SlideShare a Scribd company logo
RESUME
Name: ALFIO ROBERT LICCIARDELLO
Address: 34 Cornflower Street, Mansfield Qld. 4122
Phone: 07 3343 5254
Mobile: 0412 674 633
Email: ardell444@optusnet.com.au
CAREER HISTORY
2005 -
Telstra – Towers And Facilities Planning – Fundamental Planning
Lev. 1 – 275 George Street, Brisbane 4000
Positions: (1) CMUX Design (2) Common Station Facilities Design.
(3) TEBA – Telstra Equipment & Building Access Design
Responsibilities: Prepare new and augmentation designs of CMUX technology for
Queensland using various tools i.e. GDD – CADLINK - TRAC – CHARMS – ExADT –
MITS – EMITS - NPAMS – WAMS – CMUX Data Base – NEOS – Multiman – MS Word -
MS Outlook – MS Access – MS Excel – Integral / SAP – Alcatel Material Tool.
2003 – 2005 Mobilefonerepair.com
49 Park Road, Milton, 4064
Position: Mobile Phone Technician
Nokia – Sony-Ericsson – Motorolla – Siemens – LG – Sharp - NEC
2002 – 2003 Various contract assignments to independent dealers.
2000 - 2001 Mobile Digital Pty.Ltd.
901 Beaudesert Road, Archerfield, Qld. 4108 Phone:07 3275 3555
Position: Mobile Phone Technician
Responsibilities: Service and repairs to Nokia, Ericsson & Motorola phones to Micro BGA
replacement level. Power management recalibration, RF alignment with HP and IFR test
equipment using Wintesla and EMMA II software.
1999 - 2000 Telstra Business Solutions (State Repair Centre)
3/803 Beaudesert Road,Archerfield, Qld. 4108 Phone: 07 3216 7117
Position: Mobile Phone Technician
Responsibilities: Customer reception, Service and repairs to Nokia,Ericsson,Qualcom, LG,
Panasonic and Samsung mobile phones to level "B" standard.
1998 - 1999 Chubb Australia Limited (Security Division)
41 Pentex Street, Salisbury, Qld. Phone: 07 3874 9991
Position Intruder Alarm Technician
Responsibilities: Contract Design,installation and testing of new and existing systems for
industrial and domestic clients.
Page 1
1994 - 1998 Network Design and Construction Branch
Customer Products Design Section
Position: Principal Telecom Technical Officer Gr.1
Responsibilities: Prepare bearer and equipment designs for new and existing Customer
products in the Wideband and Data areas. To liaise with sales and construction staff in co-
ordinating the commissioning of services to achieve customer satisfaction.
e.g. CMTS (Cellular Mobile Telephone System)
ISDN (Integrated Services Digital Network)
DDN (Dedicated Data Network)
FASTPAC (2 Mbs or 34 Mbs)
MICROLINK (2 x 64 Kbs + 1 x 16 Kbs)
MACROLINK (31 Channel x 64 Kbs)
MEGALINK (2 Mbs Digital Links)
SITELIGHT / SDH (Synchronous Digital Hierarchy)
Issue of Design specifications and associated documents for Brisbane Metro, Central & South
East Qld regions: using Microsoft WORD, EXCEL, ACCESS / RACKS database -
Perform site visits and negotiate / liaise with customers and installation staff.
1990 - 1994 Network Operations Unit
Alarms Management Section
Position: Senior Telecom Technical Officer Gr.1
Responsibilities: Implementation of Alarms Project for S.E Qld Country, North & South
Sydney Metro: hardware configuration, Data base maintenance, Technical support, Production
and distribution of technical documentation to field installation staff..
1983 - 1990 Network Management Design Group:
Innovative Design Section (Design Laboratory)
Position: Technical Officer Gr.1
Responsibilities: Design ,layout and construct more complex sub-assemblies and variations of
existing equipment under limited supervision.
Test prototype equipment, describe circuit performance, and record test results.
Research methods and practices of cable termination and modifications, maintain a technical
library ,evaluation and purchase of laboratory equipment and components.
Page 2
1980 - 1983 Metropolitan Installations No.2
(CAX) Country Automatic Exchange Depot. (Moorooka)
Position:Technical Assistant Gr.2
Responsibilities: Country installation, testing and commissioning of 400 and 1000 line
portable exchanges within a 200 Klm. radius of Brisbane.
1976 - 1979 Metropolitan Installations No.2
Section Office Eagle House
Position:Technical Assistant Gr.2
Responsibilities: Maintain technical library, Compile data for three to five year
implementation programs. Material provisioning on a State level, inspection of equipment
prior to delivery to exchange locations.
1973 - 1976 Metropolitan Installations No.2
Country Automatic Exchange Depot (Moorooka)
Position: Assistant Technician
Responsibilities: Equipment installation, Cabling, terminating, quality control, modification of
exchange equipment and final testing to on site installation in remote localities. Purchasing
officer in sectional store ordering components, tools and exchange equipment.
REFEREES
Copies of references will be available at interview or upon request.
Page 3

More Related Content

What's hot

Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Ali Omar
 
Aashar_CV
Aashar_CVAashar_CV
Aashar_CV
Aashar Butt
 
Vinay resume
Vinay resumeVinay resume
Vinay resume
VINAY PATIAL
 
Reden_CV
Reden_CVReden_CV
Reden_CV
reden caadan
 
VINAY CV
VINAY CVVINAY CV
VINAY CV
VINAY PATIAL
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
BORAPUREDDI ASHOK
 
Engr_DMH
Engr_DMHEngr_DMH
Jose Coll Prof. Resume
Jose Coll Prof. ResumeJose Coll Prof. Resume
Jose Coll Prof. Resume
Jose Coll
 
CV_OLCM_R2_JUN16
CV_OLCM_R2_JUN16CV_OLCM_R2_JUN16
CV_OLCM_R2_JUN16
LEONEL CRUZ
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
bhashker sharma
 
RAS Resume_20160610
RAS Resume_20160610RAS Resume_20160610
RAS Resume_20160610
Robert Sutherland
 
shashank3
shashank3shashank3
shashank3
SHASHANK tripati
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
Alaa Mahmoud
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
Pravendra Chahal
 
cv resume
cv resumecv resume
cv resume
sherif elnawwam
 
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Belva Thomas
 
Linked In CV
Linked In CVLinked In CV
Linked In CV
Phil Conway
 
yogesh ganpat ware_original
yogesh ganpat ware_originalyogesh ganpat ware_original
yogesh ganpat ware_original
yogesh ware
 
my Resume
my Resumemy Resume
my Resume
U San Aung
 
Resume (2017-01-05)
Resume (2017-01-05)Resume (2017-01-05)
Resume (2017-01-05)
sanjay singh
 

What's hot (20)

Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014
 
Aashar_CV
Aashar_CVAashar_CV
Aashar_CV
 
Vinay resume
Vinay resumeVinay resume
Vinay resume
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
VINAY CV
VINAY CVVINAY CV
VINAY CV
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
Engr_DMH
Engr_DMHEngr_DMH
Engr_DMH
 
Jose Coll Prof. Resume
Jose Coll Prof. ResumeJose Coll Prof. Resume
Jose Coll Prof. Resume
 
CV_OLCM_R2_JUN16
CV_OLCM_R2_JUN16CV_OLCM_R2_JUN16
CV_OLCM_R2_JUN16
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
RAS Resume_20160610
RAS Resume_20160610RAS Resume_20160610
RAS Resume_20160610
 
shashank3
shashank3shashank3
shashank3
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
cv resume
cv resumecv resume
cv resume
 
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
Transport Circuit Design Engineer-Network Engineer - Migration Specialist- Ju...
 
Linked In CV
Linked In CVLinked In CV
Linked In CV
 
yogesh ganpat ware_original
yogesh ganpat ware_originalyogesh ganpat ware_original
yogesh ganpat ware_original
 
my Resume
my Resumemy Resume
my Resume
 
Resume (2017-01-05)
Resume (2017-01-05)Resume (2017-01-05)
Resume (2017-01-05)
 

Viewers also liked

Ppppppppppppp
PppppppppppppPpppppppppppp
Ppppppppppppp
Nicolas Rodriguez
 
8003154730 faq
8003154730 faq8003154730 faq
8003154730 faq
8003154730
 
RESUME Anaiz 2015
RESUME Anaiz 2015RESUME Anaiz 2015
RESUME Anaiz 2015
Anaiz Rodr
 
A PM job career story
A PM job career storyA PM job career story
A PM job career story
G.K. Jekel
 
An Assessment of Otters in Naas
An Assessment of Otters in NaasAn Assessment of Otters in Naas
An Assessment of Otters in Naas
Fiona Zimmermann
 
Historia del mercadeo
Historia del mercadeoHistoria del mercadeo
Historia del mercadeo
mendezadriana
 
Ejercicios resueltos transferencia de calor
Ejercicios resueltos transferencia de calorEjercicios resueltos transferencia de calor
Ejercicios resueltos transferencia de calor
Mathias Schuck Rey
 
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVASMOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
Telmo Viteri
 
Se hacen tesis de orientación familiar
Se hacen tesis de orientación familiar Se hacen tesis de orientación familiar
Se hacen tesis de orientación familiar
bastiano1000
 
Se hacen tesis de relaciones publicas
Se hacen tesis de relaciones publicas Se hacen tesis de relaciones publicas
Se hacen tesis de relaciones publicas
bastiano1000
 

Viewers also liked (10)

Ppppppppppppp
PppppppppppppPpppppppppppp
Ppppppppppppp
 
8003154730 faq
8003154730 faq8003154730 faq
8003154730 faq
 
RESUME Anaiz 2015
RESUME Anaiz 2015RESUME Anaiz 2015
RESUME Anaiz 2015
 
A PM job career story
A PM job career storyA PM job career story
A PM job career story
 
An Assessment of Otters in Naas
An Assessment of Otters in NaasAn Assessment of Otters in Naas
An Assessment of Otters in Naas
 
Historia del mercadeo
Historia del mercadeoHistoria del mercadeo
Historia del mercadeo
 
Ejercicios resueltos transferencia de calor
Ejercicios resueltos transferencia de calorEjercicios resueltos transferencia de calor
Ejercicios resueltos transferencia de calor
 
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVASMOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
MOTIVACIÓN NEGATIVA PARA LOGRAR COSAS POSITIVAS
 
Se hacen tesis de orientación familiar
Se hacen tesis de orientación familiar Se hacen tesis de orientación familiar
Se hacen tesis de orientación familiar
 
Se hacen tesis de relaciones publicas
Se hacen tesis de relaciones publicas Se hacen tesis de relaciones publicas
Se hacen tesis de relaciones publicas
 

Similar to ALF_TECH02

Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
thai tran
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
thai tran
 
A rosario resume_2013_a
A rosario resume_2013_aA rosario resume_2013_a
A rosario resume_2013_a
vsanchez1963
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMA
Gaurav Sharma
 
Resume
ResumeResume
Resume
Neal Bahu
 
Simpson_Thomas_Res_Draft2
Simpson_Thomas_Res_Draft2Simpson_Thomas_Res_Draft2
Simpson_Thomas_Res_Draft2
Tom Simpson
 
CV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_EngineerCV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_Engineer
James Sutton
 
New TP
New TPNew TP
New TP
Tommy Parker
 
Resume
ResumeResume
Resume
Sharif Ahmed
 
Edgar_Martinez_Resume
Edgar_Martinez_ResumeEdgar_Martinez_Resume
Edgar_Martinez_Resume
Edgar Martinez
 
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
John Greenwood
 
Tejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom EngineerTejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom Engineer
TEJENDRA BAHADUR GURUNG
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
Richard Dillard
 
alexander Eze
alexander Ezealexander Eze
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.doc
Jonathan Sawyer
 
Martin Aleksiuk Resume
Martin Aleksiuk ResumeMartin Aleksiuk Resume
Martin Aleksiuk Resume
Martin Aleksiuk
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
Dennis Santos
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
Syed Atif Shamim
 
Simon-CV-April-2015
Simon-CV-April-2015Simon-CV-April-2015
Simon-CV-April-2015
Simon Hames
 
Sanjoy_Resume (1)
Sanjoy_Resume (1)Sanjoy_Resume (1)
Sanjoy_Resume (1)
sanjoy Pal
 

Similar to ALF_TECH02 (20)

Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
Thai Tran Resume
Thai Tran ResumeThai Tran Resume
Thai Tran Resume
 
A rosario resume_2013_a
A rosario resume_2013_aA rosario resume_2013_a
A rosario resume_2013_a
 
BSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMABSS O&M CV_ GAURAV SHARMA
BSS O&M CV_ GAURAV SHARMA
 
Resume
ResumeResume
Resume
 
Simpson_Thomas_Res_Draft2
Simpson_Thomas_Res_Draft2Simpson_Thomas_Res_Draft2
Simpson_Thomas_Res_Draft2
 
CV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_EngineerCV_May_2016_James_Sutton_Network_Engineer
CV_May_2016_James_Sutton_Network_Engineer
 
New TP
New TPNew TP
New TP
 
Resume
ResumeResume
Resume
 
Edgar_Martinez_Resume
Edgar_Martinez_ResumeEdgar_Martinez_Resume
Edgar_Martinez_Resume
 
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
 
Tejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom EngineerTejendra Bahadur Gurung Datacom Engineer
Tejendra Bahadur Gurung Datacom Engineer
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.doc
 
Martin Aleksiuk Resume
Martin Aleksiuk ResumeMartin Aleksiuk Resume
Martin Aleksiuk Resume
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
 
Simon-CV-April-2015
Simon-CV-April-2015Simon-CV-April-2015
Simon-CV-April-2015
 
Sanjoy_Resume (1)
Sanjoy_Resume (1)Sanjoy_Resume (1)
Sanjoy_Resume (1)
 

ALF_TECH02

  • 1. RESUME Name: ALFIO ROBERT LICCIARDELLO Address: 34 Cornflower Street, Mansfield Qld. 4122 Phone: 07 3343 5254 Mobile: 0412 674 633 Email: ardell444@optusnet.com.au CAREER HISTORY 2005 - Telstra – Towers And Facilities Planning – Fundamental Planning Lev. 1 – 275 George Street, Brisbane 4000 Positions: (1) CMUX Design (2) Common Station Facilities Design. (3) TEBA – Telstra Equipment & Building Access Design Responsibilities: Prepare new and augmentation designs of CMUX technology for Queensland using various tools i.e. GDD – CADLINK - TRAC – CHARMS – ExADT – MITS – EMITS - NPAMS – WAMS – CMUX Data Base – NEOS – Multiman – MS Word - MS Outlook – MS Access – MS Excel – Integral / SAP – Alcatel Material Tool. 2003 – 2005 Mobilefonerepair.com 49 Park Road, Milton, 4064 Position: Mobile Phone Technician Nokia – Sony-Ericsson – Motorolla – Siemens – LG – Sharp - NEC 2002 – 2003 Various contract assignments to independent dealers. 2000 - 2001 Mobile Digital Pty.Ltd. 901 Beaudesert Road, Archerfield, Qld. 4108 Phone:07 3275 3555 Position: Mobile Phone Technician Responsibilities: Service and repairs to Nokia, Ericsson & Motorola phones to Micro BGA replacement level. Power management recalibration, RF alignment with HP and IFR test equipment using Wintesla and EMMA II software. 1999 - 2000 Telstra Business Solutions (State Repair Centre) 3/803 Beaudesert Road,Archerfield, Qld. 4108 Phone: 07 3216 7117 Position: Mobile Phone Technician Responsibilities: Customer reception, Service and repairs to Nokia,Ericsson,Qualcom, LG, Panasonic and Samsung mobile phones to level "B" standard. 1998 - 1999 Chubb Australia Limited (Security Division) 41 Pentex Street, Salisbury, Qld. Phone: 07 3874 9991 Position Intruder Alarm Technician Responsibilities: Contract Design,installation and testing of new and existing systems for industrial and domestic clients. Page 1
  • 2. 1994 - 1998 Network Design and Construction Branch Customer Products Design Section Position: Principal Telecom Technical Officer Gr.1 Responsibilities: Prepare bearer and equipment designs for new and existing Customer products in the Wideband and Data areas. To liaise with sales and construction staff in co- ordinating the commissioning of services to achieve customer satisfaction. e.g. CMTS (Cellular Mobile Telephone System) ISDN (Integrated Services Digital Network) DDN (Dedicated Data Network) FASTPAC (2 Mbs or 34 Mbs) MICROLINK (2 x 64 Kbs + 1 x 16 Kbs) MACROLINK (31 Channel x 64 Kbs) MEGALINK (2 Mbs Digital Links) SITELIGHT / SDH (Synchronous Digital Hierarchy) Issue of Design specifications and associated documents for Brisbane Metro, Central & South East Qld regions: using Microsoft WORD, EXCEL, ACCESS / RACKS database - Perform site visits and negotiate / liaise with customers and installation staff. 1990 - 1994 Network Operations Unit Alarms Management Section Position: Senior Telecom Technical Officer Gr.1 Responsibilities: Implementation of Alarms Project for S.E Qld Country, North & South Sydney Metro: hardware configuration, Data base maintenance, Technical support, Production and distribution of technical documentation to field installation staff.. 1983 - 1990 Network Management Design Group: Innovative Design Section (Design Laboratory) Position: Technical Officer Gr.1 Responsibilities: Design ,layout and construct more complex sub-assemblies and variations of existing equipment under limited supervision. Test prototype equipment, describe circuit performance, and record test results. Research methods and practices of cable termination and modifications, maintain a technical library ,evaluation and purchase of laboratory equipment and components. Page 2
  • 3. 1980 - 1983 Metropolitan Installations No.2 (CAX) Country Automatic Exchange Depot. (Moorooka) Position:Technical Assistant Gr.2 Responsibilities: Country installation, testing and commissioning of 400 and 1000 line portable exchanges within a 200 Klm. radius of Brisbane. 1976 - 1979 Metropolitan Installations No.2 Section Office Eagle House Position:Technical Assistant Gr.2 Responsibilities: Maintain technical library, Compile data for three to five year implementation programs. Material provisioning on a State level, inspection of equipment prior to delivery to exchange locations. 1973 - 1976 Metropolitan Installations No.2 Country Automatic Exchange Depot (Moorooka) Position: Assistant Technician Responsibilities: Equipment installation, Cabling, terminating, quality control, modification of exchange equipment and final testing to on site installation in remote localities. Purchasing officer in sectional store ordering components, tools and exchange equipment. REFEREES Copies of references will be available at interview or upon request. Page 3