SlideShare a Scribd company logo
1 of 5
Download to read offline
RESUMÈ
PERSONAL DATA
Date of Birth: December 04, 1975
Place of Birth: Makati City, Philippines
Civil Status: Married
Religion: Catholic
Height: 5’2”
Weight: 120 lbs.
FLORENCIO Z SALVADOR III
Email Address florencio04_2007@yahoo.com.ph
Mobile nos. +97474491120
Career Objective:
To enter in a dynamic and progressive company, where my skills and capabilities
can be honed and utilized.
Target Industry:
Structured Cabling, Network Designing;
Instrumentation Field Devices Installation, Maintenance, and Repair;
Manufacturing and Production;
Telecommunications;
EDUCATIONAL BACKGROUND
Tertiary: SYSTEMS TECHNOLOGY INSTITUTE
Address: Marikina City, Philippines
Course: Computer Science
Date Attended: June 2000- March 2002
Date Graduated: April 2002
Tertiary: PHILLIPPINE MARINE INSTITUTE
Address: Quezon City, Philippines
Course: Bachelor of Science Marine Engineering
Date Attended: June 1993- March 1997
Date Graduated: April 1997
Software Handled:
OFS 100 V6.82 (JDSU MTS-TBERD 4000 Fiber Trace Viewer)
SAC-100, SAC-200 (Proline ST-680 Access Control)
GV-IPCAM H.264 (GeoVision Inc. CCTV Networking)
EXFO OTDR Viewer 6.18.0.48 (Fiber Optics Result Viewer)
FITEL OTDR
FLUKE DTX 1800
Microsoft PowerPoint
Microsoft Word, Microsoft Excel
WORK EXPERIENCE
AS INVENT QATAR
Al Bandary Plaza B-Ring Rd. Fareij Bin Dirham
Building No. 4, 3rd Floor Office No. 305
T. +974 4433 8777 D. +974 4433 8720 F. +974 4433 8778
M. +974 74491120 P. 39043 Doha, Qatar E. florencio@nssc.com.qa
W. www.nssc.com.qa
Department. Elv Devision Engineering
Duration. November 27, 2015 to Present
Position. Senior Technician/Site supervisor
Company: AS invent
Location: Doha Qatar
Duties and Responsibilities
 Conducting Site survey for the new project awarded to the company
 Coordinating with the contractor/Client for the following requirement of the MOI for the
CCTV installation according to their standards.
 Setting up a solution for the issue regarding installations and troubleshooting
 Installation of GI Piping, cable routing, CAT6 termination, mounting of switch, UPS,
Battery and complete setup of the CCTV control room/ Data center, IDF, MDF
 Participating in Client inquires and meetings
 Updating report and Daily activities in Site and Project
 Network setup and Design from Implementation up to Project hand over.
 Pre-Implementation for structured cabling for Data, Voice, Backbone, CCTV and other
Networking Devices
OPTIMUM INFO SOLUTIONS Philippines Inc.
Unit 2012 Medical Plaza Ortigas
25 San Miguel Ave. Ortigas Center Pasig Philippines 1603
Google Manila Vendor
Department. APAC Infrastructure
Duration: May 04, 2013 to Feb 17, 2015
Position: Network and Infrastructure Engineer
Company: Optimum Info. Solutions
Location: Ortigas Pasig Philippines
Duties and Responsibilities:
● .Monitor the network for stability and performance in order to maintain 24x7 operations
And resolve service impacts as they occur.
● Work trouble tickets effectively and efficiently and that interact with engineering, field
Technicians, and telecommunications carriers to facilitate resolving service issues in
Accordance with established processes and procedures.
● Document problem descriptions and detailed problem diagnosis with accuracy and
Compliance with established practices. Review and where necessary update the tracking
Of problems in trouble ticketing System.
● Participate in the transfer of information from one shift to the next and assisting
Cabling vendor to other Google project
MISURATA NETWORKING INSTALLATION WLL
Airport Road (Next to Qatar Airways)
Department: Engineering/Technical
Duration: March 03 2012 – August 20 2013
Position: Telecom/Site Supervisor/ OSP/ISP
Company: Misurata Networking Installation WLL
Location: Airport Road (Next to Qatar Airways)
Department: ELV/FIBER OPTICS Department
Job Summary:
1. Operate and Design Fiber Optic & Copper Structured Cabling.
2. Design a Coaxial/UTP network for CCTV and ACCESS CCONTROL.
3. Carry out detailed site surveys, preparing BOQ, coordination.
4. Perform Fiber Optic Fusion Splicing, FLUKE OTDR & JDSU OTDR
Testing.
5. Perform UTP termination, FLUKE Cable Analyzer Testing, JDSU
VALIDATOR Testing
Equipment’s used:
1. FLUKE DTX-1800 Digital Cable Analyzer for Fiber & UTP Testing.
2. Dual Heater/Direct Core Monitoring Fusion Splicer TYPE-39 for fiber
termination.
3. JDSU MTS-TBERD 4000 OTDR for fiber optics cable testing.
4. JDSU Validator-NT for UTP connection testing
Project Handled:
1. Client: IKEA QATAR
Project: IKEA QATAR ELV Structured Cabling
Position: Site Supervisor
Duration: September 15, 1012 to January 31, 2013
Scope of Work: To install, terminate, test, & commission the following;
Fiber Optics: 204 Multi-mode and 24 Single-mode Cores Terminated end-to-
ends
Analog Telephone: 850 CAT-3 Pairs terminated end-to-end
Data: 458 UTP CAT-6 Active points
3x24 UTP CAT-6 Link between 3 MDF 42-U Cabinet/Racks
Server/Switch/Router installation including all patching and activation
VOIP Connections: 456 UTP CAT-6 Points terminated end-to-end
Wi-Fi/Access: 56 UTP CAT-6 Active points
56 AP/Wi-Fi Devices installation and activation
CCTV: 295 UTP CAT-6 Cameras active plus 21 points’ provisions
295 GeoVision IP Camera installed and 21 GeoVision NVR Installed
IPTV: 105 UTP CAT-6 IPTV Connection Ready and tested
2. Client: Al Futtaim Technology
Project: Al Futtaim Carillion Project Office
Position: Network Engineer and Site Supervisor
Duration: June 2012 to August 2012
Scope of Work: To install, terminate, test, & commission the following;
Fiber Optics: 24 Core terminated end-to end as Backbone
Telephone/PABX: Pure IP-PBX Panasonic and 312 Voice points
Terminated
Data: 237 Data points for PC connections
3. Client: Al Futtaim Technology
Project: Doha Festival City Project Office
Position: Network Engineer and Site Supervisor
Duration: March 2012 to April 2012
Scope of Work: To install, terminate, test, & commission the following;
Fiber Optics: 12 Core terminated end-to end as Backbone
Telephone/PABX: Pure IP-PBX Panasonic and 176 Voice points
Terminated
Data: 130 Data points for PC connections
PRAXILLA MIDDLE EAST LLC
Dubai Industrial City Building no 4, office 205
From; November 05, 2009 to June 1, 2011
POSITION; Site Supervisor (ISP/OSP)
Duties and Responsibilities
1. Pulling, Termination of ribbon and single fiber, Testing and Labeling of Copper and Fiber
Optic Cables.
2. Performs Splicing of fiber ribbon type and single fiber using splicing machine like FITEL,
Sumitomo type 39 and FUJIKURA 60 FSM and testing by using OTDR like JDSU
3. Handles networking trouble shooting and performing supervisory works
4. Responsible for extending telecommunication services to the tenants of villa and flats buildings
Projects working alongside with the country’s services providers of Etisalat.
5. Knows how to install, configure and troubleshoot telephone and internet services.
6. Capable to act upon technical troubleshooting of customer’s complaints and inquiries
7. Migration (provisioning) team for activation of ONU which fiber optic cable is used by the
tenant from splice point going to the villa or flats
GULF SMART SOLUTION
Address: Gulf Smart Solution FZLLC Po Box500110 Dubai UAE
From November 20 2007 to 2009
POSITION: Copper, Fiber Optic Cable Supervisor (ISP/OSP)
Duties and Responsibilities:
1. Pulling, Termination, Testing and Labeling of Copper and Fiber Optic Cables.
2. Performs copper and Fiber Optic Cables testing thru the use of Fluke and OTDR testing
equipment’s.
3. Handles networking brand products such as SYSTIMAX, AMP Tyco, Panduit and other
manufacturers.
4. Responsible for extending telecommunication services to the tenants of DIFC Gate Village
Projects working alongside with the country’s services providers Du and Etisalat.
5. Knows how to install, configure and troubleshoot telephone and internet services.
6. Capable to act upon technical troubleshooting of customer’s complaints and inquiries.
7. Coordinates with Fit-Out Contractors, MEP and IT Managers in the site.
8. Calculates the number of cables required to be pulled for vertical and horizontal cabling
Project Accomplishment
Under Vizier
Qatar Project (New Doha Airport)
Year 2011
Scope of work
Termination of UTP cat 3 and 100 pair and fiber optic cables
Installation of Data Center of New Doha International Airport
Splicing of fiber optic cables and testing by using OTDR
Testing of UTP cat 3 100 pair and fiber optic cables
Coordinating with the site engineers and other contractor
Praxilla Middle East LLC
Etisalat Project FTTH (Northern Emirates Project)
Year (2009 to 2011)
Scope of Work
Pulling of fiber optic cables manhole to manhole
Splicing of fiber single and ribbon type
Testing of fiber
Migration of copper cables to fiber optic
Gulf Smarts Solution LLC
Nominated Contractor of DIFC
Year (2007 to 2009)
DIFC, Dubai Financial Centre
Scope of work
Installation of Data Center
Pulling of cables cat6 cat 3 100 pair and fiber optic cables
Horizontal and Vertical cables
Termination of UTP and Manual Termination of Fiber Optic Cables Epoxy Type
Testing of cables by using Fluke 1800 and OTDR
JOB TRAINING
January 2001 EXCELLENCE GAME FOWL SPECIALIST
Organized Thesis Project Regarding
Systems Analysis and Design by using Database 3
SEMINAR ATTENDED
The challenging Word of Cyber Intelligence
STI. IT Expo 2000-2001
Plenary Hall. Philippine International Convention Center
February 5-6 2001
Human Relationship and Productivity (LHP)
Orientation on Occupation Safety and Health Standard
Conducted on February 4, 5 and 7 at Malolos City, Bulacan

More Related Content

What's hot

What's hot (20)

Illyas-latest_v.3.2
Illyas-latest_v.3.2Illyas-latest_v.3.2
Illyas-latest_v.3.2
 
Voice over LTE report
Voice over LTE reportVoice over LTE report
Voice over LTE report
 
shailesh
shaileshshailesh
shailesh
 
Himani_Yadav
Himani_YadavHimani_Yadav
Himani_Yadav
 
Telecom Engineer Cv
Telecom Engineer CvTelecom Engineer Cv
Telecom Engineer Cv
 
8 the path to voice over lte - vo lte
8 the path to voice over lte - vo lte8 the path to voice over lte - vo lte
8 the path to voice over lte - vo lte
 
Sandeep Das_power_resume
Sandeep Das_power_resumeSandeep Das_power_resume
Sandeep Das_power_resume
 
Irfan Telecom new
Irfan Telecom newIrfan Telecom new
Irfan Telecom new
 
VoLte overview
VoLte overviewVoLte overview
VoLte overview
 
Bluetooth
Bluetooth Bluetooth
Bluetooth
 
Overview of LTE & VoLTE
Overview of LTE & VoLTEOverview of LTE & VoLTE
Overview of LTE & VoLTE
 
JavedPatel_CV.doc
JavedPatel_CV.docJavedPatel_CV.doc
JavedPatel_CV.doc
 
CV K
CV KCV K
CV K
 
new resume
new resumenew resume
new resume
 
n_aquino_CV
n_aquino_CVn_aquino_CV
n_aquino_CV
 
VoLTE Testing Explained
VoLTE Testing ExplainedVoLTE Testing Explained
VoLTE Testing Explained
 
Industrial Training Report on Telecomunication
Industrial Training Report on Telecomunication Industrial Training Report on Telecomunication
Industrial Training Report on Telecomunication
 
Resume_Voice
Resume_VoiceResume_Voice
Resume_Voice
 
Volte ppt
Volte pptVolte ppt
Volte ppt
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
 

Similar to Florencio Salvador (20)

Eric Paras CV 2015e
Eric Paras CV 2015eEric Paras CV 2015e
Eric Paras CV 2015e
 
vimal resume
vimal resumevimal resume
vimal resume
 
RESUME_UPDATE_2016
RESUME_UPDATE_2016RESUME_UPDATE_2016
RESUME_UPDATE_2016
 
JADE SANTOS CV
JADE SANTOS CVJADE SANTOS CV
JADE SANTOS CV
 
Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)Cory Ilchuk - Resume-1 (4)
Cory Ilchuk - Resume-1 (4)
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Rakesh cv updated
Rakesh cv updatedRakesh cv updated
Rakesh cv updated
 
Amr Sabry Elsaadany CV_Update.DOC
Amr Sabry Elsaadany CV_Update.DOCAmr Sabry Elsaadany CV_Update.DOC
Amr Sabry Elsaadany CV_Update.DOC
 
Majid Ali_original
Majid Ali_originalMajid Ali_original
Majid Ali_original
 
Armando_Flores_Jr_CV_11
Armando_Flores_Jr_CV_11Armando_Flores_Jr_CV_11
Armando_Flores_Jr_CV_11
 
Sherif Mohamed Mostafa
Sherif Mohamed MostafaSherif Mohamed Mostafa
Sherif Mohamed Mostafa
 
Rudyard E
Rudyard ERudyard E
Rudyard E
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
Yameen
YameenYameen
Yameen
 
Jun-Jun ( my resume )
Jun-Jun ( my resume )Jun-Jun ( my resume )
Jun-Jun ( my resume )
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016JUAN CAREER OBJECTIVE 2016
JUAN CAREER OBJECTIVE 2016
 
Network Engineer nrc
Network Engineer nrcNetwork Engineer nrc
Network Engineer nrc
 
Saeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CVSaeed Ahmed Siddiqui - CV
Saeed Ahmed Siddiqui - CV
 

Florencio Salvador

  • 1. RESUMÈ PERSONAL DATA Date of Birth: December 04, 1975 Place of Birth: Makati City, Philippines Civil Status: Married Religion: Catholic Height: 5’2” Weight: 120 lbs. FLORENCIO Z SALVADOR III Email Address florencio04_2007@yahoo.com.ph Mobile nos. +97474491120 Career Objective: To enter in a dynamic and progressive company, where my skills and capabilities can be honed and utilized. Target Industry: Structured Cabling, Network Designing; Instrumentation Field Devices Installation, Maintenance, and Repair; Manufacturing and Production; Telecommunications; EDUCATIONAL BACKGROUND Tertiary: SYSTEMS TECHNOLOGY INSTITUTE Address: Marikina City, Philippines Course: Computer Science Date Attended: June 2000- March 2002 Date Graduated: April 2002 Tertiary: PHILLIPPINE MARINE INSTITUTE Address: Quezon City, Philippines Course: Bachelor of Science Marine Engineering Date Attended: June 1993- March 1997 Date Graduated: April 1997 Software Handled: OFS 100 V6.82 (JDSU MTS-TBERD 4000 Fiber Trace Viewer) SAC-100, SAC-200 (Proline ST-680 Access Control) GV-IPCAM H.264 (GeoVision Inc. CCTV Networking) EXFO OTDR Viewer 6.18.0.48 (Fiber Optics Result Viewer) FITEL OTDR FLUKE DTX 1800 Microsoft PowerPoint Microsoft Word, Microsoft Excel
  • 2. WORK EXPERIENCE AS INVENT QATAR Al Bandary Plaza B-Ring Rd. Fareij Bin Dirham Building No. 4, 3rd Floor Office No. 305 T. +974 4433 8777 D. +974 4433 8720 F. +974 4433 8778 M. +974 74491120 P. 39043 Doha, Qatar E. florencio@nssc.com.qa W. www.nssc.com.qa Department. Elv Devision Engineering Duration. November 27, 2015 to Present Position. Senior Technician/Site supervisor Company: AS invent Location: Doha Qatar Duties and Responsibilities  Conducting Site survey for the new project awarded to the company  Coordinating with the contractor/Client for the following requirement of the MOI for the CCTV installation according to their standards.  Setting up a solution for the issue regarding installations and troubleshooting  Installation of GI Piping, cable routing, CAT6 termination, mounting of switch, UPS, Battery and complete setup of the CCTV control room/ Data center, IDF, MDF  Participating in Client inquires and meetings  Updating report and Daily activities in Site and Project  Network setup and Design from Implementation up to Project hand over.  Pre-Implementation for structured cabling for Data, Voice, Backbone, CCTV and other Networking Devices OPTIMUM INFO SOLUTIONS Philippines Inc. Unit 2012 Medical Plaza Ortigas 25 San Miguel Ave. Ortigas Center Pasig Philippines 1603 Google Manila Vendor Department. APAC Infrastructure Duration: May 04, 2013 to Feb 17, 2015 Position: Network and Infrastructure Engineer Company: Optimum Info. Solutions Location: Ortigas Pasig Philippines Duties and Responsibilities: ● .Monitor the network for stability and performance in order to maintain 24x7 operations And resolve service impacts as they occur. ● Work trouble tickets effectively and efficiently and that interact with engineering, field Technicians, and telecommunications carriers to facilitate resolving service issues in Accordance with established processes and procedures. ● Document problem descriptions and detailed problem diagnosis with accuracy and Compliance with established practices. Review and where necessary update the tracking Of problems in trouble ticketing System. ● Participate in the transfer of information from one shift to the next and assisting Cabling vendor to other Google project
  • 3. MISURATA NETWORKING INSTALLATION WLL Airport Road (Next to Qatar Airways) Department: Engineering/Technical Duration: March 03 2012 – August 20 2013 Position: Telecom/Site Supervisor/ OSP/ISP Company: Misurata Networking Installation WLL Location: Airport Road (Next to Qatar Airways) Department: ELV/FIBER OPTICS Department Job Summary: 1. Operate and Design Fiber Optic & Copper Structured Cabling. 2. Design a Coaxial/UTP network for CCTV and ACCESS CCONTROL. 3. Carry out detailed site surveys, preparing BOQ, coordination. 4. Perform Fiber Optic Fusion Splicing, FLUKE OTDR & JDSU OTDR Testing. 5. Perform UTP termination, FLUKE Cable Analyzer Testing, JDSU VALIDATOR Testing Equipment’s used: 1. FLUKE DTX-1800 Digital Cable Analyzer for Fiber & UTP Testing. 2. Dual Heater/Direct Core Monitoring Fusion Splicer TYPE-39 for fiber termination. 3. JDSU MTS-TBERD 4000 OTDR for fiber optics cable testing. 4. JDSU Validator-NT for UTP connection testing Project Handled: 1. Client: IKEA QATAR Project: IKEA QATAR ELV Structured Cabling Position: Site Supervisor Duration: September 15, 1012 to January 31, 2013 Scope of Work: To install, terminate, test, & commission the following; Fiber Optics: 204 Multi-mode and 24 Single-mode Cores Terminated end-to- ends Analog Telephone: 850 CAT-3 Pairs terminated end-to-end Data: 458 UTP CAT-6 Active points 3x24 UTP CAT-6 Link between 3 MDF 42-U Cabinet/Racks Server/Switch/Router installation including all patching and activation VOIP Connections: 456 UTP CAT-6 Points terminated end-to-end Wi-Fi/Access: 56 UTP CAT-6 Active points 56 AP/Wi-Fi Devices installation and activation CCTV: 295 UTP CAT-6 Cameras active plus 21 points’ provisions 295 GeoVision IP Camera installed and 21 GeoVision NVR Installed IPTV: 105 UTP CAT-6 IPTV Connection Ready and tested 2. Client: Al Futtaim Technology Project: Al Futtaim Carillion Project Office Position: Network Engineer and Site Supervisor Duration: June 2012 to August 2012 Scope of Work: To install, terminate, test, & commission the following; Fiber Optics: 24 Core terminated end-to end as Backbone Telephone/PABX: Pure IP-PBX Panasonic and 312 Voice points Terminated Data: 237 Data points for PC connections
  • 4. 3. Client: Al Futtaim Technology Project: Doha Festival City Project Office Position: Network Engineer and Site Supervisor Duration: March 2012 to April 2012 Scope of Work: To install, terminate, test, & commission the following; Fiber Optics: 12 Core terminated end-to end as Backbone Telephone/PABX: Pure IP-PBX Panasonic and 176 Voice points Terminated Data: 130 Data points for PC connections PRAXILLA MIDDLE EAST LLC Dubai Industrial City Building no 4, office 205 From; November 05, 2009 to June 1, 2011 POSITION; Site Supervisor (ISP/OSP) Duties and Responsibilities 1. Pulling, Termination of ribbon and single fiber, Testing and Labeling of Copper and Fiber Optic Cables. 2. Performs Splicing of fiber ribbon type and single fiber using splicing machine like FITEL, Sumitomo type 39 and FUJIKURA 60 FSM and testing by using OTDR like JDSU 3. Handles networking trouble shooting and performing supervisory works 4. Responsible for extending telecommunication services to the tenants of villa and flats buildings Projects working alongside with the country’s services providers of Etisalat. 5. Knows how to install, configure and troubleshoot telephone and internet services. 6. Capable to act upon technical troubleshooting of customer’s complaints and inquiries 7. Migration (provisioning) team for activation of ONU which fiber optic cable is used by the tenant from splice point going to the villa or flats GULF SMART SOLUTION Address: Gulf Smart Solution FZLLC Po Box500110 Dubai UAE From November 20 2007 to 2009 POSITION: Copper, Fiber Optic Cable Supervisor (ISP/OSP) Duties and Responsibilities: 1. Pulling, Termination, Testing and Labeling of Copper and Fiber Optic Cables. 2. Performs copper and Fiber Optic Cables testing thru the use of Fluke and OTDR testing equipment’s. 3. Handles networking brand products such as SYSTIMAX, AMP Tyco, Panduit and other manufacturers. 4. Responsible for extending telecommunication services to the tenants of DIFC Gate Village Projects working alongside with the country’s services providers Du and Etisalat. 5. Knows how to install, configure and troubleshoot telephone and internet services. 6. Capable to act upon technical troubleshooting of customer’s complaints and inquiries. 7. Coordinates with Fit-Out Contractors, MEP and IT Managers in the site. 8. Calculates the number of cables required to be pulled for vertical and horizontal cabling
  • 5. Project Accomplishment Under Vizier Qatar Project (New Doha Airport) Year 2011 Scope of work Termination of UTP cat 3 and 100 pair and fiber optic cables Installation of Data Center of New Doha International Airport Splicing of fiber optic cables and testing by using OTDR Testing of UTP cat 3 100 pair and fiber optic cables Coordinating with the site engineers and other contractor Praxilla Middle East LLC Etisalat Project FTTH (Northern Emirates Project) Year (2009 to 2011) Scope of Work Pulling of fiber optic cables manhole to manhole Splicing of fiber single and ribbon type Testing of fiber Migration of copper cables to fiber optic Gulf Smarts Solution LLC Nominated Contractor of DIFC Year (2007 to 2009) DIFC, Dubai Financial Centre Scope of work Installation of Data Center Pulling of cables cat6 cat 3 100 pair and fiber optic cables Horizontal and Vertical cables Termination of UTP and Manual Termination of Fiber Optic Cables Epoxy Type Testing of cables by using Fluke 1800 and OTDR JOB TRAINING January 2001 EXCELLENCE GAME FOWL SPECIALIST Organized Thesis Project Regarding Systems Analysis and Design by using Database 3 SEMINAR ATTENDED The challenging Word of Cyber Intelligence STI. IT Expo 2000-2001 Plenary Hall. Philippine International Convention Center February 5-6 2001 Human Relationship and Productivity (LHP) Orientation on Occupation Safety and Health Standard Conducted on February 4, 5 and 7 at Malolos City, Bulacan