Well control and blowout preventer
1. Project Topic:- Well Control & Blow out
Prevention
Mentor:
Dr. Saurabh Mishra
Assistant Professor & Head
Department of Petroleum
Engineering
Project Members-
Tarique Anwar 15BPE1003
Shamim Akram 15BPE1049
Marij Zama 15BPE1050
Astha Singh 15BPE1085
8/18/2018 Department of Petroleum Engineering
2. • Well Control is controlling of
unknown amount of formation
fluid enter in well bore &
prevention of blowout due to that
fluid.
• Kick is the reason for blowout.
Introduction
8/18/2018 Department of Petroleum Engineering
Action
• Quickly shut in the well
• When in doubt shut down
the well & get help
• Act cautiously to avoid risk
3. Kick
When the formation pressure is greater than
the drilling fluid pressure, formation fluid enters
in the well which cause kick.
If flow is controlled successfully than kick is
killed or uncontrolled kick result in blowout.
8/18/2018 Department of Petroleum Engineering
5. Kick
Cause
o Insufficient mud weight.
o Improper hole fill-up during trips.
o Swabbing.
o Cut mud.
o Lost circulation
Significance
8/18/2018 Department of Petroleum Engineering
6. Kick
Cause
Significance
o Flow rate increase.
o Pit volume increase.
o Flowing well with pumps off.
o Pump pressure decrease and pump stroke
increase.
o Improper hole fill-up on trips.
o String weight change.
o Drilling break.
o Cut mud weight
8/18/2018 Department of Petroleum Engineering
7. Shut-in Procedure
8/18/2018 Department of Petroleum Engineering
When one or more signs of kicks are observed,
steps should be taken to quickly shut in the well.
In past, due the possibility of pipe sticking shut
in the well was a hesitation but now primary is
to close the well immediately than concern
about pipe sticking.
8. While Drilling
While tripping out
Shut-in Procedure
Land/ Bottom Supported offshore
o RigRaise the Kelly until a tool joint is
above the rotary table
o Stop the mud pumps.
o Close the annular preventer.
o Notify company personnel.
o Read and record the shut-in drillpipe
pressure, the shut-in casing pressure, and
the pit gain.
8/18/2018 Department of Petroleum Engineering
9. While Drilling
While tripping out
Shut-in Procedure
Land/ Bottom Supported offshore
Floating Offshore Rigs
o Stop the mud pumps.
o Close the annular preventer.
o Notify company personnel.
o Close the upper set of pipe rams.
o Reduce the hydraulic pressure on the
annular preventer.
o Lower the drillpipe until the pipe is
supported entirely by the rams.
o Read and record the shut-in drillpipe
pressure, shut-in casing pressure, and pit
gain.
8/18/2018 Department of Petroleum Engineering
10. While Drilling
While tripping out
Shut-in Procedure
Land/ Bottom Supported offshore
o Set the top tool joint on the slips.
o Install and make up a full-opening, fully
opened safety valve on the drillpipe.
o Close the safety valve and the annular
preventer.
o Notify company personnel.
o Pick up and make up the kelly.
o Open the safety valve.
o Read and record the shut-in drillpipe
pressure, shut-in casing pressure, and pit
gain.
8/18/2018 Department of Petroleum Engineering
11. While Drilling
While tripping out
Shut-in Procedure
Land/ Bottom Supported offshore
Floating Offshore Rigs
o Set the top tool joint on the slips.
o Install and make up a full-opening, fully
opened safety valve in the drillpipe.
o Close the safety valve and the annular
preventer.
o Notify company personnel.
o Pick up and make up the kelly.
o Reduce the hydraulic pressure on the
annular preventer.
o Lower the drillpipe until the rams support it.
o Read and record the shut-in drillpipe
pressure, shut-in casing pressure, and pit
gain.8/18/2018 Department of Petroleum Engineering
12. Shut-in Procedure
For All Rig- Diverter Procedure
Raise the kelly until a tool joint is
above the rotary table.
Increase the pump rate to
maximum output.
Open the diverter line valve(s).
Close the diverter unit (or annular
preventer).
Notify company personnel.
8/18/2018 Department of Petroleum Engineering
13. Reading Pressures
Interpreting Recorded
Pressures
Constant-Bottomhole-Pressure
Concept
Effects of Time
Trapped Pressure
Drill pipe Floats
Obtaining and Interpreting Shut-In Pressures
8/18/2018 Department of Petroleum Engineering
Pform = Psidp + Pdph
Pform- Formation pressure, psi;
Psidp – shut in drill pipe pressure, psi;
Pdph- drillpipe hydrostatic pressure,psi
Pform = Psic + pah + pi
psic = shut-in casing pressure, psi;
pah = annular-hydrostatic pressure, psi;
pi = influx-hydrostatic pressure, psi.
14. Reading Pressures
Interpreting Recorded
Pressures
Constant-Bottomhole-Pressure
Concept
Effects of Time
Trapped Pressure
Drill pipe Floats
Obtaining and Interpreting Shut-In Pressures
8/18/2018 Department of Petroleum Engineering
• formation pressure (pform) is
greater than the drillpipe
hydrostatic pressure by an
amount equal to the psidp
• Drill pipe pressure is bottom
hole pressure, casing pressure
can not consider as bottom
hole pressure due the
formation fluid in annulus
15. Reading Pressures
Interpreting Recorded
Pressures
Constant-Bottomhole-Pressure
Concept
Effects of Time
Trapped Pressure
Drill pipe Floats
Obtaining and Interpreting Shut-In Pressures
8/18/2018 Department of Petroleum Engineering
• Drill pipe pressure is greater
than the formation pressure,
certain amount of pressure
needs to balance by mud
pressure.
• If drill pipe pressure is slightly
greater or equal to the
formation pressure than it is
constant bottom hole pressure.
18. Reading Pressures
Interpreting Recorded
Pressures
Constant-Bottomhole-Pressure
Concept
Effects of Time
Trapped Pressure
Drill pipe Floats
Obtaining and Interpreting Shut-In Pressures
8/18/2018 Department of Petroleum Engineering
• When float valve is used a kick
can occur
• Float valve prevents fluid and
pressure through drill pipe
• Psidp = pΣ + pkr
• Pkr = PΣ - Psidp
• where pkr = pump pressure at kill rate, psi,
and pΣ = total pressure, psi
19. Influx Gradient
Kill Mud Weight
Kick Calculation
8/18/2018 Department of Petroleum Engineering
gi = influx gradient, psi/ft;
gmdp = mud gradient in drillpipe, psi/ft;
hi = influx height, ft
33. Complication brief: Drilled from 3462m to
3483m. CC for bottoms up. Observed self-flow @
18 BPH. Shut the well. SIDP = 2600 psi,
SICP=2450 psi. Arrange to kill the well. WUO.
SIDP = 2439 psi, SICP=2714 psi. CC with 15 ppg
mud. SIDP = 760, SICP = 1400 psi. Observed
traces of oil. Circ. second cycle with same MW.
SIDP = 250, SICP = 650 psi. WUO. SIDP = 300, SICP
= 75 psi. CC. Increased MW to 15.6 ppg. Opened
BOP. Observed bubbling. Closed BOP. Circulated
thru. choke. Opened BOP. Flow check – tive. P/O
to shoe. Flow check –tive.. R/I to bottom. CC.
POOH. R/I new bit to bottom. Observed heavy
bubbling at well mouth. Closed BOP. SIDP= 70,
SICP= 330 psi. Circ. out thru. choke. Opened BOP.
Slight bubbling. Drilled to 3486m.
Case Study, ONGC well 1
8/18/2018 Department of Petroleum Engineering
Sl. No. Description Details
1. Well Name (cannot be disclosed)
2. Project WESTERN OFFSHORE BASIN
(MUMBAI HIGH)
3. Rig (cannot be disclosed)
4. Target depth 3750M
5. Drilled depth 3483M
6. Complication depth 3483M
7. Previous casing shoe 9 5/8” – 2848M
8. Spud date 21.05.2003
9. Complication date 25.07.2003
10. Cumulative complication
days
3
11. Nature of complication WELL ACTIVITY
34. Complication brief: Lowered 9 5/8” casing with shoe at
1971.6m. Carried out cementation. During WOC observed gas
bubbling from annulus. Ann. Pr. rose to 356 psi. Closed BOP. Bleed
pr. Pr. rose from 150 to 348 psi and stabilised. Bleed pr. Pumped 19
bbl 14 ppg mud. Closed well. Ann. Pr 24 psi. Observed gas and little
flow of mud. Pumped 20 bbl 14 ppg mud. WUO. Ann. Pr. 279 psi.
Pumped 12 ppg mud in ann. in stages with max. pr of 350 psi. Bleed
to 200 psi. WUO. Pr. 239 psi.. Pumped 12 ppg mud with max. pr.
350 psi. Pr. dropped to 320 psi. Bleed to 200 psi. WUO. Ann. Pr 247
psi. Bleed off. Opened BOP. Set slip. Connected BOP. Pumped 4 bbl
12 ppg mud. Scrapped well to 1940m. Increased MW to 12 ppg.
Recorded logs from 1730m to 1250m. Perforated casing in the
interval 1363.5m to 1364.1m. Tried to establish circ. behind casing
but failed. Injectivity 1 BPM. Perforated at 1310 to 1311m. Tried to
establish circ. but failed. Observed flow from annulus @ 2 LPM.
Closed BOP. Bleed pr. from 265 to 80 psi. Carried out injectivity and
sq. cement. After WOC bleed pr. from ann. and casing. No flow.
Drilled out cement from 1257m to 1324m and tested casing OK.
Cleared to 1945m. Tested casing. OK.
Case Study, ONGC well 2
8/18/2018 Department of Petroleum Engineering
Sl.
No.
Description Details
1. Well Name (cannot be disclosed)
2. Project WESTERN OFFSHORE
ASSET(MUMBAI HIGH)
3. Rig (cannot be disclosed)
4. Target depth 3175M
5. Drilled depth 1972M
6. Complication depth 1972M
7. Previous casing shoe 9 5/8” – 1971.6M
8. Spud date 19.05.2003
9. Complication date 07.07.2003
10. Cumulative
complication days
17
11. Nature of
complication
ANNULUS WELL
ACTIVITY
35. Complication brief: Steered & drilled to 3186m. Observed
self flow. Shut the well. SIDP= 150 & SICP= 200 psi. Circ. with
9.9 ppg mud. Shut well SIDP= 300 & sicp=350 psi. Circ. with
10.4 ppg mud. WUO. SIDP=0 & SICP=300psi. Circ. with 10.4
ppg mud. Observed loss. Circ. with 10 ppg mud. SIDP= 400,
SICP=150 psi. Circ. with 10 ppg mud. Observed no returns.
Increased MW in stages to 11 ppg. SIDP 250 psi & SICP= 30 psi.
Loss 15-20 BPH. Pumped pill. Loss reduced to 18 BPH. Circ.
with 11 ppg mud. SIDP=30 psi, SICP= 0 psi. Opened BOP. WOS
no success. Observed self flow. Circ. 11.2 ppg mud. Pumped
HSD & pipe lax. WOS, no success. Spotted again. SIDP=400 &
SICP 175 psi. Circ. Spotted third time. SIDP= 400 & SICP=400
psi. Displaced pill. SIDP=300, SIDP 590 psi. Circ. 11.2 ppg mud.
Mud loss 40-50 BPH. Observed pr. increased and no circ. WOS.
Circ. with 11.4 ppg mud. No flow.
Case Study, ONGC well 3
8/18/2018 Department of Petroleum Engineering
Sl.
No.
Description Details
1. Well Name (cannot be disclosed)
2. Project WESTERN OFFSHORE
ASSET(MUMBAI HIGH)
3. Rig (cannot be disclosed)
4. Target depth 3837M
5. Drilled depth 4216M( L1 FROM
3373M TO 3400 & L2
FROM 3173M
6. Complication depth 3186M
7. Previous casing shoe 7”- 2697M
8. Spud date
9. Complication date 07.06.2003
10. Cumulative
complication days
16
11. Nature of
complication
ACTIVITY & LOSS.
36. Conclusion
8/18/2018 Department of Petroleum Engineering
Identification
of kick
Shut in the
well
Kick type &
pressure
calculation
Kill mud data
Pump
pressure