What is DST
Why DST
Tools of DST
How DST
Why DST
Seismic indicates the
possible existence of a
potential reservoir.
DST indicates the well
deliverability and its
worthiness for completion.
What is DST
• temporary completion of a wellbore that provides information on
whether or not to complete the well.
-> Done after installing the casing and before hooking-up the well.
Good DST yields:
• Fluid samples
• Reservoir pressure (P*)
• Formation properties, including permeability (k), skin (S), and radius of
investigation (ri)
• Productivity estimates, including flow rate (Q)
• -> Analysis of the DST transient pressure data can provide an
• estimate of formation properties and wellbore damage.
Before we start the DST
Planning: The key to successful testing depends upon planning and
teamwork between the geoscientist and the engineer. Potential pay
zones should be identified before drilling commences so that the
drilling program can be designed to accommodate the test.
Safety:
• Running a DST is one of the most dangerous jobs in the oil field
because the well is essentially uncontrolled during the test.
• All fire fighting equipment and the blowout preventers should be
inspected and tested before starting a DST.
• Hydrogen sulfide (H2S) equipment should be on hand if anticipated
conditions are sour.
• No test should be initiated at night or during an electrical storm.
• No smoking should be allowed on the drill floor or near any flow
lines or surface test equipment.
How DST
It is done in 4 stages
• Short production period (Initial Flow-IF)  5-10 minutes (A)
• Short shut-in period (Initial Build-up –IBU)  30-90 minutes (B)
• Longer flow period (Final Flow-FF)  1-5 hours (C)
• Longer shut-in period (Final Build-up-FBU)  3-10 hours (D)
Time
Pressure
A typical pressure profile observed during DST test
A B C D
Why is it like this
• The initial flow period removes the
“supercharge” effect of mud filtrate near
wellbore.
• The first build-up is run to determine a
valid P* (reservoir pressure) provides the
“guiding light” for determining the
proper slope found using buildup #2.
• The second flow period is used to collect
a fluid sample and create a pressure
disturbance at a distance beyond any
damaged zone
• The final build-up is used to evaluate
reservoir transmissibility, damage, and
radius of investigation (Build-up data
analysis).
Tools of DST
Drill
String
Packers
Testing
Tool
Anchor
Pipe
Tools of DST
• Testing tool and packer are mounted
below the drill collars.
• Below the testing tool, a perforated
pipe (anchor pipe) is mounted.
• Inside anchor, an upper pressure
gauge is situated above perforations,
reading pressure below the testing tool.
• Below the anchor pipe, another
pressure gauge, which reads the
pressure in the annulus between the
sand face and anchor pipe.
Good to Know
• The wellbore is filled with mud.
• During the DST, the string is partially filled with
Cushion.
• The testing tool isolates the overlying DCs and
DPs from the mud present in the well.
• An empty string remain empty as it is
lowered.
Why we need Cushion fluid?
• To protect the drill string from collapse.
• To reduce the inertia of formation fluid as they enter
the pipe.
• For unconsolidated formation, pressure exerted by
cushion is 400 psi difference (or less) from formation
pressure (to prevent sand production, gravel-pack
plugging, fracture proppant production).
Cushion
Water
Diesel
Nitrogen
Natural Gas
DST Pressure Profile
Pi
Warning
• Since the DST result analysis requires the knowledge of
Pressure Build-up (PBU) analysis
• Lets first review PBU
• Then for DST data apply the PBU knowledge and equations!
Review of Build-up Data Analysis
Review of Build-up Data Analysis
• B and µ known from fluid analysis
• h is known from logging
• q is the constant flow rate of the flow period done before the shut-in
• By having m, the average reservoir permeability (K) can be easily found.
Review of Build-up Data Analysis
•Permeability:
•Skin:
Review of Build-up Data Analysis
Flow rate must reach
the surface to reach
steady-state flow
regime thus having
constant q
Thanks 
 ‘Today’sPain is Tomorrow’sPower’

More Related Content

What's hot

Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
kaleem ullah
 

What's hot (20)

WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Pressure Draw Down Test
Pressure Draw Down TestPressure Draw Down Test
Pressure Draw Down Test
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Artificial lift method
Artificial lift methodArtificial lift method
Artificial lift method
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
Cementing well
Cementing well Cementing well
Cementing well
 
Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)Tubing Performance Relation (TPR)
Tubing Performance Relation (TPR)
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Well completion
Well completionWell completion
Well completion
 
Artificial lift technology
Artificial lift technologyArtificial lift technology
Artificial lift technology
 
Casing design
Casing designCasing design
Casing design
 
Formation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wellsFormation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wells
 
Sand control
Sand controlSand control
Sand control
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4Fundamentals of Petroleum Engineering Module 4
Fundamentals of Petroleum Engineering Module 4
 
Rig types.
Rig types.Rig types.
Rig types.
 

Similar to Drill stem test

26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
John Grover
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
hydrologyproject001
 

Similar to Drill stem test (20)

Well completion d.pptx
Well completion d.pptxWell completion d.pptx
Well completion d.pptx
 
Pumping test
Pumping testPumping test
Pumping test
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 
Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020Programming in Petroleum Engineering Graduation Project 2020
Programming in Petroleum Engineering Graduation Project 2020
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
Chapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdfChapter 01 Drilling Fluids Functions (1).pdf
Chapter 01 Drilling Fluids Functions (1).pdf
 
New Rulemakings: What Can We Expect - Gary Krichau
New Rulemakings: What Can We Expect - Gary KrichauNew Rulemakings: What Can We Expect - Gary Krichau
New Rulemakings: What Can We Expect - Gary Krichau
 
A Sattar CWI Engrs
A Sattar CWI EngrsA Sattar CWI Engrs
A Sattar CWI Engrs
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
PetroTeach Casing and cementing Design webinar 01 10_2020
PetroTeach Casing and cementing Design webinar 01 10_2020PetroTeach Casing and cementing Design webinar 01 10_2020
PetroTeach Casing and cementing Design webinar 01 10_2020
 
In situ permeability testing in boreholes
In situ permeability testing in boreholesIn situ permeability testing in boreholes
In situ permeability testing in boreholes
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

Drill stem test

  • 1. Prepared by: Nouh Almandhari
  • 2. What is DST Why DST Tools of DST How DST
  • 3. Why DST Seismic indicates the possible existence of a potential reservoir. DST indicates the well deliverability and its worthiness for completion.
  • 4. What is DST • temporary completion of a wellbore that provides information on whether or not to complete the well. -> Done after installing the casing and before hooking-up the well. Good DST yields: • Fluid samples • Reservoir pressure (P*) • Formation properties, including permeability (k), skin (S), and radius of investigation (ri) • Productivity estimates, including flow rate (Q) • -> Analysis of the DST transient pressure data can provide an • estimate of formation properties and wellbore damage.
  • 5. Before we start the DST Planning: The key to successful testing depends upon planning and teamwork between the geoscientist and the engineer. Potential pay zones should be identified before drilling commences so that the drilling program can be designed to accommodate the test. Safety: • Running a DST is one of the most dangerous jobs in the oil field because the well is essentially uncontrolled during the test. • All fire fighting equipment and the blowout preventers should be inspected and tested before starting a DST. • Hydrogen sulfide (H2S) equipment should be on hand if anticipated conditions are sour. • No test should be initiated at night or during an electrical storm. • No smoking should be allowed on the drill floor or near any flow lines or surface test equipment.
  • 6. How DST It is done in 4 stages • Short production period (Initial Flow-IF)  5-10 minutes (A) • Short shut-in period (Initial Build-up –IBU)  30-90 minutes (B) • Longer flow period (Final Flow-FF)  1-5 hours (C) • Longer shut-in period (Final Build-up-FBU)  3-10 hours (D) Time Pressure A typical pressure profile observed during DST test A B C D
  • 7. Why is it like this • The initial flow period removes the “supercharge” effect of mud filtrate near wellbore. • The first build-up is run to determine a valid P* (reservoir pressure) provides the “guiding light” for determining the proper slope found using buildup #2. • The second flow period is used to collect a fluid sample and create a pressure disturbance at a distance beyond any damaged zone • The final build-up is used to evaluate reservoir transmissibility, damage, and radius of investigation (Build-up data analysis).
  • 9. Tools of DST • Testing tool and packer are mounted below the drill collars. • Below the testing tool, a perforated pipe (anchor pipe) is mounted. • Inside anchor, an upper pressure gauge is situated above perforations, reading pressure below the testing tool. • Below the anchor pipe, another pressure gauge, which reads the pressure in the annulus between the sand face and anchor pipe.
  • 10. Good to Know • The wellbore is filled with mud. • During the DST, the string is partially filled with Cushion. • The testing tool isolates the overlying DCs and DPs from the mud present in the well. • An empty string remain empty as it is lowered.
  • 11. Why we need Cushion fluid? • To protect the drill string from collapse. • To reduce the inertia of formation fluid as they enter the pipe. • For unconsolidated formation, pressure exerted by cushion is 400 psi difference (or less) from formation pressure (to prevent sand production, gravel-pack plugging, fracture proppant production). Cushion Water Diesel Nitrogen Natural Gas
  • 13. Warning • Since the DST result analysis requires the knowledge of Pressure Build-up (PBU) analysis • Lets first review PBU • Then for DST data apply the PBU knowledge and equations!
  • 14. Review of Build-up Data Analysis
  • 15. Review of Build-up Data Analysis • B and µ known from fluid analysis • h is known from logging • q is the constant flow rate of the flow period done before the shut-in • By having m, the average reservoir permeability (K) can be easily found.
  • 16. Review of Build-up Data Analysis •Permeability: •Skin:
  • 17. Review of Build-up Data Analysis Flow rate must reach the surface to reach steady-state flow regime thus having constant q
  • 18. Thanks   ‘Today’sPain is Tomorrow’sPower’