Cobit 5 Checklist
Cobit is a registered trademark by ISACA (http://www.isaca.org/) - Copyright 2013 - Minimarisk® Gmbh/Sàrl – www.minimarisk.com – Tel +41 44 586 45 00
1. Cobit Goals Cascade
1. Stakeholder Drivers Influence Stakeholder Needs;
2. Stakeholder Needs Cascade to Enterprise Goals;
3. Enterprise Goals Cascade to IT-related Goals;
4. IT-related Goals Cascade to Enabler Goals.
17 Generic and IT-related goals, distributed according
Balance Score Card four dimensions (Financial, Customer,
Internal, Learning/Growth).
2. Principles of Cobit
Cobit is based on 5 key principles for governance and
management of enterprise Information Technology.
Principle 1 - Meeting Stakeholder Needs
Principle 2 - Covering the Enterprise End-to-End
Principle 3 - Applying a Single Integrated Framework
Principle 4 - Enabling a Holistic Approach
Principle 5 - Separating Governance from Management
3. Cobit Areas and Processes
Cobit splits the processes into governance and
management areas . These two areas contain a total of
5 domains with 3 letter names, and a total of 37
processes organized as follows:
Governance of Enterprise IT
x Evaluate, Direct and Monitor (EDM) – 5 processes
Management of Enterprise IT
x Align, Plan and Organise (APO) – 13 processes
x Build, Acquire and Implement (BAI) – 10 processes
x Deliver, Service and Support (DSS) – 6 processes
x Monitor, Evaluate and Assess (MEA) - 3 processes
Evaluate, Direct & Monitor (EDM)
• EDM1 Set and Maintain the Governance Framework
• EDM2 Ensure Value Optimisation
• EDM3 Ensure Risk Optimisation
• EDM4 Ensure Resource Optimisation
• EDM5 Ensure Stakeholder Transparency
Align, Plan & Organise (APO)
• APO1 Define the Management Framework for IT
• APO2 Manage Strategy
• APO3 Manage Enterprise Architecture
• APO4 Manage Innovation
• APO5 Manage Portfolio
• APO6 Manage Budget and Cost
• APO7 Manage Human Resources
• APO8 Manage Relationships
• APO9 Manage Service Agreements
• APO10 Manage Suppliers
• APO11 Manage Quality
• APO12 Manage Risk
• APO13 Manage Security
Build, Acquire & Implement (BAI)
• BAI1 Manage Programmes and Projects
• BAI2 Define Requirements
• BAI3 Identify and Build Solutions
• BAI4 Manage Availability and Capacity
• BAI5 Manage Organisational Change Enablement
Deliver, Service and Support
• BAI6 Manage Changes
• BAI7 Manage Change Acceptance and Transitioning
• BAI8 Manage Knowledge
• BAI9 Manage Assets
• BAI10 Manage Configuration
Deliver, Service & Support (DSS)
• DSS1 Manage Operations
• DSS2 Manage Service Requests and Incidents
• DSS3 Manage Problems
• DSS6 Manage Continuity
• DSS5 Manage Security Services
• DSS6 Manage Business Process Controls
Monitor, evaluate & Assess (MEA)
• MEA1 MEA Performance and Conformance
• MEA2 MEA the System of Internal Control
• MEA3 MEA Compliance with External Requirements
Cobit 5 Checklist
Cobit is a registered trademark by ISACA (http://www.isaca.org/) - Copyright 2013 - Minimarisk® Gmbh/Sàrl – www.minimarisk.com – Tel +41 44 586 45 00
4. Cobit Seven Enterprise Enablers
1. Principles, policies and frameworks are the vehicle to
translate the desired behavior into practical guidance
for day-to-day management. Internal and External
Stakeholders.
2. Processes describe an organised set of practices and
activities. Life cycle of a process; Governance and
Management Processes.
3. Organisational structures describe RACI and roles.
4. Culture, ethics and behavior of individuals and of the
enterprise are very often underestimated as a success
factor in governance and management activities.
5. Information define its attributes: Physical (Carrier,
Media); Empirical (User Interface); Syntactic
(Language, Format); Semantic (Meaning); Type,
Currency; Pragmatic (Use) Includes Retention, Status,
Contingency, Novelty; and Social (Context)
6. Services, infrastructure and applications. Includes:
reuse, buy-vs-build, agility, simplicity and openness.
Definition of Architecture Principles, Architecture
Viewpoints, and Service Levels.
7. People, skills and competencies are linked to people.
Define Role Skill, Requirements, Skill Levels, Skill
Categories and Skill Definitions.
5. Cobit Enabler dimensions
1. Stakeholders
2. Goals (Intrinsic quality [results, process according
best practices, information is actual and true],
contextual quality [fit for purpose, relevant, easy to
apply, effectiveness], Access and security
3. Life cycle (Plan, Design, Build/Acquire/Create/
Implement, Use/Operate, Evaluate/Monitor,
Update/Dispose)
4. Good practices
6. Process Capability Model and Levels
Capability Model is now based on ISO/IEC 15504 (SPICE).
• Level 0: Incomplete. The process is not implemented
or fails to achieve its purpose;
• Level 1: Performed (Informed). The process is
implemented and achieves its purpose;
• Level 2: Managed (Planned and monitored).The
process is managed and results are specified,
controlled and maintained;
• Level 3: Established (Well defined).
A standard process is defined and used throughout
the organization;
• Level 4: Predictable (Quantitatively managed). The
process is executed consistently within defined limits
• Level 5: Optimizing (Continuous improvement). The
process is continuously improved to meet relevant
current and projected business goals.
7. Process attributes
The capability of processes is measured using process
attributes. The international standard defines nine
process attributes:
1.1 Process Performance
2.1 Performance Management
2.2 Work Product Management
3.1 Process Definition
3.2 Process Deployment
4.1 Process Measurement
4.2 Process Control
5.1 Process Innovation
5.2 Process Optimization.
Each process attribute is assessed on a four-point
(N-P-L-F) rating scale:
• Not achieved (0 - 15%)
• Partially achieved (>15% - 50%)
• Largely achieved (>50%- 85%)
• Fully achieved (>85% - 100%)
© 2012-13 Maat Consulting Ltd www.maatconsulting.com
COBIT is a registered trade mark of ISACA and the IT Governance Institute (ITGI) V1.3 Feb 2013
This is not an official COBIT publication and is not endorsed, sponsored, or otherwise affiliated with ISACA or ITGI.
COBIT 5 Foundation Exam Revision on a page!
Governance of Enterprise IT (GEIT)
Enterprise = organisation = commercial (corporate) OR public sector OR not for profit
Governance Objective: Value Creation from Benefits Realisation + Risk Optimisation+ Resource Optimisation
Governance Scope = where governance applies: usually the enterprise, but can be just some assets
GOALS CASCADE: Stakeholder Needs !
!
!
! Enterprise Goals !
!
!
! IT-related Goals !
!
!
! Enabler Goals
5 Principles of COBIT 5
1. Meeting stakeholder needs
2. Covering the Enterprise end-to-end
3. Single integrated Framework
4. Holistic approach of 7 enterprise Enablers
5. Separating governance from management
Memory aid: “Stakeholder FEES”
7 Enablers of COBIT 5 (i.e. Governance Enablers)
1. Principles, policies and frameworks
2. Processes
3. Organisational structures
4. Culture, ethics and behaviours
5. Information
6. Service infrastructure and applications
7. People skills and competencies
Generic Governance Enablers
Enabler Dimensions
Stakeholders
Internal & External
Goals = expected outcome of enabler
Intrinsic Quality (work well & provide results)
Contextual Quality (Relevance, effectiveness)
Accessibility & Security (of enablers + outcomes)
Life Cycle
Plan, Design,
Build/Acquire/Create/Implement
Use/Operate
Evaluate/Monitor
Update/Dispose
Good Practices
Practices
Work Products (Inputs & Outputs)
Enabler Performance Management
Questions to be answered:
Outcomes (Lag indicators)
Are stakeholders’ needs addressed?
Are enabler goals achieved?
Functioning of enabler itself (Lead indicator)
Is the enabler lifecycle managed?
Are good practices applied?
Information Enabler (Enabler 5)
Intrinsic quality:
Accuracy, Objectivity, Believability, Reputation
Information layers
Physical world (carrier/media), Empiric (User interface)
Syntactic (code/language), Semantic (meaning)
Pragmatic (use)
Social world (e.g. contracts, law, culture)
COBIT 5 Processes COBIT 5 Process Capability Assessment Model (PAM)
5 Domains = 37 processes
Governance
Evaluate, Direct & Monitor (EDM)
Management
Align, Plan & Organise (APO) – strategic
Build, Acquire & Implement (BAI) – tactical
Deliver, Service & Support (DSS) - operational
Monitor, Evaluate & Assess (MEA)
EDM(5) APO(13) BAI(10) DSS(6)
MEA(3)
Memory aid:
Management domains are in alphabetic
order.
E is 5th
letter in alphabet and EDM has
5 processes.
In alphabetic order, Management
processes get less by 3 or 4
0 Incomplete
1 Performed
PA1.1 Process Performance
2 Managed
PA2.1 Performance Management
PA2.2 Work Product Management
3 Established
PA3.1 Process Definition
PA3.2 Process Deployment
4 Predictable
PA4.1 Process Measurement
PA4.2 Process Control
5 Optimising
PA5.1 Process Innovation
PA5.2 Process Optimisation
COBIT 5 Implementation Lifecycle
Phase 1 2 3 4 5 6 7
What are the
drivers?
Where are we
now?
Where do we
want to be?
What needs to
be done?
How do we get
there?
Did we get
there?
How do we keep
the momentum
going?
Programme
Management
Initiate
program
Define problems
& opportunities
Define road
map
Plan
programme
Execute plan Realise
benefits
Review
Effectiveness
Change
Enablement
Establish
desire to
change
Form
implementation
team
Communicate
outcome
Identify role
players
Operate and
use
Embed new
approaches
Sustain
Continual
Improvement
Lifecycle
Recognise
need to act
Assess current
state
Define target
state
Build
improvements
Implement
improvements
Operate
improvements
Monitor and
evaluate
Memory aid:
POP PICS
Performance
Attribute (PA)
COBIT 5
Principles
1. Meeting
Stakeholder
Needs
5. Seperating
Governance
from
Management
2. Covering the
Enterprise
End-to-end
3. Applying a
Single
Integrated
Framework
4. Enabling a
Holistic
Approach
Governance Objectives:Value Creation
Benefits
Realisation
Resource
Optimisation
Risk
Optimisation
Stakeholder
Needs
Drive
Culture thics
and Behaviour
rocesses
Or ani ational
Structures
nformation
Services
nfrastructure
and pplications
eople
Skills and
Competencies
Resources
rinciples olicies and rame orks
Enablers
COBIT 5
Principles
Value Creation
Principles, policies and
frameworks are the
vehicle to translate the
desired behaviour into
practical guidance for
day-to-day management.
A process describes an
organized set of practices and
activities to achieve certain
objectives and produce a set of
outputs in support of achieving
overall IT-related goals.
Organizational structures
are the key decision-making
entities in an enterprise.
Culture, ethics and
behaviour of individuals
and of the enterprise are
very often underestimated
as a success factor
in governance and
management activities.
Information is pervasive throughout any organization
and includes all information produced and used by
the enterprise. Information is required for keeping
the organization running and well governed, but at the
operational level, information is very often the key
product of the enterprise itself.
Services, infrastructure and applications include
the infrastructure, technology and applications
that provide the enterprise with information
technology processes and services.
People, skills and
competencies are
linked to people
and are required for
successful completion
of all activities and
for making correct
decisions and taking
corrective actions.
or o o e e
ue
Generate and rocess
us ess rocess
ransform ransform
Drive
Create
rocesses
Information
Cycle
Contextual Goals
Relevancy
Completeness
Appropriateness
Conciseness
Consistency
Understandability
Ease of Manipulation
D
e
f
in
e
t
a
r
g
e
t
s
t
a
t
e
As
se
ss
cu
rr
en
t
st
at
e
Recognise
need to
act
Monitor
and
evaluate
O
p
er
at
e
an
d
m
ea
su
re
E
m
b
ed
n
ew
ap
p
ro
ac
h
es
Sustain
Establish desire
to change
F
o
r
m
im
p
le
m
e
n
ta
ti
o
n
te
a
m
O
p
e
r
a
t
e
a
n
d
u
s
e
Identify role
players
C
o
m
m
u
n
i
c
a
t
e
o
u
t
c
o
m
e
Review
effectiveness
Initiate programme
D
e
fi
n
e
p
ro
b
le
m
s
a
n
d
o
p
p
o
r
tu
n
it
ie
s
R
e
a
li
se
b
e
n
e
fi
ts
E
x
e
c
u
t
e
p
l
a
n
Plan programme
D
e
f
i
n
e
r
o
a
d
m
a
p
Programme management
(outer ring)
Change enablement
(middle ring)
Continual improvement life cycle
(inner ring)
Level 5
Level 4
Level 3
Level 2
Level 1
Level 0
Capability
Dimension
Process Dimension
PA5.2 Continuous optimization
PA5.1 Process innovation
PA4.2 Process control
PA4.1 Process measurement
PA3.2 Process deployment
PA3.1 Process definition
PA2.2 Performance management
PA2.1 Work product management
PA1.1 Process performance
BP : Base practices (Level 1)
WP :Work products (Level 1)
GP : Generic Practice (Levels 2 to 5 only)
GR : Generic Resource (Not defined)
GWP : Generic Work Product (Levels 2 to 5 only)
EDM Evaluate, Direct,
Monitor
APO Align Plan and Organize
BAI - Build,Acquire and Implement
DSS Deliver, Service and
Support
MEA Monitor, Evaluate & Assess
COBIT 5 Processes
Process Attributes
Level 1 to 5
Process Capability Attribute Indicators (PCAIs)
Level 1 to 5
Process Performance Indicators
COBIT 5 PCAIs
Process Assessment Model
Implementation
Life Cycle
Governance ensures that stakeholder needs, conditions and options are evaluated to
determine balanced, agreed-on enterprise objectives to be achieved; setting direction
through prioritization and decision making; monitoring performance, compliance and
progress against agreed direction and objectives.
Management plans, builds, runs and monitors activities in alignment with the direction set
by the governance body to achieve the enterprise objectives
© Copyright 2014 by Service Management Art Inc. All rights reserved.
These materials include COBIT 5 & 4.1, which is used with the permission of ISACA. ©1996-2012 ITGI.
COBIT is a registered trademark of the Information Systems Audit and Control Association (ISACA) and the IT Governance Institute (ITGI).
NOT FOR RESALE,Version 2.3
s
u ce
COB Val
Risk B S
Current Guidance and Contents
Structure for uture Contents
o e e se
Content ilter
for no led e Base
COB roduct amil
COB
COB Online
Collaborative
nvironment
COB rofessional Guides
COB nabler Guides
e
u ce
er s
er
r s
r e or s
nablers provide
structure to the
COB
kno led e base
Service
Capabilities
Skills and
Competencies
rinciples
and olicies
nformation
Or ani ational
Structures
Culture
thics
Behaviour
rocesses
COB
nablers
Single
Integrated
Framework
COB mplementation
COB
for nformation
Securit
COB
for ssurance
COB
for Risk
Other rofessional
Guides
Other nabler
Guides
COB :
nablin nformation
COB :
nablin rocesses
COB Online Collaborative nvironment
COB
COB nabler Guides
COB rofessional Guides
Product Family
Benefits
Reali ation
Resource
Optimi ation
Risk
Optimi ation
o er ce ec e ue re o
Governance
nablers
Governance
Scope
Ro es c es Re o s s
Governance & Management
• Intrinsic Quality
• Contextual Quality
(Relevance,
Effectiveness)
• Accessibility and
Security
• Plan
• Design
• Build/Acquire/
Create/Implement
• Use/Operate
• Evaluate/Monitor
• Update/Dispose
• Practices
• Work Products
(Inputs/Outputs)
• Internal
Stakeholders
• External
Stakeholders
Stakeholders Goals Life Cycle Good Practices
Enabler
Dimension
Enabler
Performance
Management
Are Stakeholders
Needs Addressed?
Are Enabler
Goals Achieved?
Is Life Cycle
Managed?
Are Good Practices
Applied?
Metrics for Achievement of Goals
(Lag Indicators)
Metrics for Application of Practice
(Lead Indicators)
Enablers: Generic
ana ement eedback
Business Needs
o er ce
e e
u e
rec o or
u Ru o or
r se
u c u re e e
e er er ce u or
rocesses or e e o er r se
valuate Direct and onitor
rocesses or o er ce o er r se
ana e
Operations
ana e
roblems
ana e
Continuit
ana e
Securit
Services
ana e
Business
rocess Controls
ana e
Service Re uests
and ncidents
ana e
ro rammes and
rojects
ana e
Re uirements
Definition
ana e
Solutions
dentification
and Build
ana e
vailabilit
and Capacit
ana e
Or ani ational
Chan e
nablement
ana e
Chan es
ana e
Chan e
cceptance and
ransitionin
ana e
no led e
ana e
ssets
ana e
Confi uration
o or
u e
ssess
onitor
valuate and ssess
erformance and
Conformance
onitor
valuate and ssess
the S stem of nternal
Control
onitor
valuate and ssess
Compliance ith
ternal Re uirements
ana e
the ana ement
rame ork
ana e
Strate
ana e
nterprise
rchitecture
ana e
nnovation
ana e
ortfolio
ana e
Bud et and Costs
ana e
uman Resources
ana e
Relationships
ana e
Service
reements
ana e
Suppliers
ana e
ualit
ana e
Risk
ana e
Securit
nsure
Governance
rame ork Settin
and aintenance
nsure
Benefits Deliver
nsure
Risk Optimi ation
nsure
Resource
Optimi ation
nsure
Stakeholder
ransparenc
Key Areas
Process Reference Model (PRM)
O ners and
Stakeholders
Ro es c es Re o s s
Governin
Bod
ana ement
Operations
and
ecution
nstruct and
li n
Report
onitor
Set Direction
ccountable
Dele ate
Stakeholder Needs
Benefits
Realisation
Resource
Optimisation
Risk
Optimisation
Cascade to
Cascade to
Influence
Stakeholder Drivers
(Environment, Technology Evolution, ...)
Enterprise Goals
IT-related Goals
Enabler Goals
Cascade to
Goals
Cascade
COBIT 5 Foundation Overview
proven experience • proven tactics • proven success
For more information:
Call:Toll Free 1 866 616 4195
Email: Info@ServiceManagementArt.com
C
O
B
I
T
5
E
d
i
t
i
o
n
Enterprise Goal COBIT 5 Processes
Stakeholder
value
of
business
investments
Portfolio
of
competitive
products
and
services
Managed
business
risk
(safeguarding
of
assets)
Compliance
with
external
laws
and
regulations
Financial
transparency
Customer-oriented
service
culture
Business
service
continuity
and
availability
Agile
responses
to
a
changing
business
environment
Information-based
strategic
decision
making
Optimization
of
service
delivery
costs
Optimization
of
business
process
functionality
Optimization
of
business
process
costs
Managed
business
change
programmes
Operational
and
staff
productivity
Compliance
with
internal
policies
Skilled
and
motivated
people
Product
and
business
innovation
culture
Ensure
Governance
Framework
Setting
and
Maintenance
Ensure
Beneits
Delivery
Ensure
Risk
Optimization
Ensure
Resource
Optimization
Ensure
Stakeholder
Transparency
Manage
the
IT
Management
Framework
Manage
Strategy
Manage
Enterprise
Architecture
Manage
Innovation
Manage
Portfolio
Manager
Budgets
and
Costs
Manage
Human
Resources
Manage
Relationships
Manage
Service
Agreements
Manage
Suppliers
Manage
Quality
Manage
Risk
Manage
Security
Manage
Programmes
and
Projects
Manage
Requirements
Deinition
Manage
Solutions
Identiication
and
Build
Manage
Availability
and
Capacity
Manage
Organizational
Change
Enablement
Manage
Changes
Manage
Change
Acceptance
and
Transitioning
Manage
Knowledge
Manage
Assets
Manage
Coniguration
Manage
Operations
Manage
Service
Requests
and
Incidents
Mange
Problems
Manage
Continuity
Manage
Security
Services
Manage
Business
Process
Controls
Monitor,
Evaluate
and
Assess
Performance
and
Conformance
Monitor,
Evaluate
and
Assess
the
System
on
Internal
Controls
Monitor,
Evaluate
and
Assess
Compliance
with
External
Requirements
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EDM01
EDM02
EDM03
EDM04
EDM05
APO01
APO02
APO03
APO04
APO05
APO06
APO07
APO08
APO09
APO10
APO11
APO12
APO13
BAI01
BAI02
BAI03
BAI04
BAI05
BAI06
BAI07
BAI08
BAI09
BAI10
DSS01
DSS02
DSS03
DSS04
DSS05
DSS06
MEA01
MEA02
MEA03
IT-related Goal
Financial Customer Internal
Learning
and
Growth
Evaluate, Direct and
Monitor Align, Plan and Organize Build, Acquire and Implement Deliver, Service and
Support
Monitor,
Evaluate and
Assess
Financial
01 Alignment of IT and business
strategy P P S P S P P S P S P S S ð P P S S S P P P S P S P P S S P P S S S S S S
02
IT compliance and support for
business compliance with external
laws and regulations
S P P ð S S S P S S S P P S S P S S S P S S P P
03
Commitment of executive
management for making IT-related
decisions
P S S S S S P S S ð P S S S P S S S S S S S S S S S S
04 Managed IT-related business risk P S P S P S S S ð S P S S S S S S S S S S P S P P P S S S P S S S P P P P P P P P P
05 Realized beneits from IT-enabled
investments of services portfolio P P S S S S P S S ð S P S S S P P P S S S P P S S S S S S S S S S S S
06 Transparency of IT costs, beneits
and risk S S P S P P ð S P P S P S S P S S S P P S P S S S
Customer
07 Delivery of IT services in line with
business requirements P P S S P S P S P S S S S ð P P S S P S P S S S S P P P P S S S P P P S P S S S P P P P S P P S S
08
Adequate use of applications,
information and technology
solutions
S S S S S S S P S P S S ð S S S S S P S S S S S S S S S S S S P S P S S S S S S S S S S
Internal
09 IT agility S P S S P P S S S P ð S P P S P P S S S P S S S S S S S P S S S S S S
10
Security and information,
processing infrastructure and
applications
P P P P ð S P S S S S S P P S P S S S S S S P S S S S
11 Optimization of IT assets,
resources and capabilities P S S P S P S S S ð S S P P S P P S S P S S S S S S S P S S S P P P P S S S P
12
Enablement and support of
business processes by integrating
applications and technology into
business processes
S P S S S S P S S S S ð S S S S S S P P S S S P S S S S
13
Delivery of programmes delivering
beneits, on time, on budget, and
meeting requirements and quality
standards
P S S S S S P ð S S S S S S S P S P S S S P P P S S S P S S S
14 Availability of reliable and useful
information for decision making S S S S P P S ð S S S S S S S S P S S S P S S P S S S S P S S P P S S S S
15 IT compliance with internal
policies S S P ð S P S P S S S S S S S S S S S S S S S S S P P S
Learning
and
Growth
16
Competent and motivated
business and
IT personnel
S S P S S P P S ð S S S P P S P S S S S S S S S S
17 Knowledge, expertise and
initiatives for business innovation S P S P S S S S P ð S P S S S P P S P S P P S S S S S S S P S S P S S S S S S S S
COBIT 5 Goals Cascade
P
S
Primary
Relationship
Secondary
Relationship
Cascade to
Cascade to
Enterprise Goals
IT-related Goals
Process Goals
COBIT®
Poster Series #1
Free Resource Library
www.goodelearning.com
© Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA
Transforming Stakeholder Needs into Actions
Good e-Learning Resources :: www.goodelearning.com/downloads
@goodelearning /goodelearning /company/good-e-learning
by Gregor Polančič
The COBIT 5 goals cascade is the mechanism to translate stakeholder needs into speciic, actionable and customized enterprise goals, IT-related goals and
enabler goals. This translation allows setting speciic goals at every level and in every area of the enterprise in support of the overall goals and stakeholder
requirements, and thus efectively supports alignment between enterprise needs and IT solutions and services.
Stakeholder Drivers
Stakeholder Needs
Enterprise Goals
IT Related Goals
Enabler Goals
A stakeholder is anyone who has a
responsibility for, an expectation from or
some other interest in an enterprise.
Stakeholder needs are inluenced by a number
of drivers, e.g., organizational changes, business
changes and technology changes.
COBIT 5 deines 22 common internal
stakeholder needs. How do I best build and
structure my IT department?
COBIT 5 deines 17 generic enterprise goals.
Stakeholder value of business investments.
Stakeholder value of business investments.
COBIT 5 deines all goals according to
Balances ScoreCard (BSC) dimensions.
COBIT 5 deines 17 information and
related technology (i.e. IT-related) goals.
Transparency of IT costs, beneits and risk.
Achieving IT-related goals requires the
successful application and use of a
number of enablers.
Enablers are broadly deined as anything that
can help to achieve the objectives of
the enterprise.
COBIT 5 contains a mapping between
IT-related goals and the relevant COBIT
5 processes, which then contain related
process goals.
Value creation means realizing beneits at an
optimal resource cost while optimizing risk.
Drive Value Creation
Common internal stakeholder needs and
enterprise goals are interrelated.
Enablers include processes, information,
organizational structures, policies,
culture, people, services, infrastructure,
and applications.
For each enabler a set of speciic goals can
be deined in support of the IT-related goals.
Inf
uence
Cascade
to
Realize
Cascade
to
Realize
Cascade
to
Realize
Enterprise goals and IT-related goals
are interrelated.
Free Resource Library
www.goodelearning.com
© Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA registered in United States of America and other countries, www.isaca.org
Good e-Learning Resources :: www.goodelearning.com/downloads
@goodelearning /goodelearning /company/good-e-learning
COBIT5®
Poster Series #2
What drives IT Governance
by Gregor Polančič and Boris Ovčjak
GOVERNANCE AND MANAGEMENT OVER ENTERPRISE IT
GOALS CASCADE
ENABLERS
Governance, as deined in the scope of COBIT 5, is driven by enablers. Enablers are factors that individually and collectively
inluence whether something will work. In the case of COBIT 5 this refers to governance and management over enterprise IT.
COBIT 5 Framework describes seven categories of enablers that are listed bellow. Some of the enablers are also enterprise
resources that need to be managed and governed as well.
Enablers are driven by the goals cascade,
that are high level IT-related goals that
deine what the diferent enablers should
achieve.
These enterprise goals for IT are used to
formalise and structure the stakeholder
needs. Enterprise goals can be linked
to IT-related goals, and these can be
achieved through the optimal use and
execution of all enablers.
PROCESSES
Describe an organised
set of practices and
activities to achieve
certain objectives.
Produce a set of outputs
and support of achieving
overall IT-related goals.
ORGANI-
SATIONAL
STRUCTURES
Key decision-making
entities in an enterprise.
CULTURE,
ETHICS AND
BEHAVIOUR
Often underestimated
as a success factor
in governance and
management activities.
PRINCIPLES, POLICIES
AND FRAMEWORKS
To achieve the main objectives of the
enterprise, it must always consider an
interconnected set of enablers. That is,
that each enabler:
• Needs the input of other enablers
to be fully efective
• Delivers output to the beneit of
other enablers
RESOURCES
INFORMATION
• Pervasive throughout
any organisation.
• Includes all information
produced and used by
the enterprise.
• Required for keeping the
organisation running
and well governed.
• Key product of the
enterprise.
SERVICES,
INFRASTRUC-
TURE AND
APPLICATION
PEOPLE,
SKILL AND
COMPETENCIES
Linked to people and
required to:
• Successful completion
of all activities
• Making correct
decisions
• Taking corrective
actions
2
5
3
6
4
7
1 PRACTICAL GUIDANCE
DAY-TO-DAY
MANAGEMENT
TRANSLATE
INFRA-
STRUCTURE
TECHNOLOGY
ENTERPRISE
APPLICATION
Provide with information
technology processing
and services
DESIRED BEHAVIOUR
ENABLERS DIRECTLY INFLUENCE
GOVERNANCE AND MANAGEMENT OVER ENTERPRISE IT.
Free Resource Library
www.goodelearning.com
© Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA registered in United States of America and other countries, www.isaca.org
Good e-Learning Resources :: www.goodelearning.com/downloads
@goodelearning /goodelearning /company/good-e-learning
COBIT5®
Poster Series #3
Can We Separate Governance From Management?
by Gregor Polančič and Boris Ovčjak
In the scope of COBIT 5 there is a clear distinction between governance and management. Although they comprise diferent types of activities with
diferent responsibilities, a set of interactions is required between governance and management to result in an eicient and efective governance
system. To achieve that, COBIT 5 also advocates that enterprises implement governance and management processes such that key areas are covered.
GOVERNANCE MANAGEMENT
INTERACTION
IS REQUIRED
Governance ensures that stakeholder needs,
conditions and options are evaluated to
determine balanced agreed-on enterprise
objectives to be achieved; setting direction
through prioritisation and decision making; and
monitoring performance and compliance against
agreed-on direction and objectives
Management plans, builds,
runs and monitors activities in
alignment with the direction set
by governance body to achieve the
enterprise objectives.
INFORMATION
Information used for evaluating, directing and monitoring enterprise IT is exchanged between governance and management as
described in the process model inputs and outputs.
CULTURE, ETHICS
AND BEHAVIOUR
Behaviour is a key enabler of good governance and management of the enterprise
PROCESS
There exist a distinction between governance and management processes, including specific sets of practices and activities for
each. The process model also includes RACI charts, describing the responsibilities of different organisational structures and
roles within the enterprise
PRINCIPLES, POLICIES
ANDFRAMEWORKS
Principles, policies and frameworks are the vehicle by which governance decisions are institutionalized within the enterprise,
and for that reason are an interaction between governance decisions and management.
ORGANISATIONAL
STRUCTURES
In the scope of organisational structures the interaction takes place between the decisions taken by the governance structures
and the decisions and operations implementing the former.
PEOPLE, SKILLS
AND COMPETENCIES
Governance and management activities require different skill sets, but an essential skill for both governance body memebers
and management is to understand both tasks and how they are different.
SERVICES, INFRASTRUCTURE
AND APPLICATIONS
Services are required, supported by applications and infrastructure to provide the governance body with adequate information
and to support governance activities of evaluating, setting direction and monitoring.
ENABLER GOVERNANCE-MANAGEMENT INTERACTION
PROCESS REFERENCE MODEL WITHIN GOVERNANCE AND MANAGEMENT KEY AREAS
DIRECT
Ensure Risk
Optimisation
Ensure Benefits
Delivery
Ensure Governance
Framework Setting
And Maintenance
Ensure Stakeholder
Transparency
Ensure Resources
Optimisation
MANAGEMENT
FEEDBACK
GOVERNANCE
MANAGEMENT
ALIGN, PLAN
AND ORGANISE
BUILD ACQUIRE
AND IMPLEMENT
DELIVER, SERVICE
AND SUPPORT
MONITOR, EVALUATE
AND ASSESS
Manage the IT
Management
Framework
Manage
Programmers
and Projects
Manage
Strategy
Manage
Requirements
Definition
Manage
Operations
Manage
Enterprise
Architecture
Manage
Knowledge
Manage Service
Requests and
Incidents
Monitor, Evaluate and
Assess Performance
and Conformance
Manage
Innovation
Manage
Availability
and Capacity
Manage
Portfolio Manage Assets Manage
Problems
Manage Budget
and Costs
Manage
Changes
Manage Security
Services
Monitor, Evaluate and
Assess the System
of Internal
Manage
Suppliers
Man. Solutions
Identification
and Builds
Manage
Quality Manage Risk
Manage
Human
Resources
Manage
Configuration
Manage
Relationships Manage Change
Acceptance and
Transitioning
Manage
Continuity
Manage Service
Agreements Manage
Organisational
Change
Enablement
Manage Business
Process Controls
Monitor, Evaluate and
Assess Compliance
With External
Requirements
Manage
Security
BUSINESS NEEDS
MONITOR
EVALUATE
ISACA COBIT® 5 - Glossary (EN)
63 terms by miroslawdabrowski
Like this study set? Create a free account to save it.
Create a free account
Create a free account
accountable party (RACI) The individual, group or entity that is
ultimately responsible for a subject
matter, process or scope
In a RACI chart, answers the question:
Who accounts for the success of the
task?
accountability of governance Governance ensures that enterprise
objectives are achieved by evaluating
stakeholder needs, conditions and
options; setting direction through
prioritisation and decision making; and
monitoring performance, compliance
and progress against plans. In most
enterprises, governance is the
responsibility of the board of directors,
under the leadership of the
chairperson.
Activity In COBIT, the main action taken to
operate the process. Guidance to
achieve management practices for
successful governance and
management of enterprise
IT. Activities:
- Describe a set of necessary and
sufficient action-oriented
implementation steps to
achieve a Governance Practice or
Management Practice
- Consider the inputs and outputs of
the process
- Are based on generally accepted
standards and good practices
- Support establishment of clear roles
and responsibilities
- Are non-prescriptive and need to be
adapted and developed into specific
procedures appropriate for the
enterprise
alignment A state where the enablers of
governance and management of
enterprise IT support the goals and
strategies of the enterprise
application architecture Description of the logical grouping of
capabilities that manage the objects
necessary to process information and
support the enterprise's objectives
architecture board A group of stakeholders and experts
who are accountable for guidance on
enterprise architecture related matters
and decisions, and for setting
architectural policies and standards
authentication The act of verifying the identity of a
user and the user's eligibility to access
computerised information
Scope Note: Assurance: Authentication
is designed to protect against
fraudulent logon activity.
It can also refer to the verification of
the correctness of a piece of data.
baseline architecture The existing description of the
fundamental underlying design of the
components of the business system
before entering a cycle of architecture
review and redesign
benefits realisation One of the objectives of governance.
The bringing about of new benefits for
the enterprise, the maintenance and
extension of existing forms of benefits,
and the elimination of those initiatives
and assets that are not creating
sufficient value.
business continuity Preventing, mitigating and recovering
from disruption. The terms 'business
resumption planning', 'disaster recovery
planning' and 'contingency planning'
also may be used in this context; they
focus on recovery aspects of continuity,
and for that reason the 'resilience'
aspect should also be taken into
account.
business goal The translation of the enterprise's
mission from a statement of intention
into performance targets and results
Business process control The translation of the enterprise's
mission from a statemenThe policies,
procedures, practices and
organisational structures designed to
provide reasonable assurance that a
business process will achieve its
objectives of intention into
performance targets and results
Chargeback The redistribution of expenditures to
the units within a company that gave
rise to them
Scope Note: Chargeback is important
because without such a policy,
misleading views may be given as to the
real profitability of a product or service,
as certain key expenditures will be
ignored or calculated according to an
arbitrary formula.
COBIT 1. COBIT 5: Formerly known as Control
Objectives for Information and related
Technology (COBIT); now used only as
the acronym in its fifth iteration. A
complete, internationally accepted
framework for governing and managing
enterprise information and technology
(IT) that supports enterprise executives
and management in their definition and
achievement of business goals and
related IT goals. COBIT describes five
principles and seven enablers that
support enterprises in the
development, implementation, and
continuous improvement and
monitoring of good IT-related
governance and management
practices.
Scope Note: Earlier versions of COBIT
focused on control objectives related to
IT processes, management and control
of IT processes and IT governance
aspects.
Adoption and use of the COBIT
framework are supported by guidance
from a growing family of supporting
products. (See www.isaca.org/cobit for
more information.)
2. COBIT 4.1 and earlier: Formerly
known as Control Objectives for
Information and related Technology
(COBIT). A complete, internationally
accepted process framework for IT that
supports business and IT executives
and management in their definition and
achievement of business goals and
related IT goals by providing a
comprehensive IT governance,
management, control and assurance
model. COBIT describes IT processes
and associated control objectives,
management guidelines (activities,
accountabilities, responsibilities and
performance metrics) and maturity
code of ethics A document designed to influence
individual and organisational behaviour
of employees by defining organisational
values and the rules to be applied in
certain situations. It is adopted to assist
those in the enterprise called upon to
make decisions understand the
difference between 'right' and 'wrong'
and to apply this understanding to their
decisions.
competence The ability to perform a specific task,
action or function successfully
consulted party (RACI) Refers to those people whose opinions
are sought on an activity (two-way
communication)
In a RACI chart, answers the question:
Who is providing input?
Key roles that provide input. Note that
it is up to the accountable and
responsible roles to obtain information
from other units or external partners,
too; however, inputs from the roles
listed are to be considered and, if
required, appropriate action has to be
taken for escalation, including the
information of the process owner
and/or the steering committee
context The overall set of internal and external
factors that might influence or
determine how an enterprise, entity,
process or individual acts Scope Note:
Context includes:
- Technology context - Technological
factors that affect organization's ability
to extract value from data
- Data context - Data accuracy,
availability, currency and quality
- Skills and knowledge - General
experience, and analytical, technical
and business skills
- Organization and cultural context -
Political factors, and whether the
organisation prefers data to intuition -
Strategic context - Strategical objectives
of the enterprise
control The means of managing risk, including
policies, procedures, guidelines,
practices or organisational structures,
which can be of an administrative,
technical, management or legal nature.
Also used as a synonym for safeguard
or countermeasure.
culture A pattern of behaviours, beliefs,
assumptions, attitudes and ways of
doing things
driver External and internal factors that
initiate and affect how an enterprise or
individuals act or change
enterprise goal See Business goal
enterprise governance A set of responsibilities and practices
exercised by the board and executive
management with the goal of providing
strategic direction, ensuring that
objectives are achieved, ascertaining
that risk is managed appropriately and
verifying that the enterprise's resources
are used responsibly. It could also
mean a governance view focussing on
the overall enterprise; the highest-level
view of governance to which all others
must align.
full economic life cycle A period of time during which material
business benefits are expected to arise
from, and/or during which material
expenditures (including investments,
running and retirement costs) are
expected to be incurred by, an
investment programme
good practice A proven activity or process that has
been successfully used by multiple
enterprises and has been shown to
produce reliable results
governance The framework, principles and policies,
structures, processes and practices,
information, skills, culture, ethics, and
behaviour to set direction and monitor
compliance and performance of the
enterprise aligned with the overall
purpose and defined objectives.
Governance defines accountability,
responsibility and decision making
(among other elements).
governance/management practice For each COBIT process, the
governance and management practices
provide a complete set of high-level
requirements for effective and practical
governance and management of
enterprise IT. They are statements of
actions from governance bodies and
management.
governance enabler Something (tangible or intangible) that
assists in the realization of effective
governance
governance framework A framework is a basic conceptual
structure used to solve or address
complex issues; an enabler of
governance; a set of concepts,
assumptions and practices that define
how something can be approached or
understood, the relationships amongst
the entities involved, the roles of those
involved, and the boundaries (what is
and is not included in the governance
system).
Examples: COBIT and COSO's Internal
Control—Integrated Framework
governance of enterprise IT An asset that, like other important
business assets, is essential to an
enterprise's business. It can exist in
many forms: printed or written on
paper, stored electronically, transmitted
by post or electronically, shown on
films, or spoken in conversation.
information An asset that, like other important
business assets, is essential to an
enterprise's business. It can exist in
many forms: printed or written on
paper, stored electronically, transmitted
by post or electronically, shown on
films, or spoken in conversation.
informed party (RACI) Refers to those people who are kept up
to date on the progress of an activity
(one-way communication)
In a RACI chart, answers the question:
Who is receiving information?
Roles who are informed of the
achievements and/or deliverables of
the task. To role in 'accountable', of
course, should always receive
appropriate information to oversee the
task, as do the responsible roles for
their area of interest.
inputs and outputs The process work products/artefacts
considered necessary to support
operation of the process.
They enable key decisions, provide a
record and audit trail of process
activities, and enable follow-up in the
event of an incident. They are defined
at the key management practice level,
may include some work products used
only within the process and are often
essential inputs to other processes. The
illustrative COBIT 5 inputs and outputs
should not be regarded as an
exhaustive list since additional
information flows could be defined
depending on a particular enterprise's
environment and process framework.
investment portfolio The collection of investments being
considered and/or being made
IT application Electronic functionality that constitutes
parts of business processes undertaken
by, or with the assistance of, IT
IT goal A statement describing a desired
outcome of enterprise IT in support of
enterprise goals. An outcome can be an
artefact, a significant change of a state
or a significant capability improvement.
IT service The day-to-day provision to customers
of IT infrastructure and applications
and support for their use. Examples
include service desk, equipment supply
and moves, and security authorisations.
management Entails the judicious use of means
(resources, people, processes, practices,
etc.) to achieve an identified end. It is a
means or instrument by which the
governance body achieves a result or
objective. Management is responsible
for execution within the direction set by
the governance body. Management is
about planning, building, organising
and controlling operational activities to
align with the direction set by the
governance body, and reporting back
on these activities.
model A way to describe a given set of
components and how those
components relate to each other to
describe the main workings of an
object, system, or concept
objective Statement of a desired outcome
organisational structure An enabler of governance and of
management. Includes the enterprise
and its structures, hierarchies and
dependencies.
Example: Steering committee
output See Inputs and outputs
owner Individual or group that holds or
possesses the rights of and the
responsibilities for an enterprise, entity
or asset, e.g., process owner, system
owner
policy Overall intention and direction as
formally expressed by management
principle An enabler of governance and of
management. Comprises the values
and fundamental assumptions held by
the enterprise, the beliefs that guide
and put boundaries around the
enterprise's decision making,
communication within and outside the
enterprise, and stewardship - caring for
assets owned by another.
Example: Ethics charter, social
responsibility charter
process Generally, a collection of practices
influenced by the enterprise's policies
and procedures that takes inputs from
a number of sources (including other
processes), manipulates the inputs and
produces outputs (e.g., products,
services)
Scope note: Processes have clear
business reasons for existing,
accountable owners, clear roles and
responsibilities around the execution of
the process, and the means to measure
performance.
process (capability) attribute ISO/IEC 15504: A measurable
characteristic of process capability
applicable to any process
process capability ISO/IEC 15504: A characterization of the
ability of a process to meet current or
projected business goals
process goal A statement describing the desired
outcome of a process. An outcome can
be an artefact, a significant change of a
state or a significant capability
improvement of other processes.
programme and project management
office (PMO)
The function responsible for supporting
programme and project managers, and
gathering, assessing and reporting
information about the conduct of their
programmes and constituent projects
quality Being fit for purpose (achieving
intended value)
RACI chart Illustrates who is responsible,
accountable, consulted and informed
within an organisational framework
resource Any enterprise asset that can help the
organisation achieve its objectives
resource optimisation One of the governance objectives.
Involves effective, efficient and
responsible use of all resources -
human, financial, equipment, facilities,
etc.
responsible party (RACI) Refers to the person who must ensure
that activities are completed
successfully In a RACI chart, answers
the question: Who is getting the task
done? Roles taking the main
operational stake in fulfilling the activity
listed and creating the intended
outcome
risk The combination of the probability of
an event and its consequence (ISO/IEC
73)
risk management One of the governance objectives.
Entails recognising risk; assessing the
impact and likelihood of that risk; and
developing strategies, such as avoiding
the risk, reducing the negative effect of
the risk and/or transferring the risk, to
manage it within the context of the
enterprise's risk appetite.
service catalogue Structured information on all IT services
available to customers
services See IT service
skill The learned capacity to achieve
predetermined results
stakeholder Anyone who has a responsibility for, an
expectation from or some other
interest in the enterprise - e.g.,
shareholders, users, government,
suppliers, customers and the public
system of internal control The policies, standards, plans and
procedures, and organisational
structures designed to provide
reasonable assurance that enterprise
objectives will be achieved and
undesired events will be prevented or
detected and corrected
value creation The main governance objective of an
enterprise, achieved when the three
underlying objectives (benefits
realisation, risk optimisation and
resource optimisation) are all balanced

Cobit_5_Checklist.pdf

  • 1.
    Cobit 5 Checklist Cobitis a registered trademark by ISACA (http://www.isaca.org/) - Copyright 2013 - Minimarisk® Gmbh/Sàrl – www.minimarisk.com – Tel +41 44 586 45 00 1. Cobit Goals Cascade 1. Stakeholder Drivers Influence Stakeholder Needs; 2. Stakeholder Needs Cascade to Enterprise Goals; 3. Enterprise Goals Cascade to IT-related Goals; 4. IT-related Goals Cascade to Enabler Goals. 17 Generic and IT-related goals, distributed according Balance Score Card four dimensions (Financial, Customer, Internal, Learning/Growth). 2. Principles of Cobit Cobit is based on 5 key principles for governance and management of enterprise Information Technology. Principle 1 - Meeting Stakeholder Needs Principle 2 - Covering the Enterprise End-to-End Principle 3 - Applying a Single Integrated Framework Principle 4 - Enabling a Holistic Approach Principle 5 - Separating Governance from Management 3. Cobit Areas and Processes Cobit splits the processes into governance and management areas . These two areas contain a total of 5 domains with 3 letter names, and a total of 37 processes organized as follows: Governance of Enterprise IT x Evaluate, Direct and Monitor (EDM) – 5 processes Management of Enterprise IT x Align, Plan and Organise (APO) – 13 processes x Build, Acquire and Implement (BAI) – 10 processes x Deliver, Service and Support (DSS) – 6 processes x Monitor, Evaluate and Assess (MEA) - 3 processes Evaluate, Direct & Monitor (EDM) • EDM1 Set and Maintain the Governance Framework • EDM2 Ensure Value Optimisation • EDM3 Ensure Risk Optimisation • EDM4 Ensure Resource Optimisation • EDM5 Ensure Stakeholder Transparency Align, Plan & Organise (APO) • APO1 Define the Management Framework for IT • APO2 Manage Strategy • APO3 Manage Enterprise Architecture • APO4 Manage Innovation • APO5 Manage Portfolio • APO6 Manage Budget and Cost • APO7 Manage Human Resources • APO8 Manage Relationships • APO9 Manage Service Agreements • APO10 Manage Suppliers • APO11 Manage Quality • APO12 Manage Risk • APO13 Manage Security Build, Acquire & Implement (BAI) • BAI1 Manage Programmes and Projects • BAI2 Define Requirements • BAI3 Identify and Build Solutions • BAI4 Manage Availability and Capacity • BAI5 Manage Organisational Change Enablement Deliver, Service and Support • BAI6 Manage Changes • BAI7 Manage Change Acceptance and Transitioning • BAI8 Manage Knowledge • BAI9 Manage Assets • BAI10 Manage Configuration Deliver, Service & Support (DSS) • DSS1 Manage Operations • DSS2 Manage Service Requests and Incidents • DSS3 Manage Problems • DSS6 Manage Continuity • DSS5 Manage Security Services • DSS6 Manage Business Process Controls Monitor, evaluate & Assess (MEA) • MEA1 MEA Performance and Conformance • MEA2 MEA the System of Internal Control • MEA3 MEA Compliance with External Requirements
  • 2.
    Cobit 5 Checklist Cobitis a registered trademark by ISACA (http://www.isaca.org/) - Copyright 2013 - Minimarisk® Gmbh/Sàrl – www.minimarisk.com – Tel +41 44 586 45 00 4. Cobit Seven Enterprise Enablers 1. Principles, policies and frameworks are the vehicle to translate the desired behavior into practical guidance for day-to-day management. Internal and External Stakeholders. 2. Processes describe an organised set of practices and activities. Life cycle of a process; Governance and Management Processes. 3. Organisational structures describe RACI and roles. 4. Culture, ethics and behavior of individuals and of the enterprise are very often underestimated as a success factor in governance and management activities. 5. Information define its attributes: Physical (Carrier, Media); Empirical (User Interface); Syntactic (Language, Format); Semantic (Meaning); Type, Currency; Pragmatic (Use) Includes Retention, Status, Contingency, Novelty; and Social (Context) 6. Services, infrastructure and applications. Includes: reuse, buy-vs-build, agility, simplicity and openness. Definition of Architecture Principles, Architecture Viewpoints, and Service Levels. 7. People, skills and competencies are linked to people. Define Role Skill, Requirements, Skill Levels, Skill Categories and Skill Definitions. 5. Cobit Enabler dimensions 1. Stakeholders 2. Goals (Intrinsic quality [results, process according best practices, information is actual and true], contextual quality [fit for purpose, relevant, easy to apply, effectiveness], Access and security 3. Life cycle (Plan, Design, Build/Acquire/Create/ Implement, Use/Operate, Evaluate/Monitor, Update/Dispose) 4. Good practices 6. Process Capability Model and Levels Capability Model is now based on ISO/IEC 15504 (SPICE). • Level 0: Incomplete. The process is not implemented or fails to achieve its purpose; • Level 1: Performed (Informed). The process is implemented and achieves its purpose; • Level 2: Managed (Planned and monitored).The process is managed and results are specified, controlled and maintained; • Level 3: Established (Well defined). A standard process is defined and used throughout the organization; • Level 4: Predictable (Quantitatively managed). The process is executed consistently within defined limits • Level 5: Optimizing (Continuous improvement). The process is continuously improved to meet relevant current and projected business goals. 7. Process attributes The capability of processes is measured using process attributes. The international standard defines nine process attributes: 1.1 Process Performance 2.1 Performance Management 2.2 Work Product Management 3.1 Process Definition 3.2 Process Deployment 4.1 Process Measurement 4.2 Process Control 5.1 Process Innovation 5.2 Process Optimization. Each process attribute is assessed on a four-point (N-P-L-F) rating scale: • Not achieved (0 - 15%) • Partially achieved (>15% - 50%) • Largely achieved (>50%- 85%) • Fully achieved (>85% - 100%)
  • 3.
    © 2012-13 MaatConsulting Ltd www.maatconsulting.com COBIT is a registered trade mark of ISACA and the IT Governance Institute (ITGI) V1.3 Feb 2013 This is not an official COBIT publication and is not endorsed, sponsored, or otherwise affiliated with ISACA or ITGI. COBIT 5 Foundation Exam Revision on a page! Governance of Enterprise IT (GEIT) Enterprise = organisation = commercial (corporate) OR public sector OR not for profit Governance Objective: Value Creation from Benefits Realisation + Risk Optimisation+ Resource Optimisation Governance Scope = where governance applies: usually the enterprise, but can be just some assets GOALS CASCADE: Stakeholder Needs ! ! ! ! Enterprise Goals ! ! ! ! IT-related Goals ! ! ! ! Enabler Goals 5 Principles of COBIT 5 1. Meeting stakeholder needs 2. Covering the Enterprise end-to-end 3. Single integrated Framework 4. Holistic approach of 7 enterprise Enablers 5. Separating governance from management Memory aid: “Stakeholder FEES” 7 Enablers of COBIT 5 (i.e. Governance Enablers) 1. Principles, policies and frameworks 2. Processes 3. Organisational structures 4. Culture, ethics and behaviours 5. Information 6. Service infrastructure and applications 7. People skills and competencies Generic Governance Enablers Enabler Dimensions Stakeholders Internal & External Goals = expected outcome of enabler Intrinsic Quality (work well & provide results) Contextual Quality (Relevance, effectiveness) Accessibility & Security (of enablers + outcomes) Life Cycle Plan, Design, Build/Acquire/Create/Implement Use/Operate Evaluate/Monitor Update/Dispose Good Practices Practices Work Products (Inputs & Outputs) Enabler Performance Management Questions to be answered: Outcomes (Lag indicators) Are stakeholders’ needs addressed? Are enabler goals achieved? Functioning of enabler itself (Lead indicator) Is the enabler lifecycle managed? Are good practices applied? Information Enabler (Enabler 5) Intrinsic quality: Accuracy, Objectivity, Believability, Reputation Information layers Physical world (carrier/media), Empiric (User interface) Syntactic (code/language), Semantic (meaning) Pragmatic (use) Social world (e.g. contracts, law, culture) COBIT 5 Processes COBIT 5 Process Capability Assessment Model (PAM) 5 Domains = 37 processes Governance Evaluate, Direct & Monitor (EDM) Management Align, Plan & Organise (APO) – strategic Build, Acquire & Implement (BAI) – tactical Deliver, Service & Support (DSS) - operational Monitor, Evaluate & Assess (MEA) EDM(5) APO(13) BAI(10) DSS(6) MEA(3) Memory aid: Management domains are in alphabetic order. E is 5th letter in alphabet and EDM has 5 processes. In alphabetic order, Management processes get less by 3 or 4 0 Incomplete 1 Performed PA1.1 Process Performance 2 Managed PA2.1 Performance Management PA2.2 Work Product Management 3 Established PA3.1 Process Definition PA3.2 Process Deployment 4 Predictable PA4.1 Process Measurement PA4.2 Process Control 5 Optimising PA5.1 Process Innovation PA5.2 Process Optimisation COBIT 5 Implementation Lifecycle Phase 1 2 3 4 5 6 7 What are the drivers? Where are we now? Where do we want to be? What needs to be done? How do we get there? Did we get there? How do we keep the momentum going? Programme Management Initiate program Define problems & opportunities Define road map Plan programme Execute plan Realise benefits Review Effectiveness Change Enablement Establish desire to change Form implementation team Communicate outcome Identify role players Operate and use Embed new approaches Sustain Continual Improvement Lifecycle Recognise need to act Assess current state Define target state Build improvements Implement improvements Operate improvements Monitor and evaluate Memory aid: POP PICS Performance Attribute (PA)
  • 4.
    COBIT 5 Principles 1. Meeting Stakeholder Needs 5.Seperating Governance from Management 2. Covering the Enterprise End-to-end 3. Applying a Single Integrated Framework 4. Enabling a Holistic Approach Governance Objectives:Value Creation Benefits Realisation Resource Optimisation Risk Optimisation Stakeholder Needs Drive Culture thics and Behaviour rocesses Or ani ational Structures nformation Services nfrastructure and pplications eople Skills and Competencies Resources rinciples olicies and rame orks Enablers COBIT 5 Principles Value Creation Principles, policies and frameworks are the vehicle to translate the desired behaviour into practical guidance for day-to-day management. A process describes an organized set of practices and activities to achieve certain objectives and produce a set of outputs in support of achieving overall IT-related goals. Organizational structures are the key decision-making entities in an enterprise. Culture, ethics and behaviour of individuals and of the enterprise are very often underestimated as a success factor in governance and management activities. Information is pervasive throughout any organization and includes all information produced and used by the enterprise. Information is required for keeping the organization running and well governed, but at the operational level, information is very often the key product of the enterprise itself. Services, infrastructure and applications include the infrastructure, technology and applications that provide the enterprise with information technology processes and services. People, skills and competencies are linked to people and are required for successful completion of all activities and for making correct decisions and taking corrective actions. or o o e e ue Generate and rocess us ess rocess ransform ransform Drive Create rocesses Information Cycle Contextual Goals Relevancy Completeness Appropriateness Conciseness Consistency Understandability Ease of Manipulation D e f in e t a r g e t s t a t e As se ss cu rr en t st at e Recognise need to act Monitor and evaluate O p er at e an d m ea su re E m b ed n ew ap p ro ac h es Sustain Establish desire to change F o r m im p le m e n ta ti o n te a m O p e r a t e a n d u s e Identify role players C o m m u n i c a t e o u t c o m e Review effectiveness Initiate programme D e fi n e p ro b le m s a n d o p p o r tu n it ie s R e a li se b e n e fi ts E x e c u t e p l a n Plan programme D e f i n e r o a d m a p Programme management (outer ring) Change enablement (middle ring) Continual improvement life cycle (inner ring) Level 5 Level 4 Level 3 Level 2 Level 1 Level 0 Capability Dimension Process Dimension PA5.2 Continuous optimization PA5.1 Process innovation PA4.2 Process control PA4.1 Process measurement PA3.2 Process deployment PA3.1 Process definition PA2.2 Performance management PA2.1 Work product management PA1.1 Process performance BP : Base practices (Level 1) WP :Work products (Level 1) GP : Generic Practice (Levels 2 to 5 only) GR : Generic Resource (Not defined) GWP : Generic Work Product (Levels 2 to 5 only) EDM Evaluate, Direct, Monitor APO Align Plan and Organize BAI - Build,Acquire and Implement DSS Deliver, Service and Support MEA Monitor, Evaluate & Assess COBIT 5 Processes Process Attributes Level 1 to 5 Process Capability Attribute Indicators (PCAIs) Level 1 to 5 Process Performance Indicators COBIT 5 PCAIs Process Assessment Model Implementation Life Cycle Governance ensures that stakeholder needs, conditions and options are evaluated to determine balanced, agreed-on enterprise objectives to be achieved; setting direction through prioritization and decision making; monitoring performance, compliance and progress against agreed direction and objectives. Management plans, builds, runs and monitors activities in alignment with the direction set by the governance body to achieve the enterprise objectives © Copyright 2014 by Service Management Art Inc. All rights reserved. These materials include COBIT 5 & 4.1, which is used with the permission of ISACA. ©1996-2012 ITGI. COBIT is a registered trademark of the Information Systems Audit and Control Association (ISACA) and the IT Governance Institute (ITGI). NOT FOR RESALE,Version 2.3 s u ce COB Val Risk B S Current Guidance and Contents Structure for uture Contents o e e se Content ilter for no led e Base COB roduct amil COB COB Online Collaborative nvironment COB rofessional Guides COB nabler Guides e u ce er s er r s r e or s nablers provide structure to the COB kno led e base Service Capabilities Skills and Competencies rinciples and olicies nformation Or ani ational Structures Culture thics Behaviour rocesses COB nablers Single Integrated Framework COB mplementation COB for nformation Securit COB for ssurance COB for Risk Other rofessional Guides Other nabler Guides COB : nablin nformation COB : nablin rocesses COB Online Collaborative nvironment COB COB nabler Guides COB rofessional Guides Product Family Benefits Reali ation Resource Optimi ation Risk Optimi ation o er ce ec e ue re o Governance nablers Governance Scope Ro es c es Re o s s Governance & Management • Intrinsic Quality • Contextual Quality (Relevance, Effectiveness) • Accessibility and Security • Plan • Design • Build/Acquire/ Create/Implement • Use/Operate • Evaluate/Monitor • Update/Dispose • Practices • Work Products (Inputs/Outputs) • Internal Stakeholders • External Stakeholders Stakeholders Goals Life Cycle Good Practices Enabler Dimension Enabler Performance Management Are Stakeholders Needs Addressed? Are Enabler Goals Achieved? Is Life Cycle Managed? Are Good Practices Applied? Metrics for Achievement of Goals (Lag Indicators) Metrics for Application of Practice (Lead Indicators) Enablers: Generic ana ement eedback Business Needs o er ce e e u e rec o or u Ru o or r se u c u re e e e er er ce u or rocesses or e e o er r se valuate Direct and onitor rocesses or o er ce o er r se ana e Operations ana e roblems ana e Continuit ana e Securit Services ana e Business rocess Controls ana e Service Re uests and ncidents ana e ro rammes and rojects ana e Re uirements Definition ana e Solutions dentification and Build ana e vailabilit and Capacit ana e Or ani ational Chan e nablement ana e Chan es ana e Chan e cceptance and ransitionin ana e no led e ana e ssets ana e Confi uration o or u e ssess onitor valuate and ssess erformance and Conformance onitor valuate and ssess the S stem of nternal Control onitor valuate and ssess Compliance ith ternal Re uirements ana e the ana ement rame ork ana e Strate ana e nterprise rchitecture ana e nnovation ana e ortfolio ana e Bud et and Costs ana e uman Resources ana e Relationships ana e Service reements ana e Suppliers ana e ualit ana e Risk ana e Securit nsure Governance rame ork Settin and aintenance nsure Benefits Deliver nsure Risk Optimi ation nsure Resource Optimi ation nsure Stakeholder ransparenc Key Areas Process Reference Model (PRM) O ners and Stakeholders Ro es c es Re o s s Governin Bod ana ement Operations and ecution nstruct and li n Report onitor Set Direction ccountable Dele ate Stakeholder Needs Benefits Realisation Resource Optimisation Risk Optimisation Cascade to Cascade to Influence Stakeholder Drivers (Environment, Technology Evolution, ...) Enterprise Goals IT-related Goals Enabler Goals Cascade to Goals Cascade COBIT 5 Foundation Overview proven experience • proven tactics • proven success For more information: Call:Toll Free 1 866 616 4195 Email: Info@ServiceManagementArt.com C O B I T 5 E d i t i o n
  • 5.
    Enterprise Goal COBIT5 Processes Stakeholder value of business investments Portfolio of competitive products and services Managed business risk (safeguarding of assets) Compliance with external laws and regulations Financial transparency Customer-oriented service culture Business service continuity and availability Agile responses to a changing business environment Information-based strategic decision making Optimization of service delivery costs Optimization of business process functionality Optimization of business process costs Managed business change programmes Operational and staff productivity Compliance with internal policies Skilled and motivated people Product and business innovation culture Ensure Governance Framework Setting and Maintenance Ensure Beneits Delivery Ensure Risk Optimization Ensure Resource Optimization Ensure Stakeholder Transparency Manage the IT Management Framework Manage Strategy Manage Enterprise Architecture Manage Innovation Manage Portfolio Manager Budgets and Costs Manage Human Resources Manage Relationships Manage Service Agreements Manage Suppliers Manage Quality Manage Risk Manage Security Manage Programmes and Projects Manage Requirements Deinition Manage Solutions Identiication and Build Manage Availability and Capacity Manage Organizational Change Enablement Manage Changes Manage Change Acceptance and Transitioning Manage Knowledge Manage Assets Manage Coniguration Manage Operations Manage Service Requests and Incidents Mange Problems Manage Continuity Manage Security Services Manage Business Process Controls Monitor, Evaluate and Assess Performance and Conformance Monitor, Evaluate and Assess the System on Internal Controls Monitor, Evaluate and Assess Compliance with External Requirements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 EDM01 EDM02 EDM03 EDM04 EDM05 APO01 APO02 APO03 APO04 APO05 APO06 APO07 APO08 APO09 APO10 APO11 APO12 APO13 BAI01 BAI02 BAI03 BAI04 BAI05 BAI06 BAI07 BAI08 BAI09 BAI10 DSS01 DSS02 DSS03 DSS04 DSS05 DSS06 MEA01 MEA02 MEA03 IT-related Goal Financial Customer Internal Learning and Growth Evaluate, Direct and Monitor Align, Plan and Organize Build, Acquire and Implement Deliver, Service and Support Monitor, Evaluate and Assess Financial 01 Alignment of IT and business strategy P P S P S P P S P S P S S ð P P S S S P P P S P S P P S S P P S S S S S S 02 IT compliance and support for business compliance with external laws and regulations S P P ð S S S P S S S P P S S P S S S P S S P P 03 Commitment of executive management for making IT-related decisions P S S S S S P S S ð P S S S P S S S S S S S S S S S S 04 Managed IT-related business risk P S P S P S S S ð S P S S S S S S S S S S P S P P P S S S P S S S P P P P P P P P P 05 Realized beneits from IT-enabled investments of services portfolio P P S S S S P S S ð S P S S S P P P S S S P P S S S S S S S S S S S S 06 Transparency of IT costs, beneits and risk S S P S P P ð S P P S P S S P S S S P P S P S S S Customer 07 Delivery of IT services in line with business requirements P P S S P S P S P S S S S ð P P S S P S P S S S S P P P P S S S P P P S P S S S P P P P S P P S S 08 Adequate use of applications, information and technology solutions S S S S S S S P S P S S ð S S S S S P S S S S S S S S S S S S P S P S S S S S S S S S S Internal 09 IT agility S P S S P P S S S P ð S P P S P P S S S P S S S S S S S P S S S S S S 10 Security and information, processing infrastructure and applications P P P P ð S P S S S S S P P S P S S S S S S P S S S S 11 Optimization of IT assets, resources and capabilities P S S P S P S S S ð S S P P S P P S S P S S S S S S S P S S S P P P P S S S P 12 Enablement and support of business processes by integrating applications and technology into business processes S P S S S S P S S S S ð S S S S S S P P S S S P S S S S 13 Delivery of programmes delivering beneits, on time, on budget, and meeting requirements and quality standards P S S S S S P ð S S S S S S S P S P S S S P P P S S S P S S S 14 Availability of reliable and useful information for decision making S S S S P P S ð S S S S S S S S P S S S P S S P S S S S P S S P P S S S S 15 IT compliance with internal policies S S P ð S P S P S S S S S S S S S S S S S S S S S P P S Learning and Growth 16 Competent and motivated business and IT personnel S S P S S P P S ð S S S P P S P S S S S S S S S S 17 Knowledge, expertise and initiatives for business innovation S P S P S S S S P ð S P S S S P P S P S P P S S S S S S S P S S P S S S S S S S S COBIT 5 Goals Cascade P S Primary Relationship Secondary Relationship Cascade to Cascade to Enterprise Goals IT-related Goals Process Goals
  • 6.
    COBIT® Poster Series #1 FreeResource Library www.goodelearning.com © Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA Transforming Stakeholder Needs into Actions Good e-Learning Resources :: www.goodelearning.com/downloads @goodelearning /goodelearning /company/good-e-learning by Gregor Polančič The COBIT 5 goals cascade is the mechanism to translate stakeholder needs into speciic, actionable and customized enterprise goals, IT-related goals and enabler goals. This translation allows setting speciic goals at every level and in every area of the enterprise in support of the overall goals and stakeholder requirements, and thus efectively supports alignment between enterprise needs and IT solutions and services. Stakeholder Drivers Stakeholder Needs Enterprise Goals IT Related Goals Enabler Goals A stakeholder is anyone who has a responsibility for, an expectation from or some other interest in an enterprise. Stakeholder needs are inluenced by a number of drivers, e.g., organizational changes, business changes and technology changes. COBIT 5 deines 22 common internal stakeholder needs. How do I best build and structure my IT department? COBIT 5 deines 17 generic enterprise goals. Stakeholder value of business investments. Stakeholder value of business investments. COBIT 5 deines all goals according to Balances ScoreCard (BSC) dimensions. COBIT 5 deines 17 information and related technology (i.e. IT-related) goals. Transparency of IT costs, beneits and risk. Achieving IT-related goals requires the successful application and use of a number of enablers. Enablers are broadly deined as anything that can help to achieve the objectives of the enterprise. COBIT 5 contains a mapping between IT-related goals and the relevant COBIT 5 processes, which then contain related process goals. Value creation means realizing beneits at an optimal resource cost while optimizing risk. Drive Value Creation Common internal stakeholder needs and enterprise goals are interrelated. Enablers include processes, information, organizational structures, policies, culture, people, services, infrastructure, and applications. For each enabler a set of speciic goals can be deined in support of the IT-related goals. Inf uence Cascade to Realize Cascade to Realize Cascade to Realize Enterprise goals and IT-related goals are interrelated.
  • 7.
    Free Resource Library www.goodelearning.com ©Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA registered in United States of America and other countries, www.isaca.org Good e-Learning Resources :: www.goodelearning.com/downloads @goodelearning /goodelearning /company/good-e-learning COBIT5® Poster Series #2 What drives IT Governance by Gregor Polančič and Boris Ovčjak GOVERNANCE AND MANAGEMENT OVER ENTERPRISE IT GOALS CASCADE ENABLERS Governance, as deined in the scope of COBIT 5, is driven by enablers. Enablers are factors that individually and collectively inluence whether something will work. In the case of COBIT 5 this refers to governance and management over enterprise IT. COBIT 5 Framework describes seven categories of enablers that are listed bellow. Some of the enablers are also enterprise resources that need to be managed and governed as well. Enablers are driven by the goals cascade, that are high level IT-related goals that deine what the diferent enablers should achieve. These enterprise goals for IT are used to formalise and structure the stakeholder needs. Enterprise goals can be linked to IT-related goals, and these can be achieved through the optimal use and execution of all enablers. PROCESSES Describe an organised set of practices and activities to achieve certain objectives. Produce a set of outputs and support of achieving overall IT-related goals. ORGANI- SATIONAL STRUCTURES Key decision-making entities in an enterprise. CULTURE, ETHICS AND BEHAVIOUR Often underestimated as a success factor in governance and management activities. PRINCIPLES, POLICIES AND FRAMEWORKS To achieve the main objectives of the enterprise, it must always consider an interconnected set of enablers. That is, that each enabler: • Needs the input of other enablers to be fully efective • Delivers output to the beneit of other enablers RESOURCES INFORMATION • Pervasive throughout any organisation. • Includes all information produced and used by the enterprise. • Required for keeping the organisation running and well governed. • Key product of the enterprise. SERVICES, INFRASTRUC- TURE AND APPLICATION PEOPLE, SKILL AND COMPETENCIES Linked to people and required to: • Successful completion of all activities • Making correct decisions • Taking corrective actions 2 5 3 6 4 7 1 PRACTICAL GUIDANCE DAY-TO-DAY MANAGEMENT TRANSLATE INFRA- STRUCTURE TECHNOLOGY ENTERPRISE APPLICATION Provide with information technology processing and services DESIRED BEHAVIOUR ENABLERS DIRECTLY INFLUENCE GOVERNANCE AND MANAGEMENT OVER ENTERPRISE IT.
  • 8.
    Free Resource Library www.goodelearning.com ©Good e-Learning 2015. COBIT® is a Registered Trademark of ISACA registered in United States of America and other countries, www.isaca.org Good e-Learning Resources :: www.goodelearning.com/downloads @goodelearning /goodelearning /company/good-e-learning COBIT5® Poster Series #3 Can We Separate Governance From Management? by Gregor Polančič and Boris Ovčjak In the scope of COBIT 5 there is a clear distinction between governance and management. Although they comprise diferent types of activities with diferent responsibilities, a set of interactions is required between governance and management to result in an eicient and efective governance system. To achieve that, COBIT 5 also advocates that enterprises implement governance and management processes such that key areas are covered. GOVERNANCE MANAGEMENT INTERACTION IS REQUIRED Governance ensures that stakeholder needs, conditions and options are evaluated to determine balanced agreed-on enterprise objectives to be achieved; setting direction through prioritisation and decision making; and monitoring performance and compliance against agreed-on direction and objectives Management plans, builds, runs and monitors activities in alignment with the direction set by governance body to achieve the enterprise objectives. INFORMATION Information used for evaluating, directing and monitoring enterprise IT is exchanged between governance and management as described in the process model inputs and outputs. CULTURE, ETHICS AND BEHAVIOUR Behaviour is a key enabler of good governance and management of the enterprise PROCESS There exist a distinction between governance and management processes, including specific sets of practices and activities for each. The process model also includes RACI charts, describing the responsibilities of different organisational structures and roles within the enterprise PRINCIPLES, POLICIES ANDFRAMEWORKS Principles, policies and frameworks are the vehicle by which governance decisions are institutionalized within the enterprise, and for that reason are an interaction between governance decisions and management. ORGANISATIONAL STRUCTURES In the scope of organisational structures the interaction takes place between the decisions taken by the governance structures and the decisions and operations implementing the former. PEOPLE, SKILLS AND COMPETENCIES Governance and management activities require different skill sets, but an essential skill for both governance body memebers and management is to understand both tasks and how they are different. SERVICES, INFRASTRUCTURE AND APPLICATIONS Services are required, supported by applications and infrastructure to provide the governance body with adequate information and to support governance activities of evaluating, setting direction and monitoring. ENABLER GOVERNANCE-MANAGEMENT INTERACTION PROCESS REFERENCE MODEL WITHIN GOVERNANCE AND MANAGEMENT KEY AREAS DIRECT Ensure Risk Optimisation Ensure Benefits Delivery Ensure Governance Framework Setting And Maintenance Ensure Stakeholder Transparency Ensure Resources Optimisation MANAGEMENT FEEDBACK GOVERNANCE MANAGEMENT ALIGN, PLAN AND ORGANISE BUILD ACQUIRE AND IMPLEMENT DELIVER, SERVICE AND SUPPORT MONITOR, EVALUATE AND ASSESS Manage the IT Management Framework Manage Programmers and Projects Manage Strategy Manage Requirements Definition Manage Operations Manage Enterprise Architecture Manage Knowledge Manage Service Requests and Incidents Monitor, Evaluate and Assess Performance and Conformance Manage Innovation Manage Availability and Capacity Manage Portfolio Manage Assets Manage Problems Manage Budget and Costs Manage Changes Manage Security Services Monitor, Evaluate and Assess the System of Internal Manage Suppliers Man. Solutions Identification and Builds Manage Quality Manage Risk Manage Human Resources Manage Configuration Manage Relationships Manage Change Acceptance and Transitioning Manage Continuity Manage Service Agreements Manage Organisational Change Enablement Manage Business Process Controls Monitor, Evaluate and Assess Compliance With External Requirements Manage Security BUSINESS NEEDS MONITOR EVALUATE
  • 9.
    ISACA COBIT® 5- Glossary (EN) 63 terms by miroslawdabrowski Like this study set? Create a free account to save it. Create a free account Create a free account accountable party (RACI) The individual, group or entity that is ultimately responsible for a subject matter, process or scope In a RACI chart, answers the question: Who accounts for the success of the task? accountability of governance Governance ensures that enterprise objectives are achieved by evaluating stakeholder needs, conditions and options; setting direction through prioritisation and decision making; and monitoring performance, compliance and progress against plans. In most enterprises, governance is the responsibility of the board of directors, under the leadership of the chairperson.
  • 10.
    Activity In COBIT,the main action taken to operate the process. Guidance to achieve management practices for successful governance and management of enterprise IT. Activities: - Describe a set of necessary and sufficient action-oriented implementation steps to achieve a Governance Practice or Management Practice - Consider the inputs and outputs of the process - Are based on generally accepted standards and good practices - Support establishment of clear roles and responsibilities - Are non-prescriptive and need to be adapted and developed into specific procedures appropriate for the enterprise alignment A state where the enablers of governance and management of enterprise IT support the goals and strategies of the enterprise application architecture Description of the logical grouping of capabilities that manage the objects necessary to process information and support the enterprise's objectives architecture board A group of stakeholders and experts who are accountable for guidance on enterprise architecture related matters and decisions, and for setting architectural policies and standards
  • 11.
    authentication The actof verifying the identity of a user and the user's eligibility to access computerised information Scope Note: Assurance: Authentication is designed to protect against fraudulent logon activity. It can also refer to the verification of the correctness of a piece of data. baseline architecture The existing description of the fundamental underlying design of the components of the business system before entering a cycle of architecture review and redesign benefits realisation One of the objectives of governance. The bringing about of new benefits for the enterprise, the maintenance and extension of existing forms of benefits, and the elimination of those initiatives and assets that are not creating sufficient value. business continuity Preventing, mitigating and recovering from disruption. The terms 'business resumption planning', 'disaster recovery planning' and 'contingency planning' also may be used in this context; they focus on recovery aspects of continuity, and for that reason the 'resilience' aspect should also be taken into account. business goal The translation of the enterprise's mission from a statement of intention into performance targets and results Business process control The translation of the enterprise's mission from a statemenThe policies, procedures, practices and organisational structures designed to provide reasonable assurance that a business process will achieve its objectives of intention into performance targets and results
  • 12.
    Chargeback The redistributionof expenditures to the units within a company that gave rise to them Scope Note: Chargeback is important because without such a policy, misleading views may be given as to the real profitability of a product or service, as certain key expenditures will be ignored or calculated according to an arbitrary formula. COBIT 1. COBIT 5: Formerly known as Control Objectives for Information and related Technology (COBIT); now used only as the acronym in its fifth iteration. A complete, internationally accepted framework for governing and managing enterprise information and technology (IT) that supports enterprise executives and management in their definition and achievement of business goals and related IT goals. COBIT describes five principles and seven enablers that support enterprises in the development, implementation, and continuous improvement and monitoring of good IT-related governance and management practices. Scope Note: Earlier versions of COBIT focused on control objectives related to IT processes, management and control of IT processes and IT governance aspects. Adoption and use of the COBIT framework are supported by guidance from a growing family of supporting products. (See www.isaca.org/cobit for more information.) 2. COBIT 4.1 and earlier: Formerly
  • 13.
    known as ControlObjectives for Information and related Technology (COBIT). A complete, internationally accepted process framework for IT that supports business and IT executives and management in their definition and achievement of business goals and related IT goals by providing a comprehensive IT governance, management, control and assurance model. COBIT describes IT processes and associated control objectives, management guidelines (activities, accountabilities, responsibilities and performance metrics) and maturity code of ethics A document designed to influence individual and organisational behaviour of employees by defining organisational values and the rules to be applied in certain situations. It is adopted to assist those in the enterprise called upon to make decisions understand the difference between 'right' and 'wrong' and to apply this understanding to their decisions. competence The ability to perform a specific task, action or function successfully
  • 14.
    consulted party (RACI)Refers to those people whose opinions are sought on an activity (two-way communication) In a RACI chart, answers the question: Who is providing input? Key roles that provide input. Note that it is up to the accountable and responsible roles to obtain information from other units or external partners, too; however, inputs from the roles listed are to be considered and, if required, appropriate action has to be taken for escalation, including the information of the process owner and/or the steering committee context The overall set of internal and external factors that might influence or determine how an enterprise, entity, process or individual acts Scope Note: Context includes: - Technology context - Technological factors that affect organization's ability to extract value from data - Data context - Data accuracy, availability, currency and quality - Skills and knowledge - General experience, and analytical, technical and business skills - Organization and cultural context - Political factors, and whether the organisation prefers data to intuition - Strategic context - Strategical objectives of the enterprise control The means of managing risk, including policies, procedures, guidelines, practices or organisational structures, which can be of an administrative, technical, management or legal nature. Also used as a synonym for safeguard or countermeasure.
  • 15.
    culture A patternof behaviours, beliefs, assumptions, attitudes and ways of doing things driver External and internal factors that initiate and affect how an enterprise or individuals act or change enterprise goal See Business goal enterprise governance A set of responsibilities and practices exercised by the board and executive management with the goal of providing strategic direction, ensuring that objectives are achieved, ascertaining that risk is managed appropriately and verifying that the enterprise's resources are used responsibly. It could also mean a governance view focussing on the overall enterprise; the highest-level view of governance to which all others must align. full economic life cycle A period of time during which material business benefits are expected to arise from, and/or during which material expenditures (including investments, running and retirement costs) are expected to be incurred by, an investment programme good practice A proven activity or process that has been successfully used by multiple enterprises and has been shown to produce reliable results governance The framework, principles and policies, structures, processes and practices, information, skills, culture, ethics, and behaviour to set direction and monitor compliance and performance of the enterprise aligned with the overall purpose and defined objectives. Governance defines accountability, responsibility and decision making (among other elements).
  • 16.
    governance/management practice Foreach COBIT process, the governance and management practices provide a complete set of high-level requirements for effective and practical governance and management of enterprise IT. They are statements of actions from governance bodies and management. governance enabler Something (tangible or intangible) that assists in the realization of effective governance governance framework A framework is a basic conceptual structure used to solve or address complex issues; an enabler of governance; a set of concepts, assumptions and practices that define how something can be approached or understood, the relationships amongst the entities involved, the roles of those involved, and the boundaries (what is and is not included in the governance system). Examples: COBIT and COSO's Internal Control—Integrated Framework governance of enterprise IT An asset that, like other important business assets, is essential to an enterprise's business. It can exist in many forms: printed or written on paper, stored electronically, transmitted by post or electronically, shown on films, or spoken in conversation. information An asset that, like other important business assets, is essential to an enterprise's business. It can exist in many forms: printed or written on paper, stored electronically, transmitted by post or electronically, shown on films, or spoken in conversation.
  • 17.
    informed party (RACI)Refers to those people who are kept up to date on the progress of an activity (one-way communication) In a RACI chart, answers the question: Who is receiving information? Roles who are informed of the achievements and/or deliverables of the task. To role in 'accountable', of course, should always receive appropriate information to oversee the task, as do the responsible roles for their area of interest. inputs and outputs The process work products/artefacts considered necessary to support operation of the process. They enable key decisions, provide a record and audit trail of process activities, and enable follow-up in the event of an incident. They are defined at the key management practice level, may include some work products used only within the process and are often essential inputs to other processes. The illustrative COBIT 5 inputs and outputs should not be regarded as an exhaustive list since additional information flows could be defined depending on a particular enterprise's environment and process framework. investment portfolio The collection of investments being considered and/or being made IT application Electronic functionality that constitutes parts of business processes undertaken by, or with the assistance of, IT IT goal A statement describing a desired outcome of enterprise IT in support of enterprise goals. An outcome can be an artefact, a significant change of a state or a significant capability improvement.
  • 18.
    IT service Theday-to-day provision to customers of IT infrastructure and applications and support for their use. Examples include service desk, equipment supply and moves, and security authorisations. management Entails the judicious use of means (resources, people, processes, practices, etc.) to achieve an identified end. It is a means or instrument by which the governance body achieves a result or objective. Management is responsible for execution within the direction set by the governance body. Management is about planning, building, organising and controlling operational activities to align with the direction set by the governance body, and reporting back on these activities. model A way to describe a given set of components and how those components relate to each other to describe the main workings of an object, system, or concept objective Statement of a desired outcome organisational structure An enabler of governance and of management. Includes the enterprise and its structures, hierarchies and dependencies. Example: Steering committee output See Inputs and outputs owner Individual or group that holds or possesses the rights of and the responsibilities for an enterprise, entity or asset, e.g., process owner, system owner policy Overall intention and direction as formally expressed by management
  • 19.
    principle An enablerof governance and of management. Comprises the values and fundamental assumptions held by the enterprise, the beliefs that guide and put boundaries around the enterprise's decision making, communication within and outside the enterprise, and stewardship - caring for assets owned by another. Example: Ethics charter, social responsibility charter process Generally, a collection of practices influenced by the enterprise's policies and procedures that takes inputs from a number of sources (including other processes), manipulates the inputs and produces outputs (e.g., products, services) Scope note: Processes have clear business reasons for existing, accountable owners, clear roles and responsibilities around the execution of the process, and the means to measure performance. process (capability) attribute ISO/IEC 15504: A measurable characteristic of process capability applicable to any process process capability ISO/IEC 15504: A characterization of the ability of a process to meet current or projected business goals process goal A statement describing the desired outcome of a process. An outcome can be an artefact, a significant change of a state or a significant capability improvement of other processes.
  • 20.
    programme and projectmanagement office (PMO) The function responsible for supporting programme and project managers, and gathering, assessing and reporting information about the conduct of their programmes and constituent projects quality Being fit for purpose (achieving intended value) RACI chart Illustrates who is responsible, accountable, consulted and informed within an organisational framework resource Any enterprise asset that can help the organisation achieve its objectives resource optimisation One of the governance objectives. Involves effective, efficient and responsible use of all resources - human, financial, equipment, facilities, etc. responsible party (RACI) Refers to the person who must ensure that activities are completed successfully In a RACI chart, answers the question: Who is getting the task done? Roles taking the main operational stake in fulfilling the activity listed and creating the intended outcome risk The combination of the probability of an event and its consequence (ISO/IEC 73) risk management One of the governance objectives. Entails recognising risk; assessing the impact and likelihood of that risk; and developing strategies, such as avoiding the risk, reducing the negative effect of the risk and/or transferring the risk, to manage it within the context of the enterprise's risk appetite. service catalogue Structured information on all IT services available to customers services See IT service
  • 21.
    skill The learnedcapacity to achieve predetermined results stakeholder Anyone who has a responsibility for, an expectation from or some other interest in the enterprise - e.g., shareholders, users, government, suppliers, customers and the public system of internal control The policies, standards, plans and procedures, and organisational structures designed to provide reasonable assurance that enterprise objectives will be achieved and undesired events will be prevented or detected and corrected value creation The main governance objective of an enterprise, achieved when the three underlying objectives (benefits realisation, risk optimisation and resource optimisation) are all balanced