SlideShare a Scribd company logo
 Maruti Suzuki India Limited (MSIL) has been
established and incorporated since 1983.
 MSIL is a subsidy of the Suzuki Motor
Corporation, Japan.
 Maruti Suzuki has been renowned for producing
the most fuel efficient, affordable and reliable
cars and therefore has been the leader of the
Indian car market for over the past two and
halve decades.
 Manufacturing facilities are located at two
facilities Gurgaon and Manesar
 India's largest passenger car company,
accounting for over 45% of the
domestic car market
 First company in India to mass-produce
and sell more than a million cars
 Annually exports more than 50,000 cars
 It offers 14 brands and over 150 variants
ranging from peoples car Maruti Alto
800 to the stylish hatchback
 On 18th July 2012 at Maruti’s labour plant, industrial
disputes broke out when workers became aggressive
and over 96 staff members were injured while also
leading to the death of a human resource manager.
 More then two-thirds of the employees were
involved in the strike, causing Maruti to lose about
INR 75 crores ($11.81 million) in revenue and INR
8 crores ($1.3 million) in operating profit daily while
also halting Maruti‟s production line causing it to
lose around 1200-1400 units daily.
 The company knew that trouble was brewing, they
knew that some workers planned on registering a
separate union and the company had already
prepared legal documents for a possible expulsion of
workers from the premises.
 Maruti Suzuki management tried to back a single
union, the Maruti Suzuki Kamgar Union, for both
Gurgaon and Manesar plant.
 This union had been set-up by forces close to
management after the lock-out at Gurgaon plant in
2000/2001.
 “On 3rd of June, eleven leaders of the workers went to
Chandigarh to meet the Labour Department to complete
the formalities regarding registration of our union on June
3, 2011. On the morning of that day, the labour department
officials faxed the news of our application to the
management.
 On the morning of June 4, 2011, through struggle, we were
able to retrieve some of the blank signed papers from the
management. By the afternoon, it became clear that the
management was using all kind of tricks to break our unity.
In such circumstances, we were forced to go on flash tool
down strike from the afternoon of June 4, 2011.”
 On the 4th of June after the change between morning
and late shift around 2,000 workers stop work and
remain in factory. Later on, the C-shift would not be
refused entry by management and these workers largely
remained outside the factory.
 During this initial stage, workers raised various issues
and demands: low wages, incentive cuts, few breaks.
The workers have demanded that the temporary
workers should be given preference for permanent posts
in new departments, which the company is currently
building on the premises.
 Differences in salary pay
 Working Conditions
 Unions generally limit themselves
to acting as a voice of permanent
employees
 Demand for a new union
I. Operations stopped for a month.
II. Loss estimated to be over Rs. 1,500 crore
III. Fear of insecurity to the employees and their
families
IV. Problem of lack of labor resource
V. Maruti changed its recruitment policy
VI. Goodwill affected.
 Large labor- unemployed
 GDP affected
 Loss of country resources
 Disturbance- affecting the common man
 Lack of communication between HR people and
labour
 Lack of coordination between labour union and
HR department
“If the floor supervisor is rude and even
slaps us, he is awarded with a promotion but
in case a labourer dares to reply, he is issued
a notice on grounds of disciplinary action,"
said Rajender Kumar, a technician
 Revenge for June's strike.
 Cockroaches and dead flies found in the food in the hurried
lunch-break that workers earn in the canteen ½ km from the working station.
 The tea was without tea leaves or sugar in the 7 minute break
The company doctor give heavy doses of „instant‟ medicines
even on minor complaint so that disruption of work could be
prevented.
 One day‟s wage cut of Rs.1500, two days Rs.2200, three days
cut of Rs.7-8000 is implemented, so that almost the total
month‟s wage is cut.
 One second late into punching-card entry is a day‟s wage cut,
but they have to give full production for that day too.
 Forced to fill an undertaking form, which means
that in case of any problem, workers cannot raise
any objections against management.
 Worker‟s demand to establish an independent union
Maruti Suzuki Employees Union (MSEU)in the
company.
 Currently, the company has one recognized union –
Maruti Udyog Kamgar Union which is dominated by
workers at the Gurgaon plant
“ Unhappy workers have found out a new way to
disrupt ongoing work at the plant by creating
serious defects in quality of the cars, so they
would fail the compulsory vehicle inspection (VI)
quality test.”
 Workers indulging in deliberate attempts to reduce
output and are compromising customer interests
 Revenge for the June strike.
 Refused to sign good conduct form which aims at
ensuring the production of good quality products.
 Employees are being charged with sabotage and
causing quality problems in the cars produced.
"In the last three days, a series of serious quality
problems have been observed in the vehicles
produced. For example, vehicle door was not
properly clamped leading to doors falling during
production, wiring harnesses were found cut in
produced vehicle, dents were noticed on the body
and critical components were not fitted on to
vehicles. Such deliberate acts, if not detected during
quality checks, would have led to serious
implications and directly harmed customers," a
senior company official said.
Suspension of 10 workers
Dismissal of five
Discontinued the services of six trainees.
Also suspended four workers for "instigating
indiscipline" a week before
Another four suspended in late July for
manhandling supervisors.
Charges of sabotage and causing quality problems
in the cars produced.
On 14th August; police force of 500 send to
occupy the factory to „prevent violent activities‟
The company terminated 11 workers and suspended
38 on August 29th and 30th on false charges demanding
a „good-conduct bond‟ with the state police and
administration, the media, and „bouncers‟ on its payroll as
its willing pawns.
The Maruti Suzuki Employees Union (MSEU) is
demanding as an immediate measure, the withdrawal of
the charge-sheet, termination, suspension of the 49
workers. The workers are sitting day-and-night at the
factory gate, peeling off the layers of Maruti Suzuki‟s
“way of life”.
Trade union would be established with prior
conditions: -
1. Members of the trade union to be nominated
with consent of both workers and management.
2. The leader of this union would be appointed by
the management.
If not agreed then management would move to plan
B.
3. Technology oriented operations reducing
demand of man power.
• They have to Properly Co Ordinate with each
other
• Proper rules for indiscrimination in salary
• They have to control the public pokers
• They should try to understand the labour‟s
problem.
Labour Law
A minimum time rate of wages
A minimum piece rate
Non-Discrimination of people at Workplace.
Local Hiring
Leave without wages
Working hours, holidays and overtime
Labour Laws tweaked by Maruti
 Enforcement of the Labour Laws was not followed
strictly.
 Differences in Salary Pay.
 Working Conditions.
 Lack of proper negotiations.
Necessary changes done after the event
 Hiring contract workers through company HR and
not through a contractor.
 Reopened the plant with 300 workers
 Fresh recruitment of permanent workers
 Terminate the services of 500 permanent
workers. (Involved in Violence)
Employee Labour Relationship should had been
maintained in decorum.
Flexibility is the key, not the cheapness.
Treat workers in the factory like humans.
The workers should refrain from taking law into their own
hands.
This would be a wrong reading. Companies hire
temporary (temps) and contract workers not only
because they are cheaper, but because they can be laid
off when they are not required. Flexibility is the key, not
the cheapness.
Collective bargaing maruti suzuki manesar plant case study

More Related Content

What's hot

Maruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plantMaruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plant
Bhavin Agrawal
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
Viraj Chandratre
 
Maruti Suzuki Labour Unrest at Manesar Plant
Maruti Suzuki Labour Unrest at Manesar PlantMaruti Suzuki Labour Unrest at Manesar Plant
Maruti Suzuki Labour Unrest at Manesar Plant
Shubham Mongia
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
Satyam Chauhan
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
Anupriya. C
 
Lockout at mrf tyres
Lockout at mrf tyresLockout at mrf tyres
Lockout at mrf tyres
Prerna Verma
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
Pallav Tyagi
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog pptimamraza
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
Slide Dragon
 
Adjudication settlement of industrial disputes with case study.
Adjudication settlement of industrial disputes with case study.Adjudication settlement of industrial disputes with case study.
Adjudication settlement of industrial disputes with case study.
Madeha Rafiqi
 
Performance Appraisal in Tata Motors
Performance Appraisal in Tata MotorsPerformance Appraisal in Tata Motors
Performance Appraisal in Tata Motorssurabhi agarwal
 
Maruti suzuki case study
Maruti suzuki case studyMaruti suzuki case study
Maruti suzuki case study
Himanshu Swarnkar
 
Toyota – case study
Toyota – case study   Toyota – case study
Toyota – case study
subhaprasad79
 
A Case Study on Maruti Suzuki
A Case Study on Maruti SuzukiA Case Study on Maruti Suzuki
A Case Study on Maruti Suzuki
Qazi Faheem
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
SUDARSHAN TIWARI
 
Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company
ChitleenkaurArora
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips indiaSandeep Jadagoud
 

What's hot (20)

Maruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plantMaruti suzuki dispute in manesar plant
Maruti suzuki dispute in manesar plant
 
Maruti unrest
Maruti unrestMaruti unrest
Maruti unrest
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
 
Maruti Suzuki Labour Unrest at Manesar Plant
Maruti Suzuki Labour Unrest at Manesar PlantMaruti Suzuki Labour Unrest at Manesar Plant
Maruti Suzuki Labour Unrest at Manesar Plant
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
 
Lockout at mrf tyres
Lockout at mrf tyresLockout at mrf tyres
Lockout at mrf tyres
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog ppt
 
Maruti Manesar Case
Maruti Manesar CaseMaruti Manesar Case
Maruti Manesar Case
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
 
Adjudication settlement of industrial disputes with case study.
Adjudication settlement of industrial disputes with case study.Adjudication settlement of industrial disputes with case study.
Adjudication settlement of industrial disputes with case study.
 
Performance Appraisal in Tata Motors
Performance Appraisal in Tata MotorsPerformance Appraisal in Tata Motors
Performance Appraisal in Tata Motors
 
Maruti suzuki case study
Maruti suzuki case studyMaruti suzuki case study
Maruti suzuki case study
 
Toyota – case study
Toyota – case study   Toyota – case study
Toyota – case study
 
A Case Study on Maruti Suzuki
A Case Study on Maruti SuzukiA Case Study on Maruti Suzuki
A Case Study on Maruti Suzuki
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
 
Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company
 
Presentation1
Presentation1Presentation1
Presentation1
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
 

Similar to Collective bargaing maruti suzuki manesar plant case study

manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
ssusercd51df
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalJagtar Dhaliwal
 
Labour unrest and strikes
Labour unrest and strikesLabour unrest and strikes
Labour unrest and strikesNinoe George
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
Satyam Chauhan
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
Yamini Kahaliya
 
Maruti unrest (manesar)
Maruti unrest (manesar)Maruti unrest (manesar)
Maruti unrest (manesar)
Ashik11
 
Hrm final ppt
Hrm final pptHrm final ppt
Hrm final ppt
Swati Lal
 
Presentationon 170104162112
Presentationon 170104162112Presentationon 170104162112
Presentationon 170104162112
Anjan Dutta
 
People management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem GiriPeople management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem Giri
Prem Giri
 
case study on automotive private limited
case study on automotive private limitedcase study on automotive private limited
case study on automotive private limited
Arpit Upadhyay
 
Make in India Needs Labour Reforms
Make in India Needs Labour ReformsMake in India Needs Labour Reforms
Make in India Needs Labour Reforms
Arul Edison
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzukiTaha Sodawala
 
IR Case-2.pptx
IR Case-2.pptxIR Case-2.pptx
IR Case-2.pptx
kcsekar77
 

Similar to Collective bargaing maruti suzuki manesar plant case study (20)

manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
 
Maruti’s lanka—a sensational ir case in an industry
Maruti’s  lanka—a sensational ir case in an industryMaruti’s  lanka—a sensational ir case in an industry
Maruti’s lanka—a sensational ir case in an industry
 
Maruti
MarutiMaruti
Maruti
 
Maruti
MarutiMaruti
Maruti
 
Labour unrest and strikes
Labour unrest and strikesLabour unrest and strikes
Labour unrest and strikes
 
Manesar plant
Manesar plantManesar plant
Manesar plant
 
Ammy maruti
Ammy marutiAmmy maruti
Ammy maruti
 
Hrm
HrmHrm
Hrm
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
 
Maruti article final
Maruti article finalMaruti article final
Maruti article final
 
Maruti unrest (manesar)
Maruti unrest (manesar)Maruti unrest (manesar)
Maruti unrest (manesar)
 
Hrm final ppt
Hrm final pptHrm final ppt
Hrm final ppt
 
Presentationon 170104162112
Presentationon 170104162112Presentationon 170104162112
Presentationon 170104162112
 
People management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem GiriPeople management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem Giri
 
case study on automotive private limited
case study on automotive private limitedcase study on automotive private limited
case study on automotive private limited
 
Make in India Needs Labour Reforms
Make in India Needs Labour ReformsMake in India Needs Labour Reforms
Make in India Needs Labour Reforms
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzuki
 
IR Case-2.pptx
IR Case-2.pptxIR Case-2.pptx
IR Case-2.pptx
 

Recently uploaded

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
Fundacja Rozwoju Społeczeństwa Przedsiębiorczego
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 

Recently uploaded (20)

1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdfESC Beyond Borders _From EU to You_ InfoPack general.pdf
ESC Beyond Borders _From EU to You_ InfoPack general.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 

Collective bargaing maruti suzuki manesar plant case study

  • 1.
  • 2.  Maruti Suzuki India Limited (MSIL) has been established and incorporated since 1983.  MSIL is a subsidy of the Suzuki Motor Corporation, Japan.  Maruti Suzuki has been renowned for producing the most fuel efficient, affordable and reliable cars and therefore has been the leader of the Indian car market for over the past two and halve decades.  Manufacturing facilities are located at two facilities Gurgaon and Manesar
  • 3.  India's largest passenger car company, accounting for over 45% of the domestic car market  First company in India to mass-produce and sell more than a million cars  Annually exports more than 50,000 cars  It offers 14 brands and over 150 variants ranging from peoples car Maruti Alto 800 to the stylish hatchback
  • 4.  On 18th July 2012 at Maruti’s labour plant, industrial disputes broke out when workers became aggressive and over 96 staff members were injured while also leading to the death of a human resource manager.  More then two-thirds of the employees were involved in the strike, causing Maruti to lose about INR 75 crores ($11.81 million) in revenue and INR 8 crores ($1.3 million) in operating profit daily while also halting Maruti‟s production line causing it to lose around 1200-1400 units daily.
  • 5.  The company knew that trouble was brewing, they knew that some workers planned on registering a separate union and the company had already prepared legal documents for a possible expulsion of workers from the premises.  Maruti Suzuki management tried to back a single union, the Maruti Suzuki Kamgar Union, for both Gurgaon and Manesar plant.  This union had been set-up by forces close to management after the lock-out at Gurgaon plant in 2000/2001.
  • 6.  “On 3rd of June, eleven leaders of the workers went to Chandigarh to meet the Labour Department to complete the formalities regarding registration of our union on June 3, 2011. On the morning of that day, the labour department officials faxed the news of our application to the management.  On the morning of June 4, 2011, through struggle, we were able to retrieve some of the blank signed papers from the management. By the afternoon, it became clear that the management was using all kind of tricks to break our unity. In such circumstances, we were forced to go on flash tool down strike from the afternoon of June 4, 2011.”
  • 7.  On the 4th of June after the change between morning and late shift around 2,000 workers stop work and remain in factory. Later on, the C-shift would not be refused entry by management and these workers largely remained outside the factory.  During this initial stage, workers raised various issues and demands: low wages, incentive cuts, few breaks. The workers have demanded that the temporary workers should be given preference for permanent posts in new departments, which the company is currently building on the premises.
  • 8.  Differences in salary pay  Working Conditions  Unions generally limit themselves to acting as a voice of permanent employees  Demand for a new union
  • 9. I. Operations stopped for a month. II. Loss estimated to be over Rs. 1,500 crore III. Fear of insecurity to the employees and their families IV. Problem of lack of labor resource V. Maruti changed its recruitment policy VI. Goodwill affected.
  • 10.  Large labor- unemployed  GDP affected  Loss of country resources  Disturbance- affecting the common man
  • 11.  Lack of communication between HR people and labour  Lack of coordination between labour union and HR department
  • 12.
  • 13. “If the floor supervisor is rude and even slaps us, he is awarded with a promotion but in case a labourer dares to reply, he is issued a notice on grounds of disciplinary action," said Rajender Kumar, a technician
  • 14.  Revenge for June's strike.  Cockroaches and dead flies found in the food in the hurried lunch-break that workers earn in the canteen ½ km from the working station.  The tea was without tea leaves or sugar in the 7 minute break The company doctor give heavy doses of „instant‟ medicines even on minor complaint so that disruption of work could be prevented.  One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.7-8000 is implemented, so that almost the total month‟s wage is cut.  One second late into punching-card entry is a day‟s wage cut, but they have to give full production for that day too.
  • 15.  Forced to fill an undertaking form, which means that in case of any problem, workers cannot raise any objections against management.
  • 16.  Worker‟s demand to establish an independent union Maruti Suzuki Employees Union (MSEU)in the company.  Currently, the company has one recognized union – Maruti Udyog Kamgar Union which is dominated by workers at the Gurgaon plant
  • 17. “ Unhappy workers have found out a new way to disrupt ongoing work at the plant by creating serious defects in quality of the cars, so they would fail the compulsory vehicle inspection (VI) quality test.”
  • 18.  Workers indulging in deliberate attempts to reduce output and are compromising customer interests  Revenge for the June strike.  Refused to sign good conduct form which aims at ensuring the production of good quality products.  Employees are being charged with sabotage and causing quality problems in the cars produced.
  • 19. "In the last three days, a series of serious quality problems have been observed in the vehicles produced. For example, vehicle door was not properly clamped leading to doors falling during production, wiring harnesses were found cut in produced vehicle, dents were noticed on the body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said.
  • 20. Suspension of 10 workers Dismissal of five Discontinued the services of six trainees. Also suspended four workers for "instigating indiscipline" a week before Another four suspended in late July for manhandling supervisors. Charges of sabotage and causing quality problems in the cars produced. On 14th August; police force of 500 send to occupy the factory to „prevent violent activities‟
  • 21. The company terminated 11 workers and suspended 38 on August 29th and 30th on false charges demanding a „good-conduct bond‟ with the state police and administration, the media, and „bouncers‟ on its payroll as its willing pawns. The Maruti Suzuki Employees Union (MSEU) is demanding as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers are sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzuki‟s “way of life”.
  • 22. Trade union would be established with prior conditions: - 1. Members of the trade union to be nominated with consent of both workers and management. 2. The leader of this union would be appointed by the management. If not agreed then management would move to plan B. 3. Technology oriented operations reducing demand of man power.
  • 23. • They have to Properly Co Ordinate with each other • Proper rules for indiscrimination in salary • They have to control the public pokers • They should try to understand the labour‟s problem.
  • 24.
  • 25. Labour Law A minimum time rate of wages A minimum piece rate Non-Discrimination of people at Workplace. Local Hiring Leave without wages Working hours, holidays and overtime
  • 26. Labour Laws tweaked by Maruti  Enforcement of the Labour Laws was not followed strictly.  Differences in Salary Pay.  Working Conditions.  Lack of proper negotiations.
  • 27. Necessary changes done after the event  Hiring contract workers through company HR and not through a contractor.  Reopened the plant with 300 workers  Fresh recruitment of permanent workers  Terminate the services of 500 permanent workers. (Involved in Violence)
  • 28. Employee Labour Relationship should had been maintained in decorum. Flexibility is the key, not the cheapness. Treat workers in the factory like humans. The workers should refrain from taking law into their own hands. This would be a wrong reading. Companies hire temporary (temps) and contract workers not only because they are cheaper, but because they can be laid off when they are not required. Flexibility is the key, not the cheapness.