.
.
.
CURRICULUM VITAE.
BRIAN TIMPSON.
Deck foreman / rigging supervisor.
35 ,Jefferson drive,
Ulverston,
Cumbria,la12 9lu.
England,
Uk.
01229219449.
Mob. 07749492997.
briantimpson@hotmail.co.uk.
Dob,22-12-1947.
N.I.Number: YK 53 97 17 D
Passport No: 458268692 Expires: 28th
May 2016 got second new passport. Also.
Shell Optic Number: 10991-FS10MAPS61827
Offshore Survival: Cert. No. 0010585801052012015,
FOET, further offshore emergency training,
Start date: 01-may-2012,
Expire date: 29-july-2016.
Offshore Medical: Completed 25sept 2013 to 24th
sept 2015.
Pin no, ukooa,-2003-598.
Norwegian medical: Helseerkiaering. 25th
sept 2013 to sept 24th
2015.
1
Scats course: Cert. No. 577230 expires 17/7/11.
FAS/Safe Pass: Reg No. SP2/586/124227/0606 Expires June 2006
Pegasus Passport: Reg. No. R168868
ECITB Course: Erector/Rigger Grade 6 / Category B – Ref. No. 0081531
Expires 27/8/07
M.O.D: Clearance Form Dated to 5/6/2011
Driving License: Full UK No. TIMPS412227 BJ9GR
Breathing Apparatus: I.C.I. Peter Lee Sabre Centaur 15/9/2000
Union: Amicus/AEEU – Membership No. A1072987
Permit Picws Certs: Shell UK No. 014890-23-1-05
L.O.L.E.R Planner: ‘Evolve’ Cert. Achievement
Assessor: Cert No. 14700-20/9/2004
Rigger Assessment: Sparrows Offshore, Opito approved – rigging & lifting operations;
Safety Environmental cert, no.at.2735 30/05/2005. Awarded for first class job.
Excellence Certificate: Britannia Platform, BG Armada Shutdown, Brit Scats hook up &
Britannia shutdown, 2/01/2007
8-9-2014. expire.7-9-2016. EVOLVE.
Opito banks man slingers stage 3.
Course code. 9068.
Opito approved certificate no.0060906808091 4001.
EVOLVE.
17/18th
sept 2014-16sept 2016.
Opito rigger competence stage 3.
Course code 9099.
Opito approved certificate no.00609099180914004.
BRIAN JOSEPH TIMPSON, CV – Cont.
2
INNOCULATIONS:
All injections, June 2004...cholera, yellow fever, small pox, diphtheria, tetanus
Hep A. polio, typhoid, malaria.
All inoculations have been updated last year, and are good for another 10 years now.
Aug 7th
.2013.
17th
June 2014 to July 2014.
TECHNIP.
Rigging supervisor,
Triton F.P.S.O., North Sea.
DANA PETROLEUM.
Triton riser & umbilical installation project.
Disconected and laid on sea bed two 4ins risers, reinstated two new 4ins
risers,and reinstated one 8 ins riser hang off clamps and fitted test head ect.
. REEF SUBSEA.
Deck foreman.
Feb 3rd
2014 to 5th
march, 2014.
Vessel, polar king..
GWENT Y MORE wind farm.
Cable pulling vessel.
Of north Wales.
Aug 7th
2013 to 29thdec 2013.
REEF SUBSEA.
Deck foreman.
Vessel. Reef Larissa,
ANGOLA.
C.R.Z.project. for SAIPEM.
South nemba river crossing.
Laying sleepers, and concrete mats.
Working along side pipe layer, CASTRO,7.
3
July 22nd
, 2012,to aug 2nd
.
Deck supervisor,
SKANDI INSPECTOR vessel,
Dsv, rov, inspection,
Laying down 17 mattresses and clamps,in various locations in north sea,
Northern sector,plus inspection on pipe lines well heads ect.
sept 2nd
to sept 30th
. , 2011
Deck supervisor.
OIS ABERDEEN.
Vessel, Olympic triton.
Abandonment project.
Intervention project.
North sea.uk.
August 1- 27 aug 2011. OIS, ABERDEEN.
Deck supervisor
SKANDI CONSTRUCTOR.
Offshore installation services
Intervention wells, running scat tool.
Abandonment wells
June 4th
2011 - Aug 2011
Earth stream, agency Spain.
Rigging supervisor
In charge of 8 riggers 12 steel erectors 2 crane drivers.
Building camps and two bridges
In the jungle of SIERRA LEONE
AFRICA.
For African mining..
Aml, south Africa.
4
Feb,2011 may,2011.
Rigging supervisor,
B.J.A. services,
Tenerife, construction.
Shut down, water plant.
Renewal of pipe work, heat exchangers, filters,
Valves, pipe trains.ect.
May 2010, nov. 2010.
Deck supervisor,
Maersk recorder,
Cable pulling vessel,
Bard wind farm project,
Germany.
Dec,2009 23 march , 2009.
GLOBAL.
, deck supervisor.
Atlantic guardian, survey vessel.
Brit ned project.
Germany, England.
May 2009 nov 2009, CTC.through subserv pro.
deck foreman.
Atlantic challenger,
Dive support vessel,
CTC, South China Sea’s.
China.
27th
august 2008,to feb 2009.
Mermaid maritime offshore construction.
Gulf of Thailand.
Position. .deck supervisor.
5
Gulf of Thailand,
Running riser pipe,tie –ins,spools,ect.
All sat diving work,and rigging up for riser pipe on platforms in various
locations in gulf of Thailand..
31st
January 2008- 11th
may 2008
Rigging supervisor
Baker/OTS
Nigeria L.N.G, plant shutdown,
BONNY ISLAND, NIGERIA.
13th
December 2006 –10 January 2008.
AMEC OFFSHORE CONSTRUCTION.
Position: Rigging foreman.
Details: Amec Group Ltd. BG ‘Armada Shutdown’ / ‘’Britstats’’ hook-up.
Britannia EC Shutdown, Britsats,north sea.
11th
October 2006 – 30th
November 2006
Position: Rigger foreman.
Details: Atlantic Resourcing Ltd.
BG Armada Shutdown / ‘’Britstats’’ hook-up
Britannia EC shutdown
20th
September 2006 – 4th
October 2006
Position: Rigger foreman.
Details: Amec Darlington Grange Mouth Oil Refinery
Shutdown BP
2nd
August 2006 – 13th
September 2006
Position: Rigger foreman.
Details: Atlantic Resourcing Ltd. Douglas Platform, Liverpool Bay
Shutdown and upgrade
6th
June 2006 – 18th
July 2006
Position: Rigging Foreman
Details: Woodgroup Brent Bravo Platform Upgrade
6
18th
May 2006 – 29th
May 2006
Position: Rigger foreman.
Details: Claymore Alpha PWRI Project – P.S.N. ‘’Talisman’’
27th
April 2006 – 11th
May 2006
Position: Rigger supervisor.
Details: Clyde Platform, PWRI Project – P.S.N. ‘’Talisman’’
3rd
March 2006 – 14th
April 2006
Position: Rigging Foreman
Details: Woodgroup Alba Platform Shevron-Texico
12th
January 2006 – 26th
January 2006
Position: Rigging Foreman
Details: Woodgroup Offshore, Claymore Alpha Platform
Construction of diesel tanks and new pipe work
20th
November 2005 – 2nd
December 2005
Position: Rigger foreman.
Details: Woodgroup Offshore, Magnus Platform
Maintenance contract.
23rd
October 2005 – 5th
November 2005
Position: Rigger foreman.
Details: Woodgroup Offshore, Schiehallion F.P.S.O Northwest Shetlands
13th
September 2005 – 2nd
October 2005
Position: Rigging Foreman
Details: Kellog-Brown & Root, Shutdown at ICI Bilingham
23rd
March 2005 – 12th
September 2005
Position: Rigger supervisor.
Details: Amec Oil & Gas, Britannia Upgrade - New Bridge landing for
New jacket due following year, Offshore North Sea
26th
September 2004 – 12th
April 2005
Position: Rigging supervisor.
Details: Amec Oil & Gas, Bonga F.P.S.O – Offshore Lagos
OPL218 – Nigeria
7
16th
June 2004 – 20th
July 2004
Position: Rigging Supervisor
Details: Amec Oil & Gas, Offshore Shirag 1 2004 turn-around shutdown.
Baku, Azerbaijan
20th
may 2004 – 3rd
June 2004
Position Rigger supervisor.
Details: Devonport dockyard Plymouth
Lots of rigging and crane work on frigates.
Removing old propeller, and reinstate new one in dry dock.
9th
Dec 2003 – 15th
may 2004
Position: Rigger. Supervisor.
Details: Wood group offshore. Brent Charlie,
Fire pumps maintenance.and upgrade.
10th
Sept 2003 – 1st
Nov 2003
Position Rigger forman.
Details: Ledwood mechanical. Texaco oil refinery shutdown, Pembroke west
Wales
11TH
June 2003 – 23rd
Aug 2003
Position: Rigger forman.
Details: Kellog brown and root ltd. Barrow gas terminal shutdown.
Replacing all fire stations,pipe trains,pipe work.valves ect.
3rd
June 2003 – 11th
June 2003
Position: Rigger supervisor.
Details: Becks and Politzer. “Kimberly Clark” Barrow in Furness
Heavy rigging, removing heavy machinery,of assembly lines,
Reinstate new machinery on assembly lines.lots of crane work.
23rd
Sept 2002 – 2nd
June 2003
Position: Rigger Foreman
Details: HA O’Neil. Intel computers Liekslip Co Clare Eire, Construction of
FAB 22.lots of large pipe work,pipe trains,transferring heavy
machinery into work modules,and bolting them down.
8
Lots of crane work,
10TH
March 2002 – 20th
Sept 2002
Position: Rigger supervisor.
Details: B.M.D.(Cork) Jacobs Lend Lease. Wyeth medica, Ireland.
Biotechnology campus, Clondalkin.
Lots of pipe work, pipe trains, valves ect.big 40 ton boilers and pipe
work, lots of crane work and rigging involved.
20th
Nov 2001 – 10th
March 2002
Position; Rigger Banks man, crane coordinator.
Details: Watergate water treatment plant. Kendal, Cumbria. Construction of
new plant, shap fell.
20th
Oct 2001 – 10th
March 2001
Position: rigging supervisor,
Details: Halliburton brown and root ltd. Metering project, British gas, barrow in
Furness, installing new metering pipe work and valves,to meter gas
control systems for flow. All crane work, and rigging.
2nd
Nov2000 – 20th
Oct 2001
Position: rigging supervisor, over heavy lifts.
Details. S.M.O.C. Project, south Morecambe onshore compression. British
gas, barrow in Furness .Construction of new plant, installation of gas
turbines, compressors and control systems,heavy pipe spools,valves
and pipe trains.lots of crane work and rigging.
2nd
0ct 2000 – 1st
Nov 2000
Position: foreman rigger on board cruse liner.
Details: Cardiff Craftsman. M.V Sunbird, M.V. Sundream refit Barcelona dry
dock.destruct all pipe work and reinstate all pipe work in cabins,
removal of allpipe work to dock side, erecting all heavy machines into
casino and fixing to deck,lots of crane work and rigging ,renewing
press machines in laundry,through side of ship with crane,lots of
replacing of pipe work in engine room, and valves and filtters,ect.
6th
Aug 2000 – 20th
Sept 2000
Position: rigging foreman.
Details: Halliburton Brown and root ltd. I.C.I Cassal works. INEOS Cassal 2000
Overhaul.
9
12th
May 2000 – 6th
Aug 2000
Position: rigging foreman.
Details: Halliburton Brown and Root ltd. Bitish gas, Barrow in Furness Metering
Project
1st
Nov 1999 -7th
May 2000
Position: Industrial Marine Engineer, supervisor over refit.
Details: Cardiff craftsman Ltd. Oil tanker refit. “M.T Estreca de ceara”. H.M.N.B.
Royal navy dockyard Portsmouth.
28th
Sept 1999 – 27th
Oct 1999
Position: Erector rigger foreman.
Details: Delta Catalytic (UK) ltd. Texaco oil refinery, Pembroke south Wales
Shutdown 2000.
23rd
Aug 1999 – 10th
Sept 1999
Position: foreman rigger.
Details: Delta Catalytic (UK) ltd. ELF oil refinery, auto oils 2000 project. South
Wales project. Pre shut down work, steel erection project for six
vessels, pipe trains, flow lines etc.
6th
Feb 1999 – 1st
June 1999
Position: Rigging supervisor
Details: I.C.I. Billingham, Shutdown cassal works.
1st May 1998 – 3rd
Sept 1998
Position: superintendant.
Details: B.J.A Services water plant, Tenerife. Shut down, stage 2 removal of
Heavy pipe work, removal of 4 generators, valves, and pipe trains,
reinstate pipe work and pipe trains. Reinstate pumps and vessels.
18th
Jan 1998 – 12th
March 1998
Position: superintendant.
Position: B.J.A.services water plant, Tenerife. Shut down, removal of all
Pumps, valves, pipe work, vessels etc, stage one
4th
Sept 1998 – 18th
Jan 1998
Position: superintendant.
Details; Mitsui Babcock energy services ltd. Shut down, full overhead on
Hydro cracker, removal and reinstate of cat coolers, 50 ton each,
10
Slide valves and bundles, various pumps, pipe work and valves etc.
4th
Sept 1997 – 12th
Jan 1997
Position: Rigging supervisor
Details: UK Labour I.C.I...Brunamond Northwich. Shut down Ammonia plant,
Strip and reinstate all pipe work, valves etc
22nd
May 1997 – 12th
Oct 1997
Position: Rigging foreman.
Details: A.O.C. Brown and root. I.C.I. Rock savage works, Runcorn.
S.A.Plant job, Runcorn Acid Plant, Full overhaul
12th
May 1993 – 22nd
May 1997.
Position: Rigging foreman.
Details: A.O.C.Brown and root. B.P Kinneli oil refinery, Grange mouth,
Scotland. Shut down, trains 1 & 2 also dismantle of flare tip and pipe
Work and reinstate tip and pipe work
10th
Feb 1993 – 10th
May 1993
Position: Foreman Rigger
Details: A.O.C. International. Modification Maintenance service contract.
“Brent Alpha”
Feb 1992 – Feb 1993
Position: Rigging foreman.
Details; AMEC offshore Development, CATS project “Everest” Hook-up, riser
Platform E.S.D valves etc.
July 1991 – July 1992
Position: Rigging foreman.
Details: A.O.C. International. Gannet hook up topside compression etc,
Nov 1990 – June 1991
Position: Rigging foreman.
Details: A.O.C.International. “Claymore alpha” Shutdown (northern
Sector).North sea.Maintenence.
Oct 1988 – Nov 1990
Position: Foreman Rigger
11
Details: Press offshore. (Great Yarmouth) Ltd.Shell, Juliet, Conoco (UK)
Logs. Construction of ESD. Valves and maintenance.
Full upgrade.
April 1988 – Oct 1988.
Position: Rigging supervisor.
Details: SLP engineering ltd. work locations ARCO Thames hook up, shell
, Kilo, bravo, Juliet, New accommodation and cranes, Sole pit,
clipper,
PT pc, pw, Hook up, Barque, BP hook up.
Feb 1988 – march 1988
Position: Rigging Supervisor.
Details: De Groot offshore ltd.Construction of sand separators on F & G
Platforms. Maintenance on deluge systems.
Nov 1987 – Jan 1988
Position: Rigging supervisor
Details: Team sel. Contracted to land and marine.BP west sole
Platform.48/66c (WCO &WB) New accommodation and crane
July 1987 – Oct 1987
Position: Rigging Supervisor
Details: Jobec scaffolding.
1986 – 1987
Position: Rigging supervisor
Details: A. Hack. Offshore Holland. N.A.M.shut down.Maintenence,
Changing out old valves on Christmas trees and flow lines.
1985 – 1986
Position: Rigging foreman.
Details: SLP catfield.Shell A.K hook up.
1983 – 1984
Position: Rigging supervisor
Details: Press Offshore, Sean hook –up.
1982 – 1983
Position: Foreman Rigger
Details: Interweld offshore.Maintenence
12
1981 – 1982
Position: Rigging supervisor.
Details: M.K.M Engineering. Rough field, new hellideck, Maintenance.
1979 – 1981
Position: Foreman rigger.
Details: R.Blacket and charleton.Penbrook. Texaco oil refinery. Maintenance
On Cracker plant.
1977 – 1979
Position: Foreman rigger.
Details: Interweld. Maintenance.
1970 – 1973
Position: Rigging supervisor
Details: Fieldco (now grootcon). Construction of “claymore alpha” and
Ninnion southern, north of Aberdeen.
1970 – 1973
Position: Rigging supervisor.over refits on jackups.
Details: Keydrill. In North Sea, Holland, Tunisia, Gabon, West Africa, Zaire,
Re Fitting jack up drilling rigs, shaker houses and pipe work etc.
Prior to the above employment positions I was at sea with the *blue funnel shipping line* out of
Liverpool on board the M.V Menesteus and M.V Hector.
I have worked on vessels most of my working life, from merchant navy,all kinds of dive vessels.
I am a time served rigger and erector who has worked both on and offshore on oil and gas rigs
And platforms, semi’s and barges alike.
I have worked on major shut downs both for ICI and the major oil refineries for 25 years in
Various parts of the world. I would consider moving or working abroad should the right position
Become available.im used to working with over sea’s nationals, and have a good working relat
Ionship with the client, offshore, and onshore, and im a team player, im looking for long term
Work if possible, oversea’s first choice, but would consider other places.
Brian Timpson..
13
14

brian cv march 2014.

  • 1.
    . . . CURRICULUM VITAE. BRIAN TIMPSON. Deckforeman / rigging supervisor. 35 ,Jefferson drive, Ulverston, Cumbria,la12 9lu. England, Uk. 01229219449. Mob. 07749492997. briantimpson@hotmail.co.uk. Dob,22-12-1947. N.I.Number: YK 53 97 17 D Passport No: 458268692 Expires: 28th May 2016 got second new passport. Also. Shell Optic Number: 10991-FS10MAPS61827 Offshore Survival: Cert. No. 0010585801052012015, FOET, further offshore emergency training, Start date: 01-may-2012, Expire date: 29-july-2016. Offshore Medical: Completed 25sept 2013 to 24th sept 2015. Pin no, ukooa,-2003-598. Norwegian medical: Helseerkiaering. 25th sept 2013 to sept 24th 2015. 1
  • 2.
    Scats course: Cert.No. 577230 expires 17/7/11. FAS/Safe Pass: Reg No. SP2/586/124227/0606 Expires June 2006 Pegasus Passport: Reg. No. R168868 ECITB Course: Erector/Rigger Grade 6 / Category B – Ref. No. 0081531 Expires 27/8/07 M.O.D: Clearance Form Dated to 5/6/2011 Driving License: Full UK No. TIMPS412227 BJ9GR Breathing Apparatus: I.C.I. Peter Lee Sabre Centaur 15/9/2000 Union: Amicus/AEEU – Membership No. A1072987 Permit Picws Certs: Shell UK No. 014890-23-1-05 L.O.L.E.R Planner: ‘Evolve’ Cert. Achievement Assessor: Cert No. 14700-20/9/2004 Rigger Assessment: Sparrows Offshore, Opito approved – rigging & lifting operations; Safety Environmental cert, no.at.2735 30/05/2005. Awarded for first class job. Excellence Certificate: Britannia Platform, BG Armada Shutdown, Brit Scats hook up & Britannia shutdown, 2/01/2007 8-9-2014. expire.7-9-2016. EVOLVE. Opito banks man slingers stage 3. Course code. 9068. Opito approved certificate no.0060906808091 4001. EVOLVE. 17/18th sept 2014-16sept 2016. Opito rigger competence stage 3. Course code 9099. Opito approved certificate no.00609099180914004. BRIAN JOSEPH TIMPSON, CV – Cont. 2
  • 3.
    INNOCULATIONS: All injections, June2004...cholera, yellow fever, small pox, diphtheria, tetanus Hep A. polio, typhoid, malaria. All inoculations have been updated last year, and are good for another 10 years now. Aug 7th .2013. 17th June 2014 to July 2014. TECHNIP. Rigging supervisor, Triton F.P.S.O., North Sea. DANA PETROLEUM. Triton riser & umbilical installation project. Disconected and laid on sea bed two 4ins risers, reinstated two new 4ins risers,and reinstated one 8 ins riser hang off clamps and fitted test head ect. . REEF SUBSEA. Deck foreman. Feb 3rd 2014 to 5th march, 2014. Vessel, polar king.. GWENT Y MORE wind farm. Cable pulling vessel. Of north Wales. Aug 7th 2013 to 29thdec 2013. REEF SUBSEA. Deck foreman. Vessel. Reef Larissa, ANGOLA. C.R.Z.project. for SAIPEM. South nemba river crossing. Laying sleepers, and concrete mats. Working along side pipe layer, CASTRO,7. 3
  • 4.
    July 22nd , 2012,toaug 2nd . Deck supervisor, SKANDI INSPECTOR vessel, Dsv, rov, inspection, Laying down 17 mattresses and clamps,in various locations in north sea, Northern sector,plus inspection on pipe lines well heads ect. sept 2nd to sept 30th . , 2011 Deck supervisor. OIS ABERDEEN. Vessel, Olympic triton. Abandonment project. Intervention project. North sea.uk. August 1- 27 aug 2011. OIS, ABERDEEN. Deck supervisor SKANDI CONSTRUCTOR. Offshore installation services Intervention wells, running scat tool. Abandonment wells June 4th 2011 - Aug 2011 Earth stream, agency Spain. Rigging supervisor In charge of 8 riggers 12 steel erectors 2 crane drivers. Building camps and two bridges In the jungle of SIERRA LEONE AFRICA. For African mining.. Aml, south Africa. 4
  • 5.
    Feb,2011 may,2011. Rigging supervisor, B.J.A.services, Tenerife, construction. Shut down, water plant. Renewal of pipe work, heat exchangers, filters, Valves, pipe trains.ect. May 2010, nov. 2010. Deck supervisor, Maersk recorder, Cable pulling vessel, Bard wind farm project, Germany. Dec,2009 23 march , 2009. GLOBAL. , deck supervisor. Atlantic guardian, survey vessel. Brit ned project. Germany, England. May 2009 nov 2009, CTC.through subserv pro. deck foreman. Atlantic challenger, Dive support vessel, CTC, South China Sea’s. China. 27th august 2008,to feb 2009. Mermaid maritime offshore construction. Gulf of Thailand. Position. .deck supervisor. 5
  • 6.
    Gulf of Thailand, Runningriser pipe,tie –ins,spools,ect. All sat diving work,and rigging up for riser pipe on platforms in various locations in gulf of Thailand.. 31st January 2008- 11th may 2008 Rigging supervisor Baker/OTS Nigeria L.N.G, plant shutdown, BONNY ISLAND, NIGERIA. 13th December 2006 –10 January 2008. AMEC OFFSHORE CONSTRUCTION. Position: Rigging foreman. Details: Amec Group Ltd. BG ‘Armada Shutdown’ / ‘’Britstats’’ hook-up. Britannia EC Shutdown, Britsats,north sea. 11th October 2006 – 30th November 2006 Position: Rigger foreman. Details: Atlantic Resourcing Ltd. BG Armada Shutdown / ‘’Britstats’’ hook-up Britannia EC shutdown 20th September 2006 – 4th October 2006 Position: Rigger foreman. Details: Amec Darlington Grange Mouth Oil Refinery Shutdown BP 2nd August 2006 – 13th September 2006 Position: Rigger foreman. Details: Atlantic Resourcing Ltd. Douglas Platform, Liverpool Bay Shutdown and upgrade 6th June 2006 – 18th July 2006 Position: Rigging Foreman Details: Woodgroup Brent Bravo Platform Upgrade 6
  • 7.
    18th May 2006 –29th May 2006 Position: Rigger foreman. Details: Claymore Alpha PWRI Project – P.S.N. ‘’Talisman’’ 27th April 2006 – 11th May 2006 Position: Rigger supervisor. Details: Clyde Platform, PWRI Project – P.S.N. ‘’Talisman’’ 3rd March 2006 – 14th April 2006 Position: Rigging Foreman Details: Woodgroup Alba Platform Shevron-Texico 12th January 2006 – 26th January 2006 Position: Rigging Foreman Details: Woodgroup Offshore, Claymore Alpha Platform Construction of diesel tanks and new pipe work 20th November 2005 – 2nd December 2005 Position: Rigger foreman. Details: Woodgroup Offshore, Magnus Platform Maintenance contract. 23rd October 2005 – 5th November 2005 Position: Rigger foreman. Details: Woodgroup Offshore, Schiehallion F.P.S.O Northwest Shetlands 13th September 2005 – 2nd October 2005 Position: Rigging Foreman Details: Kellog-Brown & Root, Shutdown at ICI Bilingham 23rd March 2005 – 12th September 2005 Position: Rigger supervisor. Details: Amec Oil & Gas, Britannia Upgrade - New Bridge landing for New jacket due following year, Offshore North Sea 26th September 2004 – 12th April 2005 Position: Rigging supervisor. Details: Amec Oil & Gas, Bonga F.P.S.O – Offshore Lagos OPL218 – Nigeria 7
  • 8.
    16th June 2004 –20th July 2004 Position: Rigging Supervisor Details: Amec Oil & Gas, Offshore Shirag 1 2004 turn-around shutdown. Baku, Azerbaijan 20th may 2004 – 3rd June 2004 Position Rigger supervisor. Details: Devonport dockyard Plymouth Lots of rigging and crane work on frigates. Removing old propeller, and reinstate new one in dry dock. 9th Dec 2003 – 15th may 2004 Position: Rigger. Supervisor. Details: Wood group offshore. Brent Charlie, Fire pumps maintenance.and upgrade. 10th Sept 2003 – 1st Nov 2003 Position Rigger forman. Details: Ledwood mechanical. Texaco oil refinery shutdown, Pembroke west Wales 11TH June 2003 – 23rd Aug 2003 Position: Rigger forman. Details: Kellog brown and root ltd. Barrow gas terminal shutdown. Replacing all fire stations,pipe trains,pipe work.valves ect. 3rd June 2003 – 11th June 2003 Position: Rigger supervisor. Details: Becks and Politzer. “Kimberly Clark” Barrow in Furness Heavy rigging, removing heavy machinery,of assembly lines, Reinstate new machinery on assembly lines.lots of crane work. 23rd Sept 2002 – 2nd June 2003 Position: Rigger Foreman Details: HA O’Neil. Intel computers Liekslip Co Clare Eire, Construction of FAB 22.lots of large pipe work,pipe trains,transferring heavy machinery into work modules,and bolting them down. 8
  • 9.
    Lots of cranework, 10TH March 2002 – 20th Sept 2002 Position: Rigger supervisor. Details: B.M.D.(Cork) Jacobs Lend Lease. Wyeth medica, Ireland. Biotechnology campus, Clondalkin. Lots of pipe work, pipe trains, valves ect.big 40 ton boilers and pipe work, lots of crane work and rigging involved. 20th Nov 2001 – 10th March 2002 Position; Rigger Banks man, crane coordinator. Details: Watergate water treatment plant. Kendal, Cumbria. Construction of new plant, shap fell. 20th Oct 2001 – 10th March 2001 Position: rigging supervisor, Details: Halliburton brown and root ltd. Metering project, British gas, barrow in Furness, installing new metering pipe work and valves,to meter gas control systems for flow. All crane work, and rigging. 2nd Nov2000 – 20th Oct 2001 Position: rigging supervisor, over heavy lifts. Details. S.M.O.C. Project, south Morecambe onshore compression. British gas, barrow in Furness .Construction of new plant, installation of gas turbines, compressors and control systems,heavy pipe spools,valves and pipe trains.lots of crane work and rigging. 2nd 0ct 2000 – 1st Nov 2000 Position: foreman rigger on board cruse liner. Details: Cardiff Craftsman. M.V Sunbird, M.V. Sundream refit Barcelona dry dock.destruct all pipe work and reinstate all pipe work in cabins, removal of allpipe work to dock side, erecting all heavy machines into casino and fixing to deck,lots of crane work and rigging ,renewing press machines in laundry,through side of ship with crane,lots of replacing of pipe work in engine room, and valves and filtters,ect. 6th Aug 2000 – 20th Sept 2000 Position: rigging foreman. Details: Halliburton Brown and root ltd. I.C.I Cassal works. INEOS Cassal 2000 Overhaul. 9
  • 10.
    12th May 2000 –6th Aug 2000 Position: rigging foreman. Details: Halliburton Brown and Root ltd. Bitish gas, Barrow in Furness Metering Project 1st Nov 1999 -7th May 2000 Position: Industrial Marine Engineer, supervisor over refit. Details: Cardiff craftsman Ltd. Oil tanker refit. “M.T Estreca de ceara”. H.M.N.B. Royal navy dockyard Portsmouth. 28th Sept 1999 – 27th Oct 1999 Position: Erector rigger foreman. Details: Delta Catalytic (UK) ltd. Texaco oil refinery, Pembroke south Wales Shutdown 2000. 23rd Aug 1999 – 10th Sept 1999 Position: foreman rigger. Details: Delta Catalytic (UK) ltd. ELF oil refinery, auto oils 2000 project. South Wales project. Pre shut down work, steel erection project for six vessels, pipe trains, flow lines etc. 6th Feb 1999 – 1st June 1999 Position: Rigging supervisor Details: I.C.I. Billingham, Shutdown cassal works. 1st May 1998 – 3rd Sept 1998 Position: superintendant. Details: B.J.A Services water plant, Tenerife. Shut down, stage 2 removal of Heavy pipe work, removal of 4 generators, valves, and pipe trains, reinstate pipe work and pipe trains. Reinstate pumps and vessels. 18th Jan 1998 – 12th March 1998 Position: superintendant. Position: B.J.A.services water plant, Tenerife. Shut down, removal of all Pumps, valves, pipe work, vessels etc, stage one 4th Sept 1998 – 18th Jan 1998 Position: superintendant. Details; Mitsui Babcock energy services ltd. Shut down, full overhead on Hydro cracker, removal and reinstate of cat coolers, 50 ton each, 10
  • 11.
    Slide valves andbundles, various pumps, pipe work and valves etc. 4th Sept 1997 – 12th Jan 1997 Position: Rigging supervisor Details: UK Labour I.C.I...Brunamond Northwich. Shut down Ammonia plant, Strip and reinstate all pipe work, valves etc 22nd May 1997 – 12th Oct 1997 Position: Rigging foreman. Details: A.O.C. Brown and root. I.C.I. Rock savage works, Runcorn. S.A.Plant job, Runcorn Acid Plant, Full overhaul 12th May 1993 – 22nd May 1997. Position: Rigging foreman. Details: A.O.C.Brown and root. B.P Kinneli oil refinery, Grange mouth, Scotland. Shut down, trains 1 & 2 also dismantle of flare tip and pipe Work and reinstate tip and pipe work 10th Feb 1993 – 10th May 1993 Position: Foreman Rigger Details: A.O.C. International. Modification Maintenance service contract. “Brent Alpha” Feb 1992 – Feb 1993 Position: Rigging foreman. Details; AMEC offshore Development, CATS project “Everest” Hook-up, riser Platform E.S.D valves etc. July 1991 – July 1992 Position: Rigging foreman. Details: A.O.C. International. Gannet hook up topside compression etc, Nov 1990 – June 1991 Position: Rigging foreman. Details: A.O.C.International. “Claymore alpha” Shutdown (northern Sector).North sea.Maintenence. Oct 1988 – Nov 1990 Position: Foreman Rigger 11
  • 12.
    Details: Press offshore.(Great Yarmouth) Ltd.Shell, Juliet, Conoco (UK) Logs. Construction of ESD. Valves and maintenance. Full upgrade. April 1988 – Oct 1988. Position: Rigging supervisor. Details: SLP engineering ltd. work locations ARCO Thames hook up, shell , Kilo, bravo, Juliet, New accommodation and cranes, Sole pit, clipper, PT pc, pw, Hook up, Barque, BP hook up. Feb 1988 – march 1988 Position: Rigging Supervisor. Details: De Groot offshore ltd.Construction of sand separators on F & G Platforms. Maintenance on deluge systems. Nov 1987 – Jan 1988 Position: Rigging supervisor Details: Team sel. Contracted to land and marine.BP west sole Platform.48/66c (WCO &WB) New accommodation and crane July 1987 – Oct 1987 Position: Rigging Supervisor Details: Jobec scaffolding. 1986 – 1987 Position: Rigging supervisor Details: A. Hack. Offshore Holland. N.A.M.shut down.Maintenence, Changing out old valves on Christmas trees and flow lines. 1985 – 1986 Position: Rigging foreman. Details: SLP catfield.Shell A.K hook up. 1983 – 1984 Position: Rigging supervisor Details: Press Offshore, Sean hook –up. 1982 – 1983 Position: Foreman Rigger Details: Interweld offshore.Maintenence 12
  • 13.
    1981 – 1982 Position:Rigging supervisor. Details: M.K.M Engineering. Rough field, new hellideck, Maintenance. 1979 – 1981 Position: Foreman rigger. Details: R.Blacket and charleton.Penbrook. Texaco oil refinery. Maintenance On Cracker plant. 1977 – 1979 Position: Foreman rigger. Details: Interweld. Maintenance. 1970 – 1973 Position: Rigging supervisor Details: Fieldco (now grootcon). Construction of “claymore alpha” and Ninnion southern, north of Aberdeen. 1970 – 1973 Position: Rigging supervisor.over refits on jackups. Details: Keydrill. In North Sea, Holland, Tunisia, Gabon, West Africa, Zaire, Re Fitting jack up drilling rigs, shaker houses and pipe work etc. Prior to the above employment positions I was at sea with the *blue funnel shipping line* out of Liverpool on board the M.V Menesteus and M.V Hector. I have worked on vessels most of my working life, from merchant navy,all kinds of dive vessels. I am a time served rigger and erector who has worked both on and offshore on oil and gas rigs And platforms, semi’s and barges alike. I have worked on major shut downs both for ICI and the major oil refineries for 25 years in Various parts of the world. I would consider moving or working abroad should the right position Become available.im used to working with over sea’s nationals, and have a good working relat Ionship with the client, offshore, and onshore, and im a team player, im looking for long term Work if possible, oversea’s first choice, but would consider other places. Brian Timpson.. 13
  • 14.