Safety, Health and Environment (SHE) Group
STFC SHE Group
Corporate Services
• The STFC manages directly, or
through others, a large programme of
construction and modification of
buildings and experimental facilities.
• Construction is one of the most
dangerous work activities.
• Construction projects involve a range
of hazards including: fire, scaffolding,
excavation, electrical, demolition,
work at height,
Why a CDM SHE Code?
STFC SHE Group
Corporate Services
WHAT IS CDM?
The Construction Design and Management Regulations
2015, also known as CDM Regulations or CDM2015, are
regulations governing the way construction projects of all
sizes and types are planned and managed.
CDM2015 aims to ensure health and safety issues are
appropriately considered during the development of
construction projects. The overall goal is to reduce the risk
of harm to those who have to build, use and maintain
structures.
The key to the regulations is the COMMUNICATION
between ALL parties involved to ensure Health and Safety
STFC SHE Group
Corporate Services
WHAT IS THE PURPOSE OF CDM2015
CDM aims to improve health and safety by
helping you to:
sensibly plan the work so the risks
involved are managed from start to finish
have the right people for the right job at
the right time
cooperate and coordinate your work
with others
have the right information about the
risks and how they are being managed
communicate this information effectively
to those who need to know
consult and engage with workers about
the risks and how they are being managed
STFC SHE Group
Corporate Services
WHAT ARE THE REQUIREMENTS?
The regulations identify 3 main roles within any project and have
assigned duties to those fulfilling these roles. STFC staff may fulfil
one or more, or all, of these key roles.
The Client ensures that the construction project is set up so that it is
carried out from start to finish in a way that adequately controls the
risks to the health and safety of those who may be affected.
The Principal Designer manages health and safety in the pre-
construction phase of a project. The role extends to the construction
phase through the principal designer's duties to liaise with the
principal contractor and on-going design work
The Principal Contractor manages the construction phase of a
project. This involves liaising with the client and principal designer
throughout the project, including during the pre-construction phase.
Depending upon the nature of the project, the principal designer
and principal contractor may be supported by designers,
contractors and workers.
STFC SHE Group
Corporate Services
Examples of projects classed as construction work
• Major new building or extension.
• Preparation of an area or building to house a new beamline/experiment including for
example: partitions, ceilings, structural modifications, shielding, piped services, fire and
alarm systems and isolatable services.
• Installation of major equipment that can reasonably be considered to be a structure (for
example an ISIS target blockhouse) or is integral to the structure/fabric of the building.
• Re-organising or redesigning machinery, experiments or physical layouts within a facility
involving the alteration of “hard wired / hard piped” mains services which are integral to
the structure.
• Dismantling experiments which are structures for repair, refurbishment or
decommissioning.
• Modifying internal facility areas by installing or removing structures such as walls (this
would include radiation shielding forming a shielded enclosure, bunker, block house or
tunnel).
• Installation, commissioning, maintenance, repair or removal of services (electrical, gas,
compressed air, hydraulic, heating, cooling, ventilation, telecommunications, computer
or similar services) which are normally fixed within or to a structure.
• Project involving the erection of scaffolding by specialist scaffold contactors (for
example, tube & clip scaffolds).
CDM applies to ALL construction projects
STFC SHE Group
Corporate Services
Examples of projects not classed as construction work
• Surveying – this includes taking levels, making measurements and
examining a structure for faults.
• Installation, assembly and commissioning of scientific and other
equipment, for example;
• vacuum chambers,
• optics tables,
• smaller scale experimental apparatus,
• equipment in a beam line
• Work on or maintenance of experimental equipment and machinery
e.g. bench top equipment which is plugged-in, wheeled equipment,
battery operated equipment or stand-alone items.
• Tree planting and general horticultural work (unless as part of a larger
construction project).
• Putting up and taking down marquees and similar temporary
structures
STFC SHE Group
Corporate Services
Key points
STFC SHE Group
Corporate Services
Notifiable Projects
CDM2015 applies to ALL construction and demolition projects.
Some projects are ‘Notifiable’ and
must be reported to the Health &
Safety Executive (HSE) by the Client
• If work is scheduled to last longer
than 30 working days and have
more than 20 workers working
simultaneously at any point in the
project, or
• exceeds 500 person days
STFC SHE Group
Corporate Services
Key points
Does CDM2015 apply to projects you
are working on?
If YES – have the roles of client,
designer and contractor been
established?
Read the part of the Code
relevant to you

More Related Content

Similar to construction management related presentation

LEADING UK COMMISSIONING MANAGEMENT COMPANY
LEADING UK COMMISSIONING MANAGEMENT COMPANYLEADING UK COMMISSIONING MANAGEMENT COMPANY
LEADING UK COMMISSIONING MANAGEMENT COMPANYOlivia Wilson
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfVincent Bui
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CMemad salim
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxmelvinjrobinson2199
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Amin
 
DMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure BrochureDMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure BrochureDMT GROUP
 
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...INP projects, Commercial Space, Business Center and Office /Retail Space Serv...
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...Buildzs.com., 3T Media Technologies Pvt Ltd
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInGabriel Koncal
 
2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdfssuserce0bdc
 
PLS 2019: Considerations, interactions & impact of the construction design an...
PLS 2019: Considerations, interactions & impact of the construction design an...PLS 2019: Considerations, interactions & impact of the construction design an...
PLS 2019: Considerations, interactions & impact of the construction design an...Institution of Lighting Professionals
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdfShaikhBilal24
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdfShaikhBilal24
 
Construction Quality & Safety Management
Construction Quality & Safety ManagementConstruction Quality & Safety Management
Construction Quality & Safety ManagementYahaya Hassan Labaran
 
Const. Productivity Management
Const. Productivity ManagementConst. Productivity Management
Const. Productivity Managementsmall_nomi
 

Similar to construction management related presentation (20)

LEADING UK COMMISSIONING MANAGEMENT COMPANY
LEADING UK COMMISSIONING MANAGEMENT COMPANYLEADING UK COMMISSIONING MANAGEMENT COMPANY
LEADING UK COMMISSIONING MANAGEMENT COMPANY
 
Birhanu
BirhanuBirhanu
Birhanu
 
commissioning-federal-facilities.pdf
commissioning-federal-facilities.pdfcommissioning-federal-facilities.pdf
commissioning-federal-facilities.pdf
 
CV - Emad Fathi CM
CV - Emad Fathi CMCV - Emad Fathi CM
CV - Emad Fathi CM
 
F.M.Camus (CV 2016)
F.M.Camus (CV 2016)F.M.Camus (CV 2016)
F.M.Camus (CV 2016)
 
Construction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docxConstruction Management Jump StartChapter 5Project Sta.docx
Construction Management Jump StartChapter 5Project Sta.docx
 
Gary Blakeley CV
Gary Blakeley CVGary Blakeley CV
Gary Blakeley CV
 
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-QatarMohamed Tarek Amin-Senior Mech Engineer-Qatar
Mohamed Tarek Amin-Senior Mech Engineer-Qatar
 
DMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure BrochureDMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure Brochure
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...INP projects, Commercial Space, Business Center and Office /Retail Space Serv...
INP projects, Commercial Space, Business Center and Office /Retail Space Serv...
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedIn
 
2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf2017Method statements and demolition techniques..pdf
2017Method statements and demolition techniques..pdf
 
Contractors all risk insurance
Contractors all risk insuranceContractors all risk insurance
Contractors all risk insurance
 
PLS 2019: Considerations, interactions & impact of the construction design an...
PLS 2019: Considerations, interactions & impact of the construction design an...PLS 2019: Considerations, interactions & impact of the construction design an...
PLS 2019: Considerations, interactions & impact of the construction design an...
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdf
 
ab+ group SARL (1).pdf
ab+ group SARL (1).pdfab+ group SARL (1).pdf
ab+ group SARL (1).pdf
 
Construction Quality & Safety Management
Construction Quality & Safety ManagementConstruction Quality & Safety Management
Construction Quality & Safety Management
 
Const. Productivity Management
Const. Productivity ManagementConst. Productivity Management
Const. Productivity Management
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 

Recently uploaded

Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 

Recently uploaded (20)

Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 

construction management related presentation

  • 1. STFC SHE Group Corporate Services Introduction to SHE Code 13 - Construction Design and Management (CDM2015) Safety, Health and Environment (SHE) Group
  • 2. STFC SHE Group Corporate Services • The STFC manages directly, or through others, a large programme of construction and modification of buildings and experimental facilities. • Construction is one of the most dangerous work activities. • Construction projects involve a range of hazards including: fire, scaffolding, excavation, electrical, demolition, work at height, Why a CDM SHE Code?
  • 3. STFC SHE Group Corporate Services WHAT IS CDM? The Construction Design and Management Regulations 2015, also known as CDM Regulations or CDM2015, are regulations governing the way construction projects of all sizes and types are planned and managed. CDM2015 aims to ensure health and safety issues are appropriately considered during the development of construction projects. The overall goal is to reduce the risk of harm to those who have to build, use and maintain structures. The key to the regulations is the COMMUNICATION between ALL parties involved to ensure Health and Safety
  • 4. STFC SHE Group Corporate Services WHAT IS THE PURPOSE OF CDM2015 CDM aims to improve health and safety by helping you to: sensibly plan the work so the risks involved are managed from start to finish have the right people for the right job at the right time cooperate and coordinate your work with others have the right information about the risks and how they are being managed communicate this information effectively to those who need to know consult and engage with workers about the risks and how they are being managed
  • 5. STFC SHE Group Corporate Services WHAT ARE THE REQUIREMENTS? The regulations identify 3 main roles within any project and have assigned duties to those fulfilling these roles. STFC staff may fulfil one or more, or all, of these key roles. The Client ensures that the construction project is set up so that it is carried out from start to finish in a way that adequately controls the risks to the health and safety of those who may be affected. The Principal Designer manages health and safety in the pre- construction phase of a project. The role extends to the construction phase through the principal designer's duties to liaise with the principal contractor and on-going design work The Principal Contractor manages the construction phase of a project. This involves liaising with the client and principal designer throughout the project, including during the pre-construction phase. Depending upon the nature of the project, the principal designer and principal contractor may be supported by designers, contractors and workers.
  • 6. STFC SHE Group Corporate Services Examples of projects classed as construction work • Major new building or extension. • Preparation of an area or building to house a new beamline/experiment including for example: partitions, ceilings, structural modifications, shielding, piped services, fire and alarm systems and isolatable services. • Installation of major equipment that can reasonably be considered to be a structure (for example an ISIS target blockhouse) or is integral to the structure/fabric of the building. • Re-organising or redesigning machinery, experiments or physical layouts within a facility involving the alteration of “hard wired / hard piped” mains services which are integral to the structure. • Dismantling experiments which are structures for repair, refurbishment or decommissioning. • Modifying internal facility areas by installing or removing structures such as walls (this would include radiation shielding forming a shielded enclosure, bunker, block house or tunnel). • Installation, commissioning, maintenance, repair or removal of services (electrical, gas, compressed air, hydraulic, heating, cooling, ventilation, telecommunications, computer or similar services) which are normally fixed within or to a structure. • Project involving the erection of scaffolding by specialist scaffold contactors (for example, tube & clip scaffolds). CDM applies to ALL construction projects
  • 7. STFC SHE Group Corporate Services Examples of projects not classed as construction work • Surveying – this includes taking levels, making measurements and examining a structure for faults. • Installation, assembly and commissioning of scientific and other equipment, for example; • vacuum chambers, • optics tables, • smaller scale experimental apparatus, • equipment in a beam line • Work on or maintenance of experimental equipment and machinery e.g. bench top equipment which is plugged-in, wheeled equipment, battery operated equipment or stand-alone items. • Tree planting and general horticultural work (unless as part of a larger construction project). • Putting up and taking down marquees and similar temporary structures
  • 8. STFC SHE Group Corporate Services Key points
  • 9. STFC SHE Group Corporate Services Notifiable Projects CDM2015 applies to ALL construction and demolition projects. Some projects are ‘Notifiable’ and must be reported to the Health & Safety Executive (HSE) by the Client • If work is scheduled to last longer than 30 working days and have more than 20 workers working simultaneously at any point in the project, or • exceeds 500 person days
  • 10. STFC SHE Group Corporate Services Key points Does CDM2015 apply to projects you are working on? If YES – have the roles of client, designer and contractor been established? Read the part of the Code relevant to you