SlideShare a Scribd company logo
RANA ALYAS
(248) 238-3168 | ranagag@yahoo.com | www.linkedin.com/in/ranagag
C O S T E S T I M A T O R
Professional within the engineering/construction field with experience with all facets of project coordination from estimation to
completion. Ability to conceptualize the big picture and minute details with an expertise in scheduling and follow up. Work with
minimal supervision, known as a highly responsible and reliable worker.
RELEVANT TALENTS
Budgeting Mathematics Organization Communication
Computer & Technical Customer Relations Negotiation Scheduling
Leadership Self-Taught Highly Analytical Accuracy & Attention to detail
Reading Blueprints Time Management Administrative Support Deadline Driven
C O M P U T E R S K I L L S
Bluebeam Estimating On-Screen Takeoff estimation program Tradesman software masonry
Microsoft Project 2000 Primavera Contactor, version 6.1 Microsoft Office
Sage Construction Software Auto-CAD
PROFESSIONAL EXPERIENCE SUMMARY
Project Estimator EJH Construction, Farmington Hills, MI Jul 2016-Current
• Prepare budged and calculate cost estimate for different type of buildings/project including a new construction or
renovation of interior and exterior elements of the building using Bluebeam estimation software and utilizing excel sheets
to calculate the project requirement to submit the documentation for the draft proposal and clarify the bid line items and
activities included in the bid.
• Interact with client and architect by sending Request for information-RFI to clarify construction documents sent at Request
for Proposal/Invitation to bid
• Estimate the amount and type of material needed to complete the construction job and check the compatibility against our
subcontractor bids/suppliers and decide which subcontractor will use per each cost code line item
• Prepare bid document per the instruction to the bidder to submit the bid including the estimated time line for the project
/schedule
• Make sure that all cost estimate submitted by the contractor are as accurate as possible and obtain subcontractors’ bids
• Maintain constant contact with site managers and engineers to evaluate the existing conditions of the project that have an
impact on the project estimate
• Survey site to determine the cost and scope of work are exact
• Estimate cost of inclement weather and unforeseen event that might have impact on the time line and general condition of
the project
• Calculates the general condition of the construction project and analyze the impact of the time line and items needed for
each project individually including but not limited to the project labor, procurement, change order, overhead
• Assist in keeping building project within client’s budged limitation while providing value engineering and advice to the
clients with the alternates
• Track all cost from inception of project to its completion and document it for historical data and lesson learned for future
reference
• Create responsibility matrix for material used in the project to confirm contractor/owner provide, contractor/owner install
items
• Participate in buy out process after project award and procurement
• Create purchase order/ change order for items purchased from suppliers and subcontractors using sage construction
software
RANA ALYAS
Page 2
Project Estimator D’Aloisio Construction & Masonry, Inc., Farmington Hills, MI Jul 2012-Jul 2015
• Prepared portion of contract proposal estimate including the determination of applicable project plans and specifications
• Interpreted design/Drawings and specifications
• Coordinated and negotiated suppliers’ prices
• Tracked historical data and priced updates
• Used Tradesman software for preparing cost estimate and quantities
• Provided value engineering services on project designs to bring project within owner’s financial limitations
• Interfaced externally with architect/engineer and contractors to provide engineering and cost data regarding project
feasibility
• Knowledgeable of contracting, insurance and bonding
• Compared monthly actuals and adjusted projection based on actual cost
• Managed cost of materials, overhead and job profitability
• Managed contracts with subcontractors and suppliers, testing, general contractors and design professionals
Some Projects Managed:
º Inkster Justice Center/Inkster with Boji Development
º Oak Wood South Shore MRI Addition/Trenton with Kasco Construction
º International Door Relocation /Canton with Walbridge
º Woodward Willis/Detroit with The Monahan Company
º Westland Fire Station /Westland with J.S Vig Construction Company
º Costco Gas Station/ Bloomfield Hills with Jackson Dean
EDUCATION & TRAINING
MASTER IN CONSTRUCTION ENGINEERING MANAGEMENT, Lawrence Technological University, Southfield, MI
Graduated Dec. 2012 - GPA 3.83
Relevant courses:
Techniques of Project Planning & Control (using Primavera Contractor, version 6.1) | Advanced Construction Technique & Methods |
Infrastructure Program Management | Conceptual Estimating (using On-Screen Takeoff estimation program) | Construction Law
CERTIFICATION – CAPM (Certification of Associate of Project Management), PMI, 2010
BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING, University of Technology, Baghdad, Iraq
Senior Project: Design and modeling of City Hall Building
CERTIFICATES OF COMPLETION: New Horizons Learning Center, Livonia, MI
- Coursework in Certification Associate of Project Management (CAPM)
- Microsoft Project 2007
- Microsoft Office 2007
- Negotiating in Business
- Project Communication Management
ASSOCIATIONS & AWARDS
Member of the Project Management Institute
National Member of American Society of Civil Engineers
Member of National Society of Leadership and Success, Lawrence Technological University
Asphalt Pavement Association of Michigan Scholarship award, December, 2011.

More Related Content

What's hot

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJTapesh Ajmera
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
Susitra Anandan
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons Learnt
PMA Consultants
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and tracking
Computer_ at_home
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Schedulingsaurabmi2
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Ahmed Fouad, MCIArb, PMP, SP, RMP
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
sulaiman khan
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
Akash Prasanna
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
SHAZEBALIKHAN1
 
The Benefits of 5D BIM Cost Estimation
The Benefits of 5D BIM Cost Estimation The Benefits of 5D BIM Cost Estimation
The Benefits of 5D BIM Cost Estimation
nibtedu
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
maria_singh
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
Aditi Garg
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
SHAZEBALIKHAN1
 
Detailed project schedule
Detailed project scheduleDetailed project schedule
Detailed project schedulePeica Ionela
 
Construction project coordinator
Construction project coordinatorConstruction project coordinator
Construction project coordinator
projectmanagement12
 

What's hot (17)

COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJCOST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
COST AND TIME CONTROL OF CONSTRUCTION PROJECTS_TKAJ
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
Project Control System
Project Control SystemProject Control System
Project Control System
 
Project Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons LearntProject Cost & Schedule Integration Lessons Learnt
Project Cost & Schedule Integration Lessons Learnt
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and tracking
 
Project planning and Scheduling
Project planning and SchedulingProject planning and Scheduling
Project planning and Scheduling
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
 
construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
The Benefits of 5D BIM Cost Estimation
The Benefits of 5D BIM Cost Estimation The Benefits of 5D BIM Cost Estimation
The Benefits of 5D BIM Cost Estimation
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Detailed project schedule
Detailed project scheduleDetailed project schedule
Detailed project schedule
 
Construction project coordinator
Construction project coordinatorConstruction project coordinator
Construction project coordinator
 

Similar to Construction Estimator

Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam ResumeSamsul Alam
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Amir Mohammed
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERAbd~el Hakim mohamed izran
 
Ppt for Real Estate Project
Ppt for Real Estate ProjectPpt for Real Estate Project
Ppt for Real Estate Project
Isha M
 
Ritwik resume- July
Ritwik resume- JulyRitwik resume- July
Ritwik resume- Julyritwik goud
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanMohideen Sheik Asan
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cvMadhu Civil
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
manishsharma1778
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
manishsharma1778
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas
 

Similar to Construction Estimator (20)

Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
sravankumar
sravankumarsravankumar
sravankumar
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Sunil Final Resume
Sunil Final ResumeSunil Final Resume
Sunil Final Resume
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
CV
CVCV
CV
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEERResume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
Resume - PROJECTS PLANNING, PROJECTS CONTROL LEAD-ENGINEER
 
Ppt for Real Estate Project
Ppt for Real Estate ProjectPpt for Real Estate Project
Ppt for Real Estate Project
 
Ritwik resume- July
Ritwik resume- JulyRitwik resume- July
Ritwik resume- July
 
ASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR octoberASHKAN ROHANIPOUR october
ASHKAN ROHANIPOUR october
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
 
Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises Engineer
 

Recently uploaded

Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

Construction Estimator

  • 1. RANA ALYAS (248) 238-3168 | ranagag@yahoo.com | www.linkedin.com/in/ranagag C O S T E S T I M A T O R Professional within the engineering/construction field with experience with all facets of project coordination from estimation to completion. Ability to conceptualize the big picture and minute details with an expertise in scheduling and follow up. Work with minimal supervision, known as a highly responsible and reliable worker. RELEVANT TALENTS Budgeting Mathematics Organization Communication Computer & Technical Customer Relations Negotiation Scheduling Leadership Self-Taught Highly Analytical Accuracy & Attention to detail Reading Blueprints Time Management Administrative Support Deadline Driven C O M P U T E R S K I L L S Bluebeam Estimating On-Screen Takeoff estimation program Tradesman software masonry Microsoft Project 2000 Primavera Contactor, version 6.1 Microsoft Office Sage Construction Software Auto-CAD PROFESSIONAL EXPERIENCE SUMMARY Project Estimator EJH Construction, Farmington Hills, MI Jul 2016-Current • Prepare budged and calculate cost estimate for different type of buildings/project including a new construction or renovation of interior and exterior elements of the building using Bluebeam estimation software and utilizing excel sheets to calculate the project requirement to submit the documentation for the draft proposal and clarify the bid line items and activities included in the bid. • Interact with client and architect by sending Request for information-RFI to clarify construction documents sent at Request for Proposal/Invitation to bid • Estimate the amount and type of material needed to complete the construction job and check the compatibility against our subcontractor bids/suppliers and decide which subcontractor will use per each cost code line item • Prepare bid document per the instruction to the bidder to submit the bid including the estimated time line for the project /schedule • Make sure that all cost estimate submitted by the contractor are as accurate as possible and obtain subcontractors’ bids • Maintain constant contact with site managers and engineers to evaluate the existing conditions of the project that have an impact on the project estimate • Survey site to determine the cost and scope of work are exact • Estimate cost of inclement weather and unforeseen event that might have impact on the time line and general condition of the project • Calculates the general condition of the construction project and analyze the impact of the time line and items needed for each project individually including but not limited to the project labor, procurement, change order, overhead • Assist in keeping building project within client’s budged limitation while providing value engineering and advice to the clients with the alternates • Track all cost from inception of project to its completion and document it for historical data and lesson learned for future reference • Create responsibility matrix for material used in the project to confirm contractor/owner provide, contractor/owner install items • Participate in buy out process after project award and procurement • Create purchase order/ change order for items purchased from suppliers and subcontractors using sage construction software
  • 2. RANA ALYAS Page 2 Project Estimator D’Aloisio Construction & Masonry, Inc., Farmington Hills, MI Jul 2012-Jul 2015 • Prepared portion of contract proposal estimate including the determination of applicable project plans and specifications • Interpreted design/Drawings and specifications • Coordinated and negotiated suppliers’ prices • Tracked historical data and priced updates • Used Tradesman software for preparing cost estimate and quantities • Provided value engineering services on project designs to bring project within owner’s financial limitations • Interfaced externally with architect/engineer and contractors to provide engineering and cost data regarding project feasibility • Knowledgeable of contracting, insurance and bonding • Compared monthly actuals and adjusted projection based on actual cost • Managed cost of materials, overhead and job profitability • Managed contracts with subcontractors and suppliers, testing, general contractors and design professionals Some Projects Managed: º Inkster Justice Center/Inkster with Boji Development º Oak Wood South Shore MRI Addition/Trenton with Kasco Construction º International Door Relocation /Canton with Walbridge º Woodward Willis/Detroit with The Monahan Company º Westland Fire Station /Westland with J.S Vig Construction Company º Costco Gas Station/ Bloomfield Hills with Jackson Dean EDUCATION & TRAINING MASTER IN CONSTRUCTION ENGINEERING MANAGEMENT, Lawrence Technological University, Southfield, MI Graduated Dec. 2012 - GPA 3.83 Relevant courses: Techniques of Project Planning & Control (using Primavera Contractor, version 6.1) | Advanced Construction Technique & Methods | Infrastructure Program Management | Conceptual Estimating (using On-Screen Takeoff estimation program) | Construction Law CERTIFICATION – CAPM (Certification of Associate of Project Management), PMI, 2010 BACHELOR OF SCIENCE IN ARCHITECTURAL ENGINEERING, University of Technology, Baghdad, Iraq Senior Project: Design and modeling of City Hall Building CERTIFICATES OF COMPLETION: New Horizons Learning Center, Livonia, MI - Coursework in Certification Associate of Project Management (CAPM) - Microsoft Project 2007 - Microsoft Office 2007 - Negotiating in Business - Project Communication Management ASSOCIATIONS & AWARDS Member of the Project Management Institute National Member of American Society of Civil Engineers Member of National Society of Leadership and Success, Lawrence Technological University Asphalt Pavement Association of Michigan Scholarship award, December, 2011.