© 2016
IBM Softlayer
Configuration
Softlayer Setup for VNS3
2016
© 2016
Table of Contents
2
Requirements 3
Step 1: Softlayer Deployment Setup 9
VNS3 Configuration Document Links 21
© 2016
Requirements
3
© 2016
Requirements
4
•You have a Softlayer CCI.
•Ability to configure a client (whether desktop based or cloud based) to use OpenVPN client
software.
•You have a compliant IPsec firewall/router networking device:
Preferred  Most models from Cisco Systems*, Juniper, Watchguard, Dell SONICWALL, Netgear,
Fortinet, Barracuda Networks, Check Point*, Zyxel USA, McAfee Retail, Citrix Systems, Hewlett
Packard, D-Link, WatchGuard, Palo Alto Networks, OpenSwan, pfSense, and Vyatta.
Best Effort  Any IPsec device that supports: IKE1 or IKE2, AES256 or AES128 or 3DES, SHA1 or
MD5.
*Known Exclusions  Checkpoint R65+ requires native IPSec connections as Checkpoint does
not conform to NAT-Traversal Standards and Cisco ASA 8.4(2)-8.4(4) bugs prevent a stable
connection from being maintained.
© 2016
Getting Help with VNS3
5
This guide covers a very generic VNS3 setup in Softlayer cloud. If you need specific help
with project planning, POCs, or audits, contact our professional services team via
sales@cohesive.net for details.
This guide uses Cisco’s Adaptive Security Device Controller UI. Setting up your IPsec
Extranet device may have a different user experience than what is shown here. All the
information entered in this guide will be same regardless of your UI or cmd line setup.


Please review the VNS3 Support Plans and Contacts before sending support inquiries.
© 2016
Firewall Considerations
6
VNS3 Controller instances use the following TCP and UDP ports.

• UDP port 1194 

For client VPN connections; must be accessible from all servers that will join VNS3 topology as clients.

• UDP 1195-1203*

For tunnels between Controller peers; must be accessible from all peers in a given topology.
• TCP port 8000 

HTTPS admin interface; must be accessible from hosts where you will want to obtain runtime status or configure peering, also needs to be open to and from
the Controllers at least for the peering process, and needs to be accessible when downloading credentials for installation on overlay network clients.
• UDP port 500

UDP port 500 is used the phase 1 or IKE (Internet Key Exchange) component of an IPsec VPN connection.

• ESP Protocol 50 and possibly UDP port 4500

Protocol 50 is used for phase 2 or ESP (Encapsulated Security Payload) component of an IPsec VPN connection only when negotiating with native IPsec. UDP
port 4500** is used for the phase 2 or ESP (Encapsulated Security Payload) component of an IPsec VPN connection when using NAT-Traversal Encapsulation.
*VNS3:vpn and VNS3:net Lite Edition will not require UDP ports 1195-1197 access as it is not licensed for Controller Peering.
** Some public cloud providers require IPsec connections to use NAT-Traversal encapsulation on UDP port 4500
© 2016
Sizing Considerations
7
Image Size and Architecture
VNS3 Controller Images are available as 64bit images to allow the greatest flexibility for your use-case. We
recommend Controller instances be launched with at least 512MB of RAM. Smaller sizes are supported but the
performance will depend on the use-case.
Clientpack Key Size
VNS3 Controllers currently generate 1024 bit keys for connecting the clients to the overlay network via the
“clientpacks”. Smaller or larger encryption keys can be provided upon request (from 64 bit to 2048 bit). Future
releases of VNS3 will provide the user control over key size and cipher during initialization and configuration.
© 2016
Remote Support
8
Note that TCP 22 (ssh) is not required for normal operations.
Each VNS3 Controller is running a restricted SSH daemon, with
access limited only to Cohesive for debugging purposes controlled
by the user via the Remote Support toggle and key exchange
generation.
In the event Cohesive needs to observe runtime state of a VNS3
Controller in response to a tech support request, we will ask you to
open Security Group access to SSH from our support IP range and
Enable Remote Support via the Web UI.
Cohesive will send you an encrypted passphrase to generate a
private key used by Cohesive Support staff to access your
Controller. Access to the restricted SSH daemon is completely
controlled by the user. Once the support ticket has been closed
you can disable remote support access and invalidate the access
key.
© 2016
Step 1: Softlayer Deployment Setup
9
© 2016
Softlayer Configuration: Select VNS3:net Template
10
From the Public Image listing, (Devices Menu,
Manage, Images) select the “Order Hourly”
option on the Actions menu for the Cohesive
VNS3 template.
You will find free/trial/pay-as-you-go editions in
the Softlayer public image listing. Bring-your-
own-license editions may have been shared
with you by Cohesive and then be visible in
your private images listing.
© 2016
Softlayer Configuration: Public IP Access
11
There are two ways of accessing the VNS3 UI in Softlayer; in both instances the public facing IP
must be configured on the “outer” adapter of the Controller, which at Softlayer is eth1, and the
“inner” adapter (eth0) must be configured with an IP from your internal private VLAN.
• Option 1 - If you do not launch VNS3 in a specific “front end” network and “back end” network, then
VNS3 will receive a public IP on its outer ethernet adapter, which at Softlayer is eth1. Softlayer will
assign a public IP to your instance with no choice on your part.
• Option 2 (RECOMMENDED) - Use a Softlayer VLAN which is comprised of a “front end” network
(Softlayer describes it as the FCR) choice and a corresponding “back end” network choice (Softlayer
describes it as the BCR). Softlayer will allocate one of the public IPs in your front end network to
your VNS3 Controller.
• NOTE: VLANs are created by contacting your Softlayer account representative.
© 2016
Launch a VNS3 Controller
12
After selecting “Order Hourly” or “Order
Monthly” from the Images page a
configuration screen will pop up.
You will be able to specify how many instances
to launch (usually 1) and select the Softlayer
datacenter within which to launch the
instance.
© 2016
Launch a VNS3 Controller
13
You can then configure the amount of memory to and
CPU to use for your VNS3 Controller. A minimum of
2 GB of memory is recommended and at least two
virtual cores.
However, the amount of memory and number of
cores to use is a function of how much load you will
be putting on the VNS3 Controller in terms of total
throughput, number of network connections, etc..
Even though you clicked on a specific image, you will
still need to click on the “Select Operating System” tab
in order to expose the operating system that is inside
your VNS3 Image template.
Pick Ubuntu Linux 10.04 LTS as shown.
© 2016
Launch a VNS3 Controller
14
You can then configure the amount of memory to and
CPU to use for your VNS3 Controller. A minimum of
2 GB of memory is recommended and at least two
virtual cores.
However, the amount of memory and number of
cores to use is a function of how much load you will
be putting on the VNS3 Controller in terms of total
throughput, number of network connections, etc..
Even though you clicked on a specific image, you will
still need to click on the “Select Operating System” tab
in order to expose the operating system that is inside
your VNS3 Image template.
Pick Ubuntu Linux 10.04 LTS as shown.
© 2016
Launch a VNS3 Controller
15
There are quite a number of additional
options on the Softlayer configuration page for
additional disks, adapters, etc. Do not choose
any of these.
At the bottom of the configuration page there
is a choice to “Continue Your Order”.
Choose it after confirming your choices for
Softlayer data center location, Operating
System, Memory and CPU.
© 2016
Launch a VNS3 Controller
16
The next page to pop up is an “Order
Summary and Billing” page which reviews your
previous choices.
© 2016
Launch a VNS3 Controller
17
Further down the page you then make your
VLAN selection with the Backend VLAN
selected first.
© 2016
Launch a VNS3 Controller
18
A Hostname and Domain name entry is
required.
Softlayer allows you to use the domain
softlayer.com as part of your fully qualified
domain name. This name must be unique
across all Softlayer hosts.
You then select the “Place an oder” radio
button.
© 2016
Launch a VNS3 Controller
19
A Hostname and Domain name entry is required.
Softlayer allows you to use the domain softlayer.com
as part of your fully qualified domain name. This name
must be unique across all Softlayer hosts.
You then select the “Place an oder” radio button.
At the bottom of the page acknowledge the Softlayer
Master Services Agreement and select “FinalizeYour
Order”.
© 2016
Optional - Configuring VNS3 as the network device gateway
20
© 2016
Softlayer Configuration: Public IP Access
21
In Softlayer an instance can have a public IP on eth1 and a private VLAN IP on eth0.
As a result VNS3 can be used as an Internet Gateway, sitting at a private VLAN edge,
providing NAT-ing and port forwarding for the other devices in the private VLAN.
© 2016
Configure Hosts to use VNS3 as Internet Gateway
22
WARNING
Do not configure privateVLAN hosts to useVNS3 as an
Internet Gateway until theVNS3 instance is fully configured
with PrivateVLAN settings and Firewall rules for NAT-ing
installed. If you have public IPs temporarily assigned to your
privateVLAN hosts, and create a route to theVNS3 as the
gateway to 0.0.0.0/0, you will most likely lose connectivity
until theVNS3 configuration is complete, including port
forwarding information to SSH or RDP into theVLAN host
through theVNS3 Controller.
Here we show the first steps to make theVNS3 appliance an
the internet or network device gateway,. In this case the
addresses used are based upon the privateVLAN addresses
used for theVNS3 Controller in Softlayer.
eth0
eth0
eth0
© 2016
Configure Softlayer Hosts to use VNS3 as Internet Gateway
23
WARNING
Do not configure privateVLAN hosts to useVNS3 as an
Internet Gateway until theVNS3 instance is fully configured
with PrivateVLAN settings and Firewall rules for NAT-ing
installed. If you have public IPs temporarily assigned to your
privateVLAN hosts, and create a route to theVNS3 as the
gateway to 0.0.0.0/0, you will most likely lose connectivity
until theVNS3 configuration is complete, including port
forwarding information to SSH or RDP into theVLAN host
through theVNS3 Controller.
After bringing up the “eth1” interface and configuring the
network interface information, the networking can be restarted.
In this instance, using Ubuntu.The setup will be comparable but
a bit different on RedHat based hosts.
After the networking is restarted, an “ifconfig” command shows
the instance has an “eth1” with the address of 192.168.10.2 as
specified.
eth1
eth0
© 2016
Configure VNS3 as Internet Gateway
24
In order to configureVNS3 as the Internet Gateway the
following Firewall rules need to be entered. (The example
continues assuming theVLAN is 192.168.10.0/24)
# Allow traffic to/from theVLAN to thisVNS3:net Controller

INPUT_CUST -s 192.168.10.0/24 -j ACCEPT

OUTPUT_CUST -d 192.168.10.0/24 -j ACCEPT
# NAT traffic from theVLAN that is using thisVNS3
Controller as Internet Gateway

MACRO_CUST -o eth1 -s 192.168.10.0/24 -d 0.0.0.0/0 -j
MASQUERADE
# Port forward traffic to my 192.168.10.2 host
PREROUTING_CUST -i eth1 -p tcp -s 0.0.0.0/0 --dport 33 -j
DNAT --to 192.168.10.2:22
Assuming yourVLAN host is like the example, at 192.168.10.2,
and is accessible via SSH, then the firewall is now configured
to NAT traffic for anyVLAN host configured to use it as the
Internet Gateway, and shows how to port forward traffic into
theVLAN through theVNS3 Controller.
© 2016
Configure Hosts Route to VNS3 Controller
25
WARNING
Do not configure private VLAN hosts to use VNS3 as an Internet Gateway until the VNS3 instance is fully configured with Private
VLAN settings and Firewall rules for NAT-ing installed. If you have public IPs temporarily assigned to your private VLAN hosts, and
create a route to the VNS3 as the gateway to 0.0.0.0/0, you will most likely lose connectivity until the VNS3 configuration is
complete, including port forwarding information to SSH or RDP into the VLAN host through the VNS3 Controller.
The last step after all the previous are complete is to enter a route on the Softlayer VLAN host, pointing to the VNS3
Controller’s private ip as the gateway to the Internet.
On the Softlayer host enter:

ip route add 0.0.0.0/0 via 192.168.10.1
(The address 192.168.10.1 is used because in this example that is the VNS3 Controller private IP.)
You should now be able to reach Internet resources even without a public IP attached to the Softlayer host.
Depending on the operating system used in the cloud hosts, the route will need to be made persistent. This varies by
operating system.
© 2016
VNS3 Configuration Document Links
26
© 2016
VNS3 Configuration Document Links
27
VNS3 Product Resources - Documentation | Add-ons
VNS3 Configuration Instructions

Instructions and screenshots for configuring a VNS3 Controller in a single or multiple Controller topology. Specific steps include,
initializing a new Controller, generating clientpack keys, setting up peering, building IPsec tunnels, and connecting client servers to
the Overlay Network. 

VNS3 Administration Document

Covers the administration and operation of a configured VNS3 Controller. Additional detail is provided around the VNS3 Firewall,
all administration menu items, upgrade licenses, other routes and SNMP traps.

VNS3 Docker Instructions

Explains the value of the VNS3 3.5 Docker integration and covers uploading, allocating and exporting application containers.
VNS3 Troubleshooting

Troubleshooting document that provides explanation issues that are more commonly experienced with VNS3.


Cohesive Networks Support Docs: VNS3 Configuration for IBM Softlayer

  • 1.
  • 2.
    © 2016 Table ofContents 2 Requirements 3 Step 1: Softlayer Deployment Setup 9 VNS3 Configuration Document Links 21
  • 3.
  • 4.
    © 2016 Requirements 4 •You havea Softlayer CCI. •Ability to configure a client (whether desktop based or cloud based) to use OpenVPN client software. •You have a compliant IPsec firewall/router networking device: Preferred  Most models from Cisco Systems*, Juniper, Watchguard, Dell SONICWALL, Netgear, Fortinet, Barracuda Networks, Check Point*, Zyxel USA, McAfee Retail, Citrix Systems, Hewlett Packard, D-Link, WatchGuard, Palo Alto Networks, OpenSwan, pfSense, and Vyatta. Best Effort  Any IPsec device that supports: IKE1 or IKE2, AES256 or AES128 or 3DES, SHA1 or MD5. *Known Exclusions  Checkpoint R65+ requires native IPSec connections as Checkpoint does not conform to NAT-Traversal Standards and Cisco ASA 8.4(2)-8.4(4) bugs prevent a stable connection from being maintained.
  • 5.
    © 2016 Getting Helpwith VNS3 5 This guide covers a very generic VNS3 setup in Softlayer cloud. If you need specific help with project planning, POCs, or audits, contact our professional services team via sales@cohesive.net for details. This guide uses Cisco’s Adaptive Security Device Controller UI. Setting up your IPsec Extranet device may have a different user experience than what is shown here. All the information entered in this guide will be same regardless of your UI or cmd line setup. 
 Please review the VNS3 Support Plans and Contacts before sending support inquiries.
  • 6.
    © 2016 Firewall Considerations 6 VNS3Controller instances use the following TCP and UDP ports.
 • UDP port 1194 
 For client VPN connections; must be accessible from all servers that will join VNS3 topology as clients.
 • UDP 1195-1203*
 For tunnels between Controller peers; must be accessible from all peers in a given topology. • TCP port 8000 
 HTTPS admin interface; must be accessible from hosts where you will want to obtain runtime status or configure peering, also needs to be open to and from the Controllers at least for the peering process, and needs to be accessible when downloading credentials for installation on overlay network clients. • UDP port 500
 UDP port 500 is used the phase 1 or IKE (Internet Key Exchange) component of an IPsec VPN connection.
 • ESP Protocol 50 and possibly UDP port 4500
 Protocol 50 is used for phase 2 or ESP (Encapsulated Security Payload) component of an IPsec VPN connection only when negotiating with native IPsec. UDP port 4500** is used for the phase 2 or ESP (Encapsulated Security Payload) component of an IPsec VPN connection when using NAT-Traversal Encapsulation. *VNS3:vpn and VNS3:net Lite Edition will not require UDP ports 1195-1197 access as it is not licensed for Controller Peering. ** Some public cloud providers require IPsec connections to use NAT-Traversal encapsulation on UDP port 4500
  • 7.
    © 2016 Sizing Considerations 7 ImageSize and Architecture VNS3 Controller Images are available as 64bit images to allow the greatest flexibility for your use-case. We recommend Controller instances be launched with at least 512MB of RAM. Smaller sizes are supported but the performance will depend on the use-case. Clientpack Key Size VNS3 Controllers currently generate 1024 bit keys for connecting the clients to the overlay network via the “clientpacks”. Smaller or larger encryption keys can be provided upon request (from 64 bit to 2048 bit). Future releases of VNS3 will provide the user control over key size and cipher during initialization and configuration.
  • 8.
    © 2016 Remote Support 8 Notethat TCP 22 (ssh) is not required for normal operations. Each VNS3 Controller is running a restricted SSH daemon, with access limited only to Cohesive for debugging purposes controlled by the user via the Remote Support toggle and key exchange generation. In the event Cohesive needs to observe runtime state of a VNS3 Controller in response to a tech support request, we will ask you to open Security Group access to SSH from our support IP range and Enable Remote Support via the Web UI. Cohesive will send you an encrypted passphrase to generate a private key used by Cohesive Support staff to access your Controller. Access to the restricted SSH daemon is completely controlled by the user. Once the support ticket has been closed you can disable remote support access and invalidate the access key.
  • 9.
    © 2016 Step 1:Softlayer Deployment Setup 9
  • 10.
    © 2016 Softlayer Configuration:Select VNS3:net Template 10 From the Public Image listing, (Devices Menu, Manage, Images) select the “Order Hourly” option on the Actions menu for the Cohesive VNS3 template. You will find free/trial/pay-as-you-go editions in the Softlayer public image listing. Bring-your- own-license editions may have been shared with you by Cohesive and then be visible in your private images listing.
  • 11.
    © 2016 Softlayer Configuration:Public IP Access 11 There are two ways of accessing the VNS3 UI in Softlayer; in both instances the public facing IP must be configured on the “outer” adapter of the Controller, which at Softlayer is eth1, and the “inner” adapter (eth0) must be configured with an IP from your internal private VLAN. • Option 1 - If you do not launch VNS3 in a specific “front end” network and “back end” network, then VNS3 will receive a public IP on its outer ethernet adapter, which at Softlayer is eth1. Softlayer will assign a public IP to your instance with no choice on your part. • Option 2 (RECOMMENDED) - Use a Softlayer VLAN which is comprised of a “front end” network (Softlayer describes it as the FCR) choice and a corresponding “back end” network choice (Softlayer describes it as the BCR). Softlayer will allocate one of the public IPs in your front end network to your VNS3 Controller. • NOTE: VLANs are created by contacting your Softlayer account representative.
  • 12.
    © 2016 Launch aVNS3 Controller 12 After selecting “Order Hourly” or “Order Monthly” from the Images page a configuration screen will pop up. You will be able to specify how many instances to launch (usually 1) and select the Softlayer datacenter within which to launch the instance.
  • 13.
    © 2016 Launch aVNS3 Controller 13 You can then configure the amount of memory to and CPU to use for your VNS3 Controller. A minimum of 2 GB of memory is recommended and at least two virtual cores. However, the amount of memory and number of cores to use is a function of how much load you will be putting on the VNS3 Controller in terms of total throughput, number of network connections, etc.. Even though you clicked on a specific image, you will still need to click on the “Select Operating System” tab in order to expose the operating system that is inside your VNS3 Image template. Pick Ubuntu Linux 10.04 LTS as shown.
  • 14.
    © 2016 Launch aVNS3 Controller 14 You can then configure the amount of memory to and CPU to use for your VNS3 Controller. A minimum of 2 GB of memory is recommended and at least two virtual cores. However, the amount of memory and number of cores to use is a function of how much load you will be putting on the VNS3 Controller in terms of total throughput, number of network connections, etc.. Even though you clicked on a specific image, you will still need to click on the “Select Operating System” tab in order to expose the operating system that is inside your VNS3 Image template. Pick Ubuntu Linux 10.04 LTS as shown.
  • 15.
    © 2016 Launch aVNS3 Controller 15 There are quite a number of additional options on the Softlayer configuration page for additional disks, adapters, etc. Do not choose any of these. At the bottom of the configuration page there is a choice to “Continue Your Order”. Choose it after confirming your choices for Softlayer data center location, Operating System, Memory and CPU.
  • 16.
    © 2016 Launch aVNS3 Controller 16 The next page to pop up is an “Order Summary and Billing” page which reviews your previous choices.
  • 17.
    © 2016 Launch aVNS3 Controller 17 Further down the page you then make your VLAN selection with the Backend VLAN selected first.
  • 18.
    © 2016 Launch aVNS3 Controller 18 A Hostname and Domain name entry is required. Softlayer allows you to use the domain softlayer.com as part of your fully qualified domain name. This name must be unique across all Softlayer hosts. You then select the “Place an oder” radio button.
  • 19.
    © 2016 Launch aVNS3 Controller 19 A Hostname and Domain name entry is required. Softlayer allows you to use the domain softlayer.com as part of your fully qualified domain name. This name must be unique across all Softlayer hosts. You then select the “Place an oder” radio button. At the bottom of the page acknowledge the Softlayer Master Services Agreement and select “FinalizeYour Order”.
  • 20.
    © 2016 Optional -Configuring VNS3 as the network device gateway 20
  • 21.
    © 2016 Softlayer Configuration:Public IP Access 21 In Softlayer an instance can have a public IP on eth1 and a private VLAN IP on eth0. As a result VNS3 can be used as an Internet Gateway, sitting at a private VLAN edge, providing NAT-ing and port forwarding for the other devices in the private VLAN.
  • 22.
    © 2016 Configure Hoststo use VNS3 as Internet Gateway 22 WARNING Do not configure privateVLAN hosts to useVNS3 as an Internet Gateway until theVNS3 instance is fully configured with PrivateVLAN settings and Firewall rules for NAT-ing installed. If you have public IPs temporarily assigned to your privateVLAN hosts, and create a route to theVNS3 as the gateway to 0.0.0.0/0, you will most likely lose connectivity until theVNS3 configuration is complete, including port forwarding information to SSH or RDP into theVLAN host through theVNS3 Controller. Here we show the first steps to make theVNS3 appliance an the internet or network device gateway,. In this case the addresses used are based upon the privateVLAN addresses used for theVNS3 Controller in Softlayer. eth0 eth0 eth0
  • 23.
    © 2016 Configure SoftlayerHosts to use VNS3 as Internet Gateway 23 WARNING Do not configure privateVLAN hosts to useVNS3 as an Internet Gateway until theVNS3 instance is fully configured with PrivateVLAN settings and Firewall rules for NAT-ing installed. If you have public IPs temporarily assigned to your privateVLAN hosts, and create a route to theVNS3 as the gateway to 0.0.0.0/0, you will most likely lose connectivity until theVNS3 configuration is complete, including port forwarding information to SSH or RDP into theVLAN host through theVNS3 Controller. After bringing up the “eth1” interface and configuring the network interface information, the networking can be restarted. In this instance, using Ubuntu.The setup will be comparable but a bit different on RedHat based hosts. After the networking is restarted, an “ifconfig” command shows the instance has an “eth1” with the address of 192.168.10.2 as specified. eth1 eth0
  • 24.
    © 2016 Configure VNS3as Internet Gateway 24 In order to configureVNS3 as the Internet Gateway the following Firewall rules need to be entered. (The example continues assuming theVLAN is 192.168.10.0/24) # Allow traffic to/from theVLAN to thisVNS3:net Controller
 INPUT_CUST -s 192.168.10.0/24 -j ACCEPT
 OUTPUT_CUST -d 192.168.10.0/24 -j ACCEPT # NAT traffic from theVLAN that is using thisVNS3 Controller as Internet Gateway
 MACRO_CUST -o eth1 -s 192.168.10.0/24 -d 0.0.0.0/0 -j MASQUERADE # Port forward traffic to my 192.168.10.2 host PREROUTING_CUST -i eth1 -p tcp -s 0.0.0.0/0 --dport 33 -j DNAT --to 192.168.10.2:22 Assuming yourVLAN host is like the example, at 192.168.10.2, and is accessible via SSH, then the firewall is now configured to NAT traffic for anyVLAN host configured to use it as the Internet Gateway, and shows how to port forward traffic into theVLAN through theVNS3 Controller.
  • 25.
    © 2016 Configure HostsRoute to VNS3 Controller 25 WARNING Do not configure private VLAN hosts to use VNS3 as an Internet Gateway until the VNS3 instance is fully configured with Private VLAN settings and Firewall rules for NAT-ing installed. If you have public IPs temporarily assigned to your private VLAN hosts, and create a route to the VNS3 as the gateway to 0.0.0.0/0, you will most likely lose connectivity until the VNS3 configuration is complete, including port forwarding information to SSH or RDP into the VLAN host through the VNS3 Controller. The last step after all the previous are complete is to enter a route on the Softlayer VLAN host, pointing to the VNS3 Controller’s private ip as the gateway to the Internet. On the Softlayer host enter:
 ip route add 0.0.0.0/0 via 192.168.10.1 (The address 192.168.10.1 is used because in this example that is the VNS3 Controller private IP.) You should now be able to reach Internet resources even without a public IP attached to the Softlayer host. Depending on the operating system used in the cloud hosts, the route will need to be made persistent. This varies by operating system.
  • 26.
    © 2016 VNS3 ConfigurationDocument Links 26
  • 27.
    © 2016 VNS3 ConfigurationDocument Links 27 VNS3 Product Resources - Documentation | Add-ons VNS3 Configuration Instructions
 Instructions and screenshots for configuring a VNS3 Controller in a single or multiple Controller topology. Specific steps include, initializing a new Controller, generating clientpack keys, setting up peering, building IPsec tunnels, and connecting client servers to the Overlay Network. 
 VNS3 Administration Document
 Covers the administration and operation of a configured VNS3 Controller. Additional detail is provided around the VNS3 Firewall, all administration menu items, upgrade licenses, other routes and SNMP traps.
 VNS3 Docker Instructions
 Explains the value of the VNS3 3.5 Docker integration and covers uploading, allocating and exporting application containers. VNS3 Troubleshooting
 Troubleshooting document that provides explanation issues that are more commonly experienced with VNS3.