2. 2
Learning objectives
• Identify the types of bridges
• Identify the different materials for the proposed pedestrian
bridge.
• Identify the different bridge designs and materials used in
modern day engineering.
• Identify how to use various equipment
3. About DCC (Pvt.)Ltd
DCC (PVT) Ltd is a leader in the Construction sector and
has been committed to provide the best solutions working
as the major constructor over 6 years.
DCC (PVT) Ltd has a breadth of experience encompassing
all forms of construction works like bridges,
communication towers and wind power plants.
DCC (PVT) Ltd is confident in its ability to meet specific
project needs through its superior quality specialized in
minor construction with Singaporean quality standard.
3
4. Organization of DCC (Pvt.)Ltd
4
Mr. Pramodya M.H.D
Mr. Weerasinghe C.C
Board of Directors
Mr. Lunuvilage W.L.R
Project Engineer
Mr. Wickramasinghe A.A.K.G
Project Designer
Miss. Dias T.G.S.L.S
Project Co-ordinator
Mr. Pramodya M.H.D
CEO
Miss. Weerasinghe
W.M.N.R
Secretary
6. Phase I
• Collecting the necessary materials for the
construction
• Assembling the components.
• Completed on the 12th September
Phase II
• Testing and development stage: Testing if the ropes
have enough strength to hold. And also testing if
the type of timber has enough strength to carry 70
kg load.
• Completed on 21st September
Time schedule
6
8. Comparison between Principals of Engineering and
Previous Learning.
8
Principals of engineering previous learning
• Documentary purpose.(RFP,
Proposals, Change request forms)
• No documentary purpose
• Project was done by a contractor. • No any contractors involved.
• Contractors were consult by a
specific consulting group.
• Consultations were not given during the
project.
• Every task of the project was done
by a company .
• Project was only a group project .
9. 9
What we have learnt?
• How to form a company
• How the professional constructions were done
• How to make an agreement according to a RFP and how to work with it
• Assuring the dead lines for submissions were met.
• The correct order when making changes in change requests
• How to contract a project under consultation
• How to consult a project
11. 11
Future application of the
learning.
This learning outcomes are better
path for our future engineering
activates.
From the all documentary activity
we got an experience how to
world in a project.