Presentation to Westwind Partners
Diamond Conference
An update on the African Diamonds /
De Beers JV in Boteti Exploration
(Botswana)
James AH Campbell
B.Sc. (Hons) ARSM MBA (Dunelm) Dipl Datm (UNISA) MIMMM C.Eng C.Sci Pr.Sci.Nat
General Manager – Group Exploration
12th May 2006
2
Agenda
 AK6 Location
 Update on the AK06 resource delivery project
 Update on the mine delivery programme
 Immediate next steps
3
Locality Map
JV Ground
DAMTSHAA
Update on the AK06 Resource
Delivery Project
5
Deposit level assessment
 Boteti JV (DB 51%, AD 49%)
 De Beers is the Operator and can earn up to 70%
by delivering the first bankable feasibility study
 Surface area: 9.5Ha
 Volume: 59M tons
 Grade: 25cpht
 Value: $138/ct (+1mm)
6
Programme Schedule & Budget
AK6 Resource
Delivery Project,
Conceptual & Pre-feas.
2006 YTD Actual (USD) 2006 Forecast (USD) 2006 Budget (USD)
2006 Programme 2, 305, 129 19, 350, 000 19, 350, 000
Budget
Phased Approach
 Phase 1 (planned to deliver a high confidence inferred resource): 500 carats - 70m grid centre
Large Diameter Drilling & core drilling.
 Phase 2 (planned to give an indicated resource): 500 carats - 50m grid centre Large Diameter
Drilling, 4,000 carats – Bulk sampling & core drilling. An indicated resource is a requirement of a
bankable feasibility study, as required by the Boteti JV agreement
 Phase 3: 1,000 carats - 25m grid centre LDD (may not be required, depending on Phase 1
and 2 results)
7
Summary of Phase 1 results
 Macro-diamond results issued for 12 LDD holes (82 tonnes of
DMS concentrate), 13th and last hole results to be issued
during May 2006.
 A total of 9,970 diamonds weighing 661 carats to date
recovered from 2,438 ton of in situ sample from 12 LDD holes
 Diamond Characteristics
● Largest diamond recovered c. 8-carats in size
● Presence of Type II diamonds
● Low % diamond breakage
● Diamonds adhering to kimberlite during recovery, especially in the
harder south lobe kimberlite
8
Progress on Phase 2
Pilot Core Drilling
 10 (3,472m) holes to precede Phase 2 LDD completed as planned.
 All core logged and sampled for petrography, Ore Dressing Studies
& density.
 Some holes in south lobe indicate additional kimberlite than model
suggests. To extend PLT016 deeper
Delineation Drilling
 Vertical hole drilled north of north lobe indicates additional
kimberlite volume. Further delineation required.
 Deep hole to delineate root zones of north/centre lobes & bottom of
south lobe in progress. Potential for additional kimberlite.
 Dedicated delineation programme (>7,000m) to arrive at an indicated
level of confidence in geological model will commence in Q2 2006.
Completion in Q3 2006.
 Preliminary geotechnical drilling (4-5 holes) planned as output to pre-
feasibility study.
Phase 2 Large Diameter Drilling
 Re-scheduled ahead of planned bulk sampling.
 In-fill drilling:10 x 23-inch LDD holes to determine grade at 50m hole
spacing grid.
 3 holes completed in centre lobe. South lobe drilling in progress.
 2 of 7 holes planned in south lobe to go 600-700m depth to confirm
grade continuity with depth.
 Planned to complete drilling end August and processing end
September 2006.
The current 3D geological model
suggests a total resource to 59Mt.
There is potential for additional
kimberlite volume
9
Phase 2 Bulk Sampling Strategy
 Bulk sampling options to recover c.4,000 carats (2,000 carats centre & south lobes
each) for revenue estimation
● Shaft & horizontal adits to targeted areas
● Surface trenching
● Drill 1.5m diameter holes using Bauer BG36 rig
● Easy-Pipe directional tunneling system
 Decision about which method(s) will be based on the outcome of Phase 1 diamond
revenue results post the layout in early July. In the meantime scopes of work and
contract tender preparations in progress for selected technology
 The current diamond size frequency distributions tend to support a difference between
South and Centre lobes, therefore assortments may be different. North lobe not
material.
 Investigations aimed at increasing the plant top cut-off size to c. 20mm in progress. Aim
is also to recover the large diamonds including the fragile Type II’s.
 DMS plant upgrades to handle the bulk sample throughputs (and ensure large & Type II
diamond recoveries where present) to commence after Phase 2 LDD sample
processing in early September 2006.
Update on Mine Delivery Programme
11
Plant Designs and Mine Planning
Plant Design Studies
 Various block flow diagrams currently being considered:
● Conventional block flow diagram - baseline design
● ‘Voorspoed’ type design with High Pressure Rolls Crusher in a
secondary application
● ‘Canadian’ type block flow diagram (Tahera, etc)
● Application of autogenous Milling
 Capital and operating costing in progress
 Option for ore processing at Letlhakane being considered
Mine Planning
 Letlhakane Mine slope angles assumed for conceptual study
 Geotechnical & hydro-geological modelling planned
 Conventional shovel truck method. Diesel powered fleet
 Continuous operations environment
 Host rock mined from the upper benches of the pit will be used
during construction.
 Maintenance of a minimum of six months exposed kimberlite at
Run of Mine (ROM) grade
 Purchase and operate all the earthmoving equipment
 All equipment will be maintained on a Repair & Maintenance
(R&M) agreement
 Multi-skilled operators to provide flexibility and contingency
Cut 1
12.9Mt ore
3.3M carats
14.7Mt waste
190m depth
Commence 2009
Cut 2
15.7Mt ore
3.0M carats
24.9Mt waste
238m depth
Commence 2012
Cut 3
10.6Mt ore
1.9M carats
56.4Mt waste
341m depth
Commence 2014
Cut 1
12.9Mt ore
3.3M carats
14.7Mt waste
190m depth
Commence 2009
Cut 2
15.7Mt ore
3.0M carats
24.9Mt waste
238m depth
Commence 2012
Cut 3
10.6Mt ore
1.9M carats
56.4Mt waste
341m depth
Commence 2014
Immediate next steps
13
Immediate target next steps
 Diamond Layout : early July 2006
 Global (inferred) resource : end July 2006
 Conceptual Study completion : Q3 2006
The Conceptual Study is being worked-on from the perspective of a stand-
alone mine
Gate to pre-feasibility
 Local (indicated) resource : Q2 2007
 Pre-Feasibility Study phase : 9 months (Q2 2007)
The pre-feasibility study will essentially be a suite of trade-off studies within a
settled corporate arrangement
Gate to feasibility
 Feasibility Study phase : 9 months (Q1 2008)
 Detailed Design Phase : 6 months (Q3 2008)
Gate to implementation
The above timeline for mine development (aside from the resource
phase) is merely a standard template
There is significant opportunity to improve timelines when the Organisation
to Organisation (O to O) partner is selected and also undertaking
activities in parallel (as opposed to in series) where possible
Questions?

More Related Content

What's hot

Example work sample RNChatterjee April 2015
Example work sample RNChatterjee April 2015Example work sample RNChatterjee April 2015
Example work sample RNChatterjee April 2015Rob Chatterjee
 
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...Symposium
 
2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirsSteve Wittrig
 
Investor Presentation August 2011
Investor Presentation August 2011Investor Presentation August 2011
Investor Presentation August 2011Sagegold
 
With a portable core drill, Nick tested some discovery outcrops
With a portable core drill, Nick tested some discovery outcropsWith a portable core drill, Nick tested some discovery outcrops
With a portable core drill, Nick tested some discovery outcropsStephan Bogner
 
CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018MomentumPR
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Lovemore Freddie Mauled (Geologist)
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringStatoil
 
LCA of RE production from Mz
LCA of RE production from MzLCA of RE production from Mz
LCA of RE production from MzCallum Browning
 
Fabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio Brambilla
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...Symposium
 

What's hot (20)

Coal Bed Methane (CBM) in India
Coal Bed Methane (CBM) in IndiaCoal Bed Methane (CBM) in India
Coal Bed Methane (CBM) in India
 
490 Final Presentation
490 Final Presentation490 Final Presentation
490 Final Presentation
 
Example work sample RNChatterjee April 2015
Example work sample RNChatterjee April 2015Example work sample RNChatterjee April 2015
Example work sample RNChatterjee April 2015
 
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...
Investor Presentation | MacPherson' Resources (ASX:MRP) | Gold Investment Sym...
 
Niobium in the American heartland
Niobium in the American heartlandNiobium in the American heartland
Niobium in the American heartland
 
2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs2013 iea - potential for CO2 storage in oil gas shale reservoirs
2013 iea - potential for CO2 storage in oil gas shale reservoirs
 
Investor Presentation August 2011
Investor Presentation August 2011Investor Presentation August 2011
Investor Presentation August 2011
 
Corporate Profile
Corporate ProfileCorporate Profile
Corporate Profile
 
With a portable core drill, Nick tested some discovery outcrops
With a portable core drill, Nick tested some discovery outcropsWith a portable core drill, Nick tested some discovery outcrops
With a portable core drill, Nick tested some discovery outcrops
 
CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018CCW - Canada Cobalt Works Corporate Presentation - September 2018
CCW - Canada Cobalt Works Corporate Presentation - September 2018
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
 
Jamalganj coal field
Jamalganj coal fieldJamalganj coal field
Jamalganj coal field
 
Alnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoringAlnes et al gravity and subsidence monitoring
Alnes et al gravity and subsidence monitoring
 
LCA of RE production from Mz
LCA of RE production from MzLCA of RE production from Mz
LCA of RE production from Mz
 
Fabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconiFabio brambilla shale_gas_convegno_bocconi
Fabio brambilla shale_gas_convegno_bocconi
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
BAR MIB
BAR MIBBAR MIB
BAR MIB
 
M Abe JCCS
M Abe JCCSM Abe JCCS
M Abe JCCS
 
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
Investor Presentation | Impact Minerals (ASX:IPT) | Gold Investment Symposium...
 

Viewers also liked

Iso 45001 official announcement june 2016
Iso 45001 official announcement june 2016Iso 45001 official announcement june 2016
Iso 45001 official announcement june 2016Chris J Ward CMIOSH
 
Requirements Rodeo: Wrangling and Taming Your Project Needs
Requirements Rodeo: Wrangling and Taming Your Project NeedsRequirements Rodeo: Wrangling and Taming Your Project Needs
Requirements Rodeo: Wrangling and Taming Your Project NeedsOPIN Software Inc.
 
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR Imaging
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR ImagingReal-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR Imaging
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR ImagingLiheng Guo
 
Negocio y sociologia
Negocio y sociologiaNegocio y sociologia
Negocio y sociologiaTECTASA
 
May 1, 2016.docx with charts
May 1, 2016.docx with chartsMay 1, 2016.docx with charts
May 1, 2016.docx with chartsScutify
 

Viewers also liked (6)

AOT
AOTAOT
AOT
 
Iso 45001 official announcement june 2016
Iso 45001 official announcement june 2016Iso 45001 official announcement june 2016
Iso 45001 official announcement june 2016
 
Requirements Rodeo: Wrangling and Taming Your Project Needs
Requirements Rodeo: Wrangling and Taming Your Project NeedsRequirements Rodeo: Wrangling and Taming Your Project Needs
Requirements Rodeo: Wrangling and Taming Your Project Needs
 
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR Imaging
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR ImagingReal-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR Imaging
Real-time 3D MR Respiratory Motion Acquisition for Simultaneous PET-MR Imaging
 
Negocio y sociologia
Negocio y sociologiaNegocio y sociologia
Negocio y sociologia
 
May 1, 2016.docx with charts
May 1, 2016.docx with chartsMay 1, 2016.docx with charts
May 1, 2016.docx with charts
 

Similar to African Diamonds corporate presentation 2006

The discovery and evaluation of AK6
The discovery and evaluation of AK6The discovery and evaluation of AK6
The discovery and evaluation of AK6James AH Campbell
 
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEChromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEAdnet Communications
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013KGHM
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 
Panex Resources Giro Goldfield Presentation (Feb 2014)
Panex Resources Giro Goldfield Presentation (Feb 2014)Panex Resources Giro Goldfield Presentation (Feb 2014)
Panex Resources Giro Goldfield Presentation (Feb 2014)Commodity Investor
 
Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013reservoirminerals
 
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G TaylorThe Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G TaylorJohn Guy Taylor
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022InvestorStream
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesMD.Suresh Kumar
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Industrial Alliance: Standard Graphite Corp
Industrial Alliance: Standard Graphite Corp Industrial Alliance: Standard Graphite Corp
Industrial Alliance: Standard Graphite Corp Graphite Graphite
 
Canada Cobalt Works Corporate Presentation
Canada Cobalt Works Corporate PresentationCanada Cobalt Works Corporate Presentation
Canada Cobalt Works Corporate PresentationMomentumPR
 
Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013reservoirminerals
 
Mine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperMine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperAlfred Madowe
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019MomentumPR
 

Similar to African Diamonds corporate presentation 2006 (20)

The discovery and evaluation of AK6
The discovery and evaluation of AK6The discovery and evaluation of AK6
The discovery and evaluation of AK6
 
The Development of AK6
The Development of AK6The Development of AK6
The Development of AK6
 
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEChromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
 
Results of KGHM International in 2013
Results of KGHM International in 2013Results of KGHM International in 2013
Results of KGHM International in 2013
 
VAN NIEKERK_COMMISSIONING.PDF
VAN NIEKERK_COMMISSIONING.PDFVAN NIEKERK_COMMISSIONING.PDF
VAN NIEKERK_COMMISSIONING.PDF
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 
Brixton presentation 2015 June
Brixton presentation 2015 JuneBrixton presentation 2015 June
Brixton presentation 2015 June
 
Panex Resources Giro Goldfield Presentation (Feb 2014)
Panex Resources Giro Goldfield Presentation (Feb 2014)Panex Resources Giro Goldfield Presentation (Feb 2014)
Panex Resources Giro Goldfield Presentation (Feb 2014)
 
Corp pres
Corp pres Corp pres
Corp pres
 
Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013
 
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G TaylorThe Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe, J G Taylor
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
 
TerraX Minerals
TerraX Minerals TerraX Minerals
TerraX Minerals
 
State of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground minesState of art of Mechanisation of Underground mines
State of art of Mechanisation of Underground mines
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Industrial Alliance: Standard Graphite Corp
Industrial Alliance: Standard Graphite Corp Industrial Alliance: Standard Graphite Corp
Industrial Alliance: Standard Graphite Corp
 
Canada Cobalt Works Corporate Presentation
Canada Cobalt Works Corporate PresentationCanada Cobalt Works Corporate Presentation
Canada Cobalt Works Corporate Presentation
 
Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013
 
Mine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paperMine planning process A Madowe SAIMM paper
Mine planning process A Madowe SAIMM paper
 
Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019Canada cobalt-presentation-june-4-2019
Canada cobalt-presentation-june-4-2019
 

More from James AH Campbell

Diamond exploration, mining, financing and driving entrepreneurial behaviour.
Diamond exploration, mining, financing and driving entrepreneurial behaviour.Diamond exploration, mining, financing and driving entrepreneurial behaviour.
Diamond exploration, mining, financing and driving entrepreneurial behaviour.James AH Campbell
 
The Economic Diamond Potential of the Kalahari of Botswana
The Economic Diamond Potential of the Kalahari of BotswanaThe Economic Diamond Potential of the Kalahari of Botswana
The Economic Diamond Potential of the Kalahari of BotswanaJames AH Campbell
 
Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)James AH Campbell
 
Attracting Funds to Develop the Diamond Potential of Southern Africa
Attracting Funds to Develop the Diamond Potential of Southern AfricaAttracting Funds to Develop the Diamond Potential of Southern Africa
Attracting Funds to Develop the Diamond Potential of Southern AfricaJames AH Campbell
 
Junior Indaba June 2023 Myth Busting Green Metals
Junior Indaba June 2023 Myth Busting Green MetalsJunior Indaba June 2023 Myth Busting Green Metals
Junior Indaba June 2023 Myth Busting Green MetalsJames AH Campbell
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryJames AH Campbell
 
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdf
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdfBotswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdf
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdfJames AH Campbell
 
Is there any overlap between Corporate Governance & Public Reporting?
Is there any overlap between Corporate Governance & Public Reporting?Is there any overlap between Corporate Governance & Public Reporting?
Is there any overlap between Corporate Governance & Public Reporting?James AH Campbell
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryJames AH Campbell
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryJames AH Campbell
 
Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)James AH Campbell
 
Africa Report BOD 6 Sept 2022.pdf
Africa Report BOD 6 Sept 2022.pdfAfrica Report BOD 6 Sept 2022.pdf
Africa Report BOD 6 Sept 2022.pdfJames AH Campbell
 
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...James AH Campbell
 
The Future of Botswana's Diamond Resources
The Future of Botswana's Diamond ResourcesThe Future of Botswana's Diamond Resources
The Future of Botswana's Diamond ResourcesJames AH Campbell
 
Botswana Diamonds starting to shine.
Botswana Diamonds starting to shine.Botswana Diamonds starting to shine.
Botswana Diamonds starting to shine.James AH Campbell
 

More from James AH Campbell (20)

Diamond exploration, mining, financing and driving entrepreneurial behaviour.
Diamond exploration, mining, financing and driving entrepreneurial behaviour.Diamond exploration, mining, financing and driving entrepreneurial behaviour.
Diamond exploration, mining, financing and driving entrepreneurial behaviour.
 
The Economic Diamond Potential of the Kalahari of Botswana
The Economic Diamond Potential of the Kalahari of BotswanaThe Economic Diamond Potential of the Kalahari of Botswana
The Economic Diamond Potential of the Kalahari of Botswana
 
Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)
 
Attracting Funds to Develop the Diamond Potential of Southern Africa
Attracting Funds to Develop the Diamond Potential of Southern AfricaAttracting Funds to Develop the Diamond Potential of Southern Africa
Attracting Funds to Develop the Diamond Potential of Southern Africa
 
Junior Indaba June 2023 Myth Busting Green Metals
Junior Indaba June 2023 Myth Busting Green MetalsJunior Indaba June 2023 Myth Busting Green Metals
Junior Indaba June 2023 Myth Busting Green Metals
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining Industry
 
Tirisano 43-101_2010
Tirisano 43-101_2010Tirisano 43-101_2010
Tirisano 43-101_2010
 
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdf
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdfBotswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdf
Botswana Diamonds - 5 Oct 22 - FEQ Buy Note TP 6.8p.pdf
 
Is there any overlap between Corporate Governance & Public Reporting?
Is there any overlap between Corporate Governance & Public Reporting?Is there any overlap between Corporate Governance & Public Reporting?
Is there any overlap between Corporate Governance & Public Reporting?
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining Industry
 
Prospecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining IndustryProspecting for Solutions: Challenges facing the South African Mining Industry
Prospecting for Solutions: Challenges facing the South African Mining Industry
 
Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)Corporate Governance for South African Mining Companies (a practitioner's view)
Corporate Governance for South African Mining Companies (a practitioner's view)
 
Africa Report BOD 6 Sept 2022.pdf
Africa Report BOD 6 Sept 2022.pdfAfrica Report BOD 6 Sept 2022.pdf
Africa Report BOD 6 Sept 2022.pdf
 
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...
Southern Africa deemed highly prospective for diamonds – Nadine Ramdass – Bos...
 
The Future of Botswana's Diamond Resources
The Future of Botswana's Diamond ResourcesThe Future of Botswana's Diamond Resources
The Future of Botswana's Diamond Resources
 
Botswana Diamonds starting to shine.
Botswana Diamonds starting to shine.Botswana Diamonds starting to shine.
Botswana Diamonds starting to shine.
 
Father of the Bride speech
Father of the Bride speechFather of the Bride speech
Father of the Bride speech
 
CPR Bat Shelomo
CPR Bat ShelomoCPR Bat Shelomo
CPR Bat Shelomo
 
Volcanoes Presentation
Volcanoes Presentation Volcanoes Presentation
Volcanoes Presentation
 
2021 highlights
2021 highlights2021 highlights
2021 highlights
 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 

African Diamonds corporate presentation 2006

  • 1. Presentation to Westwind Partners Diamond Conference An update on the African Diamonds / De Beers JV in Boteti Exploration (Botswana) James AH Campbell B.Sc. (Hons) ARSM MBA (Dunelm) Dipl Datm (UNISA) MIMMM C.Eng C.Sci Pr.Sci.Nat General Manager – Group Exploration 12th May 2006
  • 2. 2 Agenda  AK6 Location  Update on the AK06 resource delivery project  Update on the mine delivery programme  Immediate next steps
  • 4. Update on the AK06 Resource Delivery Project
  • 5. 5 Deposit level assessment  Boteti JV (DB 51%, AD 49%)  De Beers is the Operator and can earn up to 70% by delivering the first bankable feasibility study  Surface area: 9.5Ha  Volume: 59M tons  Grade: 25cpht  Value: $138/ct (+1mm)
  • 6. 6 Programme Schedule & Budget AK6 Resource Delivery Project, Conceptual & Pre-feas. 2006 YTD Actual (USD) 2006 Forecast (USD) 2006 Budget (USD) 2006 Programme 2, 305, 129 19, 350, 000 19, 350, 000 Budget Phased Approach  Phase 1 (planned to deliver a high confidence inferred resource): 500 carats - 70m grid centre Large Diameter Drilling & core drilling.  Phase 2 (planned to give an indicated resource): 500 carats - 50m grid centre Large Diameter Drilling, 4,000 carats – Bulk sampling & core drilling. An indicated resource is a requirement of a bankable feasibility study, as required by the Boteti JV agreement  Phase 3: 1,000 carats - 25m grid centre LDD (may not be required, depending on Phase 1 and 2 results)
  • 7. 7 Summary of Phase 1 results  Macro-diamond results issued for 12 LDD holes (82 tonnes of DMS concentrate), 13th and last hole results to be issued during May 2006.  A total of 9,970 diamonds weighing 661 carats to date recovered from 2,438 ton of in situ sample from 12 LDD holes  Diamond Characteristics ● Largest diamond recovered c. 8-carats in size ● Presence of Type II diamonds ● Low % diamond breakage ● Diamonds adhering to kimberlite during recovery, especially in the harder south lobe kimberlite
  • 8. 8 Progress on Phase 2 Pilot Core Drilling  10 (3,472m) holes to precede Phase 2 LDD completed as planned.  All core logged and sampled for petrography, Ore Dressing Studies & density.  Some holes in south lobe indicate additional kimberlite than model suggests. To extend PLT016 deeper Delineation Drilling  Vertical hole drilled north of north lobe indicates additional kimberlite volume. Further delineation required.  Deep hole to delineate root zones of north/centre lobes & bottom of south lobe in progress. Potential for additional kimberlite.  Dedicated delineation programme (>7,000m) to arrive at an indicated level of confidence in geological model will commence in Q2 2006. Completion in Q3 2006.  Preliminary geotechnical drilling (4-5 holes) planned as output to pre- feasibility study. Phase 2 Large Diameter Drilling  Re-scheduled ahead of planned bulk sampling.  In-fill drilling:10 x 23-inch LDD holes to determine grade at 50m hole spacing grid.  3 holes completed in centre lobe. South lobe drilling in progress.  2 of 7 holes planned in south lobe to go 600-700m depth to confirm grade continuity with depth.  Planned to complete drilling end August and processing end September 2006. The current 3D geological model suggests a total resource to 59Mt. There is potential for additional kimberlite volume
  • 9. 9 Phase 2 Bulk Sampling Strategy  Bulk sampling options to recover c.4,000 carats (2,000 carats centre & south lobes each) for revenue estimation ● Shaft & horizontal adits to targeted areas ● Surface trenching ● Drill 1.5m diameter holes using Bauer BG36 rig ● Easy-Pipe directional tunneling system  Decision about which method(s) will be based on the outcome of Phase 1 diamond revenue results post the layout in early July. In the meantime scopes of work and contract tender preparations in progress for selected technology  The current diamond size frequency distributions tend to support a difference between South and Centre lobes, therefore assortments may be different. North lobe not material.  Investigations aimed at increasing the plant top cut-off size to c. 20mm in progress. Aim is also to recover the large diamonds including the fragile Type II’s.  DMS plant upgrades to handle the bulk sample throughputs (and ensure large & Type II diamond recoveries where present) to commence after Phase 2 LDD sample processing in early September 2006.
  • 10. Update on Mine Delivery Programme
  • 11. 11 Plant Designs and Mine Planning Plant Design Studies  Various block flow diagrams currently being considered: ● Conventional block flow diagram - baseline design ● ‘Voorspoed’ type design with High Pressure Rolls Crusher in a secondary application ● ‘Canadian’ type block flow diagram (Tahera, etc) ● Application of autogenous Milling  Capital and operating costing in progress  Option for ore processing at Letlhakane being considered Mine Planning  Letlhakane Mine slope angles assumed for conceptual study  Geotechnical & hydro-geological modelling planned  Conventional shovel truck method. Diesel powered fleet  Continuous operations environment  Host rock mined from the upper benches of the pit will be used during construction.  Maintenance of a minimum of six months exposed kimberlite at Run of Mine (ROM) grade  Purchase and operate all the earthmoving equipment  All equipment will be maintained on a Repair & Maintenance (R&M) agreement  Multi-skilled operators to provide flexibility and contingency Cut 1 12.9Mt ore 3.3M carats 14.7Mt waste 190m depth Commence 2009 Cut 2 15.7Mt ore 3.0M carats 24.9Mt waste 238m depth Commence 2012 Cut 3 10.6Mt ore 1.9M carats 56.4Mt waste 341m depth Commence 2014 Cut 1 12.9Mt ore 3.3M carats 14.7Mt waste 190m depth Commence 2009 Cut 2 15.7Mt ore 3.0M carats 24.9Mt waste 238m depth Commence 2012 Cut 3 10.6Mt ore 1.9M carats 56.4Mt waste 341m depth Commence 2014
  • 13. 13 Immediate target next steps  Diamond Layout : early July 2006  Global (inferred) resource : end July 2006  Conceptual Study completion : Q3 2006 The Conceptual Study is being worked-on from the perspective of a stand- alone mine Gate to pre-feasibility  Local (indicated) resource : Q2 2007  Pre-Feasibility Study phase : 9 months (Q2 2007) The pre-feasibility study will essentially be a suite of trade-off studies within a settled corporate arrangement Gate to feasibility  Feasibility Study phase : 9 months (Q1 2008)  Detailed Design Phase : 6 months (Q3 2008) Gate to implementation The above timeline for mine development (aside from the resource phase) is merely a standard template There is significant opportunity to improve timelines when the Organisation to Organisation (O to O) partner is selected and also undertaking activities in parallel (as opposed to in series) where possible