Facility Testing & Commissioning
Agenda
Karle Infra Pvt. Ltd
2
 Introduction
 Commissioning process
 Commissioning Team
 Roles and Responsibilities
 Requirements for Commissioning
 Co-ordination and Weekly meetings
 Sample checklists and formats
 Commissioning schedule
Process
Karle Infra Pvt. Ltd3
 KIP / commissioning team will interact with T&C for Inspection and
Reliability Testing.
 A “Inspection and Testing plan” ( including TP inspections) shall be
developed by the agency for the project in line with the requirement of
specifications
 KIP Project / KIP Facilities will review the documents / witness testing
before a go-ahead to use materials or accepting works.
Karle Infra Pvt. Ltd4
 Needs to submit approved samples to Project Manager and obtain
sign off
 Additional tests and inspections will be carried out wherever
required
 Green-tagging will be done for all the equipments prior to
commissioning.
 Blue tagging will be done after closing the SORs
 Components of the commissioning process
 Design Verification
 Operational Acceptance Test (OAT) / Room readiness
 Green Tag
 Functional Acceptance Test (FAT)
 Blue Tag
 Start Up
 Shakedown
Requirements
Karle Infra Pvt. Ltd5
 IFC (Issued for Construction)Drawings
 Basis of comparison for design verification
 (owner : KIP to provide one set to commissioning team)
 Equipment list and tag numbers
(owner- KIP)
 Commissioning Checklists
 (Owner : Facilities / C&W )
 Operation manuals / Catalogues
 (Owner : PMC / KIP to provide all docs to commissioning team)
 Site observation reports / Punch lists
 (Owner : TP/ Facilities / C&W)
 As built drawings
 ( Owner : KIP / Project)
 Room readiness checks and results
 Special commissioning tools and instruments
 (Owner : Facilities / C&W or TP vendor on need basis)
 Tags
 (Owner : Commissioning team)
Karle Infra Pvt. Ltd6
System Acceptance Process
Design Verification
Site Observation Report / Punch List
Fix Critical SORs
Operational Acceptance Tests
Fix all SORs
Functional Acceptance Tests
Green Tag
Blue Tag
KIP Facilities / Sustaining
Project Team
Facilities Sustaining Team
Co-ordination & Recurrence Weekly
Meetings
Karle Infra Pvt. Ltd7
 For better Co-ordination
 Facilities / TP (C&W) commissioning team single point of contact for all
commissioning issues
 Pre-planning daily tasks based on commissioning schedule
 Sharing of all checklists and formats for clear understanding
 Publication of all SORs to stakeholders at the end of each day
 Prompt closure of SORs and communication of closure
 Prioritization of work – Focus on critical SORs
 Issues if any noticed by commissioning team shall be addressed to Karle
PM/ SPOC
 No deviation from set process – follow established schedule
Commissioning meetings will be held on XXXXX Facilities
decides
Check lists & SORs
Karle Infra Pvt. Ltd8
Commissioning submittals
Karle Infra Pvt. Ltd9
10
TBD
Security issues
CCTV @ entry & Exit.
Laour/manpower management - location
Transit Management
Bill of Quantities
Statutory Documents
As Built Drawings
Project Review
Design Aspects
Equipment Selection
HOTO
Green Tag 3rd Party Inspection
Blue Tag
Operation & Management
equipment Selection
Spares
Service manuals
Fit out Issues
Safety
material management and etc
Water Consumption
Electricity Consumption
Work Schedule Plan
Pumps
CCTV app.
Exhaust System
Go Green
Energy Meter
Water Flow ,meter
List of Vendors
Contract Terms and Condition
Training
Signage's

Testing And Commissioning

  • 1.
    Karle Infra Pvt.Ltd1 Facility Testing & Commissioning
  • 2.
    Agenda Karle Infra Pvt.Ltd 2  Introduction  Commissioning process  Commissioning Team  Roles and Responsibilities  Requirements for Commissioning  Co-ordination and Weekly meetings  Sample checklists and formats  Commissioning schedule
  • 3.
    Process Karle Infra Pvt.Ltd3  KIP / commissioning team will interact with T&C for Inspection and Reliability Testing.  A “Inspection and Testing plan” ( including TP inspections) shall be developed by the agency for the project in line with the requirement of specifications  KIP Project / KIP Facilities will review the documents / witness testing before a go-ahead to use materials or accepting works.
  • 4.
    Karle Infra Pvt.Ltd4  Needs to submit approved samples to Project Manager and obtain sign off  Additional tests and inspections will be carried out wherever required  Green-tagging will be done for all the equipments prior to commissioning.  Blue tagging will be done after closing the SORs  Components of the commissioning process  Design Verification  Operational Acceptance Test (OAT) / Room readiness  Green Tag  Functional Acceptance Test (FAT)  Blue Tag  Start Up  Shakedown
  • 5.
    Requirements Karle Infra Pvt.Ltd5  IFC (Issued for Construction)Drawings  Basis of comparison for design verification  (owner : KIP to provide one set to commissioning team)  Equipment list and tag numbers (owner- KIP)  Commissioning Checklists  (Owner : Facilities / C&W )  Operation manuals / Catalogues  (Owner : PMC / KIP to provide all docs to commissioning team)  Site observation reports / Punch lists  (Owner : TP/ Facilities / C&W)  As built drawings  ( Owner : KIP / Project)  Room readiness checks and results  Special commissioning tools and instruments  (Owner : Facilities / C&W or TP vendor on need basis)  Tags  (Owner : Commissioning team)
  • 6.
    Karle Infra Pvt.Ltd6 System Acceptance Process Design Verification Site Observation Report / Punch List Fix Critical SORs Operational Acceptance Tests Fix all SORs Functional Acceptance Tests Green Tag Blue Tag KIP Facilities / Sustaining Project Team Facilities Sustaining Team
  • 7.
    Co-ordination & RecurrenceWeekly Meetings Karle Infra Pvt. Ltd7  For better Co-ordination  Facilities / TP (C&W) commissioning team single point of contact for all commissioning issues  Pre-planning daily tasks based on commissioning schedule  Sharing of all checklists and formats for clear understanding  Publication of all SORs to stakeholders at the end of each day  Prompt closure of SORs and communication of closure  Prioritization of work – Focus on critical SORs  Issues if any noticed by commissioning team shall be addressed to Karle PM/ SPOC  No deviation from set process – follow established schedule Commissioning meetings will be held on XXXXX Facilities decides
  • 8.
    Check lists &SORs Karle Infra Pvt. Ltd8
  • 9.
  • 10.
    10 TBD Security issues CCTV @entry & Exit. Laour/manpower management - location Transit Management Bill of Quantities Statutory Documents As Built Drawings Project Review Design Aspects Equipment Selection HOTO Green Tag 3rd Party Inspection Blue Tag Operation & Management equipment Selection Spares Service manuals Fit out Issues Safety material management and etc Water Consumption Electricity Consumption Work Schedule Plan Pumps CCTV app. Exhaust System Go Green Energy Meter Water Flow ,meter List of Vendors Contract Terms and Condition Training Signage's