Project Info
JUL
1 Summer 2018
CC8TM
Batched Rolls
1250m2
Transverse layers
Aberdeen Western
Peripheral Route/
Balmedie-Tipperty project,
Aberdeenshire, Scotland
AWPR/B-T CJV
CC used to provide
erosion control & scour
resistance to a series
of drainage channels
used to divert surface
water run-off from the
new constructed dual
carriageway.
Completed channel lining installation in the AWPR-BT Fastlink Section
In July 2018, Concrete Canvas®
GCCM* (CC) was used to line a series of drainage channels on the Aberdeen Western
Peripheral Route/ Balmedia-Tipperty (AWPR/B-T) project in Scotland. The AWPR/B-T is a major infrastructure project
that will significantly improve travel in north east Scotland. It involves the construction of a new dual carriageway which
is projected to cost £745 million and create an alternative route from north to south Aberdeen, bypassing the city.
The project is being delivered by Transport Scotland on behalf of the Scottish Government and in partnership with
Aberdeen City Council and Aberdeenshire Council and will include 58km of new road, 40km of new side roads, and
30km of access tracks. It will also include 12 junctions, two river crossings at the River Dee and the River Don, and
a bridge over the Aberdeen to Inverness Railway. As part of the drainage works, numerous drainage channels were
installed at the boundaries off the dual carriageway to direct surface run-off water into culvert headwalls and diversion
channels.The slopes in some areas were very steep with limited access for heavy machinery and mobile equipment.
The contractor, AWPR/B-T CJV, originally considered using a combination of rip rap and geotextile for a series of
drainage channels, however the steep and varying slopes around the site would have made this very difficult and time
consuming. CC was specified as an alternative to provide a long-term, durable solution which would also provide weed
suppression within the channels to prevent blockages and reduce future maintenance.
The CC was delivered to site in man-portable batched rolls of CC8TM
, allowing for easy transportation on site without the
need for large plant equipment.
© Concrete Canvas Ltd. 2018
The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express
www.concretecanvas.com
info@concretecanvas.com
+44 (0) 345 680 1908 www
®
®
Dual carriageway on the AWPR/B-T
CC installed on steep slope
CC installed around headwall
Channel prior to installation
CC terminated into culvert headwall behind diversion channel
CC lined channels
© Concrete Canvas Ltd. 2018
The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express
www.concretecanvas.com
info@concretecanvas.com
+44 (0) 345 680 1908 www
®
®
Completed CC lined drainage channels
Prior to installation the channel was excavated and compacted to profile using an excavator and V bucket. A 150mm x
150mm anchor trench was created on either side of the channel to allow the leading edge of the CC to be buried so as
to prevent undermining.The CC batched rolls were then unrolled before being cut to specific profile length with a utility
knife, minimising material wastage.
The contractor laid the CC transversely to accommodate changes in profile, overlapping layers by 100mm in the direction
of water flow.The overlaps were screwed together at 200mm intervals with 30mm stainless steel screws.The installers
then inserted 250mm steel ground pegs through each overlap in the anchor trenches on either side of the channel and
the anchor trench was subsequently backfilled with material as an extra precaution against undermining. Following
each day’s work, the CC was hydrated with a minimum of 6 liters/m2
as required for CC8TM
. The material cannot be
overhydrated and has a working time of 1-2 hours after hydration.Just 24 hours after hydration, the material had reached
80% strength, but will continue to gain strength over time.
Despite the steep and varying slopes and difficult to access areas on site, the contractor achieved installation rates of
over 250m2
per day. In total, 1250m2
of CC8TM
were installed within 1 week. The contractor and client were impressed
with the speed and ease of installation which allowed them to complete the installation much quicker than the original
specification of riprap and geotextile.

More Related Content

What's hot

BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_Fphilip dobson
 
Capabilities Statement
Capabilities StatementCapabilities Statement
Capabilities StatementSteve Coates
 
Brochure - Temporary Ground Protection
Brochure - Temporary Ground ProtectionBrochure - Temporary Ground Protection
Brochure - Temporary Ground ProtectionOwen Hutchison
 
Viapont® - Lightened asphalt concrete
Viapont® - Lightened asphalt concreteViapont® - Lightened asphalt concrete
Viapont® - Lightened asphalt concrete
Eurovia_Group
 
B&B Attachments Presents New Material Handling Innovations at IMHX
B&B Attachments Presents New Material Handling Innovations at IMHXB&B Attachments Presents New Material Handling Innovations at IMHX
B&B Attachments Presents New Material Handling Innovations at IMHX
MJDelaMasa
 
355 Fresh Pond Parkway - Moving Forward
355 Fresh Pond Parkway - Moving Forward355 Fresh Pond Parkway - Moving Forward
355 Fresh Pond Parkway - Moving Forward
HansStrauch
 
Berm protection
Berm protectionBerm protection
Berm protection
Steve Neschleba
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product Overview
The Howard Group Inc.
 
RICK RESUME 15
RICK RESUME 15RICK RESUME 15
RICK RESUME 15rick wells
 
Mobile crusher
Mobile crusherMobile crusher
Mobile crusher
registeblog
 
Village of Port Edwards: Opportunity Zone
Village of Port Edwards: Opportunity ZoneVillage of Port Edwards: Opportunity Zone
Village of Port Edwards: Opportunity Zone
Alex Rudie
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
The Howard Group Inc.
 
JAYERS Enterprises
JAYERS EnterprisesJAYERS Enterprises
JAYERS Enterprises
Senihd102578
 
Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)James Gormley
 
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshHITESH RATHOD
 

What's hot (19)

BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_F
 
Capabilities Statement
Capabilities StatementCapabilities Statement
Capabilities Statement
 
ScottA new resume 2017
ScottA new resume 2017ScottA new resume 2017
ScottA new resume 2017
 
Brochure - Temporary Ground Protection
Brochure - Temporary Ground ProtectionBrochure - Temporary Ground Protection
Brochure - Temporary Ground Protection
 
Viapont® - Lightened asphalt concrete
Viapont® - Lightened asphalt concreteViapont® - Lightened asphalt concrete
Viapont® - Lightened asphalt concrete
 
B&B Attachments Presents New Material Handling Innovations at IMHX
B&B Attachments Presents New Material Handling Innovations at IMHXB&B Attachments Presents New Material Handling Innovations at IMHX
B&B Attachments Presents New Material Handling Innovations at IMHX
 
355 Fresh Pond Parkway - Moving Forward
355 Fresh Pond Parkway - Moving Forward355 Fresh Pond Parkway - Moving Forward
355 Fresh Pond Parkway - Moving Forward
 
Berm protection
Berm protectionBerm protection
Berm protection
 
Jumbo CC-S Elevator Buckets
Jumbo CC-S Elevator BucketsJumbo CC-S Elevator Buckets
Jumbo CC-S Elevator Buckets
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product Overview
 
RICK RESUME 15
RICK RESUME 15RICK RESUME 15
RICK RESUME 15
 
injo slip update
injo slip updateinjo slip update
injo slip update
 
Mobile crusher
Mobile crusherMobile crusher
Mobile crusher
 
Village of Port Edwards: Opportunity Zone
Village of Port Edwards: Opportunity ZoneVillage of Port Edwards: Opportunity Zone
Village of Port Edwards: Opportunity Zone
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
 
JAYERS Enterprises
JAYERS EnterprisesJAYERS Enterprises
JAYERS Enterprises
 
Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)Case Study - Castle Gardens (072)
Case Study - Castle Gardens (072)
 
Geoff James2 CV
Geoff James2 CVGeoff James2 CV
Geoff James2 CV
 
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO HiteshPROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
PROJECT PROFILE ANNEXURE A2 KAMOTO Hitesh
 

Similar to Cc channel lining aberdeen western peripheral route - transport scotland (1)

CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining ApplicationsChristiane Cyr
 
CC Intro
CC IntroCC Intro
CC Intro
Steve Neschleba
 
Concrete Canvas
Concrete CanvasConcrete Canvas
Concrete Canvas
Budi Suryanto
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02Minh Bui Si
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline ProtectionSikko Krol
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
AKASHGARG131
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
Beipazilaikibby
 
Presentation on Concrete Cloth
Presentation on Concrete ClothPresentation on Concrete Cloth
Presentation on Concrete Cloth
AjeetPanedakatti
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concreteMylene Delmoro
 
Highway network system
Highway network system Highway network system
Highway network system
sanjay majumdar
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
IRJET Journal
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
Akhilesh Kumar
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
Andrew White
 
Site Report
Site ReportSite Report
Site Report
ShavneelChand
 
Project Management of M&E works at a WwTW
Project Management of M&E works at a WwTWProject Management of M&E works at a WwTW
Project Management of M&E works at a WwTW
ftwg
 
CC-Shelters-Brochure-1.pdf
CC-Shelters-Brochure-1.pdfCC-Shelters-Brochure-1.pdf
CC-Shelters-Brochure-1.pdf
laplayadeladerecha
 
Advance Prestress Bridge
Advance Prestress BridgeAdvance Prestress Bridge
Advance Prestress Bridge
University of Tikrit
 

Similar to Cc channel lining aberdeen western peripheral route - transport scotland (1) (20)

CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining Applications
 
CC Intro
CC IntroCC Intro
CC Intro
 
Concrete Canvas
Concrete CanvasConcrete Canvas
Concrete Canvas
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
PPT FINAL.pptx
PPT FINAL.pptxPPT FINAL.pptx
PPT FINAL.pptx
 
Presentation on Concrete Cloth
Presentation on Concrete ClothPresentation on Concrete Cloth
Presentation on Concrete Cloth
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Road pavements-of-cement-concrete
Road pavements-of-cement-concreteRoad pavements-of-cement-concrete
Road pavements-of-cement-concrete
 
Highway network system
Highway network system Highway network system
Highway network system
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Site Report
Site ReportSite Report
Site Report
 
AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3AMC5477 AMC corporate profile 6pp_v3
AMC5477 AMC corporate profile 6pp_v3
 
Project Management of M&E works at a WwTW
Project Management of M&E works at a WwTWProject Management of M&E works at a WwTW
Project Management of M&E works at a WwTW
 
CC-Shelters-Brochure-1.pdf
CC-Shelters-Brochure-1.pdfCC-Shelters-Brochure-1.pdf
CC-Shelters-Brochure-1.pdf
 
Advance Prestress Bridge
Advance Prestress BridgeAdvance Prestress Bridge
Advance Prestress Bridge
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 

Cc channel lining aberdeen western peripheral route - transport scotland (1)

  • 1. ® © Concrete Canvas Ltd. 2018 The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express www.concretecanvas.com info@concretecanvas.com +44 (0) 345 680 1908 www ® *Geosynthetic Cementitious Composite Mat i # Project Info JUL 1 Summer 2018 CC8TM Batched Rolls 1250m2 Transverse layers Aberdeen Western Peripheral Route/ Balmedie-Tipperty project, Aberdeenshire, Scotland AWPR/B-T CJV CC used to provide erosion control & scour resistance to a series of drainage channels used to divert surface water run-off from the new constructed dual carriageway. Completed channel lining installation in the AWPR-BT Fastlink Section In July 2018, Concrete Canvas® GCCM* (CC) was used to line a series of drainage channels on the Aberdeen Western Peripheral Route/ Balmedia-Tipperty (AWPR/B-T) project in Scotland. The AWPR/B-T is a major infrastructure project that will significantly improve travel in north east Scotland. It involves the construction of a new dual carriageway which is projected to cost £745 million and create an alternative route from north to south Aberdeen, bypassing the city. The project is being delivered by Transport Scotland on behalf of the Scottish Government and in partnership with Aberdeen City Council and Aberdeenshire Council and will include 58km of new road, 40km of new side roads, and 30km of access tracks. It will also include 12 junctions, two river crossings at the River Dee and the River Don, and a bridge over the Aberdeen to Inverness Railway. As part of the drainage works, numerous drainage channels were installed at the boundaries off the dual carriageway to direct surface run-off water into culvert headwalls and diversion channels.The slopes in some areas were very steep with limited access for heavy machinery and mobile equipment. The contractor, AWPR/B-T CJV, originally considered using a combination of rip rap and geotextile for a series of drainage channels, however the steep and varying slopes around the site would have made this very difficult and time consuming. CC was specified as an alternative to provide a long-term, durable solution which would also provide weed suppression within the channels to prevent blockages and reduce future maintenance. The CC was delivered to site in man-portable batched rolls of CC8TM , allowing for easy transportation on site without the need for large plant equipment.
  • 2. © Concrete Canvas Ltd. 2018 The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express www.concretecanvas.com info@concretecanvas.com +44 (0) 345 680 1908 www ® ® Dual carriageway on the AWPR/B-T CC installed on steep slope CC installed around headwall Channel prior to installation CC terminated into culvert headwall behind diversion channel CC lined channels
  • 3. © Concrete Canvas Ltd. 2018 The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express www.concretecanvas.com info@concretecanvas.com +44 (0) 345 680 1908 www ® ® Completed CC lined drainage channels Prior to installation the channel was excavated and compacted to profile using an excavator and V bucket. A 150mm x 150mm anchor trench was created on either side of the channel to allow the leading edge of the CC to be buried so as to prevent undermining.The CC batched rolls were then unrolled before being cut to specific profile length with a utility knife, minimising material wastage. The contractor laid the CC transversely to accommodate changes in profile, overlapping layers by 100mm in the direction of water flow.The overlaps were screwed together at 200mm intervals with 30mm stainless steel screws.The installers then inserted 250mm steel ground pegs through each overlap in the anchor trenches on either side of the channel and the anchor trench was subsequently backfilled with material as an extra precaution against undermining. Following each day’s work, the CC was hydrated with a minimum of 6 liters/m2 as required for CC8TM . The material cannot be overhydrated and has a working time of 1-2 hours after hydration.Just 24 hours after hydration, the material had reached 80% strength, but will continue to gain strength over time. Despite the steep and varying slopes and difficult to access areas on site, the contractor achieved installation rates of over 250m2 per day. In total, 1250m2 of CC8TM were installed within 1 week. The contractor and client were impressed with the speed and ease of installation which allowed them to complete the installation much quicker than the original specification of riprap and geotextile.