Culzean HPHT:
Lessons Learnt From Maersk Oil UK’s 1st HPHT Exploration Well
&
Issues Related to Appraisal Planning
Jim Manson, Culzean Drilling & Completion Team Leader
18 November, 2009
2
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
3
Presentation Outline
• Culzean Prospect Background Information
• Location, Geology, History Timelines, Challenges
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
4
10 km
242km from Aberdeen to Culzean
Heron
Marnock
Elgin, Franklin &
Shearwater
Jackdaw
NO.
UK.
Culzean Prospect Location
Culzean Prospect:
49.99% Maersk Oil NS UK Ltd
16.9% ENI UK Ltd
17.1% Nippon UK
16% BP
18 November, 2009
5HPHT Province with offset fields
(After Winefield et.al. 2005)
Culzean
22/25a-9z
O/P circa 6500psi
Temperature ~380 degrees F
18 November, 2009
6
Culzean Seismic Section West to East
Source: United Kingdom Discovery Digest. Special thanks to CGG Veritas
18 November, 2009
7
Culzean Prospect Timelines
• Exploration well 22/25a-1 drilled 1986 by BP
• Dormont until operatorship transferred to Maersk Aug 05
• Maersk Conceptual Planning/Discussions from 2002
• Provisional Casing Design – June 05
• Long Leads ordered May 06
• Exploration Well, 22/25a-9/9Z
• Spud - May 08
• P& A – Dec 08
• Drilled utilising Ensco 101 HDJU Rig
• Appraisal Well Planning Started Jan 09
• Planned Two Well Appraisal Campaign
• 18 month planning phase
• Planned Spud Appraisal 1 – Jul 10
18 November, 2009
8
Culzean Exploration Well Challenges
• Limited offset wells – 22/25a-1 well drilled in 1986 by BP. Littered by drilling
problems, failed to reach TD. Extensive well control issues , including classic
wellbore breathing. Limited detailed information on this well.
• High geological uncertainty.
• High Pressure Uncertainty - BHP Range 17.0 ppg to 18.5 ppg emw
• ~380 deg F BHT.
• Drill close to crest - Narrow window between PP & FG - potentially un-drillable!
OVERALL CHANCE OF DRILLING SUCCESS =53%
Breakdown of 47% Drilling Risk of Failure:
Risks 1 to 3 – Potentially too narrow and un-drillable drilling window
1. Aquifer Overpressure Greater than Predicted = 20%
2. Sand above the target reservoir =2.5%
3. Fracture Gradient Less than Estimated =25%
4. Problematic Gas in Hidra =10%
18 November, 2009
9
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Well Objectives
• Non DST/Finder Well Rational
• Well Design Options
• Planning Issues
• Results - High Level Summary & Lessons Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
10
Culzean Exploration Well
Well Objectives
• Drill a safe and incident free well.
• Reach well planned TD.
• Penetrate all reservoir prospects.
• Successfully log all reservoir prospects.
• In success case, MDT pressures and samples over reservoir
prospects.
• No Coring
• No DST to be carried out.
• P&A.
18 November, 2009
11
Culzean Exploration Well
Non DST/Finder Well Exploration Rational
• Chances of Exploration Success?
• Extra cost to include DST considerations in casing design.
• Final hole size drives well design.
• HPHT DST standard tools – 5” OD
• Test tools as close to perforations as possible ( well kill volumes & complexity if
testing with a drilling liner)
• Thus preferred 8 ½” hole x 7” liner at TD for DST well.
• Heavier casing design required – HPHT Heavy vs HPHT Light
• Increased loads – Increase casing specification – Increased costs (10 ¾” -
9 7/8” up to £1.0m more, 13 5/8” or 14” vs. 13 3/8”)
• DST Long Leads ~£1m
• Contingency tie-back string ~ £1m.
• DST planning – manpower and hours
• Total Cost Differential ~ £8m- £10m less for Non/DST Finder
“Light” design
18 November, 2009
12
Culzean Exploration Well
Non DST/Finder Well Exploration Rational (Cont’d)
Worked Example:
Eg. Chance of Exploration Success - 1 in 7 or 14.3%
Expected Cost to go to Development?
Conclusion: Culzean Exploration - Non DST, P & A
HPHT Light
£49m/well
HPHT Heavy
£59m/well
HPHT Light/Finder
(£M)
HPHT Heavy
(£M)
7 Exploration Wells 343 413
Test Exploration Well 0 19
1 Appraisal Well 59 49
Test Appraisal Well 19 0
Total To Go To Development 421 481
60Cost Saving with Finder Exploration Concept
18 November, 2009
13
18 November, 2009
13
Culzean Exploration Well
Design Options : HPHT “Heavy” vs HPHT “Light”
36” x 26” hole
26” x 20” Conductor
set @ 3000ft
16” or 17 ½” hole
13 5/8” Intermediate
casing set
~ 11,000ft to ~12,000 ft
12-1/4” hole
10 ¾” x 9 7/8” Production
casing set
~14,000ft to ~15,000ft
8-1/2” hole
7” Test liner set
@ TD
~17,000ft
HPHT “Heavy” HPHT “Light”
36” x 26” hole
26” x 20” Conductor
set @ 1900ft
16” or 17 ½” hole
13 3/8” Intermediate
casing set
~ 5,000ft to ~6,500 ft
12-1/4” hole
9 7/8” Production casing set
~13,500ft to ~14,000ft
TD in 8 1/2” hole
18 November, 2009
14
18 November, 2009
14
Casing Setting Depths - Contingency
8-1/2” hole
7” Drilling liner
set @
~14,400ft
5-7/8” hole
4 ½” Test liner
set @ TD
HPHT “Heavy”
16” or 17 ½” hole
13 5/8” Intermediate
casing set
~ 11,000ft to ~12,000 ft
12-1/4” hole
10 ¾” x 9 7/8” Production
casing set
~14,000ft
HPHT “Light”
12-1/4” hole
9 7/8” Production casing set
~13,500ft to ~14,000ft
8-1/2” hole, 7 5/8” Drilling
liner
6 5/8”” hole
6” by 7 5/8” SET , then
6” hole
TD in 6 5/8” or 6” hole
Culzean Exploration Well
Design Options : HPHT “Heavy” vs HPHT “Light”
18 November, 2009
15
Culzean Exploration Well
HPHT “Heavy” Design
Pro’s
• 12 ¼” hole can be drilled deep into PTZ
• Increased chance of higher FG at 9 7/8” shoe and TD in 8 ½”
hole.
Con’s
• Slower to drill, heavier and more expensive design
• Drilling hard abrasive Palaeocene & chalks in slower 16” or 17
½” hole.
• Increase volume OBM cuttings for containment
18 November, 2009
16
Exploration Well Planning
HPHT “Light” Design – Chosen Exploration Well Design
Pro’s
• Slimmer, faster, cheaper design
• Drilling hard abrasive Palaeocene & chalks in quicker 12 ¼” hole.
• WBM 17 ½” section.
• Possible further expandable liner option available just to reach TD
objectives.
• Possible further optimisation of deletion of separate 20” casing string.
Con’s
• Due to weak Palaeocene/Tor formations, 12 ¼” hole cannot be drilled
deep into PTZ.
• Less chance of TD in 8 ½” hole.
• Not a problem – no DST or coring required.
18 November, 2009
17
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
18Exploration Well Planning
Planning
• Maersk HPHT Experience
• 1st Maersk UK HPHT Exploration well.
• Gain knowledge & experience.
• Hire/Recruit
• Networking: HPHT Operators Forum, Conferences, Contacts?
• Lead times – realistically >2 years, or more
• G & G review prospect – ? years
• Detailed casing/design iterations w/ G&G – 1year
• Lead time on bespoke equipment – 1 year.
• Integrated/Interdisciplinary Approach Essential.
• Service Providers into Team early.
• Management Of Stakeholders?
• Partners, Management, All Disciplines, HSE, Well Examiner
• Alignment, Inform, Draw on HPHT experience
18 November, 2009
19
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• High Level Summary & Lessons Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
20
Culzean Exploration Well - High Level Summary
Highlights
• Challenging Prospect -53% Chance of Drilling Success @ Crestal Location.
• Achieved planned well TD, meeting ALL Well Objectives.
• Close to not achieving objectives through PTZ!
• Narrow PPFG window , Utilised contingency 7 5/8” Liner to open up.
• Milestones:
• 9 7/8” Casing on depth, Well Cemented, Coped with High PP on bottom and loss
zone above.
• 7 5/8” , As Above.
Lowlights
• 8 ½” Kick – Poor Offshore Practices and decision making – should have
been better handled.
• 17 ½” Hole – 13 3/8” Casing stood-up, section re-drill required.
18 November, 2009
21
Just some of the PPFG Models !
Depth
Pressure (ppg)
Pore
Pressure
Forties
Lwr. Cretaceous
Top Reservoir
Fracture
Gradient
Point of Note:
HPHT Geological Surprises
• Expect surprises.
• Multiple PPFG Models
• Plan for the extremes of PPFG –
cover all the bases!
• Build in maximum flexibility in
well design to achieve
objectives.
• Gathered some information,
but still many unknowns on
prospect.
18 November, 2009
22
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well- Challenges &
Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
23
Appraisal Well Planning
Appraisal Well -Challenges & Objectives
• Challenges
• Crestal Locations
• Still with major geological uncertainty
• one appraisal, one exploration well.
• Seismic formation top accuracy.
• Pore pressure uncertainty
• Aquire sufficient key data for ascertaining economic
development
• DST, Cores, Fluid Data, Log Data
• Sufficient data to proceed to project sanction.
• Aquire sufficient data for detailed development design.
18 November, 2009
24
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Well?
• Culzean Development Well Planning Issues
18 November, 2009
25
Appraisal Well Design
• Exploration Well HPHT ”Light” Design & 12 ¼” TD
• Achieved ”All” well objectives, still had one more contingency hole size
available.
• However, went too deep into PTZ w/ shallow 13 3/8” shoe.
• Weak zone(s) in Paleocene (Forties) and/or top Tor.
• Design incompatible w/ drive 9 7/8” shoe as deep as possible into PTZ.
• Exploration Well - Needed Contingency Liner Option to
Negotiate PTZ.
• Appraisal well - DST Required from multiple zones
• Conclusion: HPHT ”Heavy” Design required with deep set 13
5/8” Casing.
• Optimum setting depth for 9 7/8” shoe? As deep as possible,
preferably the Valhall.
• 13 5/8” shoe depth? To facilitate above.
18 November, 2009
26
22/25a-9z Fracture Pressure in Tor
ft/hr
0.2 2 20 200
ohmm
200 0
low resistivity
high ROP
higher porosity
weaker formation
18 November, 2009
27
18 November, 2009
27
Culzean Exploration Well
Design Options : HPHT “Heavy” vs HPHT “Light”
36” x 26” hole
26” x 20” Conductor
set @ 3000ft
16” or 17 ½” hole
13 5/8” Intermediate
casing set
~ 11,000ft to ~12,000 ft
12-1/4” hole
10 ¾” x 9 7/8” Production
casing set
~14,000ft to ~15,000ft
8-1/2” hole
7” Test liner set
@ TD
~17,000ft
HPHT “Heavy” HPHT “Light”
36” x 26” hole
26” x 20” Conductor
set @ 1900ft
16” or 17 ½” hole
13 3/8” Intermediate
casing set
~ 5,000ft to ~6,500 ft
12-1/4” hole
9 7/8” Production casing set
~13,500ft to ~14,000ft
TD in 8 1/2” hole
18 November, 2009
28
18 November, 2009
28
Casing Setting Depths - Contingency
8-1/2” hole
7” Drilling liner
set @
~14,400ft
5-7/8” hole
4 ½” Test liner
set @ TD
HPHT “Heavy”
16” or 17 ½” hole
13 5/8” Intermediate
casing set
~ 11,000ft to ~12,000 ft
12-1/4” hole
10 ¾” x 9 7/8” Production
casing set
~14,000ft
HPHT “Light”
12-1/4” hole
9 7/8” Production casing set
~13,500ft to ~14,000ft
8-1/2” hole, 7 5/8” Drilling
liner
6 5/8”” hole
6” by 7 5/8” SET , then
6” hole
TD in 6 5/8” or 6” hole
Culzean Exploration Well
Design Options : HPHT “Heavy” vs HPHT “Light”
18 November, 2009
29
Appraisal Well Planning
HPHT “Heavy” – Chosen Appraisal Design
Pro’s
• 12 ¼” hole can be drilled deep into PTZ
• Thus increased chance of FG at 9 7/8” shoe enabling TD in 8 ½” hole.
• Implications of 7” Drilling Liner
• DST well kill distance from perforations.
• DST well kill volumes.
• DST multiple zone testing – mill packer or re-use.
• 5 7/8” hole – limitations on logs , smaller core- limitations on modelling
Con’s
• Slower to drill, heavier and more expensive design
• Drilling hard abrasive Palaeocene & chalks in slower 16” or 17 ½”
hole.
• Increase volume OBM cuttings for containment
18 November, 2009
30
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
31
Culzean Appraisal - Keeper Well?
Prize?
• ~£80m/appraisal well , P & A ?
• + ~£80m/development well = £160m
• Keeper – Potential to save £15m to £30m/development well?
Issues?
• Assumed dry tree development.
• No fully qualified & field proven HPHT MLT equipment.
• Integrity at MLT? ( multiple use, MTM seal, Incaloy material, verticality etc.)
• Alternative Shallow or Deep Tie-back options?
• Tie-back operations - Complex, multiple operations. Poor success in past. High
risk of failure.
• Uncertainty on appraisal prospect – Size? Shape? Variability?
Compartmentalisation? Upside? Downside?
• Appraisal surface location drives platform location?
• High risk of non-use , and potential high later abandonment costs.
• Early installation of wellhead jacket ? – time & cost!
Conclusion?
• Tie-back Low Chance of Success, High Chance of Cost Over-Run
• P & A appraisal well.
• Review Keeper options for further potential appraisal wells.
Prize?
• HPHT Mudline tie-back? Alternative Approach? Service Sector?
18 November, 2009
32
Presentation Outline
• Culzean Prospect Background Information
• Culzean Exploration Well
• Well Design Issues
• Planning Issues
• Results - High Level Summary & Lessons
Learnt
• Culzean Appraisal Well Planning
• Appraisal Well Challenges & Objectives
• Appraisal Well Design
• Appraisal Keeper Wells?
• Culzean Development Well Planning Issues
18 November, 2009
33
Development Well Planning Issues
• Timelines
• Earliest spud of development wells on critical path to 1st
hydrocarbons
• Depletion drilling challenges?
• Earliest installation of wellhead jacket?
• Concurrent with appraisal planning and appraisal
drilling.
• Still many unknowns
• Size, Productivity, Homogeneity, Connectivity
• Fluids
• Conceptual Casing & Completion Design
• All the issues & input parameters
• HPHT Light vs. HPHT Heavy!
• Knowledge & Experience?
CONFERENCEPROGRAMME2010
Reduce risk and deliver optimal operational
success in your HPHT projects. Hear directly
from leading experts on key strategies to:
n Manage risk,plan for emergency response and assess the
critical safety factors for HPHT operations - with insight from
the HSE,Cameron McKenna and Marsh
n Ensure wellbore stability while drilling - Chevron Upstream Europe
share insight from the Erskine field
n Customise QA/QC procedures for your HPHT project - with
experience from the International Research Institute of StavangerAS
n Drive advances in completions for HPHT deep tight gas wells -
Lukoil SaudiArabia Energy Ltd bring case study experience of both
appraisal and exploration wells
n Optimise HPHT well design:From concept to well construction -
hear from Ed Mcfadden,Independent Consultant Engineer
HPHTWells - From perception to reality
Main conference:24th & 25th November 2010
Pre-conference workshops:23rd November 2010
Venue:Ardoe House Hotel,Aberdeen
Sponsors & Exhibitors:
www.hphtwells.com/slide
CONFERENCEPROGRAMME2010
20% Discountfor Operators– Quote HPHTSLIDEO10% Discountfor Consultants& Equipment Providers
– Quote HPHTSLIDEV
A welcome note from the HPHT Programme Steering Committee…
Dear industry colleagues,
HPHT operations are integral to the growth of the oil and gas industry.Getting the most out of your HPHT operations requires
continuous learning and refinement of techniques and technologies to push the envelope as we continue to explore new areas,
face new challenges and capture opportunities.
The Programme Steering Committee came together inAberdeen for extensive discussions to draw up the key topics for
the 2010 HPHTWells Summit.We formulated an agenda with a number of new topics to cover this year including:
n Suspension and abandonment of HPHT wells
n Risk management,emergency response planning and safety of HPHT operations
n HPHT well design:From concept to well construction
n Effectively managing uncertainty in pore pressure,fracture gradient and the“transition zone”
n Delimiting the operational limits on drilling,logging & testing tools
Other major themes that have been highlighted for discussions at this year’s meeting include:
n Well architecture and delivering a safe HPHT well
n Well integrity challenges
n Emerging technologies and technology gaps for HPHT
n Operational considerations for HPHT well evaluations
The conference format is unique and mixes presentations,panel discussions,roundtables and workshops to ensure that you are
able to learn first-hand from the practical experience shared amongst both expert speakers and the wider delegate audience.
We look forward to seeing you there.
Andrew McHardy,Independent Consultant
Grant Affleck,Weatherford
Jean-Paul Stuyck,GDF Suez
HPHT Wells 2010 Programme Steering Committee
Telephone:
+44 (0)20 7368 9300
Fax:
+44 (0)20 7368 9301
Email:
enquire@iqpc.co.uk
Visit:
www.hphtwells.com/slide
Programme highlights for this year include:
Industry breakfast with the HSE Thursday 25th November 2010,7.45am
Join the HPHT community for a breakfast meeting on the morning of the second day of the conference.During breakfast,
you’ll hear directly from Grant Moody,HM Principal Inspector of Health & Safety,HSE who will deliver a brief presentation
on‘Challenging wells in the UKCS – a regulator’s perspective’.
Case study experience of HPHT deep tight gas wells
Lukoil Saudi Arabia Energy Ltd share insight into the process of optimisation for stimulation and production operations in a
case study presentation of their drilling and completions experience in both exploration and appraisal wells in SaudiArabia.
Safety & risk management panel discussion
This year,there is an exclusive interactive panel bringing together legal,risk,insurance,HSE and operator’s perspectives
of key safety considerations for HPHT operations.
Topics include:
n Key considerations for environmental protection and pollution
n Balancing risk and exposure
n Response team planning:Emergency response and oil spill response considerations
The 2010 speakers & panellists include:
EdMcfadden,IndependentConsultantEngineer
GrantMoody,HMPrincipalInspectorofHealth&Safety,HSE
RaidBu-Khamseem,KECCompany
JoergZaske,SeniorGeophysicist,ChevronUpstreamEurope
DerekCharlton,HP/HTDrillingManager,MaerskOil
AndrewMcHardy,IndependentConsultant&WellExaminer,Total
GrantAffleck,BusinessDevelopmentManager,Weatherford
StuartCole,Manager,TechnicalSalesandServices,VallourecGroup
TonyFurniss,RegionalSalesManager,EnventureInternationalLLC
CraigHendrie,ManagingDirector,PlexusOceanSystems
SteveKirby,DrillingEngineer,SasokLtd
JohnMunningstomes,SeniorRiskEngineer–Upstream,Marsh
JanBurgess,Partner,CameronMcKenna
RJBoocock,ConsultantPetroleumEngineer
OddvarSkjæveland,VPUllriggDrillingandWellCentre,IRIS
Interactive Workshops Tuesday 23rd November 2010
			 08.45 – 12.00 Interactive Workshop A:
			Examine critical completions
considerations and well integrity issues
for HPHT environments
			This in-depth workshop will give you the opportunity to assess first-hand
some of the most effective completions and well integrity challenges,and
discover the techniques and strategies required to overcome them.
			 During the interactive discussions,you will have the opportunity to:
	 n 	 Explore in detail the use of various HPHT completion techniques
	 n 	 Understand what the emerging technologies are in this space
	 n 	 Examine the critical aspects of HPHT well integrity
	 n 	Address issues surrounding HPHT well integrity with application to life
of well prediction
	 n 	 Gain insight into cementing practices and cement fatigue in HPHT wells
	 n 	 Measure corrosive formation fluids effects on:
			 -Tubular integrity
			 - Pressure barrier sealing performance
			 -Well head seals
			 - Downhole mechanical seals in packers
	 n 	 Key considerations for cement sealing and structural integrity
		Workshop leader to be announced
	 12.30 – 15.30 Interactive Workshop B:
			Understand the need for discipline
integration with HPHT wells
			During this“hands-on”workshop,teams will work through an exercise to
carry out a plan for well construction within a set scenario.Through this
exercise,you will:
	 n 	Definethechallengesandbeingawareof“rippleon”effectsofdecisionsmade
	 n	Determinetheplayersandtheirroles–possibleshiftinpresentorganisationrequired
	 n 	Engage in discussions as to why early buy-in from senior management
is critical
			In order to maximise group participation,you will be split into teams.In your
teams,you will work out a plan based around your scenario and then you
will then report back to the whole workshop.Key considerations will include:
	 n 	 Bringing the ultimate goal of production back to the initial planning stage
	 n 	Setting up a paper exercise of a well construction based on known reservoir
conditions and having back-up plans to address possible surprises
	 n 	 Establishing guidelines for drilling team
			In this session,you will understand why thinking about the well objectives is
critical to the well design.You will take into account the fact that if you only
look at the drilling of the well (pressure integrity of the casing) rather than
size,type and depth of the specific string,you may plan yourself into a
corner with no room to adjust should higher pressures be encountered
further up-hole.This could mean that you need to run another intermediate
string and that could not be available or be wrongly sized to enable test tools
to get to the depth required.You need to avoid having a drilled hole
that nothing can fit in for evaluation purposes.
			Jointlyafinalplanismadecompletewithcontingenciesandobjectivesallagreed.
			 Led by R.J. Boocock,Consultant Petroleum Engineer
			All of R.J.Boocock’s experience has been“hands-on”within the oil and gas industry,specialising in
field development,reservoir engineering,production operations,optimisation and surveillance,drilling,
completions,work-overs and contract negotiations.He has been heavily involved in training programs
and produced manuals such as“AdvancedWellTesting”,“Drilling and Geological Operations”and
“ExplorationWell Programmes”.He recently completed an assignment for GSPC doing well testing
work in HPHT wells.
Baker Hughes delivers innovative,reliable products and services designed to help customers manage operating expenses,maximize reserve recovery
and boost overall return on investment.Baker Hughes has been a technology leader in the oil and gas industry for over 100 years and continues to
partner with operators to find solutions for progressively more complex technical challenges.A leading global oilfield service company with operations
in over 90 countries and nearly 50,000 employees globally,Baker Hughes provides advanced products and services to help customers drill,evaluate,
complete and produce oil and gas wells.Baker Hughes’ reservoir technology experts offer independent consulting services,geomechanics modeling,
petroleum engineering and reservoir simulation services to achieve superior results that lower costs,reduce risk,improve productivity and increase
ultimate recovery.At Baker Hughes collaboration is at the heart of our business.Our 23 local geomarket teams work side by side with customers to
engineer reliable,application-specific products and services – whether the application is deep water,unconventional hydrocarbons or production and
water management - and deliver technologies that improve operating efficiency and create more value from the reservoir.
READ Well Services is a downhole technology specialist providing a variety of new downhole well construction,repair and well intervention services to
the oil and gas industry.RWS’s expertise lies in its ground breaking Hydraulically ExpandableTubular System (HETS),Cased Hole Logging services (data
acquisition and analysis) and Development and Engineering.
Houston-based Enventure Global Technology,L.L.C.,the world’s leading provider of SET® solid expandable technology solutions for the energy
industry,has a global presence with operations in NorthAmerica,the Middle East,SouthAmerica,Europe and the Far East.Enventure’s SET® technology
minimizes the tapering event in oil and gas wells by radially enlarging proprietary tubulars through a cold-drawing process.SET® systems are used in
openhole and cased-hole environments to mitigate trouble zones,add casing points,remediate damaged casing and cover perforations.
Weatherford International Ltd (WFT: NYSE) is the fourth-largest diversified upstream oilfield service company in the world.Our global network includes
more than 34,000 people,730 service bases,87 manufacturing facilities,and 13Technology Centers in more than100 countries.Our products and services
span the lifecycle of a well,including drilling,evaluation,completion,production and intervention.The Company’s range of production enabling technologies
include evaluation services,directional drilling services,controlled pressure drilling® (CPD®) systems,cased hole completion systems,expandable
technologies,intelligent completion technologies,production optimisation systems and all major forms of artificial lift systems.
WeatherfordInternationalLtd,Tel:+44(0)1224380180 Fax:+44(0)1224241601Email:grant.affleck@eu.weatherford.com Web:www.weatherford.com
Roundtable Sponsor:Vallourec  Mannesmann Oil  Gas UK (VMOG UK) manufactures casing and tubing to the highest industry standards,for the
world’s most progressive oil companies. Over the last year,VMOG UK has been facilitating the upsurge in HP-HT activity in the North Sea through a
project-based approach to the most extreme exploration projects ever seen,with extensive qualification testing and dedicated manufacturing quality
plans.The expertise gained through supplying casing and tubing forTotal’s Elgin-Franklin and Glenelg projects,and Shell’s Shearwater,Onyx andAragorn
projects (to name but a few) ensured thatVM has the extensive experience so vital to delivering success in HP-HT wells. In 2007,VMOG UK has
supplied all of the casing and tubing for the highest pressure well ever drilled in the UKCS North Sea,from the 13 5/8”production casing through to the
3 1/2”sour service work-string for the well test.
Vallourec Mannesmann Oil  Gas UK Office,Tel:+44 (0) 1224 279350 Fax:+44 (0) 1224 279341 Email: scole@vmog.co.uk
Web: www.vamservices.com /www.vmog.co.uk
Plexus Holdings plc. is anAIM listed engineering and service business in the oil and gas industry based inAberdeen.Plexus has developed and
patented a unique method of engineering for oil and gas field wellheads and connectors,called POS-GRIP®Technology which involves deforming
one tubular member against another to effect gripping and sealing.POS-GRIPWellheads are the leading technology for HPHT exploration drilling
and production due to their through-BOP and true metal to metal“HG”Seal capability.
Plexus Ocean Systems Ltd,Plexus House,Burnside Drive,Dyce,Aberdeen,AB21 0HW,UK.Tel:+44 (0)1224 774222 Web:www.posgrip.com
Email:cfh@posgrip.com
Sponsors  Exhibitors:
Conference Day One Wednesday 24th November 2010
08.30 Coffee and morning registration
09.00 Chairman’s opening remarks outlining the HPHT
market overview
	 n Assess what has changed in the global offshore environment in the past
12 months and understand the impact on HPHT operations in the future
	 n Global insights into HPHT projects
	 n New technologies and pushing the envelope with HPHT operations
09.30 Examine advances in completions for HPHT deep tight gas
wells through insight into the process of optimisation for
stimulation and production operations
	 n ExploreLuksar’s testing andcompletionchallengesinthefirstexplorationstage
	 n Assess how Luksar are advancing in completion and testing forA-1  F-2
exploration wells
	 n Lessons learnt and the way forward forT-4 appraisal well
Raid Bu-Khamseen,KEC Company
10.15 Icebreaker networking and problem solving session
In this interactive session,delegates will be assigned a team to work with
in order to solve a set scenario.In these teams,you will take the time to
talk through the proposed scenario and evaluate the challenges,risks and
opportunities you would be likely to come across.Each team’s spokesperson
reports their findings back to the wider delegation.
10.45 Coffee and networking break
FOCUS ON HPHT SAFETY
11.15 Emergency response planning and critical safety factors
for HPHT operations
A panel of health and safety and risk experts will kick off by delivering short
10 minute overviews where they briefly share their perspective on what
2010 going forwards means for managing HPHT operational safety and risk
management.
11.15 The regulator’s perspective
	 n Understand key safety considerations for HPHT operations and ensure
that your safety strategies are robust for 2010 going forwards
	 n Examine requirements for the operators’ compliance with safety regulations
for HPHT operations
	 n Understand the importance of promoting a safety culture
Grant Moody,HM Principal Inspector of Health  Safety,
Health and Safety Executive (HSE)
11.25 The legal perspective
	 n What are the legal requirements for HPHT drilling safety and risk?
	 n Examine key considerations for environmental protection and pollution
	 n Mitigating risks and compliance
Jan Burgess,Partner,CMS Cameron McKenna
11.35 The risk and insurance perspective
	 n Ensure that you are effectively prepared when it comes to emergency
response and oil spill response
	 n Understand key considerations for balancing risk and exposure
	 n Explore what is required of the operator from the insurer’s perspective
John Munningstomes,Senior Risk Engineer – Upstream,Marsh
11.45 Interactive panel debate and QA session
You’ve heard the different perspectives from the HSE and risk professionals.
Now it is your opportunity to raise your questions and put forward any
challenges and concerns directly to the panel of experts.
Interactive panellists:
Andrew McHardy,Well Examiner,Total  Independent Consultant
Jan Burgess,Partner,Cameron McKenna
John Munningstomes,Senior Risk Engineer – Upstream,Marsh
Grant Moody,HM Principal Inspector of Health  Safety,
Health and Safety Executive (HSE)
12.15 Seated lunch and networking break
13.15 Carry out effective planning for the suspension and
abandonment of HPHT wells
	 n Examine the legislative and guideline background
	 n Understand the technical challenges involved and the required technologies
	 n Assess your tubing and cementing requirements
	 n Explorethemajorenvironmentalconsiderations surroundingthiscomplexarea
Steve Kirby,Drilling Engineer,Sasok Ltd
14.00 Gain insight into the geophysical challenges at the depleted
HPHT Erskine Field,North Sea
Gain insight into the Erskine Field,a depleted HPHT gas condensate
accumulation located on the western margin of the East Central Graben,
Central North Sea,UKCS.This presentation will give you insight into:
	 n The challenges with wellbore stability while drilling,integrity due to
significant liner deformations and sanding issues
	 n The geophysical and geomechanical studies conducted over the last couple
of years,their applicability to HPHT reservoirs and the challenges to
implement modern geophysical tools at a mature field
	 n The identification of high risk areas for wellbore integrity of existing wells
and for the optimisation of potential infill well locations,changes in mud
window during drilling and completion integrity
Joerg Zaske,Senior Geophysicist,Chevron Upstream Europe
14.45 Coffee and networking break
15.15 BLUE SKY THINKING - TECHNOLOGY REQUIREMENTS
ROUNDTABLE SESSION
This interactive session will see the delegate audience split into two groups.
This is your opportunity to voice your opinion on technology gaps and
industry requirements for your forthcoming HPHT projects.
GROUP A: Expandable technology requirements
	 n Gain insight into“Hot off the press”new technology
	 n What does the industry require for expandable technology developments?
	 n Explore effective strategies for the application of expandables in HPHT
environments
Led by:Tony Furniss,Regional Sales Manager,
Enventure International LLC
GROUP B: Casing and tubing requirements
	 n Casing and tubing requirements for HPHT depleted zones
	 n Selecting the appropriate materials and connections
	 n Casing with drilling applications – gain insight into developments
Ledby:StuartCole,Manager,TechnicalSalesandServices,VallourecGroup
16.30 Chairman’s close and end of day one
17.00 Networking drinks reception
Join your peers in a relaxed and
informal setting for this excellent
networking opportunity.This is a
fantastic way to establish contacts
early on at the conference and to
strengthen relationships with
existing contacts.
Telephone:
+44 (0)20 7368 9300
Fax:
+44 (0)20 7368 9301
Email:
enquire@iqpc.co.uk
Visit:
www.hphtwells.com/slide
Conference Day Two Thursday 25th November 2010
07.45 	 HPHT industry breakfast with the HSE
			Join your peers from the HPHT community for an industry breakfast
meeting.You can take this opportunity to catch up with your contacts
informally whilst enjoying a full English breakfast and bacon rolls.
			During breakfast,you’ll hear directly from Grant Moody,HM Principal
Inspector of Health  Safety, HSE who will deliver a brief presentation
on‘Challenging wells in the UKCS – a regulator’s perspective’.
08.30 	 Coffee and registration
09.00 	 Chairman’s welcome
09.15 	 Exploring HPHT well design: From concept to well construction
	 n 	Explore effective strategies to ensure that you have clear well objectives
	 n 	Understandhowallowingforuncertaintyinporepressure,fracturegradientand
the“transitionzone”predictionsiskeytothesuccessofyourwellconstruction
	 n 	Understand why casing shoe points and casing strategy is as important as
detailed casing design
	 n 	Examine the“lack of accurate data”paradox
			 Ed Mcfadden,Independent Consultant Engineer
10.00 	 HPHT logging: Going the extra mile
	 n 	 New techniques extend the valid operating envelope
	 n 	Data from case studies in Gulf of Mexico and North Sea
	 n 	Increases in operating efficiency
			 GrantAffleck,Business Development Manager,Weatherford
10.45 	 Coffee and networking break
11.15 	Interactive panel discussion: Identifying technology gaps
for HPHT completions
	 n 	Understanding fluid selection for your completions projects
	 n 	Seals and tubular integrity – key technology gaps
	 n 	Explore pore pressure projects
	 n 	Key considerations for polymers and metallurgy
	 n 	BOP considerations
			 Interactive panellists:
			 Derek Charlton,HP/HT Drilling Manager,Maersk Oil
			 Andrew McHardy,Well Examiner,Total/ Independent Consultant
			 Ed Mcfadden,Independent Consultant Engineer
12.00 	Gain insight into requirements for friction grip
technology and solid metal seals for HPHT surface
and subsea wellheads
	 n 	Explore current industry standards for wellheads
	 n 	Establish what makes a product fit for purpose for HPHT drilling and explore
testing and qualification procedures
	 n 	Gain insight into key case studies on HPHT wellhead experience
			 Craig Hendrie,Managing Director,Plexus Ocean Systems
12.45 	 Lunch and networking break
13.45 	 Testingandqualificationofequipmentforextremeapplications
	 n 	Customising QA/QC procedures for your HPHT project
	 n	ExplorehowtechnologyandmaterialscanbetterwithstandhostileHPHTconditions
	 n 	Specification and design of equipment:Managing risk in the design process
	 n 	Ensuringyourequipmentis fit-for-purpose:Fromrawmaterialstomanufacture
			Oddvar Skjæveland,VP Ullrigg Drilling andWell Centre,
International Research Institute of Stavanger AS
14.30 	Addressing the many challenges of HPHT well evaluations
			HPHT wells offer an opportunity to shift the paradigm while adjusting the
mindset to cope with the current technological limitations.Success is often
measured through the pre-determined KPIs which can fail to encompass
the need for a fully integrated approach.In this session,you will explore how:
	 n 	Understanding past failures in reservoir management can provide the key to
future success stories
	 n 	Well planning needs to be all encompassing and deal with all aspects from
location,trajectory,well construction,drilling and completion fluid systems to
available evaluation tools
	 n 	HPHT environments not only affect the drill bit selection and downhole
steerable assemblies,but also the reservoir properties and test tools as well.
Test programmes need to apply a suite of achievable objectives and a clear
understanding of the effects of time and temperature on downhole logging
and test tools
	 n 	Good planning with sufficient lead time can make all the difference
			 R J Boocock,Consultant Petroleum Engineer
15.15 	 Coffee and networking break
15.45 	Group competition of the well construction process
			During this group session,the delegation will be split into teams to build an
ideal well in a given scenario.
			 You will:
			 A) Consider what is currently available to you
			 B) Identify any current technology gaps
			 1) Planning tools - integrated planning,hydraulics,real time to
actual comparisons
			 2) Rig capacity - size,onboard mud coolers fluid capacity,MPD spread,
(And total number of“capable”rigs)
			 3) Drilling tools - downhole equipment premium threaded components,etc
			 4) Fluids - weight,rheology,variable behaviour with heating / cooling cycles,
control with mpd
			 5) Cement - design,testing,“foams”
			 6) Casing - steels etc
			 7) Completions - tools transferring conventional technology to ht domain
			 8) Well test - special tools,differing test patterns
			 9) Logging - real time vs.recorded vs.wireline,new developments
			This group exercise is created to determine the difference between
the actual edge of the current envelope,and the theoretical limit of
upcoming potential wells.
16.30 	 Chairman’s close and end of conference
Supported by:
Event partnership opportunities
Make the most of this unique opportunity to further your business development and marketing in the HPHT marketplace.Through tailored networking,sponsors can achieve the
face-to-face contact that overcrowded trade shows cannot deliver.Sponsorship options are extensive and packages can be tailor-made to suit your company’s individual needs.
Most packages include targeted marketing to over 10,000 HPHT professionals and tailored networking opportunities.For further information on exclusive profiling at the 2010
HPHTWells Summit please call us on +44 (0) 20 7368 9300 or e-mail sponsorship@iqpc.co.uk
Main conference:
24th  25th November 2010
Pre-conference workshops:
23rd November 2010
Venue:Ardoe House Hotel,Aberdeen
5 easy ways to register
Web: www.hphtwells.com/slide
Phone: +44 (0) 20 7368 9300
Fax: +44 (0) 20 7368 9301
Email: enquire@iqpc.co.uk
Post: IQPC Ltd. Anchor House,
15-19 Britten Street,
London SW3 3QL
PAYMENT MUST BE RECEIVED PRIOR TO THE CONFERENCE
To speed registration, please provide the priority code located on the mailing label or in the box below.
My registration code is 	 HPHTSLIDE0
		 HPHTSLIDEV
Please contact our database manager on +44(0) 207 368 9300 or at database@iqpc.co.uk
quoting the registration code above to inform us of any changes or to remove your details.
ConferenceCode:11887.004
FREE ONLINE RESOURCE
Our website has changed! You will now find a variety of resources such
as articles, news, podcasts and presentations available online.
Many of these features are exclusive to IQPC so visit
www.hphtwells.com/slide today and learn something new for free.
VENUE INFORMATION
Venue: Ardoe House Hotel and Spa,South Deeside Road Blairs,AB125YP,
Aberdeen,United Kingdom
Phone: :+44 (0) 1224 860600 Fax:+44 (0) 1224 860644
ACCOMMODATION
Accommodation is not included in the registration fee. To book
accommodation Tel: +44 (0)1224 860600. Always quote IQPC when
booking. It is advisable to book before 23 October 2010. Prices from
£120.00 inclusive vat and breakfast. For alternative hotels, please search
http://www.4cityhotels.com/aberdeen.html
TERMS  CONDITIONS
Please read the information listed below as each booking is subject to IQPC Ltd
standard terms and conditions.
Payment terms: Upon completion and return of the registration form, full payment
is required no later than 5 business days from the date of invoice. Payment of
invoices by means other than by credit card, or purchase order (UK Plc and UK
government bodies only) will be subject to a £49 (plus VAT) per delegate processing
fee. Payment must be received prior to the conference date. We reserve the right
to refuse admission to the conference if payment has not been received.
IQPC Cancellation, Postponement and Substitution Policy: You may substitute
delegates at any time by providing reasonable advance notice to IQPC. For any
cancellations received in writing not less than eight (8) days prior to the conference,
you will receive a 90% credit to be used at another IQPC conference which must
occur within one year from the date of issuance of such credit. An administration
fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations.
No credit will be issued for any cancellations occurring within seven (7) days
(inclusive) of the conference. In the event that IQPC cancels an event for any reason,
you will receive a credit for 100% of the contract fee paid. You may use this credit
for another IQPC event to be mutually agreed with IQPC, which must occur within
one year from the date of cancellation. In the event that IQPC postpones an event
for any reason and the delegate is unable or unwilling to attend in on the rescheduled
date, you will receive a credit for 100% of the contract fee paid. You may use
this credit for another IQPC event to be mutually agreed with IQPC, which must
occur within one year from the date of postponement. Except as specified above,
no credits will be issued for cancellations. There are no refunds given under any
circumstances. IQPC is not responsible for any loss or damage as a result of
a substitution, alteration or cancellation/postponement of an event. IQPC shall
assume no liability whatsoever in the event this conference is cancelled, rescheduled
or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any
other event that renders performance of this conference impracticable, illegal or
impossible. For purposes of this clause, a fortuitous event shall include, but not
be limited to: war, fire, labour strike, extreme weather or other emergency. Please
note that while speakers and topics were confirmed at the time of publishing,
circumstances beyond the control of the organizers may necessitate substitutions,
alterations or cancellations of the speakers and/or topics. As such, IQPC reserves
the right to alter or modify the advertised speakers and/or topics if necessary
without any liability to you whatsoever. Any substitutions or alterations will be
updated on our web page as soon as possible.
Discounts: All ‘Early Bird’ Discounts require payment at time of registration and
before the cut-off date in order to receive any discount. Any discounts offered
whether by IQPC (including team discounts) must also require payment at the time
of registration. All discount offers cannot be combined with any other offer.
Data protection: Personal data is gathered in accordance with the Data Protection
Act 1998.Your details may be passed to other companies who wish to communicate
with you offers related to your business activities. If you do not wish to receive
these offers, please tick the box below.
c Please do not pass my information to any third party
©IQPC Ltd. 2010 UK VAT registration no. GB 799 2259 67
DELEGATE: Mr c Mrs c Miss c Ms c Dr c Other c
First Name
Family Name
Position
Email
Organisation
Address
Tel 						 Fax
Dietary Requirements
Approving Manager
Signature
I agree to IQPC’s cancellation and payment terms
Delegate Information
Registration Form
Payment Methods Total price for your organisation (Add total of all individuals attending):
Card Type: VISA c  M/C c  AMEX c  
Card Number: c c c c  c c c c  c c c c  c c c c
Exp. Date: c c c c Sec: c c c c
Name On Card: 				 Signature:
Billing Address (if different from above):
City/County/Postcode
Cheque enclosed for: £
(Made payable to IQPC Ltd.)
By Direct Transfer: (Please quote 11887.004 with remittance advice). IQPC Bank details: Account No: 51304143
IBAN Code: GB59 MIDL 4038 1851 3041 43, Sort Code: 40 38 18, Swift Code: MIDLGB2112V, Account name: International Quality
 Productivity Centre Ltd., Bank: HSBC Bank Plc, 67 George Street, Richmond, Surrey TW9 1HG, United Kingdom
DIGITAL CONFERENCE ON CD ROM
A digital version of the conference proceedings,
including all presentations, is available to buy.
c I cannot attend the event, please send me the CD Rom
priced at £599 plus VAT
Recent digital conferences available - £599 plus VAT each
c Asset Integrity Management, November, 2009
c HPHT Wells, November, 2009
c Please send me conference materials indicated above.
c I have filled out credit card details opposite.
For further information Please call: 0207 368 9300
or email: knowledgebank@iqpc.co.uk.
To search IQPC’s archived conference documentation
visit:www.iqpcknowledgebank.com
Delegate Rates
* To qualify for this discount, bookings must be received with payment by the discount deadline. Only one discount/offer is applicable per person.
Registration fee includes conference documentation, lunch and refreshments.
** Please indicate choice of pre-conference workshops A c B c
†
I cannot make the networking Breakfast. Please remove £50 from the conference fee. c
All above prices are subject to UK VAT at 17.5%.VAT Reg# GB 799 2259 67
Package Operators
Consultants 
Equipment Providers Standard Price
Gold
Conference †
+ 2 Workshops
Quote
HPHTSLIDEO
to receive
20% Discount
Quote
HPHTSLIDEV
to receive
10% Discount
c £2547 + VAT
Silver
Conference †
+ 1 Workshop**
c £2048 + VAT
Bronze
Conference only † c £1549 + VAT
Workshop only** c £499 + VAT

More Related Content

What's hot

05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007yudi05
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic FracturingJames Craig
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERAndi Anriansyah
 
Conventional and Unconventional Reservoirs
Conventional and Unconventional ReservoirsConventional and Unconventional Reservoirs
Conventional and Unconventional ReservoirsRimsha Rais
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTINGAFATous
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdfssuserfec9d8
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalSociety of Petroleum Engineers
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a WellFarida Ismayilova
 
Repeated Formation Testers
Repeated Formation TestersRepeated Formation Testers
Repeated Formation TestersOmar ElGanzoury
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing DesignJames Craig
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniquesvelMurugan260
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfSeyedAbolfazlHossein4
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT OperationsHPHT Wells Summit
 
BHA components and performances
BHA components and performances BHA components and performances
BHA components and performances Eni
 

What's hot (20)

05 well testing trisakti 25 nov 2007
05 well testing   trisakti 25 nov 200705 well testing   trisakti 25 nov 2007
05 well testing trisakti 25 nov 2007
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic Fracturing
 
Well Integrity.pptx
Well Integrity.pptxWell Integrity.pptx
Well Integrity.pptx
 
Casing design
Casing designCasing design
Casing design
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Conventional and Unconventional Reservoirs
Conventional and Unconventional ReservoirsConventional and Unconventional Reservoirs
Conventional and Unconventional Reservoirs
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdf
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem Lawal
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Repeated Formation Testers
Repeated Formation TestersRepeated Formation Testers
Repeated Formation Testers
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Pressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdfPressure & Rate Transient Analysis.pdf
Pressure & Rate Transient Analysis.pdf
 
Major Challenges in HPHT Operations
Major Challenges in HPHT OperationsMajor Challenges in HPHT Operations
Major Challenges in HPHT Operations
 
BHA components and performances
BHA components and performances BHA components and performances
BHA components and performances
 

Viewers also liked

SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...jdowns
 
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...Jj HanXue
 
HPHT Well Engineering
HPHT Well Engineering HPHT Well Engineering
HPHT Well Engineering petroEDGE
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync
 
HPHT LWD & EWL formation testing SPWLA 2006
HPHT LWD & EWL formation testing SPWLA 2006HPHT LWD & EWL formation testing SPWLA 2006
HPHT LWD & EWL formation testing SPWLA 2006alanmchardy
 
To Study Well Design Aspects in HPHT Environment
To  Study Well Design Aspects in HPHT EnvironmentTo  Study Well Design Aspects in HPHT Environment
To Study Well Design Aspects in HPHT EnvironmentNikhil Barshettiwar
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_PresentationMuhammad Hassaan
 
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...Altair
 
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSPE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSpetroEDGE
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...tmhsweb
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technologyakpp01
 

Viewers also liked (16)

SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
 
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...
HPHT Solutions: Drilling and Evaluation – Presented by Christian Liss, Wireli...
 
HPHT Well Engineering
HPHT Well Engineering HPHT Well Engineering
HPHT Well Engineering
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
 
HPHT LWD & EWL formation testing SPWLA 2006
HPHT LWD & EWL formation testing SPWLA 2006HPHT LWD & EWL formation testing SPWLA 2006
HPHT LWD & EWL formation testing SPWLA 2006
 
HPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_VincentHPHT2014_Presentation_Larry_Vincent
HPHT2014_Presentation_Larry_Vincent
 
Baker hughes
Baker hughesBaker hughes
Baker hughes
 
To Study Well Design Aspects in HPHT Environment
To  Study Well Design Aspects in HPHT EnvironmentTo  Study Well Design Aspects in HPHT Environment
To Study Well Design Aspects in HPHT Environment
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...How Advanced Simulation will Impact the Offshore Industry both Now and in the...
How Advanced Simulation will Impact the Offshore Industry both Now and in the...
 
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONSPE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
PE979 HIGH PRESSURE HIGH TEMPERATURE COMPLETIONS
 
Well intervention
Well interventionWell intervention
Well intervention
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
02 wireline
02 wireline02 wireline
02 wireline
 
Coiled tubing technology
Coiled tubing technologyCoiled tubing technology
Coiled tubing technology
 

Similar to Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well & Issues Related to Appraisal Planning

IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1Jim Manson
 
Hpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1stHpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1stPritish Mukherjee
 
Coalbed Methane- Failure InCoals - Ian Palmer.ppt
Coalbed Methane- Failure InCoals - Ian Palmer.pptCoalbed Methane- Failure InCoals - Ian Palmer.ppt
Coalbed Methane- Failure InCoals - Ian Palmer.pptSurmaValley
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1patrickhudd
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 
SPE-PAC-Presentation-Final.pdf
SPE-PAC-Presentation-Final.pdfSPE-PAC-Presentation-Final.pdf
SPE-PAC-Presentation-Final.pdfmahsa504481
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling ProjectAndika Mahardika
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PaulOkafor6
 
SPE Evangiline Presentation
SPE Evangiline Presentation SPE Evangiline Presentation
SPE Evangiline Presentation David Mayhall
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsM.T.H Group
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalIEI GSC
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailraceRakesh Sunari Magar
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDeltares
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDDDemzy George
 
African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006James AH Campbell
 
Unconventional measurers sde11
Unconventional measurers  sde11Unconventional measurers  sde11
Unconventional measurers sde11vigyanashram
 
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...Vusal Iskandarov
 
Negdc presentation december 2013
Negdc presentation   december 2013 Negdc presentation   december 2013
Negdc presentation december 2013 carsoncorporation
 

Similar to Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well & Issues Related to Appraisal Planning (20)

IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1IQPC HPHT 2009 241109 final1
IQPC HPHT 2009 241109 final1
 
Hpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1stHpht lessons maersk oil uk 1st
Hpht lessons maersk oil uk 1st
 
Coalbed Methane- Failure InCoals - Ian Palmer.ppt
Coalbed Methane- Failure InCoals - Ian Palmer.pptCoalbed Methane- Failure InCoals - Ian Palmer.ppt
Coalbed Methane- Failure InCoals - Ian Palmer.ppt
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
SPE-PAC-Presentation-Final.pdf
SPE-PAC-Presentation-Final.pdfSPE-PAC-Presentation-Final.pdf
SPE-PAC-Presentation-Final.pdf
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)PENNGLEN FIELD Development Plan (GULF of MEXICO)
PENNGLEN FIELD Development Plan (GULF of MEXICO)
 
SPE Evangiline Presentation
SPE Evangiline Presentation SPE Evangiline Presentation
SPE Evangiline Presentation
 
Key aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirsKey aspects of reservoir evaluation for deep water reservoirs
Key aspects of reservoir evaluation for deep water reservoirs
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canal
 
Penstocks, powerhouse and tailrace
Penstocks, powerhouse and tailracePenstocks, powerhouse and tailrace
Penstocks, powerhouse and tailrace
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
Demzy's Presentation on HDD
Demzy's Presentation on HDDDemzy's Presentation on HDD
Demzy's Presentation on HDD
 
African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006African Diamonds corporate presentation 2006
African Diamonds corporate presentation 2006
 
Unconventional measurers sde11
Unconventional measurers  sde11Unconventional measurers  sde11
Unconventional measurers sde11
 
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
Drilling and Cementing to Isolate Productive Series and High Pressure Zones: ...
 
Negdc presentation december 2013
Negdc presentation   december 2013 Negdc presentation   december 2013
Negdc presentation december 2013
 

Recently uploaded

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 

Recently uploaded (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 

Culzean HPHT: Lessons Learnt From Maersk Oil UK's 1st HPHT Exploration Well & Issues Related to Appraisal Planning

  • 1. 18 November, 2009 Culzean HPHT: Lessons Learnt From Maersk Oil UK’s 1st HPHT Exploration Well & Issues Related to Appraisal Planning Jim Manson, Culzean Drilling & Completion Team Leader
  • 2. 18 November, 2009 2 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 3. 18 November, 2009 3 Presentation Outline • Culzean Prospect Background Information • Location, Geology, History Timelines, Challenges • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 4. 18 November, 2009 4 10 km 242km from Aberdeen to Culzean Heron Marnock Elgin, Franklin & Shearwater Jackdaw NO. UK. Culzean Prospect Location Culzean Prospect: 49.99% Maersk Oil NS UK Ltd 16.9% ENI UK Ltd 17.1% Nippon UK 16% BP
  • 5. 18 November, 2009 5HPHT Province with offset fields (After Winefield et.al. 2005) Culzean 22/25a-9z O/P circa 6500psi Temperature ~380 degrees F
  • 6. 18 November, 2009 6 Culzean Seismic Section West to East Source: United Kingdom Discovery Digest. Special thanks to CGG Veritas
  • 7. 18 November, 2009 7 Culzean Prospect Timelines • Exploration well 22/25a-1 drilled 1986 by BP • Dormont until operatorship transferred to Maersk Aug 05 • Maersk Conceptual Planning/Discussions from 2002 • Provisional Casing Design – June 05 • Long Leads ordered May 06 • Exploration Well, 22/25a-9/9Z • Spud - May 08 • P& A – Dec 08 • Drilled utilising Ensco 101 HDJU Rig • Appraisal Well Planning Started Jan 09 • Planned Two Well Appraisal Campaign • 18 month planning phase • Planned Spud Appraisal 1 – Jul 10
  • 8. 18 November, 2009 8 Culzean Exploration Well Challenges • Limited offset wells – 22/25a-1 well drilled in 1986 by BP. Littered by drilling problems, failed to reach TD. Extensive well control issues , including classic wellbore breathing. Limited detailed information on this well. • High geological uncertainty. • High Pressure Uncertainty - BHP Range 17.0 ppg to 18.5 ppg emw • ~380 deg F BHT. • Drill close to crest - Narrow window between PP & FG - potentially un-drillable! OVERALL CHANCE OF DRILLING SUCCESS =53% Breakdown of 47% Drilling Risk of Failure: Risks 1 to 3 – Potentially too narrow and un-drillable drilling window 1. Aquifer Overpressure Greater than Predicted = 20% 2. Sand above the target reservoir =2.5% 3. Fracture Gradient Less than Estimated =25% 4. Problematic Gas in Hidra =10%
  • 9. 18 November, 2009 9 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Well Objectives • Non DST/Finder Well Rational • Well Design Options • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 10. 18 November, 2009 10 Culzean Exploration Well Well Objectives • Drill a safe and incident free well. • Reach well planned TD. • Penetrate all reservoir prospects. • Successfully log all reservoir prospects. • In success case, MDT pressures and samples over reservoir prospects. • No Coring • No DST to be carried out. • P&A.
  • 11. 18 November, 2009 11 Culzean Exploration Well Non DST/Finder Well Exploration Rational • Chances of Exploration Success? • Extra cost to include DST considerations in casing design. • Final hole size drives well design. • HPHT DST standard tools – 5” OD • Test tools as close to perforations as possible ( well kill volumes & complexity if testing with a drilling liner) • Thus preferred 8 ½” hole x 7” liner at TD for DST well. • Heavier casing design required – HPHT Heavy vs HPHT Light • Increased loads – Increase casing specification – Increased costs (10 ¾” - 9 7/8” up to £1.0m more, 13 5/8” or 14” vs. 13 3/8”) • DST Long Leads ~£1m • Contingency tie-back string ~ £1m. • DST planning – manpower and hours • Total Cost Differential ~ £8m- £10m less for Non/DST Finder “Light” design
  • 12. 18 November, 2009 12 Culzean Exploration Well Non DST/Finder Well Exploration Rational (Cont’d) Worked Example: Eg. Chance of Exploration Success - 1 in 7 or 14.3% Expected Cost to go to Development? Conclusion: Culzean Exploration - Non DST, P & A HPHT Light £49m/well HPHT Heavy £59m/well HPHT Light/Finder (£M) HPHT Heavy (£M) 7 Exploration Wells 343 413 Test Exploration Well 0 19 1 Appraisal Well 59 49 Test Appraisal Well 19 0 Total To Go To Development 421 481 60Cost Saving with Finder Exploration Concept
  • 13. 18 November, 2009 13 18 November, 2009 13 Culzean Exploration Well Design Options : HPHT “Heavy” vs HPHT “Light” 36” x 26” hole 26” x 20” Conductor set @ 3000ft 16” or 17 ½” hole 13 5/8” Intermediate casing set ~ 11,000ft to ~12,000 ft 12-1/4” hole 10 ¾” x 9 7/8” Production casing set ~14,000ft to ~15,000ft 8-1/2” hole 7” Test liner set @ TD ~17,000ft HPHT “Heavy” HPHT “Light” 36” x 26” hole 26” x 20” Conductor set @ 1900ft 16” or 17 ½” hole 13 3/8” Intermediate casing set ~ 5,000ft to ~6,500 ft 12-1/4” hole 9 7/8” Production casing set ~13,500ft to ~14,000ft TD in 8 1/2” hole
  • 14. 18 November, 2009 14 18 November, 2009 14 Casing Setting Depths - Contingency 8-1/2” hole 7” Drilling liner set @ ~14,400ft 5-7/8” hole 4 ½” Test liner set @ TD HPHT “Heavy” 16” or 17 ½” hole 13 5/8” Intermediate casing set ~ 11,000ft to ~12,000 ft 12-1/4” hole 10 ¾” x 9 7/8” Production casing set ~14,000ft HPHT “Light” 12-1/4” hole 9 7/8” Production casing set ~13,500ft to ~14,000ft 8-1/2” hole, 7 5/8” Drilling liner 6 5/8”” hole 6” by 7 5/8” SET , then 6” hole TD in 6 5/8” or 6” hole Culzean Exploration Well Design Options : HPHT “Heavy” vs HPHT “Light”
  • 15. 18 November, 2009 15 Culzean Exploration Well HPHT “Heavy” Design Pro’s • 12 ¼” hole can be drilled deep into PTZ • Increased chance of higher FG at 9 7/8” shoe and TD in 8 ½” hole. Con’s • Slower to drill, heavier and more expensive design • Drilling hard abrasive Palaeocene & chalks in slower 16” or 17 ½” hole. • Increase volume OBM cuttings for containment
  • 16. 18 November, 2009 16 Exploration Well Planning HPHT “Light” Design – Chosen Exploration Well Design Pro’s • Slimmer, faster, cheaper design • Drilling hard abrasive Palaeocene & chalks in quicker 12 ¼” hole. • WBM 17 ½” section. • Possible further expandable liner option available just to reach TD objectives. • Possible further optimisation of deletion of separate 20” casing string. Con’s • Due to weak Palaeocene/Tor formations, 12 ¼” hole cannot be drilled deep into PTZ. • Less chance of TD in 8 ½” hole. • Not a problem – no DST or coring required.
  • 17. 18 November, 2009 17 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 18. 18 November, 2009 18Exploration Well Planning Planning • Maersk HPHT Experience • 1st Maersk UK HPHT Exploration well. • Gain knowledge & experience. • Hire/Recruit • Networking: HPHT Operators Forum, Conferences, Contacts? • Lead times – realistically >2 years, or more • G & G review prospect – ? years • Detailed casing/design iterations w/ G&G – 1year • Lead time on bespoke equipment – 1 year. • Integrated/Interdisciplinary Approach Essential. • Service Providers into Team early. • Management Of Stakeholders? • Partners, Management, All Disciplines, HSE, Well Examiner • Alignment, Inform, Draw on HPHT experience
  • 19. 18 November, 2009 19 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 20. 18 November, 2009 20 Culzean Exploration Well - High Level Summary Highlights • Challenging Prospect -53% Chance of Drilling Success @ Crestal Location. • Achieved planned well TD, meeting ALL Well Objectives. • Close to not achieving objectives through PTZ! • Narrow PPFG window , Utilised contingency 7 5/8” Liner to open up. • Milestones: • 9 7/8” Casing on depth, Well Cemented, Coped with High PP on bottom and loss zone above. • 7 5/8” , As Above. Lowlights • 8 ½” Kick – Poor Offshore Practices and decision making – should have been better handled. • 17 ½” Hole – 13 3/8” Casing stood-up, section re-drill required.
  • 21. 18 November, 2009 21 Just some of the PPFG Models ! Depth Pressure (ppg) Pore Pressure Forties Lwr. Cretaceous Top Reservoir Fracture Gradient Point of Note: HPHT Geological Surprises • Expect surprises. • Multiple PPFG Models • Plan for the extremes of PPFG – cover all the bases! • Build in maximum flexibility in well design to achieve objectives. • Gathered some information, but still many unknowns on prospect.
  • 22. 18 November, 2009 22 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well- Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 23. 18 November, 2009 23 Appraisal Well Planning Appraisal Well -Challenges & Objectives • Challenges • Crestal Locations • Still with major geological uncertainty • one appraisal, one exploration well. • Seismic formation top accuracy. • Pore pressure uncertainty • Aquire sufficient key data for ascertaining economic development • DST, Cores, Fluid Data, Log Data • Sufficient data to proceed to project sanction. • Aquire sufficient data for detailed development design.
  • 24. 18 November, 2009 24 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Well? • Culzean Development Well Planning Issues
  • 25. 18 November, 2009 25 Appraisal Well Design • Exploration Well HPHT ”Light” Design & 12 ¼” TD • Achieved ”All” well objectives, still had one more contingency hole size available. • However, went too deep into PTZ w/ shallow 13 3/8” shoe. • Weak zone(s) in Paleocene (Forties) and/or top Tor. • Design incompatible w/ drive 9 7/8” shoe as deep as possible into PTZ. • Exploration Well - Needed Contingency Liner Option to Negotiate PTZ. • Appraisal well - DST Required from multiple zones • Conclusion: HPHT ”Heavy” Design required with deep set 13 5/8” Casing. • Optimum setting depth for 9 7/8” shoe? As deep as possible, preferably the Valhall. • 13 5/8” shoe depth? To facilitate above.
  • 26. 18 November, 2009 26 22/25a-9z Fracture Pressure in Tor ft/hr 0.2 2 20 200 ohmm 200 0 low resistivity high ROP higher porosity weaker formation
  • 27. 18 November, 2009 27 18 November, 2009 27 Culzean Exploration Well Design Options : HPHT “Heavy” vs HPHT “Light” 36” x 26” hole 26” x 20” Conductor set @ 3000ft 16” or 17 ½” hole 13 5/8” Intermediate casing set ~ 11,000ft to ~12,000 ft 12-1/4” hole 10 ¾” x 9 7/8” Production casing set ~14,000ft to ~15,000ft 8-1/2” hole 7” Test liner set @ TD ~17,000ft HPHT “Heavy” HPHT “Light” 36” x 26” hole 26” x 20” Conductor set @ 1900ft 16” or 17 ½” hole 13 3/8” Intermediate casing set ~ 5,000ft to ~6,500 ft 12-1/4” hole 9 7/8” Production casing set ~13,500ft to ~14,000ft TD in 8 1/2” hole
  • 28. 18 November, 2009 28 18 November, 2009 28 Casing Setting Depths - Contingency 8-1/2” hole 7” Drilling liner set @ ~14,400ft 5-7/8” hole 4 ½” Test liner set @ TD HPHT “Heavy” 16” or 17 ½” hole 13 5/8” Intermediate casing set ~ 11,000ft to ~12,000 ft 12-1/4” hole 10 ¾” x 9 7/8” Production casing set ~14,000ft HPHT “Light” 12-1/4” hole 9 7/8” Production casing set ~13,500ft to ~14,000ft 8-1/2” hole, 7 5/8” Drilling liner 6 5/8”” hole 6” by 7 5/8” SET , then 6” hole TD in 6 5/8” or 6” hole Culzean Exploration Well Design Options : HPHT “Heavy” vs HPHT “Light”
  • 29. 18 November, 2009 29 Appraisal Well Planning HPHT “Heavy” – Chosen Appraisal Design Pro’s • 12 ¼” hole can be drilled deep into PTZ • Thus increased chance of FG at 9 7/8” shoe enabling TD in 8 ½” hole. • Implications of 7” Drilling Liner • DST well kill distance from perforations. • DST well kill volumes. • DST multiple zone testing – mill packer or re-use. • 5 7/8” hole – limitations on logs , smaller core- limitations on modelling Con’s • Slower to drill, heavier and more expensive design • Drilling hard abrasive Palaeocene & chalks in slower 16” or 17 ½” hole. • Increase volume OBM cuttings for containment
  • 30. 18 November, 2009 30 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 31. 18 November, 2009 31 Culzean Appraisal - Keeper Well? Prize? • ~£80m/appraisal well , P & A ? • + ~£80m/development well = £160m • Keeper – Potential to save £15m to £30m/development well? Issues? • Assumed dry tree development. • No fully qualified & field proven HPHT MLT equipment. • Integrity at MLT? ( multiple use, MTM seal, Incaloy material, verticality etc.) • Alternative Shallow or Deep Tie-back options? • Tie-back operations - Complex, multiple operations. Poor success in past. High risk of failure. • Uncertainty on appraisal prospect – Size? Shape? Variability? Compartmentalisation? Upside? Downside? • Appraisal surface location drives platform location? • High risk of non-use , and potential high later abandonment costs. • Early installation of wellhead jacket ? – time & cost! Conclusion? • Tie-back Low Chance of Success, High Chance of Cost Over-Run • P & A appraisal well. • Review Keeper options for further potential appraisal wells. Prize? • HPHT Mudline tie-back? Alternative Approach? Service Sector?
  • 32. 18 November, 2009 32 Presentation Outline • Culzean Prospect Background Information • Culzean Exploration Well • Well Design Issues • Planning Issues • Results - High Level Summary & Lessons Learnt • Culzean Appraisal Well Planning • Appraisal Well Challenges & Objectives • Appraisal Well Design • Appraisal Keeper Wells? • Culzean Development Well Planning Issues
  • 33. 18 November, 2009 33 Development Well Planning Issues • Timelines • Earliest spud of development wells on critical path to 1st hydrocarbons • Depletion drilling challenges? • Earliest installation of wellhead jacket? • Concurrent with appraisal planning and appraisal drilling. • Still many unknowns • Size, Productivity, Homogeneity, Connectivity • Fluids • Conceptual Casing & Completion Design • All the issues & input parameters • HPHT Light vs. HPHT Heavy! • Knowledge & Experience?
  • 34. CONFERENCEPROGRAMME2010 Reduce risk and deliver optimal operational success in your HPHT projects. Hear directly from leading experts on key strategies to: n Manage risk,plan for emergency response and assess the critical safety factors for HPHT operations - with insight from the HSE,Cameron McKenna and Marsh n Ensure wellbore stability while drilling - Chevron Upstream Europe share insight from the Erskine field n Customise QA/QC procedures for your HPHT project - with experience from the International Research Institute of StavangerAS n Drive advances in completions for HPHT deep tight gas wells - Lukoil SaudiArabia Energy Ltd bring case study experience of both appraisal and exploration wells n Optimise HPHT well design:From concept to well construction - hear from Ed Mcfadden,Independent Consultant Engineer HPHTWells - From perception to reality Main conference:24th & 25th November 2010 Pre-conference workshops:23rd November 2010 Venue:Ardoe House Hotel,Aberdeen Sponsors & Exhibitors: www.hphtwells.com/slide CONFERENCEPROGRAMME2010 20% Discountfor Operators– Quote HPHTSLIDEO10% Discountfor Consultants& Equipment Providers – Quote HPHTSLIDEV
  • 35. A welcome note from the HPHT Programme Steering Committee… Dear industry colleagues, HPHT operations are integral to the growth of the oil and gas industry.Getting the most out of your HPHT operations requires continuous learning and refinement of techniques and technologies to push the envelope as we continue to explore new areas, face new challenges and capture opportunities. The Programme Steering Committee came together inAberdeen for extensive discussions to draw up the key topics for the 2010 HPHTWells Summit.We formulated an agenda with a number of new topics to cover this year including: n Suspension and abandonment of HPHT wells n Risk management,emergency response planning and safety of HPHT operations n HPHT well design:From concept to well construction n Effectively managing uncertainty in pore pressure,fracture gradient and the“transition zone” n Delimiting the operational limits on drilling,logging & testing tools Other major themes that have been highlighted for discussions at this year’s meeting include: n Well architecture and delivering a safe HPHT well n Well integrity challenges n Emerging technologies and technology gaps for HPHT n Operational considerations for HPHT well evaluations The conference format is unique and mixes presentations,panel discussions,roundtables and workshops to ensure that you are able to learn first-hand from the practical experience shared amongst both expert speakers and the wider delegate audience. We look forward to seeing you there. Andrew McHardy,Independent Consultant Grant Affleck,Weatherford Jean-Paul Stuyck,GDF Suez HPHT Wells 2010 Programme Steering Committee Telephone: +44 (0)20 7368 9300 Fax: +44 (0)20 7368 9301 Email: enquire@iqpc.co.uk Visit: www.hphtwells.com/slide Programme highlights for this year include: Industry breakfast with the HSE Thursday 25th November 2010,7.45am Join the HPHT community for a breakfast meeting on the morning of the second day of the conference.During breakfast, you’ll hear directly from Grant Moody,HM Principal Inspector of Health & Safety,HSE who will deliver a brief presentation on‘Challenging wells in the UKCS – a regulator’s perspective’. Case study experience of HPHT deep tight gas wells Lukoil Saudi Arabia Energy Ltd share insight into the process of optimisation for stimulation and production operations in a case study presentation of their drilling and completions experience in both exploration and appraisal wells in SaudiArabia. Safety & risk management panel discussion This year,there is an exclusive interactive panel bringing together legal,risk,insurance,HSE and operator’s perspectives of key safety considerations for HPHT operations. Topics include: n Key considerations for environmental protection and pollution n Balancing risk and exposure n Response team planning:Emergency response and oil spill response considerations The 2010 speakers & panellists include: EdMcfadden,IndependentConsultantEngineer GrantMoody,HMPrincipalInspectorofHealth&Safety,HSE RaidBu-Khamseem,KECCompany JoergZaske,SeniorGeophysicist,ChevronUpstreamEurope DerekCharlton,HP/HTDrillingManager,MaerskOil AndrewMcHardy,IndependentConsultant&WellExaminer,Total GrantAffleck,BusinessDevelopmentManager,Weatherford StuartCole,Manager,TechnicalSalesandServices,VallourecGroup TonyFurniss,RegionalSalesManager,EnventureInternationalLLC CraigHendrie,ManagingDirector,PlexusOceanSystems SteveKirby,DrillingEngineer,SasokLtd JohnMunningstomes,SeniorRiskEngineer–Upstream,Marsh JanBurgess,Partner,CameronMcKenna RJBoocock,ConsultantPetroleumEngineer OddvarSkjæveland,VPUllriggDrillingandWellCentre,IRIS
  • 36. Interactive Workshops Tuesday 23rd November 2010 08.45 – 12.00 Interactive Workshop A: Examine critical completions considerations and well integrity issues for HPHT environments This in-depth workshop will give you the opportunity to assess first-hand some of the most effective completions and well integrity challenges,and discover the techniques and strategies required to overcome them. During the interactive discussions,you will have the opportunity to: n Explore in detail the use of various HPHT completion techniques n Understand what the emerging technologies are in this space n Examine the critical aspects of HPHT well integrity n Address issues surrounding HPHT well integrity with application to life of well prediction n Gain insight into cementing practices and cement fatigue in HPHT wells n Measure corrosive formation fluids effects on: -Tubular integrity - Pressure barrier sealing performance -Well head seals - Downhole mechanical seals in packers n Key considerations for cement sealing and structural integrity Workshop leader to be announced 12.30 – 15.30 Interactive Workshop B: Understand the need for discipline integration with HPHT wells During this“hands-on”workshop,teams will work through an exercise to carry out a plan for well construction within a set scenario.Through this exercise,you will: n Definethechallengesandbeingawareof“rippleon”effectsofdecisionsmade n Determinetheplayersandtheirroles–possibleshiftinpresentorganisationrequired n Engage in discussions as to why early buy-in from senior management is critical In order to maximise group participation,you will be split into teams.In your teams,you will work out a plan based around your scenario and then you will then report back to the whole workshop.Key considerations will include: n Bringing the ultimate goal of production back to the initial planning stage n Setting up a paper exercise of a well construction based on known reservoir conditions and having back-up plans to address possible surprises n Establishing guidelines for drilling team In this session,you will understand why thinking about the well objectives is critical to the well design.You will take into account the fact that if you only look at the drilling of the well (pressure integrity of the casing) rather than size,type and depth of the specific string,you may plan yourself into a corner with no room to adjust should higher pressures be encountered further up-hole.This could mean that you need to run another intermediate string and that could not be available or be wrongly sized to enable test tools to get to the depth required.You need to avoid having a drilled hole that nothing can fit in for evaluation purposes. Jointlyafinalplanismadecompletewithcontingenciesandobjectivesallagreed. Led by R.J. Boocock,Consultant Petroleum Engineer All of R.J.Boocock’s experience has been“hands-on”within the oil and gas industry,specialising in field development,reservoir engineering,production operations,optimisation and surveillance,drilling, completions,work-overs and contract negotiations.He has been heavily involved in training programs and produced manuals such as“AdvancedWellTesting”,“Drilling and Geological Operations”and “ExplorationWell Programmes”.He recently completed an assignment for GSPC doing well testing work in HPHT wells. Baker Hughes delivers innovative,reliable products and services designed to help customers manage operating expenses,maximize reserve recovery and boost overall return on investment.Baker Hughes has been a technology leader in the oil and gas industry for over 100 years and continues to partner with operators to find solutions for progressively more complex technical challenges.A leading global oilfield service company with operations in over 90 countries and nearly 50,000 employees globally,Baker Hughes provides advanced products and services to help customers drill,evaluate, complete and produce oil and gas wells.Baker Hughes’ reservoir technology experts offer independent consulting services,geomechanics modeling, petroleum engineering and reservoir simulation services to achieve superior results that lower costs,reduce risk,improve productivity and increase ultimate recovery.At Baker Hughes collaboration is at the heart of our business.Our 23 local geomarket teams work side by side with customers to engineer reliable,application-specific products and services – whether the application is deep water,unconventional hydrocarbons or production and water management - and deliver technologies that improve operating efficiency and create more value from the reservoir. READ Well Services is a downhole technology specialist providing a variety of new downhole well construction,repair and well intervention services to the oil and gas industry.RWS’s expertise lies in its ground breaking Hydraulically ExpandableTubular System (HETS),Cased Hole Logging services (data acquisition and analysis) and Development and Engineering. Houston-based Enventure Global Technology,L.L.C.,the world’s leading provider of SET® solid expandable technology solutions for the energy industry,has a global presence with operations in NorthAmerica,the Middle East,SouthAmerica,Europe and the Far East.Enventure’s SET® technology minimizes the tapering event in oil and gas wells by radially enlarging proprietary tubulars through a cold-drawing process.SET® systems are used in openhole and cased-hole environments to mitigate trouble zones,add casing points,remediate damaged casing and cover perforations. Weatherford International Ltd (WFT: NYSE) is the fourth-largest diversified upstream oilfield service company in the world.Our global network includes more than 34,000 people,730 service bases,87 manufacturing facilities,and 13Technology Centers in more than100 countries.Our products and services span the lifecycle of a well,including drilling,evaluation,completion,production and intervention.The Company’s range of production enabling technologies include evaluation services,directional drilling services,controlled pressure drilling® (CPD®) systems,cased hole completion systems,expandable technologies,intelligent completion technologies,production optimisation systems and all major forms of artificial lift systems. WeatherfordInternationalLtd,Tel:+44(0)1224380180 Fax:+44(0)1224241601Email:grant.affleck@eu.weatherford.com Web:www.weatherford.com Roundtable Sponsor:Vallourec Mannesmann Oil Gas UK (VMOG UK) manufactures casing and tubing to the highest industry standards,for the world’s most progressive oil companies. Over the last year,VMOG UK has been facilitating the upsurge in HP-HT activity in the North Sea through a project-based approach to the most extreme exploration projects ever seen,with extensive qualification testing and dedicated manufacturing quality plans.The expertise gained through supplying casing and tubing forTotal’s Elgin-Franklin and Glenelg projects,and Shell’s Shearwater,Onyx andAragorn projects (to name but a few) ensured thatVM has the extensive experience so vital to delivering success in HP-HT wells. In 2007,VMOG UK has supplied all of the casing and tubing for the highest pressure well ever drilled in the UKCS North Sea,from the 13 5/8”production casing through to the 3 1/2”sour service work-string for the well test. Vallourec Mannesmann Oil Gas UK Office,Tel:+44 (0) 1224 279350 Fax:+44 (0) 1224 279341 Email: scole@vmog.co.uk Web: www.vamservices.com /www.vmog.co.uk Plexus Holdings plc. is anAIM listed engineering and service business in the oil and gas industry based inAberdeen.Plexus has developed and patented a unique method of engineering for oil and gas field wellheads and connectors,called POS-GRIP®Technology which involves deforming one tubular member against another to effect gripping and sealing.POS-GRIPWellheads are the leading technology for HPHT exploration drilling and production due to their through-BOP and true metal to metal“HG”Seal capability. Plexus Ocean Systems Ltd,Plexus House,Burnside Drive,Dyce,Aberdeen,AB21 0HW,UK.Tel:+44 (0)1224 774222 Web:www.posgrip.com Email:cfh@posgrip.com Sponsors Exhibitors:
  • 37. Conference Day One Wednesday 24th November 2010 08.30 Coffee and morning registration 09.00 Chairman’s opening remarks outlining the HPHT market overview n Assess what has changed in the global offshore environment in the past 12 months and understand the impact on HPHT operations in the future n Global insights into HPHT projects n New technologies and pushing the envelope with HPHT operations 09.30 Examine advances in completions for HPHT deep tight gas wells through insight into the process of optimisation for stimulation and production operations n ExploreLuksar’s testing andcompletionchallengesinthefirstexplorationstage n Assess how Luksar are advancing in completion and testing forA-1 F-2 exploration wells n Lessons learnt and the way forward forT-4 appraisal well Raid Bu-Khamseen,KEC Company 10.15 Icebreaker networking and problem solving session In this interactive session,delegates will be assigned a team to work with in order to solve a set scenario.In these teams,you will take the time to talk through the proposed scenario and evaluate the challenges,risks and opportunities you would be likely to come across.Each team’s spokesperson reports their findings back to the wider delegation. 10.45 Coffee and networking break FOCUS ON HPHT SAFETY 11.15 Emergency response planning and critical safety factors for HPHT operations A panel of health and safety and risk experts will kick off by delivering short 10 minute overviews where they briefly share their perspective on what 2010 going forwards means for managing HPHT operational safety and risk management. 11.15 The regulator’s perspective n Understand key safety considerations for HPHT operations and ensure that your safety strategies are robust for 2010 going forwards n Examine requirements for the operators’ compliance with safety regulations for HPHT operations n Understand the importance of promoting a safety culture Grant Moody,HM Principal Inspector of Health Safety, Health and Safety Executive (HSE) 11.25 The legal perspective n What are the legal requirements for HPHT drilling safety and risk? n Examine key considerations for environmental protection and pollution n Mitigating risks and compliance Jan Burgess,Partner,CMS Cameron McKenna 11.35 The risk and insurance perspective n Ensure that you are effectively prepared when it comes to emergency response and oil spill response n Understand key considerations for balancing risk and exposure n Explore what is required of the operator from the insurer’s perspective John Munningstomes,Senior Risk Engineer – Upstream,Marsh 11.45 Interactive panel debate and QA session You’ve heard the different perspectives from the HSE and risk professionals. Now it is your opportunity to raise your questions and put forward any challenges and concerns directly to the panel of experts. Interactive panellists: Andrew McHardy,Well Examiner,Total Independent Consultant Jan Burgess,Partner,Cameron McKenna John Munningstomes,Senior Risk Engineer – Upstream,Marsh Grant Moody,HM Principal Inspector of Health Safety, Health and Safety Executive (HSE) 12.15 Seated lunch and networking break 13.15 Carry out effective planning for the suspension and abandonment of HPHT wells n Examine the legislative and guideline background n Understand the technical challenges involved and the required technologies n Assess your tubing and cementing requirements n Explorethemajorenvironmentalconsiderations surroundingthiscomplexarea Steve Kirby,Drilling Engineer,Sasok Ltd 14.00 Gain insight into the geophysical challenges at the depleted HPHT Erskine Field,North Sea Gain insight into the Erskine Field,a depleted HPHT gas condensate accumulation located on the western margin of the East Central Graben, Central North Sea,UKCS.This presentation will give you insight into: n The challenges with wellbore stability while drilling,integrity due to significant liner deformations and sanding issues n The geophysical and geomechanical studies conducted over the last couple of years,their applicability to HPHT reservoirs and the challenges to implement modern geophysical tools at a mature field n The identification of high risk areas for wellbore integrity of existing wells and for the optimisation of potential infill well locations,changes in mud window during drilling and completion integrity Joerg Zaske,Senior Geophysicist,Chevron Upstream Europe 14.45 Coffee and networking break 15.15 BLUE SKY THINKING - TECHNOLOGY REQUIREMENTS ROUNDTABLE SESSION This interactive session will see the delegate audience split into two groups. This is your opportunity to voice your opinion on technology gaps and industry requirements for your forthcoming HPHT projects. GROUP A: Expandable technology requirements n Gain insight into“Hot off the press”new technology n What does the industry require for expandable technology developments? n Explore effective strategies for the application of expandables in HPHT environments Led by:Tony Furniss,Regional Sales Manager, Enventure International LLC GROUP B: Casing and tubing requirements n Casing and tubing requirements for HPHT depleted zones n Selecting the appropriate materials and connections n Casing with drilling applications – gain insight into developments Ledby:StuartCole,Manager,TechnicalSalesandServices,VallourecGroup 16.30 Chairman’s close and end of day one 17.00 Networking drinks reception Join your peers in a relaxed and informal setting for this excellent networking opportunity.This is a fantastic way to establish contacts early on at the conference and to strengthen relationships with existing contacts. Telephone: +44 (0)20 7368 9300 Fax: +44 (0)20 7368 9301 Email: enquire@iqpc.co.uk Visit: www.hphtwells.com/slide
  • 38. Conference Day Two Thursday 25th November 2010 07.45 HPHT industry breakfast with the HSE Join your peers from the HPHT community for an industry breakfast meeting.You can take this opportunity to catch up with your contacts informally whilst enjoying a full English breakfast and bacon rolls. During breakfast,you’ll hear directly from Grant Moody,HM Principal Inspector of Health Safety, HSE who will deliver a brief presentation on‘Challenging wells in the UKCS – a regulator’s perspective’. 08.30 Coffee and registration 09.00 Chairman’s welcome 09.15 Exploring HPHT well design: From concept to well construction n Explore effective strategies to ensure that you have clear well objectives n Understandhowallowingforuncertaintyinporepressure,fracturegradientand the“transitionzone”predictionsiskeytothesuccessofyourwellconstruction n Understand why casing shoe points and casing strategy is as important as detailed casing design n Examine the“lack of accurate data”paradox Ed Mcfadden,Independent Consultant Engineer 10.00 HPHT logging: Going the extra mile n New techniques extend the valid operating envelope n Data from case studies in Gulf of Mexico and North Sea n Increases in operating efficiency GrantAffleck,Business Development Manager,Weatherford 10.45 Coffee and networking break 11.15 Interactive panel discussion: Identifying technology gaps for HPHT completions n Understanding fluid selection for your completions projects n Seals and tubular integrity – key technology gaps n Explore pore pressure projects n Key considerations for polymers and metallurgy n BOP considerations Interactive panellists: Derek Charlton,HP/HT Drilling Manager,Maersk Oil Andrew McHardy,Well Examiner,Total/ Independent Consultant Ed Mcfadden,Independent Consultant Engineer 12.00 Gain insight into requirements for friction grip technology and solid metal seals for HPHT surface and subsea wellheads n Explore current industry standards for wellheads n Establish what makes a product fit for purpose for HPHT drilling and explore testing and qualification procedures n Gain insight into key case studies on HPHT wellhead experience Craig Hendrie,Managing Director,Plexus Ocean Systems 12.45 Lunch and networking break 13.45 Testingandqualificationofequipmentforextremeapplications n Customising QA/QC procedures for your HPHT project n ExplorehowtechnologyandmaterialscanbetterwithstandhostileHPHTconditions n Specification and design of equipment:Managing risk in the design process n Ensuringyourequipmentis fit-for-purpose:Fromrawmaterialstomanufacture Oddvar Skjæveland,VP Ullrigg Drilling andWell Centre, International Research Institute of Stavanger AS 14.30 Addressing the many challenges of HPHT well evaluations HPHT wells offer an opportunity to shift the paradigm while adjusting the mindset to cope with the current technological limitations.Success is often measured through the pre-determined KPIs which can fail to encompass the need for a fully integrated approach.In this session,you will explore how: n Understanding past failures in reservoir management can provide the key to future success stories n Well planning needs to be all encompassing and deal with all aspects from location,trajectory,well construction,drilling and completion fluid systems to available evaluation tools n HPHT environments not only affect the drill bit selection and downhole steerable assemblies,but also the reservoir properties and test tools as well. Test programmes need to apply a suite of achievable objectives and a clear understanding of the effects of time and temperature on downhole logging and test tools n Good planning with sufficient lead time can make all the difference R J Boocock,Consultant Petroleum Engineer 15.15 Coffee and networking break 15.45 Group competition of the well construction process During this group session,the delegation will be split into teams to build an ideal well in a given scenario. You will: A) Consider what is currently available to you B) Identify any current technology gaps 1) Planning tools - integrated planning,hydraulics,real time to actual comparisons 2) Rig capacity - size,onboard mud coolers fluid capacity,MPD spread, (And total number of“capable”rigs) 3) Drilling tools - downhole equipment premium threaded components,etc 4) Fluids - weight,rheology,variable behaviour with heating / cooling cycles, control with mpd 5) Cement - design,testing,“foams” 6) Casing - steels etc 7) Completions - tools transferring conventional technology to ht domain 8) Well test - special tools,differing test patterns 9) Logging - real time vs.recorded vs.wireline,new developments This group exercise is created to determine the difference between the actual edge of the current envelope,and the theoretical limit of upcoming potential wells. 16.30 Chairman’s close and end of conference Supported by: Event partnership opportunities Make the most of this unique opportunity to further your business development and marketing in the HPHT marketplace.Through tailored networking,sponsors can achieve the face-to-face contact that overcrowded trade shows cannot deliver.Sponsorship options are extensive and packages can be tailor-made to suit your company’s individual needs. Most packages include targeted marketing to over 10,000 HPHT professionals and tailored networking opportunities.For further information on exclusive profiling at the 2010 HPHTWells Summit please call us on +44 (0) 20 7368 9300 or e-mail sponsorship@iqpc.co.uk
  • 39. Main conference: 24th 25th November 2010 Pre-conference workshops: 23rd November 2010 Venue:Ardoe House Hotel,Aberdeen 5 easy ways to register Web: www.hphtwells.com/slide Phone: +44 (0) 20 7368 9300 Fax: +44 (0) 20 7368 9301 Email: enquire@iqpc.co.uk Post: IQPC Ltd. Anchor House, 15-19 Britten Street, London SW3 3QL PAYMENT MUST BE RECEIVED PRIOR TO THE CONFERENCE To speed registration, please provide the priority code located on the mailing label or in the box below. My registration code is HPHTSLIDE0 HPHTSLIDEV Please contact our database manager on +44(0) 207 368 9300 or at database@iqpc.co.uk quoting the registration code above to inform us of any changes or to remove your details. ConferenceCode:11887.004 FREE ONLINE RESOURCE Our website has changed! You will now find a variety of resources such as articles, news, podcasts and presentations available online. Many of these features are exclusive to IQPC so visit www.hphtwells.com/slide today and learn something new for free. VENUE INFORMATION Venue: Ardoe House Hotel and Spa,South Deeside Road Blairs,AB125YP, Aberdeen,United Kingdom Phone: :+44 (0) 1224 860600 Fax:+44 (0) 1224 860644 ACCOMMODATION Accommodation is not included in the registration fee. To book accommodation Tel: +44 (0)1224 860600. Always quote IQPC when booking. It is advisable to book before 23 October 2010. Prices from £120.00 inclusive vat and breakfast. For alternative hotels, please search http://www.4cityhotels.com/aberdeen.html TERMS CONDITIONS Please read the information listed below as each booking is subject to IQPC Ltd standard terms and conditions. Payment terms: Upon completion and return of the registration form, full payment is required no later than 5 business days from the date of invoice. Payment of invoices by means other than by credit card, or purchase order (UK Plc and UK government bodies only) will be subject to a £49 (plus VAT) per delegate processing fee. Payment must be received prior to the conference date. We reserve the right to refuse admission to the conference if payment has not been received. IQPC Cancellation, Postponement and Substitution Policy: You may substitute delegates at any time by providing reasonable advance notice to IQPC. For any cancellations received in writing not less than eight (8) days prior to the conference, you will receive a 90% credit to be used at another IQPC conference which must occur within one year from the date of issuance of such credit. An administration fee of 10% of the contract fee will be retained by IQPC for all permitted cancellations. No credit will be issued for any cancellations occurring within seven (7) days (inclusive) of the conference. In the event that IQPC cancels an event for any reason, you will receive a credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of cancellation. In the event that IQPC postpones an event for any reason and the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be mutually agreed with IQPC, which must occur within one year from the date of postponement. Except as specified above, no credits will be issued for cancellations. There are no refunds given under any circumstances. IQPC is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. IQPC shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labour strike, extreme weather or other emergency. Please note that while speakers and topics were confirmed at the time of publishing, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics. As such, IQPC reserves the right to alter or modify the advertised speakers and/or topics if necessary without any liability to you whatsoever. Any substitutions or alterations will be updated on our web page as soon as possible. Discounts: All ‘Early Bird’ Discounts require payment at time of registration and before the cut-off date in order to receive any discount. Any discounts offered whether by IQPC (including team discounts) must also require payment at the time of registration. All discount offers cannot be combined with any other offer. Data protection: Personal data is gathered in accordance with the Data Protection Act 1998.Your details may be passed to other companies who wish to communicate with you offers related to your business activities. If you do not wish to receive these offers, please tick the box below. c Please do not pass my information to any third party ©IQPC Ltd. 2010 UK VAT registration no. GB 799 2259 67 DELEGATE: Mr c Mrs c Miss c Ms c Dr c Other c First Name Family Name Position Email Organisation Address Tel Fax Dietary Requirements Approving Manager Signature I agree to IQPC’s cancellation and payment terms Delegate Information Registration Form Payment Methods Total price for your organisation (Add total of all individuals attending): Card Type: VISA c M/C c AMEX c Card Number: c c c c c c c c c c c c c c c c Exp. Date: c c c c Sec: c c c c Name On Card: Signature: Billing Address (if different from above): City/County/Postcode Cheque enclosed for: £ (Made payable to IQPC Ltd.) By Direct Transfer: (Please quote 11887.004 with remittance advice). IQPC Bank details: Account No: 51304143 IBAN Code: GB59 MIDL 4038 1851 3041 43, Sort Code: 40 38 18, Swift Code: MIDLGB2112V, Account name: International Quality Productivity Centre Ltd., Bank: HSBC Bank Plc, 67 George Street, Richmond, Surrey TW9 1HG, United Kingdom DIGITAL CONFERENCE ON CD ROM A digital version of the conference proceedings, including all presentations, is available to buy. c I cannot attend the event, please send me the CD Rom priced at £599 plus VAT Recent digital conferences available - £599 plus VAT each c Asset Integrity Management, November, 2009 c HPHT Wells, November, 2009 c Please send me conference materials indicated above. c I have filled out credit card details opposite. For further information Please call: 0207 368 9300 or email: knowledgebank@iqpc.co.uk. To search IQPC’s archived conference documentation visit:www.iqpcknowledgebank.com Delegate Rates * To qualify for this discount, bookings must be received with payment by the discount deadline. Only one discount/offer is applicable per person. Registration fee includes conference documentation, lunch and refreshments. ** Please indicate choice of pre-conference workshops A c B c † I cannot make the networking Breakfast. Please remove £50 from the conference fee. c All above prices are subject to UK VAT at 17.5%.VAT Reg# GB 799 2259 67 Package Operators Consultants Equipment Providers Standard Price Gold Conference † + 2 Workshops Quote HPHTSLIDEO to receive 20% Discount Quote HPHTSLIDEV to receive 10% Discount c £2547 + VAT Silver Conference † + 1 Workshop** c £2048 + VAT Bronze Conference only † c £1549 + VAT Workshop only** c £499 + VAT