The document outlines the differences between quality control (QC) inspections and commissioning inspections within the construction industry, emphasizing the roles of each in ensuring project quality and performance. QC focuses on confirming proper installation of equipment, while commissioning verifies functionality and performance through systematic checks. Key documents like inspection test plans, mechanical completion checklists, and pre-commissioning checklists are critical to the transition from QC to commissioning.