Overview of the Company
• MARUTI SUZUKI INDIA LIMITED HAS BEEN ESTABLISHED AND INCORPORATED SINCE 1983.
• MARUTI SUZUKI INDIA LIMITED IS A SUBSIDY OF THE SUZUKI MOTOR CORPORATION
,JAPAN
overview
 India’s largest passenger car company ,accounting for over 55% of the domestic
car market
 First Company in India to mass produce and sell more than am million Cars
 Annually exports More Than 100000 Cars
 Manufacturing facilities are located at three facilities Gurgaon and Manesar and
Gujrat(2017)
What happened In Manesar Plant
 June 4 2020 – workers go on strike at MSIL Manesar plant
 June 10 2012-harnyana Bans strike a Maruti Manesar Plant
 June 13,2012-65 unions jointed strike at Manesar
 July 18,2012 violence at Maruti Plant. Near about 96 injured
 July 28,2012 Tools down strike protesting the suspension of 49 colleagues
 August 29-protest against the management’s insistence on Workers signing a ‘ good conduct
bond’
 October 1,2012 Labour unrest at plant ends ,sales decline of 20% in sept
 Oct 21 2012 fresh Maruti strike Workers want susu=pended Contract staff to be taken back
Workers demand from the company
 Differences in salary pay
 Working Conditions
 Unions generally limit themselves to acting as a voice of permanent employees
 Demand for a Independent unions
Impact on the msil company
 Operation stopped for a month
 Loss estimated to be over rs 1500 crore
 Fear of insecurity to the employees and their families
 Probe;m of lact of labour resources
 Maruti changed its recruitment policy
Impact on economy
 Large labour unemployed
 GDP affected
 Loss of country resources
 Disturbance –affecting the common man
Labour’s side problem
 A separate union for MANESAR
 Contract labourers –less pay and permanent labourers-high pay
 Long working hours
 What part did we get of the profit that the company earned by exceeding the
targets?
 1500 is deducted for every day on casual leave
Management side problem
 No clear demand
 New union will bring a third party –political party
 Lack of discipline
 Accept and sign the ‘good Contract
Maruti Suzuki solutions
 Maruti showed insouciance toward workers
 The strike ended after over 1000 protesting workers agreed to sign the ‘good
Conduct Bond’
 Company agreed to take back 44 regular employees after they Serve a suspension
period
 Within a week the company started recruiting temporary manpower from IT IS
 The company said that the workers would not be paid for the last 30 days
Solution suggested
 Good code of conduct should have acceptable conditions
 Monthly meetings should have held between management and Workers
 Recruiting company should give preliminary idea before recruiting
Them
 Demand of new union can be fulfilled if an only if the union is not political
influenced
 Provide basic Working conditions demanded by the WorkForces
 Provide communication between Hr people and labours
Case study on labour unrest at maruti suzuki

More Related Content

What's hot

Maruti strike Case study.ER
Maruti strike Case study.ERMaruti strike Case study.ER
Maruti strike Case study.ER
chaituuyt
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog pptimamraza
 
Collective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case studyCollective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case study
Jayesh Sharma
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
Anupriya. C
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
Viraj Chandratre
 
Toyota Industrial Relation
Toyota Industrial RelationToyota Industrial Relation
Toyota Industrial RelationPrasant Patro
 
Lockout at mrf tyres
Lockout at mrf tyresLockout at mrf tyres
Lockout at mrf tyres
Prerna Verma
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
Pallav Tyagi
 
HMSI HR Failure
HMSI HR FailureHMSI HR Failure
HMSI HR Failure
Manas Tripathy
 
Manesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of BusinessManesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of Business
Rajiv Sharma
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
SUDARSHAN TIWARI
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips indiaSandeep Jadagoud
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
Slide Dragon
 
Labour unrest and strikes
Labour unrest and strikesLabour unrest and strikes
Labour unrest and strikesNinoe George
 
Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company
ChitleenkaurArora
 

What's hot (20)

Maruti strike Case study.ER
Maruti strike Case study.ERMaruti strike Case study.ER
Maruti strike Case study.ER
 
Maruti udyog ppt
Maruti udyog pptMaruti udyog ppt
Maruti udyog ppt
 
Collective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case studyCollective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case study
 
Presentation1
Presentation1Presentation1
Presentation1
 
Maruti unrest
Maruti unrestMaruti unrest
Maruti unrest
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
 
Toyota Industrial Relation
Toyota Industrial RelationToyota Industrial Relation
Toyota Industrial Relation
 
Lockout at mrf tyres
Lockout at mrf tyresLockout at mrf tyres
Lockout at mrf tyres
 
Labour unrest-at-toyota
Labour unrest-at-toyotaLabour unrest-at-toyota
Labour unrest-at-toyota
 
Maruti Manesar Case
Maruti Manesar CaseMaruti Manesar Case
Maruti Manesar Case
 
HMSI HR Failure
HMSI HR FailureHMSI HR Failure
HMSI HR Failure
 
Manesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of BusinessManesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of Business
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
 
Ammy maruti
Ammy marutiAmmy maruti
Ammy maruti
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
 
Honda hr
Honda hr Honda hr
Honda hr
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
 
Labour unrest and strikes
Labour unrest and strikesLabour unrest and strikes
Labour unrest and strikes
 
Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company Industrial relations of mahindra & mahindra company
Industrial relations of mahindra & mahindra company
 

Similar to Case study on labour unrest at maruti suzuki

Presentationon 170104162112
Presentationon 170104162112Presentationon 170104162112
Presentationon 170104162112
Anjan Dutta
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalJagtar Dhaliwal
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
Satyam Chauhan
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
ssusercd51df
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
Yamini Kahaliya
 
Make in India Needs Labour Reforms
Make in India Needs Labour ReformsMake in India Needs Labour Reforms
Make in India Needs Labour Reforms
Arul Edison
 
IR Case-2.pptx
IR Case-2.pptxIR Case-2.pptx
IR Case-2.pptx
kcsekar77
 
Recruitment and selection in mahindra & mahindra111111111111111111
Recruitment and selection in mahindra & mahindra111111111111111111Recruitment and selection in mahindra & mahindra111111111111111111
Recruitment and selection in mahindra & mahindra111111111111111111
Prashant Sharma
 
Employee presentation on maruti suzuki
Employee presentation on maruti suzukiEmployee presentation on maruti suzuki
Employee presentation on maruti suzuki
Suprit Anurag Sahu
 
Et news
Et newsEt news
Et newsneha
 
Weekly media update 22.09.2014
Weekly media update 22.09.2014Weekly media update 22.09.2014
Weekly media update 22.09.2014BalmerLawrie
 
A PROJECT REPORT ON “THE LEADERSHIP STORY OF MARUTI SUZUKI”
A PROJECT REPORT ON “THE LEADERSHIP STORY OF  MARUTI SUZUKI”A PROJECT REPORT ON “THE LEADERSHIP STORY OF  MARUTI SUZUKI”
A PROJECT REPORT ON “THE LEADERSHIP STORY OF MARUTI SUZUKI”
jitendrasangle
 
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
AnthonyJudeAJME
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzukiTaha Sodawala
 
Fdocuments.in maruti suzuki-hr-practices
Fdocuments.in maruti suzuki-hr-practicesFdocuments.in maruti suzuki-hr-practices
Fdocuments.in maruti suzuki-hr-practices
Arvindsumitlakra
 
Maruti Udyog Limited
Maruti Udyog LimitedMaruti Udyog Limited
Maruti Udyog Limited
RajKansagra17
 

Similar to Case study on labour unrest at maruti suzuki (20)

Presentationon 170104162112
Presentationon 170104162112Presentationon 170104162112
Presentationon 170104162112
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 
Maruti’s lanka—a sensational ir case in an industry
Maruti’s  lanka—a sensational ir case in an industryMaruti’s  lanka—a sensational ir case in an industry
Maruti’s lanka—a sensational ir case in an industry
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
 
Maruti
MarutiMaruti
Maruti
 
Maruti
MarutiMaruti
Maruti
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
 
Make in India Needs Labour Reforms
Make in India Needs Labour ReformsMake in India Needs Labour Reforms
Make in India Needs Labour Reforms
 
Manesar plant
Manesar plantManesar plant
Manesar plant
 
IR Case-2.pptx
IR Case-2.pptxIR Case-2.pptx
IR Case-2.pptx
 
Recruitment and selection in mahindra & mahindra111111111111111111
Recruitment and selection in mahindra & mahindra111111111111111111Recruitment and selection in mahindra & mahindra111111111111111111
Recruitment and selection in mahindra & mahindra111111111111111111
 
Employee presentation on maruti suzuki
Employee presentation on maruti suzukiEmployee presentation on maruti suzuki
Employee presentation on maruti suzuki
 
Et news
Et newsEt news
Et news
 
Weekly media update 22.09.2014
Weekly media update 22.09.2014Weekly media update 22.09.2014
Weekly media update 22.09.2014
 
A PROJECT REPORT ON “THE LEADERSHIP STORY OF MARUTI SUZUKI”
A PROJECT REPORT ON “THE LEADERSHIP STORY OF  MARUTI SUZUKI”A PROJECT REPORT ON “THE LEADERSHIP STORY OF  MARUTI SUZUKI”
A PROJECT REPORT ON “THE LEADERSHIP STORY OF MARUTI SUZUKI”
 
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
A STUDY ON THE WELFARE MEASURES PROVIDED IN THE COMPANY WITH REGARDS TO JOB S...
 
Strike at maruti suzuki
Strike at maruti suzukiStrike at maruti suzuki
Strike at maruti suzuki
 
Fdocuments.in maruti suzuki-hr-practices
Fdocuments.in maruti suzuki-hr-practicesFdocuments.in maruti suzuki-hr-practices
Fdocuments.in maruti suzuki-hr-practices
 
Maruti Udyog Limited
Maruti Udyog LimitedMaruti Udyog Limited
Maruti Udyog Limited
 

Recently uploaded

Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 

Recently uploaded (20)

Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 

Case study on labour unrest at maruti suzuki

  • 1. Chandigarh University Group Assignment Case study on labour unrest at Maruti Suzuki limited at Manesar SUMMITTED TO : MRS .RIVTI CHAND SUBMITTED BY; ANURAG ANAND : 20MBF5039 AMISHA KUMARI : 20MBF5048 HARNOOR SINGH 20MBF5028 NISHTHA CHAUHAN : 20MBF5052 POOJA ROY : 20MBF5073 GURVINDER SINGH: 20MBF5092 SAGAR : 20MBF5010
  • 2. Overview of the Company • MARUTI SUZUKI INDIA LIMITED HAS BEEN ESTABLISHED AND INCORPORATED SINCE 1983. • MARUTI SUZUKI INDIA LIMITED IS A SUBSIDY OF THE SUZUKI MOTOR CORPORATION ,JAPAN
  • 3. overview  India’s largest passenger car company ,accounting for over 55% of the domestic car market  First Company in India to mass produce and sell more than am million Cars  Annually exports More Than 100000 Cars  Manufacturing facilities are located at three facilities Gurgaon and Manesar and Gujrat(2017)
  • 4. What happened In Manesar Plant  June 4 2020 – workers go on strike at MSIL Manesar plant  June 10 2012-harnyana Bans strike a Maruti Manesar Plant  June 13,2012-65 unions jointed strike at Manesar  July 18,2012 violence at Maruti Plant. Near about 96 injured  July 28,2012 Tools down strike protesting the suspension of 49 colleagues  August 29-protest against the management’s insistence on Workers signing a ‘ good conduct bond’  October 1,2012 Labour unrest at plant ends ,sales decline of 20% in sept  Oct 21 2012 fresh Maruti strike Workers want susu=pended Contract staff to be taken back
  • 5. Workers demand from the company  Differences in salary pay  Working Conditions  Unions generally limit themselves to acting as a voice of permanent employees  Demand for a Independent unions
  • 6. Impact on the msil company  Operation stopped for a month  Loss estimated to be over rs 1500 crore  Fear of insecurity to the employees and their families  Probe;m of lact of labour resources  Maruti changed its recruitment policy
  • 7. Impact on economy  Large labour unemployed  GDP affected  Loss of country resources  Disturbance –affecting the common man
  • 8. Labour’s side problem  A separate union for MANESAR  Contract labourers –less pay and permanent labourers-high pay  Long working hours  What part did we get of the profit that the company earned by exceeding the targets?  1500 is deducted for every day on casual leave
  • 9. Management side problem  No clear demand  New union will bring a third party –political party  Lack of discipline  Accept and sign the ‘good Contract
  • 10. Maruti Suzuki solutions  Maruti showed insouciance toward workers  The strike ended after over 1000 protesting workers agreed to sign the ‘good Conduct Bond’  Company agreed to take back 44 regular employees after they Serve a suspension period  Within a week the company started recruiting temporary manpower from IT IS  The company said that the workers would not be paid for the last 30 days
  • 11. Solution suggested  Good code of conduct should have acceptable conditions  Monthly meetings should have held between management and Workers  Recruiting company should give preliminary idea before recruiting Them  Demand of new union can be fulfilled if an only if the union is not political influenced  Provide basic Working conditions demanded by the WorkForces  Provide communication between Hr people and labours