SlideShare a Scribd company logo
1 of 33
Refining Reservoir Capacity Tables for Improved Water Management 2009 California Water Conference Society of Military Engineers Sacramento Post Radisson Hotel, Sacramento CA October 27, 2009 Kevin Coulton, P.E.,CFM AECOM
Agenda
Introduction An investigation into the accuracy of the reservoir capacity table was made at Hungry Horse Reservoir in Montana.  Comparisons of existing and refined active storage volumes were made and considerations for power planning were assessed.  Based on the findings from this investigation, recommendations for related capacity table investigations at other reservoirs are made.
Background Hungry Horse Reservoir description BPA reservoir bank storage study Capacity table evaluation
Hungry Horse Reservoir
Hungry Horse Reservoir Constructed from April 1948 to July 1953, filled on July 1954. Concrete arch dam 171.9-meters (564-feet) high and 644.7-meters (2,115-foot) crest length. Approximate 9,637-hectares (23,813-acre) surface area and 56.4-kilometer (35-mile) length at full pool.
Hungry Horse Reservoir Hungry Horse Reservoir has the highest pool elevation reservoir in the entire Columbia Basin system at 1,085-meters (3,560-feet) NGVD. The reservoir has an active storage volume of 367,000-hectare-meters (2.98 million acre-feet) representing about 87% of the total reservoir volume. Most importantly, this active storage is about 10% of the total storage available in the entire Columbia River system.  The reservoir has a 1.18-year storage ratio (usable storage to average annual runoff); i.e., drawdown can extend through more than one low water period.
Hungry Horse Reservoir
BPA Reservoir Bank Storage Study ,[object Object]
Bank storage is the volume of water stored in the geologic materials of the reservoir banks (the diagram below shows bank storage in a floodplain setting).,[object Object]
BPA Reservoir Bank Storage Study Study objective - Evaluate the adequacy and consistency of data for future use in water balance studies to estimate reservoir bank storage. Study tasks included: Geologic and hydrologic data collection Agency visits and field reconnaissance Geologic mapping Capacity table evaluation
Methodology – Capacity Table Evaluation Document the existing capacity table. Develop a refined capacity table. Compare the old and new datasets and estimate the change in reservoir volume. Identify reasons for the change in volume. Provide recommendations for refining capacity table data at other reservoirs.
The Existing Capacity Table Dated August 1969, but derived originally from 1954 topographic mapping by the Bureau of Reclamation. Mapping of the upper reaches of the reservoir performed by field sketching.
An Historic Opportunity An historic low pool reservoir elevation in 1993 exposed most of the active storage volume for aerial photography, mapping, and subsequent capacity table refinement.
Reservoir Mapping Mapping ground control was rapidly established using GPS and a helicopter to transport personnel and equipment.
Estimate Change in Reservoir Volume A Digital Terrain Model (DTM) was prepared from a photogrammetric model and used to compare new reservoir volumes to old volumes.
Capacity Table Comparisons The new (1993) data were compared to data currently in use (1969). Volumes were compared at 3.05-meter (10-foot) elevation increments. Incremental volumes were consistently larger and the total mapped storage was 0.7% larger than assumed.
Reasons for Reservoir Volume Change Mapping and analysis methods Original mapping done in 1954 using now outdated photogrammetric methods and sketch mapping. Vegetation obscured true bare earth elevations. Field survey and remote sensing techniques have dramatically improved in accuracy since then. Erosion of reservoir banks Boat wakes Wind waves Ice  Draft-refill action and freeze-thaw action Steep banks allows eroded sediment to deposit in dead storage zone
Erosion of Reservoir Banks Evidence of approximately 1-meter soil loss from long-term reservoir bank erosion; eroded soils are discharged into the dead storage portion of the reservoir.
Boat Wake and Wind Wave Erosion The reservoir is a popular attraction for boaters. The cumulative effect of boat wakes over time contributes to bank erosion within the active storage zone.  Wind wave erosion action can be significant along steep sloped reservoir banks where limited wave energy dissipation exists in deep water.
Mechanical Erosion by Ice Large evacuations of water occur from the reservoir between December and March.  Ice formed in the winter is drawn down with the water and erodes exposed reservoir banks.
Results Topographic and geologic mapping  Capacity table comparisons Water management considerations Power planning considerations
Topographic and Geologic Mapping The mapping effort resulted in a 1:24,000 scale and 3-meter (10-foot) contour topographic map and DTM of the 56.3-kilometer (35-mile) long reservoir. The surface areas of geologic map units comprising the reservoir banks were estimated using the DTM.
Water Management Considerations A more accurate capacity table will provide: More accurate estimates of reservoir inflow; inflow is computed by algebraically adding the daily change in reservoir storage to the gauged daily discharge from the dam. More accurate estimates of firm power production capability.
Power Planning Considerations Power planning is coordinated as though all utilities in the region operate as a single utility. An annual plan is developed to estimate how much power can be available on a guaranteed, or firm, basis each year. Firm power is established assuming the present system experiences the worst sequence of streamflows on record—termed the critical period. Each 0.03 cubic meter per second (one cubic foot per second) of water released from the reservoir generates approximately 25 kilowatts (KW) at site.
Power Planning Considerations The average annual flow of 99.1-cms (3,500-cfs) at Hungry Horse Dam results in an average annual power production of approximately 98 mega-watts (MW) at the reservoir and an average annual power contribution of 593 MW for the 20 downstream federal and non-federal projects in the Coordinated System. The 0.7-percent larger useable storage volume was estimated by BPA to result in cumulative power benefits of about 1.4 MW, worth about $1 million (1993) over the 42.5-month critical period.
Conclusions Reservoir operations in the U.S. are facing increasing water demands making every increment of water stored in reservoirs more valuable.  There is value in re-evaluating conventional tools to manage reservoir water resources, including the reservoir capacity table. Many U.S. reservoirs were constructed in the early part of the 20th century when aerial photography and even sketch maps were used to derive topographic data to construct capacity tables and these relationships may have significant errors in them due to the accuracy of the methods used at the time and years of erosion or deposition within the active storage zone of the reservoir.
Conclusions (continued)  An investigation of the Hungry Horse Reservoir capacity table in Montana illustrates methods to refine capacity table volume estimates.  These activities could potentially be part of a drought contingency plan where reservoirs reaching historic low pool elevations would be flown to collect newer LIDAR topographic data that would in turn be used to update and refine existing capacity tables.
Recommendations The findings from this investigation at Hungry Horse Reservoir have led to recommendations for reviewing reservoir capacity table accuracy at other reservoirs and improving management tools and procedures where feasible. With regard to a review of a reservoir capacity table, efforts may be taken to: Prioritize a review of large active storage reservoir projects (where a small capacity error would result in a relatively significant volume error); Prioritize a review of older reservoir projects (where out-dated mapping techniques used to develop the capacity table may likely be improved on and long-term reservoir bank erosion may be significant);
Recommendations (continued) Compare dates of the critical period to the date of reservoir construction (critical periods derived from historic streamflows occurring after reservoir construction may imply historic critical period reservoir inflows were estimated using reservoir change in storage, derived from an erroneous capacity table); Perform sensitivity tests with reservoir operation computer simulations (by varying reservoir active storage volume changes can be evaluated for their effect on system power production and water management); Develop a contingency plan for acquiring reservoir aerial photography should an abnormally low pool elevation be experienced in the future.
Acknowledgements This work was funded by the Bonneville Power Administration in 1993 and managed by the BPA Reservoir Operations Section in Vancouver WA. The study was managed by the author while with a previous employer.
Questions?

More Related Content

What's hot

Estimation of Groundwater Recharge Using WetSpass and MODFLOW
Estimation of Groundwater Recharge  Using WetSpass and MODFLOWEstimation of Groundwater Recharge  Using WetSpass and MODFLOW
Estimation of Groundwater Recharge Using WetSpass and MODFLOWPutika Ashfar Khoiri
 
Water resource model modflow
Water resource model modflowWater resource model modflow
Water resource model modflowManoj Patley
 
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...ExternalEvents
 
Ground Water Modeling & Management_part1
Ground Water Modeling & Management_part1Ground Water Modeling & Management_part1
Ground Water Modeling & Management_part1PARITOSH SINGH CHAUHAN
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGShyam Mohan Chaudhary
 
Ground Water Modeling & Management_part2
Ground Water Modeling & Management_part2Ground Water Modeling & Management_part2
Ground Water Modeling & Management_part2PARITOSH SINGH CHAUHAN
 
Hinshaw Davis Updating Catskill Mountain Regional Curves
Hinshaw Davis Updating Catskill Mountain Regional CurvesHinshaw Davis Updating Catskill Mountain Regional Curves
Hinshaw Davis Updating Catskill Mountain Regional CurvesSarah Hinshaw
 
Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)Putika Ashfar Khoiri
 
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAPPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAbhiram Kanigolla
 
Groundwater Quality Mapping and Modeling
Groundwater Quality Mapping and ModelingGroundwater Quality Mapping and Modeling
Groundwater Quality Mapping and ModelingPARITOSH SINGH CHAUHAN
 
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...IOSR Journals
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Timo Brussée
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...GavanThomas
 
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...RachelMordovancey
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Dhiraj Jhunjhunwala
 

What's hot (20)

Estimation of Groundwater Recharge Using WetSpass and MODFLOW
Estimation of Groundwater Recharge  Using WetSpass and MODFLOWEstimation of Groundwater Recharge  Using WetSpass and MODFLOW
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
 
Modflow Nepal
Modflow NepalModflow Nepal
Modflow Nepal
 
Water resource model modflow
Water resource model modflowWater resource model modflow
Water resource model modflow
 
GROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEMGROUNDWATER MODELING SYSTEM
GROUNDWATER MODELING SYSTEM
 
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
Effectiveness Analysis of Best Management Practices by SWAT for Appropriate C...
 
Ground Water Modeling & Management_part1
Ground Water Modeling & Management_part1Ground Water Modeling & Management_part1
Ground Water Modeling & Management_part1
 
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELINGREMOTE SENSING DATA FOR HYDROLOGICAL MODELING
REMOTE SENSING DATA FOR HYDROLOGICAL MODELING
 
Ground Water Modeling & Management_part2
Ground Water Modeling & Management_part2Ground Water Modeling & Management_part2
Ground Water Modeling & Management_part2
 
Hinshaw Davis Updating Catskill Mountain Regional Curves
Hinshaw Davis Updating Catskill Mountain Regional CurvesHinshaw Davis Updating Catskill Mountain Regional Curves
Hinshaw Davis Updating Catskill Mountain Regional Curves
 
Swat model
Swat model Swat model
Swat model
 
Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)Groundwater modelling (an Introduction)
Groundwater modelling (an Introduction)
 
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLINGAPPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
APPLICATIONS OF ARC SWAT MODEL FOR HYDROLOGICAL MODELLING
 
Groundwater Quality mapping
Groundwater Quality mappingGroundwater Quality mapping
Groundwater Quality mapping
 
Groundwater Quality Mapping and Modeling
Groundwater Quality Mapping and ModelingGroundwater Quality Mapping and Modeling
Groundwater Quality Mapping and Modeling
 
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
Delineation of Hydrocarbon Bearing Reservoirs from Surface Seismic and Well L...
 
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
Assessing the ability of SWAT as a water quality model in the Lake Victoria b...
 
The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...The Development of a Catchment Management Modelling System for the Googong Re...
The Development of a Catchment Management Modelling System for the Googong Re...
 
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
Development of a Field-Scale Research Facility to Assess the Effects of Sea L...
 
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
Using Computer-simulated hydrological model (SWAT) to estimate the ground-wat...
 
Jim murphy
Jim murphyJim murphy
Jim murphy
 

Viewers also liked

Sediment deposition in koyna reservoir by integrated bathymetric survey
Sediment deposition in koyna reservoir by integrated bathymetric surveySediment deposition in koyna reservoir by integrated bathymetric survey
Sediment deposition in koyna reservoir by integrated bathymetric surveyeSAT Journals
 
Sediment Behind The Dams Army Corps of Engineers
Sediment Behind The Dams Army Corps of EngineersSediment Behind The Dams Army Corps of Engineers
Sediment Behind The Dams Army Corps of EngineersChoose Clean Water
 
Dams 10 1 final
Dams 10 1 finalDams 10 1 final
Dams 10 1 finalMrJewett
 
ဘာေတြးေတြးေဇာက္ထိုးေတြး
ဘာေတြးေတြးေဇာက္ထိုးေတြးဘာေတြးေတြးေဇာက္ထိုးေတြး
ဘာေတြးေတြးေဇာက္ထိုးေတြးKyaw Tun
 
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...Rama Krishna Varanasi
 
Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Mulugeta Abera
 
Invasive species 10_8 2011
Invasive species 10_8 2011Invasive species 10_8 2011
Invasive species 10_8 2011MrJewett
 
Chapter 3 soil water and irrigation practice1
Chapter 3  soil water and irrigation practice1Chapter 3  soil water and irrigation practice1
Chapter 3 soil water and irrigation practice1Mulugeta Abera
 
Sedimentary Process
Sedimentary ProcessSedimentary Process
Sedimentary ProcessM.T.H Group
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryLatif Hyder Wadho
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcuturesMohsin Siddique
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacitychingtony mbuma
 
Canals ppt
Canals pptCanals ppt
Canals pptbyju pk
 
Irrigation water management
Irrigation water management Irrigation water management
Irrigation water management Vidhi Khokhani
 

Viewers also liked (20)

Sediment deposition in koyna reservoir by integrated bathymetric survey
Sediment deposition in koyna reservoir by integrated bathymetric surveySediment deposition in koyna reservoir by integrated bathymetric survey
Sediment deposition in koyna reservoir by integrated bathymetric survey
 
W Wright Sess8 102709
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709
 
Riley Sess3 101309
Riley Sess3 101309Riley Sess3 101309
Riley Sess3 101309
 
Sediment Behind The Dams Army Corps of Engineers
Sediment Behind The Dams Army Corps of EngineersSediment Behind The Dams Army Corps of Engineers
Sediment Behind The Dams Army Corps of Engineers
 
Weather map
Weather mapWeather map
Weather map
 
Dams 10 1 final
Dams 10 1 finalDams 10 1 final
Dams 10 1 final
 
Benefits of dams
Benefits of damsBenefits of dams
Benefits of dams
 
ဘာေတြးေတြးေဇာက္ထိုးေတြး
ဘာေတြးေတြးေဇာက္ထိုးေတြးဘာေတြးေတြးေဇာက္ထိုးေတြး
ဘာေတြးေတြးေဇာက္ထိုးေတြး
 
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
91160763 design-of-hydraulic-structures-be-civil-books-bis-codes-and-useful-l...
 
Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
Invasive species 10_8 2011
Invasive species 10_8 2011Invasive species 10_8 2011
Invasive species 10_8 2011
 
Chapter 3 soil water and irrigation practice1
Chapter 3  soil water and irrigation practice1Chapter 3  soil water and irrigation practice1
Chapter 3 soil water and irrigation practice1
 
Sedimentary Process
Sedimentary ProcessSedimentary Process
Sedimentary Process
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
Chapter 5 drop sturcutures
Chapter 5 drop sturcuturesChapter 5 drop sturcutures
Chapter 5 drop sturcutures
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacity
 
Canals ppt
Canals pptCanals ppt
Canals ppt
 
Volume
VolumeVolume
Volume
 
Irrigation water management
Irrigation water management Irrigation water management
Irrigation water management
 

Similar to Coulton Sess6 101309

Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureDave Campbell
 
Thesis_presentation_June2023.pptx
Thesis_presentation_June2023.pptxThesis_presentation_June2023.pptx
Thesis_presentation_June2023.pptxANSHUMANMISHRA72015
 
Design of small dams
Design of small damsDesign of small dams
Design of small damsmytat3
 
Stormwater BMP Poster
Stormwater BMP PosterStormwater BMP Poster
Stormwater BMP PosterRob Mooney
 
Guide on artificial_recharge
Guide on artificial_rechargeGuide on artificial_recharge
Guide on artificial_rechargehydrologyproject0
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxSsgTiger
 
Water Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonWater Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonAshwin Dhanasekar
 
Peligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfPeligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfFrancis Mitchell
 
Artificial recharge guide
Artificial recharge guideArtificial recharge guide
Artificial recharge guideGeoShiv
 
journal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfjournal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfnareshkotra
 
journal of applied science and engineering.pdf
journal of applied science and engineering.pdfjournal of applied science and engineering.pdf
journal of applied science and engineering.pdfnareshkotra
 

Similar to Coulton Sess6 101309 (20)

Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain Future
 
Caes yakima full report
Caes yakima full reportCaes yakima full report
Caes yakima full report
 
Thesis_presentation_June2023.pptx
Thesis_presentation_June2023.pptxThesis_presentation_June2023.pptx
Thesis_presentation_June2023.pptx
 
Design of small dams
Design of small damsDesign of small dams
Design of small dams
 
Stormwater BMP Poster
Stormwater BMP PosterStormwater BMP Poster
Stormwater BMP Poster
 
Guide on artificial_recharge
Guide on artificial_rechargeGuide on artificial_recharge
Guide on artificial_recharge
 
SPE-10022.pdf
SPE-10022.pdfSPE-10022.pdf
SPE-10022.pdf
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptx
 
Asdso
AsdsoAsdso
Asdso
 
Hydrogeological studies and groundwater
Hydrogeological studies and groundwaterHydrogeological studies and groundwater
Hydrogeological studies and groundwater
 
SmallDams.pdf
SmallDams.pdfSmallDams.pdf
SmallDams.pdf
 
Water Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity ComparisonWater Use Analysis & Water Intensity Comparison
Water Use Analysis & Water Intensity Comparison
 
Design of hs
Design of hsDesign of hs
Design of hs
 
CE573_Poster2
CE573_Poster2CE573_Poster2
CE573_Poster2
 
Peligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdfPeligre Dos Bocas Binational Project.pdf
Peligre Dos Bocas Binational Project.pdf
 
Artificial recharge guide
Artificial recharge guideArtificial recharge guide
Artificial recharge guide
 
Chapter Nine.ppt
Chapter Nine.pptChapter Nine.ppt
Chapter Nine.ppt
 
journal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdfjournal of engineering and applied science 18.pdf
journal of engineering and applied science 18.pdf
 
journal of applied science and engineering.pdf
journal of applied science and engineering.pdfjournal of applied science and engineering.pdf
journal of applied science and engineering.pdf
 
1.pdf
1.pdf1.pdf
1.pdf
 

More from SAME 2009 California Water Conference

More from SAME 2009 California Water Conference (20)

Wise Sess11 102509
Wise Sess11 102509Wise Sess11 102509
Wise Sess11 102509
 
Wijsman Sess2 102309
Wijsman Sess2 102309Wijsman Sess2 102309
Wijsman Sess2 102309
 
V Wright Sess2 102109
V Wright Sess2 102109V Wright Sess2 102109
V Wright Sess2 102109
 
Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709Travis Tuesdaynoon 102709
Travis Tuesdaynoon 102709
 
Tibbitts Sess14 102009
Tibbitts Sess14 102009Tibbitts Sess14 102009
Tibbitts Sess14 102009
 
Suedel Sess5 102309[1]
Suedel Sess5 102309[1]Suedel Sess5 102309[1]
Suedel Sess5 102309[1]
 
Stockton Wednesday8am 102809
Stockton Wednesday8am 102809Stockton Wednesday8am 102809
Stockton Wednesday8am 102809
 
Stockton Wed Am 102809
Stockton Wed Am 102809Stockton Wed Am 102809
Stockton Wed Am 102809
 
Sorci Sess7 101309
Sorci Sess7 101309Sorci Sess7 101309
Sorci Sess7 101309
 
Shewbridge Sess05 101309
Shewbridge Sess05 101309Shewbridge Sess05 101309
Shewbridge Sess05 101309
 
Seed Wed Am 102109
Seed Wed Am 102109Seed Wed Am 102109
Seed Wed Am 102109
 
Sabol Sess3 100909
Sabol Sess3 100909Sabol Sess3 100909
Sabol Sess3 100909
 
Ragain Sess1 102209
Ragain Sess1 102209Ragain Sess1 102209
Ragain Sess1 102209
 
Mullins Sess8 101509
Mullins Sess8 101509Mullins Sess8 101509
Mullins Sess8 101509
 
Mc Knight Sess13 102309
Mc Knight Sess13 102309Mc Knight Sess13 102309
Mc Knight Sess13 102309
 
Millet Sess5 102709
Millet Sess5 102709Millet Sess5 102709
Millet Sess5 102709
 
Mc Quirk Sess1 101509
Mc Quirk Sess1 101509Mc Quirk Sess1 101509
Mc Quirk Sess1 101509
 
Mayer Wed Am 102809
Mayer Wed Am 102809Mayer Wed Am 102809
Mayer Wed Am 102809
 
Martin Sess13 101309
Martin Sess13 101309Martin Sess13 101309
Martin Sess13 101309
 
Marks Sess13 102309
Marks Sess13 102309Marks Sess13 102309
Marks Sess13 102309
 

Recently uploaded

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 

Recently uploaded (20)

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 

Coulton Sess6 101309

  • 1. Refining Reservoir Capacity Tables for Improved Water Management 2009 California Water Conference Society of Military Engineers Sacramento Post Radisson Hotel, Sacramento CA October 27, 2009 Kevin Coulton, P.E.,CFM AECOM
  • 3. Introduction An investigation into the accuracy of the reservoir capacity table was made at Hungry Horse Reservoir in Montana. Comparisons of existing and refined active storage volumes were made and considerations for power planning were assessed. Based on the findings from this investigation, recommendations for related capacity table investigations at other reservoirs are made.
  • 4. Background Hungry Horse Reservoir description BPA reservoir bank storage study Capacity table evaluation
  • 6. Hungry Horse Reservoir Constructed from April 1948 to July 1953, filled on July 1954. Concrete arch dam 171.9-meters (564-feet) high and 644.7-meters (2,115-foot) crest length. Approximate 9,637-hectares (23,813-acre) surface area and 56.4-kilometer (35-mile) length at full pool.
  • 7. Hungry Horse Reservoir Hungry Horse Reservoir has the highest pool elevation reservoir in the entire Columbia Basin system at 1,085-meters (3,560-feet) NGVD. The reservoir has an active storage volume of 367,000-hectare-meters (2.98 million acre-feet) representing about 87% of the total reservoir volume. Most importantly, this active storage is about 10% of the total storage available in the entire Columbia River system. The reservoir has a 1.18-year storage ratio (usable storage to average annual runoff); i.e., drawdown can extend through more than one low water period.
  • 9.
  • 10.
  • 11. BPA Reservoir Bank Storage Study Study objective - Evaluate the adequacy and consistency of data for future use in water balance studies to estimate reservoir bank storage. Study tasks included: Geologic and hydrologic data collection Agency visits and field reconnaissance Geologic mapping Capacity table evaluation
  • 12. Methodology – Capacity Table Evaluation Document the existing capacity table. Develop a refined capacity table. Compare the old and new datasets and estimate the change in reservoir volume. Identify reasons for the change in volume. Provide recommendations for refining capacity table data at other reservoirs.
  • 13. The Existing Capacity Table Dated August 1969, but derived originally from 1954 topographic mapping by the Bureau of Reclamation. Mapping of the upper reaches of the reservoir performed by field sketching.
  • 14. An Historic Opportunity An historic low pool reservoir elevation in 1993 exposed most of the active storage volume for aerial photography, mapping, and subsequent capacity table refinement.
  • 15. Reservoir Mapping Mapping ground control was rapidly established using GPS and a helicopter to transport personnel and equipment.
  • 16. Estimate Change in Reservoir Volume A Digital Terrain Model (DTM) was prepared from a photogrammetric model and used to compare new reservoir volumes to old volumes.
  • 17. Capacity Table Comparisons The new (1993) data were compared to data currently in use (1969). Volumes were compared at 3.05-meter (10-foot) elevation increments. Incremental volumes were consistently larger and the total mapped storage was 0.7% larger than assumed.
  • 18. Reasons for Reservoir Volume Change Mapping and analysis methods Original mapping done in 1954 using now outdated photogrammetric methods and sketch mapping. Vegetation obscured true bare earth elevations. Field survey and remote sensing techniques have dramatically improved in accuracy since then. Erosion of reservoir banks Boat wakes Wind waves Ice Draft-refill action and freeze-thaw action Steep banks allows eroded sediment to deposit in dead storage zone
  • 19. Erosion of Reservoir Banks Evidence of approximately 1-meter soil loss from long-term reservoir bank erosion; eroded soils are discharged into the dead storage portion of the reservoir.
  • 20. Boat Wake and Wind Wave Erosion The reservoir is a popular attraction for boaters. The cumulative effect of boat wakes over time contributes to bank erosion within the active storage zone. Wind wave erosion action can be significant along steep sloped reservoir banks where limited wave energy dissipation exists in deep water.
  • 21. Mechanical Erosion by Ice Large evacuations of water occur from the reservoir between December and March. Ice formed in the winter is drawn down with the water and erodes exposed reservoir banks.
  • 22. Results Topographic and geologic mapping Capacity table comparisons Water management considerations Power planning considerations
  • 23. Topographic and Geologic Mapping The mapping effort resulted in a 1:24,000 scale and 3-meter (10-foot) contour topographic map and DTM of the 56.3-kilometer (35-mile) long reservoir. The surface areas of geologic map units comprising the reservoir banks were estimated using the DTM.
  • 24. Water Management Considerations A more accurate capacity table will provide: More accurate estimates of reservoir inflow; inflow is computed by algebraically adding the daily change in reservoir storage to the gauged daily discharge from the dam. More accurate estimates of firm power production capability.
  • 25. Power Planning Considerations Power planning is coordinated as though all utilities in the region operate as a single utility. An annual plan is developed to estimate how much power can be available on a guaranteed, or firm, basis each year. Firm power is established assuming the present system experiences the worst sequence of streamflows on record—termed the critical period. Each 0.03 cubic meter per second (one cubic foot per second) of water released from the reservoir generates approximately 25 kilowatts (KW) at site.
  • 26. Power Planning Considerations The average annual flow of 99.1-cms (3,500-cfs) at Hungry Horse Dam results in an average annual power production of approximately 98 mega-watts (MW) at the reservoir and an average annual power contribution of 593 MW for the 20 downstream federal and non-federal projects in the Coordinated System. The 0.7-percent larger useable storage volume was estimated by BPA to result in cumulative power benefits of about 1.4 MW, worth about $1 million (1993) over the 42.5-month critical period.
  • 27.
  • 28. Conclusions Reservoir operations in the U.S. are facing increasing water demands making every increment of water stored in reservoirs more valuable. There is value in re-evaluating conventional tools to manage reservoir water resources, including the reservoir capacity table. Many U.S. reservoirs were constructed in the early part of the 20th century when aerial photography and even sketch maps were used to derive topographic data to construct capacity tables and these relationships may have significant errors in them due to the accuracy of the methods used at the time and years of erosion or deposition within the active storage zone of the reservoir.
  • 29. Conclusions (continued) An investigation of the Hungry Horse Reservoir capacity table in Montana illustrates methods to refine capacity table volume estimates. These activities could potentially be part of a drought contingency plan where reservoirs reaching historic low pool elevations would be flown to collect newer LIDAR topographic data that would in turn be used to update and refine existing capacity tables.
  • 30. Recommendations The findings from this investigation at Hungry Horse Reservoir have led to recommendations for reviewing reservoir capacity table accuracy at other reservoirs and improving management tools and procedures where feasible. With regard to a review of a reservoir capacity table, efforts may be taken to: Prioritize a review of large active storage reservoir projects (where a small capacity error would result in a relatively significant volume error); Prioritize a review of older reservoir projects (where out-dated mapping techniques used to develop the capacity table may likely be improved on and long-term reservoir bank erosion may be significant);
  • 31. Recommendations (continued) Compare dates of the critical period to the date of reservoir construction (critical periods derived from historic streamflows occurring after reservoir construction may imply historic critical period reservoir inflows were estimated using reservoir change in storage, derived from an erroneous capacity table); Perform sensitivity tests with reservoir operation computer simulations (by varying reservoir active storage volume changes can be evaluated for their effect on system power production and water management); Develop a contingency plan for acquiring reservoir aerial photography should an abnormally low pool elevation be experienced in the future.
  • 32. Acknowledgements This work was funded by the Bonneville Power Administration in 1993 and managed by the BPA Reservoir Operations Section in Vancouver WA. The study was managed by the author while with a previous employer.