This document is the curriculum vitae of José Gustavo Guajardo Morales. It details his personal information, education history, and professional experience. He has worked for various telecommunications companies in Mexico since 1993, holding roles such as supervisor, analyst, and chief of engineering, where he has maintained and implemented infrastructure for cellular networks. He has extensive training in technologies from Ericsson, Alcatel-Lucent, Cisco, and Juniper.
패스트캠퍼스의 파이썬으로 시작하는 웹 프로그래밍 CAMP를 소개합니다.
프로그래밍에 관심이 있어 여러번 독학을 시도했지만, 매번 실패만 했던 분..
뭔가 시작해보고 싶지만, 어디부터 시작해야할지 영 감이 오지 않는 분..
모든 분들을 환영합니다. 좋은 결실을 거두실 때 까지 전적으로 이끌어드리겠습니다.
"Система аналитики контекстной рекламы своими руками".
Международная научно-практическая конференция International Conference on Big Data and its Applications (ICBDA) выросла из мероприятия Big Data Russia и проводится один раз в год, объединяя на одной площадке создателей новых технологий в области больших данных, представителей бизнеса, а также научных сотрудников и молодых ученых.
Организаторы: Rusbase и Global Innovation Labs.
Организаторы ICBDA благодарят Data-Centric Alliance (DCA) за поддержку мероприятия, а также отдельное спасибо Artox Media и NVIDIA.
2015년 11월 20일, 패스트캠퍼스가 개최한 [데이터를 부탁해] 오픈 세미나의 4번째 세션에서 발표하신, [러닝머신 CAMP]를 수강하셨던 황준식 님의 자료입니다.
http://www.fastcampus.co.kr/dab_openlecture_151120/
[머신러닝 CAMP] 자세히 보기 ↓
http://www.fastcampus.co.kr/data_camp_mlearning/
Technology Futurist Monty Metzger (http://blog.monty.de/keynote-speaker) speaks about how to master the fourth industrial revolution. The Digital Future will have far more impact — the next 25 years will usher more change than in the previous three centuries. What separates great leaders from the rest, is they have a precise vision of the future. A vision to enable change today.
Who will be leading the Fourth Industrial Revolution? How will our economy depend on data, analytics and AI? How Digital Transformation can boost your business?
Monty’s keynote speeches are for those who want to change things and for those who want embrace the opportunities of the Digital Future.
Book Monty for your conference, workshop or company meeting
http://blog.monty.de/keynote-speaker
1. CURRICULUM VITAE
Personal Information
José Gustavo Guajardo Morales
1828 Montes Apalaches Colinas del Valle
ZIP 31217 Chihuahua, Chihuahua.
Phone 6142615215
Cell 6141984750
email: josguamo@hotmail.com
Date and place of Birth
February 2, 1971 in Chihuahua, Chihuahua, Mexico
SCHOOLING
Elementary School:
School Name : Niños Héroes
Address: 6th
street and Ramirez Chihuahua, Chihuahua
From 1977 to 1983
High School:
School Name :Escuela Federal No 1
Address: Septiembre 16 street Ciudad Juárez, Chihuahua
From 1983 to 1984
School Name: Escuela Federal No. 1
Address: Tamborel street Col. San Rafael Chihuahua, Chihuahua
Since 1984 to 1986
Senior middle school
School Name: CBTIS 122 Chihuahua, Chihuahua.
Title reach: Physico-mathematical and Technical in Electronics
From 1986 to 1989
Professional School
School Name: Instituto Tecnologico de Chihuahua campus No. 1
Address: Tecnological Av. Chihuahua, Chihuahua, Mexico
Title Reach: Industrial Engineer in Electronics
From 1989 to 1993 (letter of intern)
Postgraduate courses
Course Name: World Class Manufacturing
Place: Instituto Tecnólogico de Chihuahua campus No. 1
Date: July 1993
2. Course Name: Intensive Conversational English
Place: English Zone Academy
Date: May 2014
Course Name: Pro Certification on English Language Intermediate 1 th advanced level
Place: UTCH ( Universidad Tecnológica de Chihuahua)
Date: From March to July 2015
PROFESSIONAL EXPERIENCE:
Company Name: Fuerza y Clima S.A. de C.V.
From August 1993 to October 1997
Job Title: Supervisor of the Integrated Digital Network
Activity: preventive and corrective maintenance of the plants of C. D. that fed to Muliplexers and transmission equipment
of the Integrated Digital Network of Telmex
Company Name: Radiomovil Dipsa S.A. de C.V.
Job Title: Analyst Complejo Industrial Mobile Switching Central (MSC) Region 3
From November 1997 to June 1999
Activity: Give preventive and corrective maintenance to the MSC, peripheral and transmission equipments such as
multiplexers, Tcoders, Voice Mailboxes and alarm equipment installed in the central of Telcel name Complejo Industrial
in the city of Chihuahua, Chihuahua, including operational routines as the core data transcript modifications, creating
trunk routes and subscribers categories, customer problems resolution reported by means of customer personnel, etc.
Company Name: Radiomovil Dipsa S.A. de C.V.
Job Title: Head of MSC Aldama Region 3
From June 1999 to December 1999
Activity: Give preventive and corrective maintenance to the MSC and peripheral equipment and transmission such as
multiplexers, Tcoders, Voice Mailboxes and teams of alarms installed in the central of Telcel Aldama in the city of
Torreón , Coahuila, including operational routines as the core data transcript modifications, creating trunk routes and
subscribers categories, customer problem resolution reported by means of customer personnel, etc. Other activities such as
support staff of Radio Frequency in the preventive and corrective maintenance of the Base Stations of the area of Torreón,
Durango and related populations .
Company Name: Radiomovil Dipsa S.A. de C.V.
Job Title: Chief Engineering for switching, signaling and New Projects Department Region 3
January 2000 to May 7 2014
Activity: Administrator and responsible for maintaining the adequacy of the required infrastructure and its
implementation on core and peripheral equipments, including new equipments that have been added to the network of
Telcel, like MSC, Media Gateways, RNC's, voice mailboxes, ring back tone, TRC/BSC, SGSN, plants of C. D. and lately
administration for IP Routers, Switches and voice and data ports for New Customer Contact Centers and MPLS backbone
network
All areas in Central and matching are also given based on the design and equipment requirements, allocate space for
equipment upgrades and new one according to the topology of Tx.
The most in places where are located cellular telephone core sites of Telcel in R3 .
Analysis failure or high rates of congestion based on reading statistics, End of selection (EOS) an b number analysis
( Ericsson Switches), Routing Case (RC) and data analysis on SS7 signaling trace, so finding the solution of the problem
to optimize the network.
It should be noted that due to the need for growth in IP and MPLS backbone network , we have been responsible for the
allocation of space in Central , validation of site surveys and validate the complete project hardware installation including
projects like charofill structure , patch panel, mutoas ,UTP cable runs and fiber optics, and of course Routers and
Switches equipment as main nodes of the MPLS data network. (Cisco and Juniper)
3. Also as mentioned above , we were dealing with migration of traditional telephony on Telcel customers Service centers to
Cisco IP telephony so I and my staff had to design the network in terms of establishment of regional and local Gateways
sites. Sizing is also made as to the requirements of IP Telephony for the new customer service centers and ultimately for
regional corporate buildings too, having to consider from required handsets , categories and specific users
characteristics as the installation requirements of new routers and / or switches and wiring, according to the network
requirements, by to be obsolete or by insufficient capacity
Therefore we emphasize our versatility, capacity of coupling and fast learning to technological changes sucitan, which are
becoming more and more constant. In order that their implementation is desired in all aspects and comply with the specific
requirements of the product.
To support the implementation of the tasks related to IP data network we have the following Cisco courses:
Designing Cisco Network Service Architectures Obtaining the Certificate May 24, 2013
Implementing Cisco Voice Communications and QoS Obtaining the Certificate September 28, 2012
Cisco Voice Over IP Obtaining the Certificate September 5, 2008
Implementing Cisco IP Routing Obtaining the Certificate May 17, 2013
Alcatel Lucent course:
Alcatel Lucent SAR 8 router
Juniper courses:
Introduction to the Junos Operating System
Junos Routing Essencials
Junos Intermediate Routing
Other activities developed in Radiomovil Dipsa SA de CV
From January 2000 to May 7 2014
Participated in the implementation of basic courses in Cellular engineering relating to topics in the part of core.
Support is given to O&M and other departments by main failures in the Network generated on the basis of the already
mentioned above.
Other data
Languages English: 80% written and spoken
Alcatel-Lucent Courses:
Routing and MPLS configuration pack 2
from : 28-10-2013 to 31-10-2013
Alcatel-Lucent University
Course Location :MEXICO, MEXICO
Course length : 32 hours
Some Ericsson Courses:
LTE L12 Radio Network Functionality
From : 17-06-2013 to 18-06-2013
Ericsson
Course Location:MEXICO, MEXICO
4. Course length: 12 hours
LTE 12 Protocols and Procedures
From: 19-06-2013 to 21-06-2013
Ericsson
Course Location:MEXICO, MEXICO
5.
6. AS140 MSC Operation
From : 26-07-1999 to 06-08-1999
Ericsson Training Center
Course Location :MEXICO, MEXICO
Course length : 80
Fundamentals of Solaris and system administration I
From : 06-08-2001 to 10-08-2001
Ericsson Training Center
Course Location :MEXICO, MEXICO
LTE/SAE System Overview
From : 29-10-2012 to 30-10-2012
Ericsson
Course Location :MEXICO, MEXICO
7. AS140 MSC Operation
From : 26-07-1999 to 06-08-1999
Ericsson Training Center
Course Location :MEXICO, MEXICO
Course length : 80
Fundamentals of Solaris and system administration I
From : 06-08-2001 to 10-08-2001
Ericsson Training Center
Course Location :MEXICO, MEXICO
LTE/SAE System Overview
From : 29-10-2012 to 30-10-2012
Ericsson
Course Location :MEXICO, MEXICO