Corporate communication is a set of activities involved in managing and orchestrating all internal and external communications aimed at creating favorable point of view among stakeholders on which the company depends.
What is corporate communication why it used and where it is.
all aspect of corporate communication with its management perspective to communication perspective. Public relations media relations internal external communication of corporate..
Presentation about common Barriers in Communication that create problems and obstacles in communication to others whether in professional as well as social life and also their types are explained.
What are communication skills? Communication skills are abilities you use when giving and receiving different kinds of information. Some examples include communicating ideas, feelings or what's happening around you. Communication skills involve listening, speaking, observing and empathizing....
Corporate communication is a set of activities involved in managing and orchestrating all internal and external communications aimed at creating favorable point of view among stakeholders on which the company depends.
What is corporate communication why it used and where it is.
all aspect of corporate communication with its management perspective to communication perspective. Public relations media relations internal external communication of corporate..
Presentation about common Barriers in Communication that create problems and obstacles in communication to others whether in professional as well as social life and also their types are explained.
What are communication skills? Communication skills are abilities you use when giving and receiving different kinds of information. Some examples include communicating ideas, feelings or what's happening around you. Communication skills involve listening, speaking, observing and empathizing....
A chaper of OB.cvccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccbhgfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrfrgtrdfgtggggggggd
Communication – Meaning
• Business Communication - Definition
• Importance
• Process
• Types –
One-way/Two-way, Verbal/Non- Verbal, Oral/Written, Formal/Informal, Upward, Downward, Lateral, Intrapersonal, Interpersonal, Organizational, Mass Communication
• Models – SMCR, Shannon Weaver
• Communication Skills-Listening, Speaking, Reading, Writing
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
We all have good and bad thoughts from time to time and situation to situation. We are bombarded daily with spiraling thoughts(both negative and positive) creating all-consuming feel , making us difficult to manage with associated suffering. Good thoughts are like our Mob Signal (Positive thought) amidst noise(negative thought) in the atmosphere. Negative thoughts like noise outweigh positive thoughts. These thoughts often create unwanted confusion, trouble, stress and frustration in our mind as well as chaos in our physical world. Negative thoughts are also known as “distorted thinking”.
2. Introduction
• Corporate communication helps the
people, in business, in analyzing the
important information and also helps in
keeping the people of a business
organization united and organized and
separating from the non-members from
them.
4. Formal Communication
• “Formal communication is that
communication which flows along with a
prescribed network .”
• “Formal communication is that flow of
information which follows an official chain
of command.
-- Thill and Bovee
5. • Communication takes place through the formal
channels of the organization structure along the
lines of authority established by the
management.
• Such communications are generally in writing
and may take any of the forms; policy; manuals:
procedures and rule books; memoranda; official
meetings; reports, etc.
7. Formal Communication : Characteristics
• Written and oral
• Formal relations
• Prescribed path organisational message
• Deliberate effort
• Definite and direct
8. Formal Communication : Merits
• Filtering of communication
• Maintenance of authority of the officers
• Vital scope
• Clear and effective communication
• Orderly flow of inormation
9. Formal Communication :Demerits
• Dilution of accuracy of message
• Overload of work
• Overlooked by the officers
• Distortion of information
12. Downward Communication
Written
Such as direction
letters, handbooks,
pamphlets, policy
matter, process, etc.
Oral
Instructions, directions,
speech, meetings,
telephones,
loudspeakers
16. Horizontal / Lateral Communication
Finance &
Accounts
Marketing Production
Personnel &
Administration
17. Lateral Communication
MERITS
• Co-ordination
• Faster Communication
DEMERITS
• Tendency of using professional language,
resulting difficulty in communication
• Noise and distance creates disturbance in
communication.
• Adversely affects motivation and inspiration
among employees.
18. Diagonal Communication :
Forms
ORAL WRITTEN
Informal
Meetings
Organisational
Meetings
Task Team
Company’s Bulletin &
Newspapers
Bulletin Board
General
Information
20. Informal Communication
• Thill and Bovee remark,“The Informal
Communication network carries information
alongwith organisational’s unofficial lives of
activity and power.”
• Communication arising out of all those channels
of communication that fall outside the formal
channels is known as informal communication.
• It is also termed as Grapevine Communication.
21. • Built around the social relationships of
members of the organization.
• Informal communication does not flow in
lines of authority as is the case of formal
communication.
• It arises due to the personal needs of the
members of an organization.
22. Informal Communication :
Characteristics
• Formation through social relations.
• Two types of information
• Uncertain route
• Possibility of rumors and distortions.
• Quick relay.
23. Informal Communication :
Advantages
• Fast and effective communication.
• Free environment.
• Better human relations.
• Easy solutions of the difficult problems.
• Satisfying the social needs of the workers.
26. Free Flow Communication.
• It is clear in the below
diagram, that the group
comprises 4 members
A,B,C and D and the
communication in them
is flowing smooth. At a
time A is engaged in
communication with
B,C,D and the same is
the case with B,C,D.
A
B D
C
27. Circular Communication
• In this, all the concerned
person communicate
with their neighbors and
all the information
gradually start flowing in
a circular manner.
• The message is
apparently moving in a
circular manner.
A
B D
C
28. Chain Communication
• It is such a series
of exchange of
thoughts which
keep on moving
forward without
returning.
C
E
D
A
B
29. Wheel Communication
• The centre of
information is only
one man. The
information is
disseminated from
one centre towards
all the directions.
• In the figure C is
doing the job.
C
A
D E
B
30. Grapevine Communication
• Acc. to Keith Davis “grapevine is basically a channel of
horizontal communication, for it is only people at the same
level of hierarchy who can informally communicate with one
another with perfect ease.
• It is a form of informal business communication, which
develops within an organization.
• It means gossip, usually gossip that spreads and covers a lot
of ground.
31. Examples of Grapevine
Network of Communication
• Suppose the profit amount of a company is
known. Rumor is spread that this much profit is
there and on that basis bonus is declared.
• CEO may be in family relation to the Production
Manager.They may have blood relations with
each other.
32. Characteristics of Grapevine
• Informal
• Spontaneous
• Adjunct to formal channel
• Multi-directional
• Mostly intra organizational
33. Importance of Grapevine
• Organizational solidarity and cohesion
• A safety value
• Supplement to other channels
• Quick transmissions
34. Grapevine : Advantages
• Helpful to other medium.
• Speedy transmission.
• Feedback value.
• Development of organisational power.
35. Grapevine : Disadvantages
• Any unconfirmed message is seriously taken.
• Unconfirmed message does not supplement a
confirmed message, satisfying the receiver I terms of a
clear picture and its authenticity.
• Unconfirmed report spoils the authenticity of factual
message.
• Organisational policies and the secrecy of decisions are
at stake.
36. Why the Grapevine Grows
• The human mind is ever active and full of
ideas.
• The tendency to communicate and share
these ideas is natural and in born.
• Individuals look for like minded people to
share feelings, fears, aspirations and
problems.
37. Types of Grapevine Chains
• Single strand chain
• Gossip chain
• Probability chain
• Cluster chain
38. Single Strand Chain
• This chain consists of one
on one interaction. In it L
says something to M who
then relays it to N and so
on.
• It is the least accurate of
the four chains and with
the increase of transit
points the chances of
distortion and deletion
increase.
L
M
N
O
39. Gossip Chain
• This chain is characterized
by a group of people
gathering to discuss
matters of mutual interest.
• Here one person seeks out
and tells everyone the
news that he/she has
gathered.
• It is used to relay
interesting bits of news
that may not be job
oriented
Q
T N
R P
S OL
M
40. Probability Chain
• Message is passed
on randomly without
direction or method.
The choice of
recipient depends on
the sender’s will,
situation or context.
Sender is indifferent
to or not interested
in the receiver he
chooses.
UO
N
Q
P
M
R
L S T
41. Cluster Chain
• This is the most popular
grapevine pattern .
Information is passed on a
selective basis to a few
members only.
• The first sender informs a few
chosen individuals who again
pass on the information to
individuals of their choice or
keep the information to
themselves.
• Choice of recipient depends
on the content and intent of
the message as well as the
relationship between the
members of the group .
P
O
N
M
Q
L
S
R
V
U
T
42. Barriers in Communication
Definition
Due to various barriers of
communication, when the message from the
sender is not received by the receiver in its
original form, then such obstructed and
ruined form of message is called mis-
communication.
43. Communication Barriers:
Different Levels
1. At sender’s level:
a) Encoding of message
b) Formulation and organising thoughts of message.
2. At receiver’s level:
a) Decoding of the encoded message to obtain through an
understandable language.
b) Receiving the message.
3. At transmission level:
The medium through which a message is transmitted.
4. At feedback level:
At this level the reaction of the receiver goes back to the
sender.
44. Mis–Communication :The Rising
• Problems in developing a message.
• Problems in transmitting a message.
• Problems in interpreting a message.
• Difficulty in expressing ideas.
• Problems in receiving message.
• Differences b/w sender and receiver.
• Differences b/w sender and receiver.
45. Barriers in Communication
Semantic Barriers
Other BarriersPersonal BarriersPhysical Barriers
Emotional or
Perceptional
Barriers
Organizational
Barriers
46. Semantic Barriers
• Semantic refers to the study of meaning in
terms of physical and psychological aspect.
• It is also a cause of communicative lapse.
• Language is the most powerful base of
communication process and any careless
use of it can lead to serious problems.
48. Organizational Barriers
• Organizational rules, structures, policies,
appointments, etc., influence the efficiency of the
employees.
• In a complicated structure of a big organization, in
addition to lengthy communication channels, the
communication process at various levels of the
cases the original form and meaning get distorted.
50. Emotional or Perceptional
Barriers
• This barrier refers to the degree of an individual’s
emotional and intellectual perception, for the lack of it
on the part, either of the sender or the receiver would
lead to serious lapse of communication.
• If either of these two participants is under some stress
or strain, anxiety, excitement, fear or any such factor,
neither the sender would be able to communicate the
message properly nor would the receiver be able to
interpret the message properly.
52. Physical Barriers
• Physical Barriers are cropped up because of
physical conditions such as noise , time distance
and financial obstacles, etc. the noise is the
outcome of the traffic outside, or the noise of
typing in the adjoining room, the frequent
physical movement of people, tickling pen or
coffee being served during the on-going
communication.
54. Personal Barriers
• Communication is a process that involves
inter-personal relations.These inter-
personal relations are of various intensity
and levels b/w senders and receivers.
• It is natural to have personal conflicts and
heart formation among employees for one
reason or the other.
56. Other Barriers
• Other barriers in the flow of communication
of message are the use of unsuitable
channel, defective mechanical equipment,
pressure of communication, diversified
social and cultural background of senders/
receivers, etc.
58. Measures for Barriers of
Communication
• Clear objectives
• General idea about audience
• Use of easy and clear language
• Effective listening
• Total control over emotions
• Lessen the noise
• Completion of message
• Suitable environment
• Effective use of body language
• Proper use of feedback.
59. Groups Discussions
• What is a Group?
In a formal or informal organization where a
group of people, assemble together to take
an important decision through discussions
and contemplation over some significant
subject or problem, is called a group.
60. Characteristics of a Group
1) Congregation of two or more persons.
2) Common goal.
3) Interact with another to achieve
common goal.
4) Formal or informal organization.
61. Types of Groups
• Formal Groups
• Informal Groups
• Primary Groups
• Secondary Groups
62. • What is Discussion?
Discussion means interaction, an activity
which involves a complete debate on a
subject or an objective in order to arrive
at a decision after an investigation into
the details from every possible aspect.
64. Stages of Group Development
• Forming : at this stage, the group is concerned
with testing the boundaries of appropriate
behavior in very careful and conscious way.
Members are dependant upon group leader.
• Storming : in this stage, conflict emerges among
members as they tend to seek personal
recognition. Underlining issues at this stage are
concerned with prestige and power.
65. • Norming : at this stage, counter movements develop
to soften the hostility with open communication and
reorganizing the group. Personal feelings are
subordinated to the group interest.
• Performing : at this stage, the members of the group
channelize their energies into work after solving the
structural problems and their interpersonal
differences. Members feel greater degree of
freedom and assume a sense of responsibility for the
group goals.
66. • Reforming : sometimes tension remain
and working groups are not continuously
feeling harmony.Therefore, group
members initiate to reform with new
norms to strengthen the group.
67. Group Discussion
• Group Discussion is the process of oral
communication, adopted by business
organization to arrive at a collective
decision.
68. Objectives of Group Discussion
1) Solving Problem
2) Making Decision
3) Collecting and Exchanging Ideas
69. Features of G.D.
• Purpose
• Planning
• Participation
• Free communication
• Leadership
71. Personality traits assessed in G.D.
• Team spirit
• Leadership
• Flexibility
• Reasoning ability
• Assertiveness
• Initiative
• Creativity
• Listening and
empathy
• Awareness
72. Prerequisites of Successful G.D.
1. Achievement of objectives
2. Listening constructive criticism
3. Exchange of ideas
4. Positive attitude
5. Co-operative attitude
73. Prerequisites of Successful G.D.
6. Appropriate evaluation
7. Accuracy
8. Brief and precise
9. Progress
10.Patience
11.Vocabulary
74. G.D : Advantages
• Collective opinion
• Expert opinion
• Acceptable by all
• More authentic and valuable
• Generates more beautiful ideas
• It is a repository of several minds
• Collective opinion always useful for all
75. G.D : Disadvantages
• An encroacher upon time.
• Involves diversity of opinions and becomes
problematic.
• Sometimes decisions are attributed to some experts
causing dissention.
• A product of difference of opinions, hence not
welcomed by all.
• It is more expensive in terms of time, energy and
money.
76. Interview
• An interview is a conversation between two or
more people where questions are asked by the
interviewer to elicit facts or statements from the
interviewee.
• “An interview is a psychological document cum
introspective analysis of the mind of the
interviewee”.
-- M.K.Sharma
77. Interview : Characteristics
• The process of interview implies an involvement of two
participants engaged in a face-to-face personal interaction.
• An interview is always purposeful and the purpose is already
known to both the participants.
• Both the participants are psychologically prepared for all the
interview pre-decided.
• By means of interview much is learnt about the life of an
interviewee.
• Pre- interview information reinforce the credibility and priority.
• Interview is a part of the formal communication.
78. Interview :Types
• Employment or selection interview
• Problem interview
• Promotion interview
• Personal interview
• Interview for job completion
• Interview for collecting information
• Counseling interview
• Mock interview
79. Seminar
• A seminar is, generally, a form of academic
instruction, either at an academic institution or
offered by a commercial or professional
organization.
• It has the function of bringing together small groups
for recurring meetings, focusing each time on some
particular subject, in which everyone present is
requested to actively participate.
80. Definition of Seminar
• It is a detailed discussion by a limited
group of intellectuals by which the result
or research or advance study is
presented through oral or written
reports.
81. Seminar : Characteristics
• Seminar refers to the discussion on a subject by
a group of subject experts.
• The subject of discussion is of highly intellectual
standard.
• Seminar is an oral form of communication.
• The outcome of the discussion in a seminar in
which the participants are highly educated and
intellectual nd the inferences evolved are of a
great value and advantage.
82. Seminar :Types
• Mini Seminar: the objective is to hold
discussion, at a lower level, on a specific
issue. It is used at the formative stage.
• Main Seminar: such seminars are organized
by some department or an institution once
either in a week or a month, as scheduled.
83. Seminar :Types
• National Seminar: in this, the subject authorities
are called upon and the expenditure is incurred
by the organization.The venue and the norms
are pre-determined.
• International Seminar: such seminars are
arranged by national organizations and the
report of the seminar is vital and has a far-
reaching effect.
84. Seminar : Objectives
• Developing tolerance, in fact, on antagonistic view.
• Developing positive attitude towards opinions and
viewpoints.
• Developing analytical and critical insight.
• Developing the art of expression on the basis of
observations and experience.
• Developing purity and chastity of thoughts and an
attitude of co-operation.
85. Presentations
• The word ‘presentation’ refers to the deliverance of a
pre-drafted speech or in business communication.
• The word ‘presentation’ means a prepared speech on a
given topic that is made to a small audience.
• The presentation of the matter should be effective and
must be suitable to listeners, keeping in view the
circumstances that influence the listener.
86. Presentation
• Presenting new goods, services and system.
• To construct a model, a layout and a policy.
• Selling goods, services, concepts and thoughts.
• Representing a group and a department.
• Suggestions about any solution, problems and
new concept.
• Entertainment of participants, audience and
others.
88. Individual Presentations
• It refers to one individual presentation on a pre
selected subject before audiences, who are well
versed in the subject.
• For making the individual presentations,
consider the following aspects:
– Strategy
– Structure
– Support
– Speeches
89. Group Presentation
• It refers to a presentation, by a group of people,
on the same topic before audiences.
• All the members of the group select the points of
the topic as per their predilection prior to their
presentation.
• There is one leader of the group to regulate and
monitor the presentation.
91. • Informative Presentation : It refers to sending
information to audience regarding a specific subject,eg.,
organizing a training camp.
• Persuasive Presentation : it refers to a process of
persuading the audience to do some job, to accept
or to change something in the system of functioning.
• Goodwill Presentation : it refers to an invitation to
audience over some important events and also for
the sake of entertainment such as post speech lunch
or dinner.