27Th1995 To July 7Th May 7Th 1997
Project: Thall-Parachinar Road Project
Client: National Highway Authority (NHA)
Project Role: Surveyor/Site Engineer/Site In charge.
Duties included the following:
 Construction of 28 Nos. of bridges.
 Piling works of 28 nos. of bridges.
 Casting, stressing and launching of pre-stressed concrete girders.
 Layout of multi span bridges
 Load Test of 1 meter dia. Pile.
 Scheduling and tracking of work progress of site.
 Dealing of lab .tests.
 Dealing with client and consultants.

More Related Content

What's hot

shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
shoukat ali soomro
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
Mohammad Sarowar
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
muhammad aslam
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
Amanat ali
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
Md Saidul Islam
 
k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016
kandasamy Ramakkannu PMP
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
Abdul Saeed
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
syedmohd77
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
Abdul Hameed Randawah
 
HAmmad Resume
HAmmad ResumeHAmmad Resume
HAmmad Resume
Hammad Ali
 
CV of engr. Ghulam Azhar with 14 years exp (1)
CV of engr. Ghulam Azhar with 14 years exp (1)CV of engr. Ghulam Azhar with 14 years exp (1)
CV of engr. Ghulam Azhar with 14 years exp (1)
ghulam azhar kandhir
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
Mateti Srinivas
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
zafarullah khan
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
muhammadmasood75
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor khan
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
Debajit Dhar
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
pritam thakore
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
Habibur Rahman
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
Mohamed Aladly
 

What's hot (20)

shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV of M Saidul Islam.os
CV of M Saidul Islam.osCV of M Saidul Islam.os
CV of M Saidul Islam.os
 
k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016k.Ramakkannu cv 06 jan2016
k.Ramakkannu cv 06 jan2016
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
Abdul Hameed Civil supervisor
Abdul Hameed Civil supervisorAbdul Hameed Civil supervisor
Abdul Hameed Civil supervisor
 
HAmmad Resume
HAmmad ResumeHAmmad Resume
HAmmad Resume
 
CV of engr. Ghulam Azhar with 14 years exp (1)
CV of engr. Ghulam Azhar with 14 years exp (1)CV of engr. Ghulam Azhar with 14 years exp (1)
CV of engr. Ghulam Azhar with 14 years exp (1)
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 

Similar to Arshad Jan CV

CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
Muhammad Ilyas Memon
 
Sharma cv
Sharma  cv Sharma  cv
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
Sachin Chitnis
 
CV (2)
CV (2)CV (2)
CV (2)
Abdul Waheed
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
zeeshan Ali
 
MCV
MCVMCV
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
Muneer Muneermk
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
Haseeb Ahmed
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
Imran Khalil
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
Imran Khalil
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
BHUPINDER SINGH
 
Amir Muneer (1)
Amir Muneer (1)Amir Muneer (1)
Amir Muneer (1)
Amir Muneer
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
Mubasher Malik
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
SOHAIL SHAH
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
Satyeshwar Sharma
 
Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)
Usman Altaf
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
Rajib Ali
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
Jundee Mar Tejedo
 
jainco
jaincojainco
jainco
rama trivedi
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
iftekhar Ahmad Baig
 

Similar to Arshad Jan CV (20)

CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV (2)
CV (2)CV (2)
CV (2)
 
CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)CopyofZeeshanAliChannaResume1 (1) (1) (1)
CopyofZeeshanAliChannaResume1 (1) (1) (1)
 
MCV
MCVMCV
MCV
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Asstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder SinghAsstt Bridge Engineer - Bhupinder Singh
Asstt Bridge Engineer - Bhupinder Singh
 
Amir Muneer (1)
Amir Muneer (1)Amir Muneer (1)
Amir Muneer (1)
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)Civil Design Engineer- (6 Yrs Exp)
Civil Design Engineer- (6 Yrs Exp)
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
jainco
jaincojainco
jainco
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 

Arshad Jan CV

  • 1. ARSHAD JAN arshadjanpk@yahoo.com Mob- 00923350020071 (Pakistan) EDUCATION  Diploma of Associate Engineer in Civil Technology, Board of Technical Education Peshawar. 1992.  Bachelor of Technology Civil Preston University Peshawar July 2011 REGISTRATIONS/ CERTIFICATIONS  Registration with Board of Technical Education KPK ADDITIONAL COURSEWORK AND TRAINING  Primavera Project Planning  Project Management COMPUTER/SOFTWARE SKILLS Primavera Project Planning MS Office 3D Home Designing Auto Cad LANGUAGES Pashto Urdu English Punjabi OBJECTIVES: To seek a secure and responsible position in a dynamic and reputed organization in order to achieve a sustained growth and recognition and to be a contributing member where my capabilities and experience can be a significant factor to help in achieving the targeted goals of organization. PROJECT EXPERIENCE SHAZ Consultants Peshawar September, 15Th 2014 to date. Project: Construction of Jalozai Housing Scheme District Nowshera Client: Provincial Housing Authority (PHA) KPK Project Role: Resident Engineer Duties and responsibilities:  Inspecting the construction of road such including the formation ,earthwork, sub grade, sub base and Aggregate base, curbs stone and asphalt pavement  Inspection and supervision of all construction activities at site.  Conduction of different technical tests that required for Roads and structure.  Supervision of Roads, Bridges, culverts etc.  Preparation and checking of Vernation orders (V.O) and Technical Sanction.(TS)  Checking of Contractor IPCs and tracking the progress with the submitted work schedule. Shazaman (Pvt.) Limited March,1st 2013 to August, 20Th 2014 Project: Construction of RCC Bridge Over River Swat (13 span 450 Meters) Client: Khyber Pukhtunkhwa Highways Authority (KPHA) KPK Project Role: Project Manager Duties performed  Construction, Supervision and Inspection of overall project.  Casting of 42 Nos. of 1 meter dia. Piles.  Casting, Stressing/Grouting and launching of 52 nos. pre-stressed concrete girders having 30 meter length each.  Casting of 1 meter dia. concrete columns of 14 nos.  Casting of 14 nos. transoms, 14 nos. of deck slabs and 3kms approach road.  Coordination with the concerned authorities in relation to the relocation of existing utilities and ensuring the traffic flow and necessary diversions.  Correspondence with the Client and dealing with the sub-contractors.  Tracking the project schedule submitted to the client.
  • 2. DATE OF BIRTH March 19Th 1973. National Engineering Services of Pakistan (Nespak) May, 20Th 2012 To February 2013 Project: Construction of Qulangi Bridge at District Malakind Client: Communication and Works Department KPK Project Role: Assistant Resident Engineer. Duties included the following:  Supervision of Pilling, columns, transoms, girders, deck slabs, railings etc.  Inspection of approach roads.  Inspecting of road works and RCC structural activities at site.  Inspecting lay out for retaining walls, toe walls, water drainage lines and marking the ROW as per drawing and road alignment.  Conducting concrete cube testing in the laboratory and preparing material test reports for the management team. M/S Shahzaman (Pvt. )Limited February, 22nd 2009 To April, 25Th 2012 Project: Infrastructural Works University of Engineering and Technology Campus Jalozai Client: University of Engineering and Technology Peshawar. Project Role: Project Manager Duties included the following:  Detail supervision of different constructional activities at site.  Construction of Roads, Culverts, Bridges and Flood Channels  Checking and monitoring day to day work and manage the material resources.  Utilizing and encouraging the skill of the subordinates on site.  Conducting meetings and correspondence with the department.  Preparing and tracking the work schedule of the site progress. M/S Sarwar Construction Company May 21st 2008 to February 21St 2009 Project: Construction of Palai Dam at District Charsadda Client: Irrigation Small Dams Department Project Role: Project Manager Duties performed.  Inspection and site supervision of all earthwork including cut and and fill ,embankment, aggregate base course, protection works, bituminous Base course, wearing course and different tests at site.  Construction of RCC structural works including culverts, retaining walls.  Construction of Dam structure including RCC spillways.  Construction of 10 Kms. Of water channel.  Inspecting the removal and relocation of utilities in compliance with department approved route plan and specifications.  Recording daily, weekly and monthly progress reporting to the management.
  • 3. M/S Zahir and Brother (ZKB) March, 1997 to April, 2000 Project: Islamabad-Peshawar Motorway (M1) Client: National Highway Authority.(NHA) Project Role: Section Manager Duties included the following:  Construction of 4 Nos. Underpasses, 2 Nos. Bridges.  Construction of 2 Nos. Cattle Creeps and 24 Nos. RCC culverts  Preparing of day to day and monthly progress on site.  Laboratory work for material testing and reporting to the seniors.  Taking samples from material borrows and concrete batching.  Preparing of IPCs and sub-contractor bills.  Meetings and Correspondence with the Client and consultants. Pakistan Motorway Contractors Joint Venture (PMC Jv.) September 14Th 2004 To July 13Th 2005 Project: Islamabad-Peshawar Motorway (M1) Client: National Highway Authority (NHA) Project Role: Structural Engineer Duties included the following:  Work as Structural Engineer  Construction of Underpasses, Cattle Creeps, Bridges and RCC Culverts  Preparing and Checking Steel Bar bending Schedules  Taking samples from material borrows and concrete batching.  Dealing with the client and consultants.  Checking of formwork, steel and poring of different classes concrete STFA Turkish Construction Company May 11Th 2004 To August 27Th 2004 Project: Construction of Sur to Quryat Road Sultanate e Oman Client: Ministry of Commination Sultanate Oman Project Role: Structural Engineer Duties included the following:  Construction of Multi spans RCC bridges.  Construction of Single and multi-span RCC culvers  Preparing of Steel bar bending schedules  Laboratory work for material testing and reporting to the seniors.  Taking samples from material borrows and concrete batching.  Casting, stressing and launching of pre stressed concrete girders  Casting of Concrete piles, columns, transoms and deck slabs.
  • 4. Pakistan Motorway Contractors Joint Venture (PMC Jv.) May 12Th 2003 To May 1St 2004 Project: Islamabad-Peshawar Motorway (M1) Client: National Highway Authority (NHA) Project Role: Structural Engineer Duties included the following:  Work as Structural Engineer  Construction of Underpasses, Cattle Creeps, Bridges and RCC Culverts  Preparing and Checking Steel Bar bending Schedules  Taking samples from material borrows and concrete batching.  Dealing with the client and consultants.  Checking of formwork, steel and poring of different classes concrete M/S KAKSAW Concrete and Construction April 15Th 2002 to April 11Th , 2003 Project: Dason Bridge and Irrigation Cana Lining Client: Irrigation Department Project Role: Senior Engineer (Structure) Duties included the following:  Piling Works of three Nos. of bridges  Casting, stressing and launching of pre-stressed concrete girders  15 Kms. Canal Concrete lining. Construction of RCC Culverts and causeways. Rana Construction Company (RCC) April 15Th 2002 to April 11Th , 2003 Project: Extension of Saif Textile Mills Client: Sarhad Development Authority Project Role: Project Engineer Duties included the following:  Work as Finishing Engineer for Industrial Building  Scheduling for the project activities physical and financial.  Correspondence with the client and consultants  Arrangements for materials and other resources for the project Bayindir Construction Insaat (Turkish Construction Company) October 5Th 1998 to May 7Th 2001 Project: Islamabad-Peshawar Motorway (M1) Sec III Client: National Highway Authority (NHA) Project Role: Site Engineer (Structure)
  • 5. Duties included the following:  Piling Works of three Nos. of bridges including one flyover.  Casting, stressing and launching of pre-stressed concrete girders  Construction of 17 nos. of underpasses of size 5.5 X 4.5 meters and 120 meters long.  Construction of 12 nos. of Cattle creeps of size3.5 x 4.5 meters and 120 meters long.  Construction of 42 nos. of RCC multi cell culverts of different sizes.  Construction of RCC Culverts and causeways.  Controlling the work according to line and grids, specification and drawing.  Dealing with client and consultants and correspondence. Dir Construction Company August 15Th 1997 To September 10Th 1998 Project: Rural Road Construction Project (RRCP) Client: Commination and works Department Project Role: Project/Quantity Engineer Duties included the following:  Construction of FMR (Form to Markets Roads) Project.  Construction of Minor Bridges and culverts.  Relocation of water courses and reconstruction.  Preparation of IPCs. China Petroleum Engineering Construction Corporation (CPECC) November 27Th1995 To July 7Th May 7Th 1997 Project: Indus Highway (From Kohat Lachi to Karak Section.) Client: National Highway Authority (NHA) Project Role: Structure Engineer Duties included the following:  Piling Works of 2 Nos. of bridges.  Casting, stressing and launching of pre-stressed concrete girders.  Layout of multi span bridges  Load Test of 1 meter dia. Pile.  Scheduling and tracking of work progress of site. Mark International (Pvt.) Ltd November 27Th1995 To July 7Th May 7Th 1997 Project: Thall-Parachinar Road Project Client: National Highway Authority (NHA) Project Role: Surveyor/Site Engineer/Site In charge. Duties included the following:
  • 6.  Construction of 28 Nos. of bridges.  Piling works of 28 nos. of bridges.  Casting, stressing and launching of pre-stressed concrete girders.  Layout of multi span bridges  Load Test of 1 meter dia. Pile.  Scheduling and tracking of work progress of site.  Dealing of lab .tests.  Dealing with client and consultants.