SlideShare a Scribd company logo
Cost Management
Gökrem Tekir

1                 2                          3




                           4




                  5                                                          6




7




                                         8


      9                                                              10




                      11




      12                                                        13




      14



EclipseCrossword.com


                                                                           variables to calculate an estimate for activity
Across                                                                     parameters, such as cost, budget, and duration.

2.         Determine Budget process input                            6.    Is an authorized time-phased budget at
                                                                           completion (BAC) used to measure, monitor,
4.         The activity cost based on analysis of the                      and control overall cost performance on the
           worst-case scenario for the activity.                           project.
5.         It is commonly used method of performance                 8.    The difference between Earned and Planned
           measurement.                                                    Value
7.         The process that is aggregating the estimated             10.   If this value is less than 1.0 indicates less work
           costs of individual activities or work packages to              was completed than was planned.
           establish an authorized cost baseline.
9.         Is the process of monitoring the status of the
           project to update the project budget and
           managing changes to the cost baseline.
11.        An input of Estimate Costs process
12.        Top-down Estimating
13.        is the calculated projection of cost performance
           that must be achieved on the remaining work to
           meet a specifi ed management goal, such as
           the BAC or the EAC.
14.        Developing an approximation of the monetary
           resources needed to complete project activities.


Down
1.         The value is the authorized budget assigned to
           the work to be accomplished for an activity or
           work breakdown structure component.
3.         EAC = BAC / Cum. ____
4.         This estimating technique uses a statistical
           relationship between historical data and other

More Related Content

Similar to Cost management

Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
IJERA Editor
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeffNASAPMC
 
Sorge.les
Sorge.lesSorge.les
Sorge.lesNASAPMC
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
M Maged Hegazy, LLM, MBA, CCP, P3O
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updatedShraddha PMP
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
TinotendaChivese
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porterNASAPMC
 
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
Brent Barton
 
Group 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdfGroup 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdf
alvieramada23
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
G K, BE,MS,ISTQB Certified Expert
 
PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7
Muzette Charles, PMP
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.garyNASAPMC
 
Cost and performance aware scheduling technique for cloud computing environment
Cost and performance aware scheduling technique for cloud  computing environmentCost and performance aware scheduling technique for cloud  computing environment
Cost and performance aware scheduling technique for cloud computing environment
International Journal of Reconfigurable and Embedded Systems
 
Project accounting an introduction
Project accounting an introductionProject accounting an introduction
Project accounting an introduction
Ismail Hamzah
 

Similar to Cost management (20)

Integration management
Integration managementIntegration management
Integration management
 
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
Sorge.les
Sorge.lesSorge.les
Sorge.les
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Quality management
Quality managementQuality management
Quality management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
Mahmood porter
Mahmood porterMahmood porter
Mahmood porter
 
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
2011 pmo symposium Bridging the Agile-to-PMO Communication Gap
 
Group 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdfGroup 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdf
 
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSISPROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
PROJECT HEALTH MONITORING BY EARNED VALUE ANALYSIS
 
PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7PMP M Charles_Spring2019_Week3_Chapter7
PMP M Charles_Spring2019_Week3_Chapter7
 
Chap013 4er1
Chap013 4er1Chap013 4er1
Chap013 4er1
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Cost and performance aware scheduling technique for cloud computing environment
Cost and performance aware scheduling technique for cloud  computing environmentCost and performance aware scheduling technique for cloud  computing environment
Cost and performance aware scheduling technique for cloud computing environment
 
Project accounting an introduction
Project accounting an introductionProject accounting an introduction
Project accounting an introduction
 

More from Gökrem Tekir, PMP®

Project Management Trainings Survey
Project Management Trainings SurveyProject Management Trainings Survey
Project Management Trainings SurveyGökrem Tekir, PMP®
 
Toplanti ve egitim salonu kiralama hizmetleri
Toplanti ve egitim salonu kiralama hizmetleriToplanti ve egitim salonu kiralama hizmetleri
Toplanti ve egitim salonu kiralama hizmetleriGökrem Tekir, PMP®
 
Timeline
TimelineTimeline

More from Gökrem Tekir, PMP® (20)

Project Management Office Survey
Project Management Office SurveyProject Management Office Survey
Project Management Office Survey
 
Project Management Trainings Survey
Project Management Trainings SurveyProject Management Trainings Survey
Project Management Trainings Survey
 
Toplanti ve egitim salonu kiralama hizmetleri
Toplanti ve egitim salonu kiralama hizmetleriToplanti ve egitim salonu kiralama hizmetleri
Toplanti ve egitim salonu kiralama hizmetleri
 
Timeline
TimelineTimeline
Timeline
 
Human resouce management
Human resouce managementHuman resouce management
Human resouce management
 
Framework
FrameworkFramework
Framework
 
Human resouce management
Human resouce managementHuman resouce management
Human resouce management
 
Time management
Time managementTime management
Time management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management (answer key)
Risk management (answer key)Risk management (answer key)
Risk management (answer key)
 
Quality management (answer key)
Quality management (answer key)Quality management (answer key)
Quality management (answer key)
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Procurement management (answer
Procurement management (answer Procurement management (answer
Procurement management (answer
 
Integration management (answer
Integration management (answer Integration management (answer
Integration management (answer
 
Human resouce management (answe
Human resouce management (answeHuman resouce management (answe
Human resouce management (answe
 
Framework (answer key)
Framework (answer key)Framework (answer key)
Framework (answer key)
 
Cost management (answer key)
Cost management (answer key)Cost management (answer key)
Cost management (answer key)
 
Communication management
Communication managementCommunication management
Communication management
 
Communication management (answe
Communication management (answeCommunication management (answe
Communication management (answe
 
Time management (answer key)
Time management (answer key)Time management (answer key)
Time management (answer key)
 

Cost management

  • 1. Cost Management Gökrem Tekir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 EclipseCrossword.com variables to calculate an estimate for activity Across parameters, such as cost, budget, and duration. 2. Determine Budget process input 6. Is an authorized time-phased budget at completion (BAC) used to measure, monitor, 4. The activity cost based on analysis of the and control overall cost performance on the worst-case scenario for the activity. project. 5. It is commonly used method of performance 8. The difference between Earned and Planned measurement. Value 7. The process that is aggregating the estimated 10. If this value is less than 1.0 indicates less work costs of individual activities or work packages to was completed than was planned. establish an authorized cost baseline. 9. Is the process of monitoring the status of the project to update the project budget and managing changes to the cost baseline. 11. An input of Estimate Costs process 12. Top-down Estimating 13. is the calculated projection of cost performance that must be achieved on the remaining work to meet a specifi ed management goal, such as the BAC or the EAC. 14. Developing an approximation of the monetary resources needed to complete project activities. Down 1. The value is the authorized budget assigned to the work to be accomplished for an activity or work breakdown structure component. 3. EAC = BAC / Cum. ____ 4. This estimating technique uses a statistical relationship between historical data and other