CONDITION SURVEY AND NON
DESTRUCTIVE EVALUTION
AVINASH KUMAR GUPTA
CCW TRAINING INSTITUTE
NEW DELHI
07/04/2017
CONDITION SURVEY
• Examination of concrete
• For identifying and defining areas of distress.
• Recording history from inception to
completion and subsequent life.
Objective
• Identify cause of distress and sources
• Assess: extent of distress due to corrosion,
fire, earthquake, any other reason
• Asses residual strength of structure and its
rehabilitability
• Prioritize the distressed elements as per
seriousness.
• To select and plan the effective remedy.
Stages of condition survey
• Prioritize distressed elements according to
seriousness for repairs.
• a) Preliminary inspection
• b) Planning
• c)Visual Inspection
• d) Field and laboratory testing.
Preliminary inspection
• History of structure from client, owner,
occupants, General public in building,
• Note records, previous repairs history and
expenses done for the same.
• All possible data and information.
• Practical restriction in survey and safety
requirements for survey team.
• Extent and quantum of survey work
• Time required ( survey and execution )
• Advise immediate safety measures
Information gathering
• . Period of construction
• Construction details (drg,arch,structural )
• Exposure conditions
• Designed and present use of structure.
• Previous changes in use
• Record of structural changes if done.
• Record of 1st
occurrence of defect.
• Details of repairs carried out previously.
• Previous reports etc.
• Details from owner, photographs
Planning survey
• Field documents
• Plans and actual observations each room-
wise.
• Previous report , advise if any and
implementation done as per report,
• Grouping of structural elements ( external,
interior etc )
• Exposure conditions
Classification of damage
• Class O : No distress but cosmetic repairs
• Class 1 : Minor repairs ( superficial repairs )
• Class 2 : Medium repairs ( patch repairs )
(minor structure cracks)
• Class 3 : Principal repairs (spalling of cover
concrete,structural cracks,cracks along bars)
• Class O : Major repairs(replacement of
structural Members)
Grade for Assessment of the building
• Based on the inspection and observation the distress level of the
selected buildings may be categorizedas mentioned below:
• G1 – No distress observed
• G1 – Minor distress observed in few structural members, which can
be repaired under the advice of a structural engineer.
• G2 – Medium distress observed in few structural members, which
can be repaired / rehabilitated including strengthening with the
advice of a structural engineer
• G3 – Severe distress observed in some of the structural members,
which can be rehabilitated including strengthening with the advice
of a structural engineer.
• G4 – Severe distress is observed which could prove dangerous,
hence evacuation at an early date is required.
Visual Inspection
• Workmanship, structural serviceability, material
deterioration mechanism
• General health( structural and non structural elements)
• Preparation of estimate / bill of quantities.
• Quantify extent of distress
• Photographic record.
• Obstructions for visual inspection to be noted.
• Understanding structural system / deviations
• Leakage , seepage due to inadequate drainage system
• Types of cracks and its pattern
• Color and texture of concrete surface (chemical attack or
disintegration by way of leaching
Record
• Areas of high distress
• Cracks and their locations
• Excessive deflections
• Exposure conditions of various distressed areas.
• Moisture / seepage / leakages / dampness
locations.
• Abnormal vibrations in structure.
• Algae, fungus growth, trees on structure.
• Photographic record.
• Areas of immediate concern
Considerations for repairs strategy
• Identification of cause of problem.
• Assessment and extent of damage.
• Availability space and accessibility w.r.t.
ongoing activities in building.
• propping structural members in case of major
repairs , severely damaged elements (columns
etc ).
• Safety measures to avoid mishaps
Non destructive Evaluation tests
• These tests do not impair performance of the
member, They are field or laboratory tests.
• Put under five categories based on purpose,
In-situ-Concrete strength
Chemical attack
Corrosion activity
Fire damage
Structural integrity and soundness
Non Destructive Testing
• Nondestructive testing in the broad sense
refers to methods whereby internal
characteristics of solid structures can be
examined without permanently affecting the
structure. Thus, parts that prove to be
satisfactory under specified test conditions
are not degraded by the test procedures
NDT , Introduction
• Nondestructive testing (NDT) is the process of
inspecting, testing, or evaluating materials,
components or assemblies for discontinuities,
or differences in characteristics without
destroying the serviceability of the part or
system. In other words, when the inspection
or test is completed the part can still be used
NDT- Purpose
•-Assessment of Existing Structures in the
Absence of Drawings.
•-Quick assessment of the structure
NDT -Advantages
• Access to hidden items – “see through
walls”
• Better investigations with NDT
• Rapid accumulation of data
• Generally less expensive than destructive
testing.
NDT - Disadvantages
1. More than one test method may be required
2. Environmental conditions may effect or
distort results
3. Construction details & building components
may effect results
4. Some conditions cannot be determined with
a reasonable degree of accuracy without
destructive testing
Non destructive Testing
• A : In- situ-concrete test
• - rebound hammer
• - Ultrasonic pulse velocity
• - Windsor probe
• - Pull out test :
• Core cutting / sampling, lab testing of cores
• - Load test
Non destructive Testing
• B : Chemical attack
• Carbonation test
• Chloride test
• Sulphate test
• C: Corrosion potential assessment
• Cover meter ( checking cover)
• Half cell potential
• Resistivity meter
• Permeability ( air and water )
Non destructive Testing.
• D: Fire damage assessment
• Thermo gravimetric analysis (TGA)
• Differential Thermal analysis (DTA)
• X-ray diffraction (XRD)
• E: Structural Integrity/ soundness
• Ultrasonic pulse velocity ( discontinuities, cracks
and depth of cracks)
• Radiography
• Impact echo test
• The rebound hammer can provide a fairly
accurate estimate of concrete compressive
strength.
• The concrete should be 14 to 56 days old.
• Surface Condition:
• The surface of the concrete at the point tested
must be smooth, dry, and free of honeycombing.
Otherwise, rebound readings will be low
Indicating a weaker concrete than is actually the
case. The rubbing stone provided can be used to
grind the surface smooth, if necessary
Location of Test PointsLocation of Test Points
• The concrete to be tested must be at least
four inches thick: It is also recommended that
readings be taken only where the concrete
has been in contact with the form. These
conditions are most easily satisfied if the
readings are taken along the edge of the tank
on the sides and ends where the adjoining
concrete face (i.e., wall, top, or bottom) can
support the point of contact.
PROCEDURE
• Remove hammer from case and press the
plunger end against a hard surface to release the
plunger from the locked position. (Do not press
lock button while doing this.)
• Position hammer horizontally with plunger end
against wall at a point.
• Slowly apply pressure until hammer fires. This
will occur when only approximately 1/2 inch of
the plunger is still visible. Do not press the lock
button during this step.
• A). Remove hammer from case and press the
plunger end against a hard surface to release
the plunger from the locked position. (Do not
press lock button while doing this.)
• B). Position hammer horizontally with plunger
end against wall at a point.
• C). Slowly apply pressure until hammer fires.
This will occur when only approximately 1/2
inch of the plunger is still visible. Do not press
the lock button during this step
Procedure Contd.
• With the hammer still pressed against the
wall, read the rebound number off the scale
provided on the hammer. If it is necessary to
move the hammer before reading, press the
lock button. The rebound number should be
read to two significant figures.
• Repeat the above procedure at different
points around the wall until a total of ten
readings has been taken
This is based on the principle that the velocity
of an ultrasonic pulse through any material
depends upon the density. Comparatively
higher velocity is obtained when concrete
quality is good in terms of density, uniformity
etc.
Pulse Velocity measurements can be used to
assess the presence of cracks, voids etc.,
quality of concrete relative to standards
requirements.
UPV Test contd.
There are three possible ways of measuring
pulse velocity.
 i) Direct transmission
ii) Semi direct transmission
iii) Indirect transmission (surface probing)
Out of the three methods, the direct
transmission method is considered to be the
best
condition of concrete based on
pulse velocity are given below
S.No. Pulse Velocity Condition of concrete
I in(Km/Sec.)
•1. Above 4.5 Excellent
•2. 3.5 to 4.5 Good
•3. 3.0 to 3.5 Medium
•4. Below 3.0 Poor
PULLOUT TESTPULLOUT TEST
• The fundamental principle behind pull out testing
with LOK-test and CAPO test is that the test
equipment designed to a specific geometry will
produce results (pull-out forces) that closely
correlate to the compressive strength of concrete.
The first method ,using the cast steel disc is called LOK
test. The second method shown in fig.2 using
expandable ring is called CAPO test (i.e. Cut and Pull
out Test). The diameter of both the disc and ring is
25mm. the distance to the concrete surface is also
25mm. the inner diameter of the counter-pressure is
55mm.
The relationship between the pullout force Fu
in kN and compressive strength Fc in MPa
The relationship between the pullout force Fu in kN and compressive strength Fc in MPa is given in fig
04/14/17 38
Pull out tests are used toPull out tests are used to
 Determine in-situ compressive strength of the
concrete
 Ascertain the strength of concrete for
carrying out post tensioning operations.
 Determine the time of removal of forms and
shores based on actual in-situ strength of the
structure.
 Terminate curing based on in-situ strength
of the structure
4.Core cutter4.Core cutter
The test should be taken at points where
minimum strength and maximum stress are
likely to coincide. But, at the same time, the
core cutting causes some damage to the
member and may impair the future
performance of the member. Therefore, in
slender members, the core should be taken
away from the critical section. For
compression testing, the diameter of the core
should be at least three times the nominal
maximum aggregate size
Core Cutter is used to cut the core from the
existing concrete structure for testing the
physical properties of the concrete like
compressive strength, density, water
absorption, crack depth and chemical test like
depth of carbonation and chloride content
etc. It can also be used to inspect the interior
region of the structural members.
Core Cutter Set UP
• Cover meters are electromagnetic in
operation. Electric currents in a coil winding in
the search head generate a magnetic field
which propagates through the concrete and
will interact with any buried metal present,
such as reinforcing steel.It is the generic term
for equipment used to locate steel reinforcing
bar in concrete and to estimate the thickness
of the concrete cover over the reinforcement
04/14/17 46
Tomography means imaging an object by
taking measurements from “slices” of its cross-
section.
Tomography means imaging an object by taking
measurements from “slices” of its cross-section.
04/14/17 47
4/14/17 4
04/14/17 49
This test is carried out to assess the quality / uniformity of concrete
at various depths. The instrument consists of a four probe device.
Electrical current is passed through the outer probes & the potential
drop is measured by the inner probes. From the current & voltage
drop measurements, the resistivity of concrete can be measured.
Electrical resistivity = 2(pi)aE/i (in kilo-ohm cm)
where a = distance between probes
= 5 cm in the 1st set of readings
= 10 cm in the 2nd set of readings
E = potential difference between inner two probes in mV
Most useful test in tunnel structure
Condition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concrete

More Related Content

What's hot

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
Shahrukh Niaz
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
Ankit Patel
 
causes & prevention of cracks
causes & prevention of crackscauses & prevention of cracks
causes & prevention of cracks
Bhavek Sharma
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
Bhalchandra Tankkar
 
Building Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresBuilding Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structures
Rithika Ravishankar
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
Ayaz khan
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
Manikandan
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
Aglaia Connect
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniques
bholu sharma
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
Karthi Kavya
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
Nayana 54321
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
SUPREETH Suppi
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
Dhaval Jadhav
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
Janki Patel
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
Yash Kumar
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
shlok patel
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
Muhammad Sultan
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
GAURAV. H .TANDON
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
brijlata sharma
 
DEFECTS IN CONCRETE
DEFECTS IN CONCRETE DEFECTS IN CONCRETE
DEFECTS IN CONCRETE
pnorhayati
 

What's hot (20)

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
causes & prevention of cracks
causes & prevention of crackscauses & prevention of cracks
causes & prevention of cracks
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Building Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structuresBuilding Failures and its Causes- Theory of structures
Building Failures and its Causes- Theory of structures
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 
Maintenance and repair strategies
Maintenance and repair strategiesMaintenance and repair strategies
Maintenance and repair strategies
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
demolition techniques
demolition techniquesdemolition techniques
demolition techniques
 
Causes of deterioration of concrete structures
Causes of deterioration of concrete structuresCauses of deterioration of concrete structures
Causes of deterioration of concrete structures
 
Crack repair techniques
Crack repair techniquesCrack repair techniques
Crack repair techniques
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
 
Retrofitting
RetrofittingRetrofitting
Retrofitting
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
types of cracks in building
types of cracks in buildingtypes of cracks in building
types of cracks in building
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
DEFECTS IN CONCRETE
DEFECTS IN CONCRETE DEFECTS IN CONCRETE
DEFECTS IN CONCRETE
 

Similar to Condition survey and non destructive evalution of concrete

Non Destructive test
Non Destructive testNon Destructive test
Non Destructive test
Gaurang Kakadiya
 
UNIT 4.ppt
UNIT 4.pptUNIT 4.ppt
UNIT 4.ppt
mythili spd
 
Non Destructive Test
Non Destructive TestNon Destructive Test
Non Destructive Test
Parth Desani
 
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHULNDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
Anshul Shakya
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
Vineeshkumar K V
 
Strength evaluation of existing structures
Strength evaluation of existing structuresStrength evaluation of existing structures
Strength evaluation of existing structures
Shahrukh Niaz
 
repairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdfrepairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdf
027NaveenKumarV
 
Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction
SAURABH GUPTA
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
Ramanuj Jaldhari
 
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / RestorationNon-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
pandian18
 
Non destructive tests on Concrete.pptx
Non destructive tests on Concrete.pptxNon destructive tests on Concrete.pptx
Non destructive tests on Concrete.pptx
ReigerRoyal
 
Non Destructive and Partially Destructive Testing Of Concrete Structures
Non Destructive and Partially Destructive Testing Of Concrete StructuresNon Destructive and Partially Destructive Testing Of Concrete Structures
Non Destructive and Partially Destructive Testing Of Concrete Structures
Gautam Chaurasia
 
summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...
Neha Singh
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structures
sanjanam9
 
Material Testing, Machines And Equipment Requirements
Material Testing, Machines And Equipment RequirementsMaterial Testing, Machines And Equipment Requirements
Material Testing, Machines And Equipment Requirements
amrutaware2
 
MATERIAL TESTING,EQUIPMENTS.pptx
MATERIAL TESTING,EQUIPMENTS.pptxMATERIAL TESTING,EQUIPMENTS.pptx
MATERIAL TESTING,EQUIPMENTS.pptx
PranotiHunungare
 
Non destructive testing (Civil Engineering )
Non destructive testing (Civil Engineering )Non destructive testing (Civil Engineering )
Non destructive testing (Civil Engineering )
AkashBhardwaj103
 
Condition survey and nde
Condition survey and ndeCondition survey and nde
Condition survey and nde
Jay Bhavsar
 
Non destruction test
Non destruction testNon destruction test
Non destruction test
Jaswanth J
 
Nondestructive Testing (NDT)
Nondestructive Testing (NDT)Nondestructive Testing (NDT)
Nondestructive Testing (NDT)
PRAVEEN KUMAR YADAV
 

Similar to Condition survey and non destructive evalution of concrete (20)

Non Destructive test
Non Destructive testNon Destructive test
Non Destructive test
 
UNIT 4.ppt
UNIT 4.pptUNIT 4.ppt
UNIT 4.ppt
 
Non Destructive Test
Non Destructive TestNon Destructive Test
Non Destructive Test
 
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHULNDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
NDT (NON DESTRUCTIVE TESTING) OF CONCRETE STRUCTURE ANSHUL
 
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEMROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
ROBOT AIDED TUNNEL INSPECTION AND MAINTENANCE SYSTEM
 
Strength evaluation of existing structures
Strength evaluation of existing structuresStrength evaluation of existing structures
Strength evaluation of existing structures
 
repairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdfrepairandrehabilitation-150105022737-conversion-gate02.pdf
repairandrehabilitation-150105022737-conversion-gate02.pdf
 
Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction Non destructive test in CIVIL ENGINEERING Construction
Non destructive test in CIVIL ENGINEERING Construction
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / RestorationNon-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
 
Non destructive tests on Concrete.pptx
Non destructive tests on Concrete.pptxNon destructive tests on Concrete.pptx
Non destructive tests on Concrete.pptx
 
Non Destructive and Partially Destructive Testing Of Concrete Structures
Non Destructive and Partially Destructive Testing Of Concrete StructuresNon Destructive and Partially Destructive Testing Of Concrete Structures
Non Destructive and Partially Destructive Testing Of Concrete Structures
 
summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structures
 
Material Testing, Machines And Equipment Requirements
Material Testing, Machines And Equipment RequirementsMaterial Testing, Machines And Equipment Requirements
Material Testing, Machines And Equipment Requirements
 
MATERIAL TESTING,EQUIPMENTS.pptx
MATERIAL TESTING,EQUIPMENTS.pptxMATERIAL TESTING,EQUIPMENTS.pptx
MATERIAL TESTING,EQUIPMENTS.pptx
 
Non destructive testing (Civil Engineering )
Non destructive testing (Civil Engineering )Non destructive testing (Civil Engineering )
Non destructive testing (Civil Engineering )
 
Condition survey and nde
Condition survey and ndeCondition survey and nde
Condition survey and nde
 
Non destruction test
Non destruction testNon destruction test
Non destruction test
 
Nondestructive Testing (NDT)
Nondestructive Testing (NDT)Nondestructive Testing (NDT)
Nondestructive Testing (NDT)
 

More from Avinash Kumar Gupta

Principles of natural justice
Principles of natural justicePrinciples of natural justice
Principles of natural justice
Avinash Kumar Gupta
 
Time schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APARTime schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APAR
Avinash Kumar Gupta
 
Orders regarding apar
Orders regarding apar Orders regarding apar
Orders regarding apar
Avinash Kumar Gupta
 
APAR guidelines
APAR  guidelinesAPAR  guidelines
APAR guidelines
Avinash Kumar Gupta
 
Total station
Total stationTotal station
Total station
Avinash Kumar Gupta
 
GPS surveying/DIGITAL SURVEYING
GPS  surveying/DIGITAL SURVEYINGGPS  surveying/DIGITAL SURVEYING
GPS surveying/DIGITAL SURVEYING
Avinash Kumar Gupta
 
Service contracts ii
Service contracts iiService contracts ii
Service contracts ii
Avinash Kumar Gupta
 
Engaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part iEngaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part i
Avinash Kumar Gupta
 
Procurement of goods , GFR provisions
Procurement of goods , GFR provisionsProcurement of goods , GFR provisions
Procurement of goods , GFR provisions
Avinash Kumar Gupta
 
Procurement of services
Procurement of  servicesProcurement of  services
Procurement of services
Avinash Kumar Gupta
 
GST on works contract
GST on  works contractGST on  works contract
GST on works contract
Avinash Kumar Gupta
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
Avinash Kumar Gupta
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
Avinash Kumar Gupta
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicals
Avinash Kumar Gupta
 
Illustrations. repairing of structures
Illustrations. repairing of structuresIllustrations. repairing of structures
Illustrations. repairing of structures
Avinash Kumar Gupta
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitation
Avinash Kumar Gupta
 
Rehabilitation methods
Rehabilitation methodsRehabilitation methods
Rehabilitation methods
Avinash Kumar Gupta
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
Avinash Kumar Gupta
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
Avinash Kumar Gupta
 
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
Avinash Kumar Gupta
 

More from Avinash Kumar Gupta (20)

Principles of natural justice
Principles of natural justicePrinciples of natural justice
Principles of natural justice
 
Time schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APARTime schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APAR
 
Orders regarding apar
Orders regarding apar Orders regarding apar
Orders regarding apar
 
APAR guidelines
APAR  guidelinesAPAR  guidelines
APAR guidelines
 
Total station
Total stationTotal station
Total station
 
GPS surveying/DIGITAL SURVEYING
GPS  surveying/DIGITAL SURVEYINGGPS  surveying/DIGITAL SURVEYING
GPS surveying/DIGITAL SURVEYING
 
Service contracts ii
Service contracts iiService contracts ii
Service contracts ii
 
Engaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part iEngaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part i
 
Procurement of goods , GFR provisions
Procurement of goods , GFR provisionsProcurement of goods , GFR provisions
Procurement of goods , GFR provisions
 
Procurement of services
Procurement of  servicesProcurement of  services
Procurement of services
 
GST on works contract
GST on  works contractGST on  works contract
GST on works contract
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicals
 
Illustrations. repairing of structures
Illustrations. repairing of structuresIllustrations. repairing of structures
Illustrations. repairing of structures
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitation
 
Rehabilitation methods
Rehabilitation methodsRehabilitation methods
Rehabilitation methods
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
 
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
 

Recently uploaded

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 

Recently uploaded (20)

在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 

Condition survey and non destructive evalution of concrete

  • 1. CONDITION SURVEY AND NON DESTRUCTIVE EVALUTION AVINASH KUMAR GUPTA CCW TRAINING INSTITUTE NEW DELHI 07/04/2017
  • 2. CONDITION SURVEY • Examination of concrete • For identifying and defining areas of distress. • Recording history from inception to completion and subsequent life.
  • 3. Objective • Identify cause of distress and sources • Assess: extent of distress due to corrosion, fire, earthquake, any other reason • Asses residual strength of structure and its rehabilitability • Prioritize the distressed elements as per seriousness. • To select and plan the effective remedy.
  • 4. Stages of condition survey • Prioritize distressed elements according to seriousness for repairs. • a) Preliminary inspection • b) Planning • c)Visual Inspection • d) Field and laboratory testing.
  • 5. Preliminary inspection • History of structure from client, owner, occupants, General public in building, • Note records, previous repairs history and expenses done for the same. • All possible data and information. • Practical restriction in survey and safety requirements for survey team. • Extent and quantum of survey work • Time required ( survey and execution ) • Advise immediate safety measures
  • 6. Information gathering • . Period of construction • Construction details (drg,arch,structural ) • Exposure conditions • Designed and present use of structure. • Previous changes in use • Record of structural changes if done. • Record of 1st occurrence of defect. • Details of repairs carried out previously. • Previous reports etc. • Details from owner, photographs
  • 7. Planning survey • Field documents • Plans and actual observations each room- wise. • Previous report , advise if any and implementation done as per report, • Grouping of structural elements ( external, interior etc ) • Exposure conditions
  • 8. Classification of damage • Class O : No distress but cosmetic repairs • Class 1 : Minor repairs ( superficial repairs ) • Class 2 : Medium repairs ( patch repairs ) (minor structure cracks) • Class 3 : Principal repairs (spalling of cover concrete,structural cracks,cracks along bars) • Class O : Major repairs(replacement of structural Members)
  • 9. Grade for Assessment of the building • Based on the inspection and observation the distress level of the selected buildings may be categorizedas mentioned below: • G1 – No distress observed • G1 – Minor distress observed in few structural members, which can be repaired under the advice of a structural engineer. • G2 – Medium distress observed in few structural members, which can be repaired / rehabilitated including strengthening with the advice of a structural engineer • G3 – Severe distress observed in some of the structural members, which can be rehabilitated including strengthening with the advice of a structural engineer. • G4 – Severe distress is observed which could prove dangerous, hence evacuation at an early date is required.
  • 10. Visual Inspection • Workmanship, structural serviceability, material deterioration mechanism • General health( structural and non structural elements) • Preparation of estimate / bill of quantities. • Quantify extent of distress • Photographic record. • Obstructions for visual inspection to be noted. • Understanding structural system / deviations • Leakage , seepage due to inadequate drainage system • Types of cracks and its pattern • Color and texture of concrete surface (chemical attack or disintegration by way of leaching
  • 11. Record • Areas of high distress • Cracks and their locations • Excessive deflections • Exposure conditions of various distressed areas. • Moisture / seepage / leakages / dampness locations. • Abnormal vibrations in structure. • Algae, fungus growth, trees on structure. • Photographic record. • Areas of immediate concern
  • 12. Considerations for repairs strategy • Identification of cause of problem. • Assessment and extent of damage. • Availability space and accessibility w.r.t. ongoing activities in building. • propping structural members in case of major repairs , severely damaged elements (columns etc ). • Safety measures to avoid mishaps
  • 13. Non destructive Evaluation tests • These tests do not impair performance of the member, They are field or laboratory tests. • Put under five categories based on purpose, In-situ-Concrete strength Chemical attack Corrosion activity Fire damage Structural integrity and soundness
  • 14. Non Destructive Testing • Nondestructive testing in the broad sense refers to methods whereby internal characteristics of solid structures can be examined without permanently affecting the structure. Thus, parts that prove to be satisfactory under specified test conditions are not degraded by the test procedures
  • 15. NDT , Introduction • Nondestructive testing (NDT) is the process of inspecting, testing, or evaluating materials, components or assemblies for discontinuities, or differences in characteristics without destroying the serviceability of the part or system. In other words, when the inspection or test is completed the part can still be used
  • 16. NDT- Purpose •-Assessment of Existing Structures in the Absence of Drawings. •-Quick assessment of the structure
  • 17. NDT -Advantages • Access to hidden items – “see through walls” • Better investigations with NDT • Rapid accumulation of data • Generally less expensive than destructive testing.
  • 18. NDT - Disadvantages 1. More than one test method may be required 2. Environmental conditions may effect or distort results 3. Construction details & building components may effect results 4. Some conditions cannot be determined with a reasonable degree of accuracy without destructive testing
  • 19. Non destructive Testing • A : In- situ-concrete test • - rebound hammer • - Ultrasonic pulse velocity • - Windsor probe • - Pull out test : • Core cutting / sampling, lab testing of cores • - Load test
  • 20. Non destructive Testing • B : Chemical attack • Carbonation test • Chloride test • Sulphate test • C: Corrosion potential assessment • Cover meter ( checking cover) • Half cell potential • Resistivity meter • Permeability ( air and water )
  • 21. Non destructive Testing. • D: Fire damage assessment • Thermo gravimetric analysis (TGA) • Differential Thermal analysis (DTA) • X-ray diffraction (XRD) • E: Structural Integrity/ soundness • Ultrasonic pulse velocity ( discontinuities, cracks and depth of cracks) • Radiography • Impact echo test
  • 22. • The rebound hammer can provide a fairly accurate estimate of concrete compressive strength. • The concrete should be 14 to 56 days old. • Surface Condition: • The surface of the concrete at the point tested must be smooth, dry, and free of honeycombing. Otherwise, rebound readings will be low Indicating a weaker concrete than is actually the case. The rubbing stone provided can be used to grind the surface smooth, if necessary
  • 23. Location of Test PointsLocation of Test Points • The concrete to be tested must be at least four inches thick: It is also recommended that readings be taken only where the concrete has been in contact with the form. These conditions are most easily satisfied if the readings are taken along the edge of the tank on the sides and ends where the adjoining concrete face (i.e., wall, top, or bottom) can support the point of contact.
  • 24.
  • 25. PROCEDURE • Remove hammer from case and press the plunger end against a hard surface to release the plunger from the locked position. (Do not press lock button while doing this.) • Position hammer horizontally with plunger end against wall at a point. • Slowly apply pressure until hammer fires. This will occur when only approximately 1/2 inch of the plunger is still visible. Do not press the lock button during this step.
  • 26. • A). Remove hammer from case and press the plunger end against a hard surface to release the plunger from the locked position. (Do not press lock button while doing this.) • B). Position hammer horizontally with plunger end against wall at a point. • C). Slowly apply pressure until hammer fires. This will occur when only approximately 1/2 inch of the plunger is still visible. Do not press the lock button during this step
  • 27. Procedure Contd. • With the hammer still pressed against the wall, read the rebound number off the scale provided on the hammer. If it is necessary to move the hammer before reading, press the lock button. The rebound number should be read to two significant figures. • Repeat the above procedure at different points around the wall until a total of ten readings has been taken
  • 28.
  • 29. This is based on the principle that the velocity of an ultrasonic pulse through any material depends upon the density. Comparatively higher velocity is obtained when concrete quality is good in terms of density, uniformity etc. Pulse Velocity measurements can be used to assess the presence of cracks, voids etc., quality of concrete relative to standards requirements.
  • 30. UPV Test contd. There are three possible ways of measuring pulse velocity.  i) Direct transmission ii) Semi direct transmission iii) Indirect transmission (surface probing) Out of the three methods, the direct transmission method is considered to be the best
  • 31.
  • 32.
  • 33.
  • 34. condition of concrete based on pulse velocity are given below S.No. Pulse Velocity Condition of concrete I in(Km/Sec.) •1. Above 4.5 Excellent •2. 3.5 to 4.5 Good •3. 3.0 to 3.5 Medium •4. Below 3.0 Poor
  • 35. PULLOUT TESTPULLOUT TEST • The fundamental principle behind pull out testing with LOK-test and CAPO test is that the test equipment designed to a specific geometry will produce results (pull-out forces) that closely correlate to the compressive strength of concrete. The first method ,using the cast steel disc is called LOK test. The second method shown in fig.2 using expandable ring is called CAPO test (i.e. Cut and Pull out Test). The diameter of both the disc and ring is 25mm. the distance to the concrete surface is also 25mm. the inner diameter of the counter-pressure is 55mm.
  • 36.
  • 37.
  • 38. The relationship between the pullout force Fu in kN and compressive strength Fc in MPa The relationship between the pullout force Fu in kN and compressive strength Fc in MPa is given in fig 04/14/17 38
  • 39. Pull out tests are used toPull out tests are used to  Determine in-situ compressive strength of the concrete  Ascertain the strength of concrete for carrying out post tensioning operations.  Determine the time of removal of forms and shores based on actual in-situ strength of the structure.  Terminate curing based on in-situ strength of the structure
  • 40. 4.Core cutter4.Core cutter The test should be taken at points where minimum strength and maximum stress are likely to coincide. But, at the same time, the core cutting causes some damage to the member and may impair the future performance of the member. Therefore, in slender members, the core should be taken away from the critical section. For compression testing, the diameter of the core should be at least three times the nominal maximum aggregate size
  • 41. Core Cutter is used to cut the core from the existing concrete structure for testing the physical properties of the concrete like compressive strength, density, water absorption, crack depth and chemical test like depth of carbonation and chloride content etc. It can also be used to inspect the interior region of the structural members.
  • 43.
  • 44.
  • 45. • Cover meters are electromagnetic in operation. Electric currents in a coil winding in the search head generate a magnetic field which propagates through the concrete and will interact with any buried metal present, such as reinforcing steel.It is the generic term for equipment used to locate steel reinforcing bar in concrete and to estimate the thickness of the concrete cover over the reinforcement
  • 47. Tomography means imaging an object by taking measurements from “slices” of its cross- section. Tomography means imaging an object by taking measurements from “slices” of its cross-section. 04/14/17 47
  • 50. This test is carried out to assess the quality / uniformity of concrete at various depths. The instrument consists of a four probe device. Electrical current is passed through the outer probes & the potential drop is measured by the inner probes. From the current & voltage drop measurements, the resistivity of concrete can be measured. Electrical resistivity = 2(pi)aE/i (in kilo-ohm cm) where a = distance between probes = 5 cm in the 1st set of readings = 10 cm in the 2nd set of readings E = potential difference between inner two probes in mV Most useful test in tunnel structure