This document discusses corrosion under insulation (CUI) inspection planning for an ammonia and urea plant. It defines CUI and outlines the susceptible materials, temperature ranges, mechanisms, and locations. It provides details on organizing the inspection work, developing a schedule, selecting inspection types, and identifying at-risk equipment. Pipeline CUI is also addressed, highlighting common locations and examples found. The conclusion emphasizes the challenges of CUI detection and recommends design improvements and coatings to reduce corrosion risks over the long-term.
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
This program is designed for in depth understanding of Inspection of piping and pipelines under operation and in-service as per API 570. This preparatory course will prepare inspectors to ensure piping and pipeline integrity in service. Practical aspect of design considerations, sizing, rating, piping and pipeline integrity, internal inspections, analysis, repair, pressure testing, and pipeline protection shall be discussed. The program shall also provide more information about types of piping system defects which may crop in during operation, repairs, maintenance and alteration. This will lead the participants to prepare them for ensuring good quality and safety of operating piping and pipelines so that they are safe in operations and ensure preventing any incident.
API 570 Piping and Pipeline Inspectors Preparatory CoursepetroEDGE
This program is designed for in depth understanding of Inspection of piping and pipelines under operation and in-service as per API 570. This preparatory course will prepare inspectors to ensure piping and pipeline integrity in service. Practical aspect of design considerations, sizing, rating, piping and pipeline integrity, internal inspections, analysis, repair, pressure testing, and pipeline protection shall be discussed. The program shall also provide more information about types of piping system defects which may crop in during operation, repairs, maintenance and alteration. This will lead the participants to prepare them for ensuring good quality and safety of operating piping and pipelines so that they are safe in operations and ensure preventing any incident.
know more about cathodic protection in such manner like some our basis of regular life and where we used parts of machine which is affected by water,air or some other things.
There are numerous welding processes including arc welding, electron beam welding,
friction welding, laser welding, and resistance welding. This article will concentrate on arc
welding, which is the most common technique used to join most steels. Factors affecting
weld quality will be discussed and how to avoid common weld defects will be presented.
Arc welding requires striking a low-voltage, high-current arc between an electrode and the
base metal. The intense heat generated with this arc melts the base metal and allows the
joining of two components. The characteristic of the metal that is being welded and the joint
type (i.e. groove, fillet, etc.) dictates the welding parameters and the procedure that needs to
be followed to obtain a sound weld joint.
The Certified Welding Inspector (CWI) plays an important role during any welded construction activities ensuring the required specifications and standards are followed. Due to the numerous materials and processes associated with metal joining (welding) THIS PRESENTATION SHALL SHOW ONLY THE BASIC WELDING PROCESSES AND EXAMINATION METHODS (NDE). National and International Codes and Specifications along with measuring devices are the Inspector’s tools. Hopefully the following presentation shall give an insight into basic welding inspection.
know more about cathodic protection in such manner like some our basis of regular life and where we used parts of machine which is affected by water,air or some other things.
There are numerous welding processes including arc welding, electron beam welding,
friction welding, laser welding, and resistance welding. This article will concentrate on arc
welding, which is the most common technique used to join most steels. Factors affecting
weld quality will be discussed and how to avoid common weld defects will be presented.
Arc welding requires striking a low-voltage, high-current arc between an electrode and the
base metal. The intense heat generated with this arc melts the base metal and allows the
joining of two components. The characteristic of the metal that is being welded and the joint
type (i.e. groove, fillet, etc.) dictates the welding parameters and the procedure that needs to
be followed to obtain a sound weld joint.
The Certified Welding Inspector (CWI) plays an important role during any welded construction activities ensuring the required specifications and standards are followed. Due to the numerous materials and processes associated with metal joining (welding) THIS PRESENTATION SHALL SHOW ONLY THE BASIC WELDING PROCESSES AND EXAMINATION METHODS (NDE). National and International Codes and Specifications along with measuring devices are the Inspector’s tools. Hopefully the following presentation shall give an insight into basic welding inspection.
Customer Bulletin 0611 Insulant Impact on Corrosion in Steel Piping Applicati...Dyplast Products
Corrosion is defined by the National Association of Corrosion Engineers as “the deterioration of a material, usually a metal, by reaction with its environment.” Corrosion under insulation (CUI) is not a distinct form of corrosion; rather it refers to the location where pipe wall material deterioration is occurring—underneath the insulation material and on the external surfaces of piping. CUI (and the corrosion of metal jackets and banding which is not addressed herein) is a recognized problem that must be addressed by designers, specifiers, and end-users. CUI can occur under any type of thermal insulation. The type of corrosion will depend on the metallurgy of the pipe as well as the mix of corrosive elements - - understanding that corrosive elements can be introduced during pipe production, pipe shipping/storage, installation, insulation contact, process liquid contact, weather, or other environmental influences.
Weld Purging ~ Corrosion Problems in Stainless Steel by WeldingRon Sewell
Abstract
Corrosion is not uncommon in stainless steels, despite their name. Salt water environments in particular can give rise to corrosion and this is even noticeable at domestic level where cutlery discolours in mild salt solutions during dishwashing cycles. Loss of corrosion resistance during welding takes place when oxygen levels in shield and purge gases are high enough to deplete the chromium content.
Only for Knowledge purpose, doesn't contains any confidential data's.
Content:
1. What is Duct & Duct design
> Typical illustration of duct work
2.
Ducting Materials
> Galvanized steel
> Aluminium (Al)
> Polyurethane and phenolic insulation
panels (pre insulated air ducts)
> Fiberglass duct board (preinsulated
non metallic ductwork)
> Flexible ducting
> Fabric ducting
> PVC low
profile ducting
> Waterproofing
3. Components of Duct System
> Vibration isolators
> Take
offs
> Stack boots and heads
> Volume control dampers
> Smoke and fire dampers
> Turning vanes
> Plenums
> Terminal units
> Air terminals & Louvers
> Duct joints
4. Air leakage in duct
> Why duct leak test required
> Where Does Duct Leakage Occurs
> Methods to test Duct Leakage
5. Duct sealing
> Duct sealing methods
Duct tape,
Water based sealant, Mastic resin
based sealant, Metallic tapes
6. Duct maintenance
> Methods
Contact vacuuming, Air
sweeping, Power brushing, Sealing of
air leak.
Apakah itu Corrugated Steel Pipe / Armco?
Plat Baja (SPHC - SS400) yang telah mengalami proses pembentukan gelombang (Corrugation), dan pelengkungan (Curving) serta di coating dengan sistem Hot Dip Galvanize setelah di pabrikasi
Dibuat bergelombang agar menghasilkan momen inertia yang besar sehingga dengan tebal plat yang tipis dapat menahan beban yang cukup besar.
Corrosion is one of the main concerns in the durability of materials and structures. Much effort has been made to develop a corrosion inhibition process to prolong the life of existing structures and minimize corrosion damages in new structures.
Fusion bonded epoxy coating, also known as fusion -bond epoxy powder coating and commonly referred to as FBE coating, is an epoxy-based powder coating that is widely used to protect concrete reinforcing bars. FBE coated bars are covered under BIS 13620/93
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
SPECIFICATIONS & SCOPE OF WORKS
FOR BUILDING & UNDERGROUND CABLES CIVIL WORKS
AUTHOR: EDUARDO H. PARE, BSCE, HAU, EPCC, PMC
CIVIL/STRUCTURAL ENGINEER
DESIGN & CONSTRUCTION
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS
DESIGN & CONSTRUCTION SPECIFICATIONS
AUTHOR: EDUARDO H. PARE, BSCE, HAU, EPCC, PMC
CIVIL/STRUCTURAL ENGINEER
DESIGN & CONSTRUCTION
Similar to Corrosion Under Insulation Inspection In Ammonia Urea Plant (20)
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
2. Definition of CUI
“Corrosion of piping, pressure
vessels and structural
components resulting from water
or moisture trapped under
insulation or fireproofing.”
Affected Materials:
Carbon steel, low alloy steels, 300
Series SS and duplex stainless
steels.
Ammonia jetty area pipeline CUI, 2009
3. Corrosion Under Insulation (CUI)
As per Giel Notten, widely known corrosion expert
“Corrosion Under Insulation (CUI) is the number-1
problem in Chemical Process plant after 20 years of
operation”
The plant is getting older and the insulation cover
sheeting is deteriorating. Near lugs, attachments,
instrumentation nozzles and inlet & outlet lines, the
insulation cover sheeting is not properly installed.
Rainwater can penetrate into the insulation and
cause CUI.
4. Susceptible temperature range
As per API 510- 9th Edition susceptable temperature range
for CUI is
• 10°F (–12°C) and 350°F (175°C) for carbon
and low alloy steels
140ºF (60ºC) and 400ºF (205ºC) for austenitic
stainless steels.
5. CUI Mechanism
Corrosion Under Insulation caused by:
Ingress of water through-insulation
Water vapors condensation
Corrosion promoted by:
Trapping of water
Elevated temperatures (around 100º C)
Temperature gradient
Temperature cycling (Intermediate Service)
Absence or poor condition of coating
Poor/broken insulation
Marine Environment (Chloride Deposition)
Ammonia jetty area pipeline CUI, 2009
10. Morphology of CUI
After insulation is removed from carbon
and low alloy steels, CUI damage often
appears as loose, flaky scale covering the
corroded component.
In some localized cases, the corrosion can
appear to be carbuncle type pitting
Austenitic SS often shows Cl-SCC
12. CUI Inspection: Work Organization
Manager
Inspection
Supervisor from
Production for
permit and process
related support
(To be nominated
for each plant)
Visual Inspectors
From Inspection
Section
Insulation Removal
& Re-insulation
work
supervisor
(To be nominated)
Maintenance
Support
supervisor
(To be nominated
from each plant)
Civil Supervisor
For re-painting
job
(To be
nominated)
Operator from
NH3/ Urea &
Utility Plant
Insulation
Technician for
Insulation
removal
Mechanical
Technician for
scaffolding,
surface
preparation for
NDT
Civil contactor
for repainting
Production Inspection Workshop Maintenance Civil
13. Work Organization (cont.)
CUI inspection is a multi disciplinary work. Good
communication & understanding is required between group
members.
Best time to execute such inspection is during plant shut
down period and dry season.
Insulation is hazardous material so proper safety
supervision is also important.
14. Work Schedule
Date April 2013 May 2013 June 2013
Job Tasks Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2
Study CUI as per API 510, 571 & RBI
recommendation
Preparation of CUI Job volume
Assessment of material and Job by
maintenance
Inspection Checklist preparation
CUI inspection work of Ammonia Plant
Repainting and reinsulation job in Ammonia
Plant
CUI inspection work of Utility Plant
Repainting and reinsulation job in Utility
Plant
CUI inspection work of Urea Plant
Repainting and reinsulation job in Urea
Plant
Report Preparation
Update information into RBI Software
15. Inspection Type
Stainless Steel
Uniform Oxidation &Thinning
UltrasonicThickness
Measurement (UT)
Localized Metal Loss Pit Depth Measurement
Carbon Steel
Cl stress Corrosion Cracking Dye PenetrationTesting (DPT)
16. Ammonia Plant Equipment
Sl Equipment
Number
Equipment Name Shell Material Probable
CUI Locations
1 1-S-202 PROCESS CONDENSATE
SEPARATOR
Carbon Steel Bottom Skirt,
Manhole, Lifting
Lug
2 1-S-302 MIST SEPARATOR Carbon Steel Bottom Skirt,
Manhole, Lugs
3 1-S-304 HOT CONDENSATE
SEPARATOR
Carbon Steel Bottom Skirt,
Manhole, Lugs
4 1-S-412 INTER SEPARATOR FOR 1-K-
401
Carbon Steel Bottom Skirt,
Ladder Supports,
Lugs
5 1-S-502 Let DownVessel Carbon Steel Ladder, Manhole
cover support
6 1-S-503 FlashVessel Carbon Steel Ladder, Level
Gauge, Lugs
7 1-V-102 Blow DownVessel Carbon Steel Lugs, Manhole,
Ladder supports
18. Ammonia Plant Equipment
Sometimes insulation is used at locations where only
personal protection (PP) is required.This increases the
risk for CUI considerably.When installing personal
protection instead of insulation, the structural integrity
will be improved.
1-E-421 1st intercooler (air) no insulation required, only personal
protection
1-E-504 NH3 water cooler no insulation required on inlet line
(only PP).
1-E-510A/B NH3 condensers no insulation required, only
personal protection
1-V-601 A/B Adsorber A & B
19. Utility Plant Equipment
Sl Equipment
Number
Equipment Name Shell Material Probable CUI
Locations
1 3-V-201 Continuous Blow Down
Flash Tank
Carbon Steel Near bottom support,
flange connection
2 3-V-203 Drain Flash Tank Carbon Steel Near bottom support,
flange connection
3 3-V-901 A Adsorber A Carbon Steel Around Insulation Support
Ring, Lugs
4 3-V-901B Adsorber B Carbon Steel Around Insulation Support
Ring, Lugs
5 3-S-901 MOISTURE SEPARATOR Carbon Steel Around Insulation Support
Ring, nameplate
6 3-E-701 Mixing Station Heat
Exchanger
Carbon Steel Insulation support ring,
nameplate, base
7 3-E-901 Air Cooler Carbon Steel Near nameplate & base
8 3-E-903 Regenaration Gas Heater Carbon Steel Near nameplate & base
25. Common Locations of pipeline CUI
1. Pipes those are in intermittent service
2. Steam tracing pipe lines
(sometimes in Urea plant SS pipe is steam traced by CS tracing
line- Introduce risk of external Cl-SCC)
3.Termination of insulation in a vertical pipe.
4. Bulges or staining of the insulation or jacketing system or
missing bands.
5. Low points in piping systems that have a known breach in
the insulation system
26. Pipeline CUI
Vertical run pipeline partially
insulated are very prone for
CUI at the lower portion of
the pipe.
Several Pipelines in Boil Off Gas
and Ammonia Loading pump
area were found continually
wet and cold insulation
lifetime exhausted. Immediate
insulation replacement is
recommended
28. Conclusion
Atmospheric corrosion is a serious threat to the safe
operation of older, petro-chemical process plant.
CUI detection is a challenging job; it is highly
unpredictable
Reduce use of insulation as much as possible
Avoid insulation where it is not a process requirements
Design modification, apply suitable coating, surface
preparation, use suitable aluminum cover sheet etc.
Prepare painting surface and apply coating as per
internationally acceptable codes & standard.