This resume summarizes San Aung's work experience and qualifications. He has over 18 years of experience in telecommunications projects, including installation of transmission equipment, wireless networks, and IP networks. Notable projects include expansion of military and government fiber networks, GSM network implementation, and IP public address systems. San Aung held roles such as team leader, project manager, and chief engineer. He has expertise in transmission technologies, wireless networks, and IP networks. Education includes a BSC in Zoology and an AGTI in Electronics and Communication.
PAKISTAN TELECOM COMPANY. (PTCL)
1 Terminations of Primary & Secondary Cable.
2 Method of Erection of Telephone Lines.
3 Line Fault Rectification Procedures.
BTC TELECOM COMPANY.KSA
1 Programming Procedure for Mobile & Handheld Radios.
2 Basic Installation Steps for Transmitter/Receiver Units.
3 Base Station & Mobile Vehicle Installation Procedures.
4 Basic Testing Method of Tx/Rx.
5 Optical Fiber Installation and testing with OTDR
PAKISTAN TELECOM COMPANY. (PTCL)
1 Terminations of Primary & Secondary Cable.
2 Method of Erection of Telephone Lines.
3 Line Fault Rectification Procedures.
BTC TELECOM COMPANY.KSA
1 Programming Procedure for Mobile & Handheld Radios.
2 Basic Installation Steps for Transmitter/Receiver Units.
3 Base Station & Mobile Vehicle Installation Procedures.
4 Basic Testing Method of Tx/Rx.
5 Optical Fiber Installation and testing with OTDR
COnvergent Study of the Deployment of LTE technology based on the infrastruct...Goummo Privat
Internship report on the convergent study of the deployment of LTE technology based on the infrastructure of CDMA network of Camtel Douala. for full Report please email me at goummoprivat@gmail.com
COnvergent Study of the Deployment of LTE technology based on the infrastruct...Goummo Privat
Internship report on the convergent study of the deployment of LTE technology based on the infrastructure of CDMA network of Camtel Douala. for full Report please email me at goummoprivat@gmail.com
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Ali Omar
• Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements
• Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks)
• Good Experience in electrical cables Installations L.V (Infrastructure).
1. 1
RESUME
Personal Information
Name San Aung Gender Male
Date of Birth July/09/1970 Present Locus No.595/49, North Dagon Tsp. Yangon
Years of Work 18 years Email usaw2k@gmail.com
Education AGTI (EC) Major Electronics and Communication
Work Experience
2013-2015 : Installation Subcontract from Elite Tech Manufacturing Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Team Leader
Training *Huawei Subcontract training at Elite Tech Manufacturing Co., Ltd.
Telenor EHS (Environment Health and Safety) ISO14001 EMS and OHSMS 18001.
HuaweiTransmission (ATN 910I)
HuaweiWireless (DBS 3900) for Node B.
Responsibilities General control all engineering activities, such as safety, equipment layout, equipment
installation, customer requirement photos, reporting and other information to improve
network with customer approval of equipment layout and installation.
Managing and supervision for the installation of
Huawei’s DWDM (OSN 8800) equipment.
ZTE BBU and RRU were swapped with HuaweiDBS 3900 equipment.
HuaweiATN (910) transmission.
Installation, commissioning and operation of generator and ATS.
Achievements Improve negotiation skill between customer, subcontractor and installation team.
Good coordination of work, cost and quality to finish within project target time.
Finished DWDM ( OSN 8800 ) 2 sites at Oak Twin and Taung Oo.
Finished swap 10 sites and dismantle 18 sites for the MPT swap project at Naypyitaw.
Finished swap 10 sites and 10 sites dismantle for the MPT swap project at Yangon.
Finished 7 sites for the installation, commissioning and operation of generator and ATS
(power plant) for the MPT expansion project at Naypyitaw.
1.2.2014-1.8.2014 : Merry Mesh Network Integration Co.,Ltd.
Industry IP PAand IT
Country/City Myanmar/Yangon
Position Project Manager
Training Self-study on-line training for IP Network Audio System with iTC China brand.
Responsibilities Project management for Wi-Fi network in Yangon University.
Planning and negotiation with customer to get good quality and their required internet
access and services.
Planed suitable resources and provide to the customer implementation requirement.
Supervision and control of Sub-contractors, our engineer team and labours to comply
with the relevant conditions of the project requirement.
Project management of installation, configuration and operation of windows server
2008,TMG and Unifi controller software on the Dell R320 and installation of 24 ports switch
to get internet access via cable and Wi-Fi link in the whole Yangon University Campus.
2. 2
Supervised and installed fiber installation at Yangon University Campus.
Installed and configured Unifi AP (Access Point) to get mobile Internet access by using
Wi-Fi link.
Supervision and cooperation of IPPAproject for the national guest house at Nay Pyi
Taw. Installed IPPA(IP Public Address) software,equipment and fiber at National guest
house in Nay Pyi Taw and project management in term of scope, time, quality and risk.
Achievements Project management, development, implementation and operation of IPPAand IT network.
Get good knowledge and experience of IPPAsystem and IT network.
Fiber installation experience.
Finished 52 Unifi AP Wi-Fi points and fiber installation atYangon University Campus.
Finished Wi-Fi network using with Windows server 2008 and TMG on Dell R320 server,
data switch and media converter.
Finished 2 Nos.of IP NetworkAudio Systems with 32 terminal points and fiber installation at
National guest house in Nay Pyi Taw.
2000 - 3.6.2013 : Integrator Services Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Chief Engineer
Training *The Training course of Optical fiber transmission, RAD Megaplex MP-2200 and Alcatel
Omni PCX-4400 EPABX.
01 Nov - 12 Nov 2010
12 days SDH (Synchronous Digital Hierarchy) transmission theories and ECI fiber
transmission equipment’s advance training in Singapore for MOD, MPT,MEC,MRTV and
MWD fiber transmission network.
26 Feb - 28 Feb 2003
3 days RAD Megaplex MP-2200 data training in Singapore for MOD ISDN network.
17 Feb - 25 Feb 2003
9 days PDH,SDH basic transmission theories and ECI equipment installation and
operation training in Singapore for MOD fiber network.
20 Sept - 23 Sept 2002
Alcatel Omni PCX4400 PABXlocal training at CSW (Central Signal Workshop) in the
whole Myanmar country for MOD network.
10 Jun - 22 Jun 2001
Visited to Communic Asia 2001 at Singapore Expo and Eci equipment inspection.
05 Jun - 09 Jun 2001
5 days discussion of vest spectrum Microwave equipment in Malaysia.
12 days DWDM,IP, MPLS training at company office.
Responsibilities Project management of engineering activities such as equipment layout plan, overall
in-charge of power plants, assistanced and performed PDH, SDH fiber transmission network
planning, design, installation, commissioning and testing.
Made PAT (Provisional Acceptance Test).Made commissioning and testing of ECI fiber
transmission equipment, generator and ATS, EPABXequipment before sent those to the site.
Upgrade from STM-16 to STM-64 transmission of phase (4) project for MOD (military
of defense) fiber backbone network. Installation, commissioning, Operation and Maintenance
of ECI fiber transmission and power plants ( Gen sets,ATS and Rectifiers ) and ECI Syncom,
BroadGate, and XDM equipment for MOD, MPT,MRTV, MWD, and Special development
project Naypyitaw and MEC optical fiber network in the whole Myanmar country. Made site
3. 3
planning, Installation progress, PAT and FAT for all equipment in MOD fiber project.
Project management of accommodation, food and beverage and equipment installation
of new MRTV TV and Radio, studio complex and transmitter Broadcasting Project in
Tatkone.
Installation, operation and maintenance of firewall and 3 Nos. of Cisco routers atYGN,
KSE and NPT for MWD On-Line Banking and UMEHLdata network.
Installation, commissioning, operation and maintenance of RAD Megaplex MP-2200,
2100 and Alcate Omini PCX-4400 EPABX100 lines, 200 lines and 1000 lines for MOD
voice and data network in the whole Myanmar country.
Give presentation and training of PDH and SDH fiber transmission theories and ECI
equipments installation, Alcatel Omni PCX4400 EPABXto our engineers and our customers
at Pyin Oo Lwin training school.
Achievements Get good experience of team leadership, management and cooperation.
Services and Hardware Delivery experience of fiber transmission and EPABX.
Good trainer experience of PDH,SDH and EPABXpresentation and training.
Finished MPT, MOD,MRTV, MWD and MEC transmission project with the installation over
250 Nos. of fiber transmission equipments and over 250 Nos. of generator & ATS.
Finished MOD project with the installation over 35 Nos. of EPABXequipment.
Finished MWD on-line banking project with 3 Nos. of Cisco (2800) routers and switches.
Finished new MRTV TV and radio studio complex at Tatkone for MTRV broadcasting.
1998-2000 : Sky-Link Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Executive Engineer
Training *The Training course of GSM.
18 Dec -21 Dec 2000
4 days SIEMENS MN1707-7 BSS Delta Training BR4.0-5.0 at Sedona Hotel in
Myanmar for MPT’s GSM project.
I attended Information and Communication Networks Training Institute at Munich in
Germany for Yangon GSM project as the following SIEMENS GSM Training Courses.
11 Oct - 29 Oct 1999
19 days MN2582-5 SBS (Siemens Base Station) Network Element Management
OBR/BR4.0.
02 Nov - 10 Nov 1999
9 days MN1790 BSS (Base Station Subsystem) Radio Network Planning
11 Nov - 18 Nov 1999
8 days MN1736-5 SBS Performance Measurement
MN1789-5 SBS Radio Network Parameters
Responsibilities Supervised for the installation of shelters, towers, antennas and feeders in the first MPT
GSM project in Yangon and Mandalay.
Made site planning, radio network planning and design.
Installation, commissioning and operation of BTS, BSC and TRAU.
Some micro wave installation.
Installation, commissioning, testing and operation of rectifiers and BTS.
Installation progress report, drive test and made PAT and FAT for rectifier, BTS, BSC
and TRAU in Yangon MPT GSM project.
4. 4
Achievements Experience of GSM Network especially power and radio.
On the job and oversea training with GSM network.
Finished MPT GSM project in Yangon with 18 BTS, 1 BSC, 4 TRAU and Rectifiers.
12.7.1996-1998 : Comm Tech Co., Ltd.
Industry Telecommunications
Country/City Myanmar/Yangon
Position Engineer
Training On the job training of cabling and installation of RCS at company office.
Responsibilities Installation of Rectifier, antenna and feeder forAuto Radio Telephone System (ARTS)
project of MPT.
Production of 24 VDC auto voltage regulator power supply unit for ARTS phone and 24
VDC charger.
Installation of RCS for MPTARTS project.
Repaired and serviced for ARTS radio telephone and power supply.
Achievements Installation of rectifier, antenna and feeder forARTS system.
Experience of Radio for the ARTS system.
Can repair the ARTS radio Equipment and production of 24 VDC Power supply for ARTS
phone and 24 VDC charger.
Voluntary Experience
27.7.2014-10.2.2015 : SawKhonYit Roadworks at (49) ward, North Dagon Tsp.
Industry Civil service
Country/City Myanmar/Yangon
Position Secretary (1)
Responsibilities Saw Khon Yit road’s roadworks
To finish roadworks before raining season. To established roadwork’s committee at ward.
Collection of fund for roadworks at ward. Managing and control of funds.
Requested and informed to Administration, and Civil servant of government to permit
roadworks of Saw Khon Yit road.
Achievements Saw Khon Yit road’s roadworks was finished.
Improvements of negotiation, dealing, other organization and volunteer skill.
Education
1993-2005 :Yangon University ofDistant Education
Major Zoology
Degree BSC ( Zoology )
1993-1995 : Mandalay Government Technical Institute
Major Electronics and communication
Degree AGTI ( EC )
Language
Myanmar Excellent written and oral skills
English Good written and oral skills