Agenda
  In 2010, should you care about
  cloud computing?

  Can you get quick wins?

  Can you mitigate risks?




www.cloudtp.com    CONFIDENTIAL    2
Yes

  Yes Yes Yes Yes Yes
  Yes Yes Yes Yes Yes
  Yes Yes Yes Yes Yes
  Yes Yes Yes Yes Yes
  Yes Yes Yes Yes Yes
www.cloudtp.com   CONFIDENTIAL   3
CIO in 2010
  “If by mid-year you have not
  developed and begun to
  execute upon an ambitious
  and enterprise-wide cloud          Bob Evans
                                     GlobalCIO.com
                                     Information Week
  strategy, then by year-end
  the odds are good you'll no
  longer be a CIO.”
www.cloudtp.com       CONFIDENTIAL                      4
What are the cloud layers?
Who uses them?




                                                    Business Analysts


 Business Users                                          Developers


                                                                Developers



                                                                          IT


 Source: David Wells, BeyeNetwork


 www.cloudtp.com                    CONFIDENTIAL                                5
Cloud is where the best
solutions will be found
“The single biggest reason
public clouds will dominate
the next era of IT:

The public cloud is where the
best and richest variety of
business solutions will be
found.”                                               Frank Gens
                                                      IDC Cloud Research Group




       IDC is telling you the future is cloud.

www.cloudtp.com                        CONFIDENTIAL                              6
Cloud accelerates the
pace of innovation

    "The most interesting aspect
    of the cloud isn't the cost. It's
        the pace of innovation"




                                                    Rajen Sheth

                                                Invented Google Apps
          Cloud solves the 80/20                and is now the suite’s
                                               Senior Product Manager
   maintenance/innovation problem giving
      enterprises flexibility and speed.
www.cloudtp.com                 CONFIDENTIAL                             7
Cloud also saves money


 Companies that took a disciplined approach to adopting
 cloud computing reduced costs by an average of 18% and
 data center power consumption by 16%. Companies that
 adopted cloud computing haphazardly increased IT costs by 2-
 3%.

  Business Drivers for Cloud Adoption:
 ◦45% - Reduce cost of IT infrastructure
 ◦31% - Enhance competitive advantage
 ◦19% - Inflexibility of current infrastructure
 ◦13% - Need to support additional users or services


www.cloudtp.com             CONFIDENTIAL                        8
Cloud gives mid-market
enterprises scale
Anyone, anywhere can get access to
cost-effective scalable computing resources
SMBs now have elastic high-end global
computing power at their fingertips, minimizing
the competitive advantage of size.




www.cloudtp.com        CONFIDENTIAL               9
Cloud is the next logical step
 Cloud is evolutionary
 Cloud frees your resources
 Cloud is changing the game
                                             Cloud computing




Internal
data center-centric
applications




 www.cloudtp.com              CONFIDENTIAL                 10
Cloud success: Government
Nebula Launches – the US Government Gets Cloud
 Computing Right!
   The US government will use 2010 developing and executing
    pilot cloud-based projects.

   Each government agency must consider virtualization and data center
    consolidation in their IT budget planning.

   Each agency can now quickly request, approve, and deploy Software as a
    Service applications.

   The US government projects 6 months of time savings and $1.7 million
    dollars in procurement and deployment costs per application.

                  If government, which is considered slow, can do it,     Source: Cloud
                    you can do it! Achieve a shorter time to market.    Computing Journal
                                                                         October 4, 2009
    www.cloudtp.com                         CONFIDENTIAL                               11
Cloud success:
Cross-Enterprise Collaboration


 Eli Lilly is reducing the time it takes to develop new medicines
    using cloud computing and collaboration.

    Lilly is scaling cloud computing environments up and down to meet the
     changing needs of its researchers' workloads.

    Cloud computing has allowed Lilly to establish external collaboration
     environments in minutes.


 Source: www.informationweek.com




 www.cloudtp.com                     CONFIDENTIAL                            12
Ah, but what about risk?


  Reducing risk
  is the 3rd most
  important job
  of a CIO.

                                           Laef Olson
                                   CIO, RightNow Technologies




www.cloudtp.com     CONFIDENTIAL                                13
Is the cloud secure enough?

     How secure is my data?
                                                                       Yes
                                                         How private is my data?



Where in the world                        SaaS                              Is my data
  is the cloud?                    PaaS                                     encrypted?



                                                                           Can I VPN into
 Read the fine print                                     IaaS                the cloud?




                    Who is doing                           Who is responsible
                     backups?                                for my data?

             Is the cloud more or less secure than your current practices?

  www.cloudtp.com                         CONFIDENTIAL                                      14
Success: Health Info Security
WASHINGTON, DC, September 30, 2009 — Harris Corporation, in
 collaboration with Cisco Systems, has demonstrated the ability to rapidly,
 safely, and securely exchange healthcare information in a virtual — or
 cloud — computing environment.

   …security and privacy of web-based health information remains protected with a
    service as data is encrypted in transit and stored securely in the cloud.

   ... a standards-based, scalable, open-source gateway solution that enables secure
    health information exchange between health information organizations across
    the Nationwide Health Information Network (NHIN)




    www.cloudtp.com                      CONFIDENTIAL                                   15
Success: Credit Card Security
     Predictix cloud solutions provide advanced PCI-compliant merchandising
      solutions to retailers with lower risk and more compelling economics
      than traditional software alternatives.


     Security is the key. Predictix leverages technology from enStratus
      for a configurable automated encryption system from the file
      system to backup management to network communications that
      enables total data security. enStratus also provides intrusion
      detection and has a "no credentials in the cloud" policy.




 www.cloudtp.com                    CONFIDENTIAL                               16
Success: Cloud Adoption

Security concerns have not stopped major companies from
  entrusting key client and financial information in the cloud.

Salesforce.com has 50,000+ customers, 1.5 million subscribers,
  $1 billion in annual revenue, 53% market share, and a market
  capitalization of $8 billion.

Example customers include: NBC, Avis, Canon, Chrysler,
  Deutsche Bank, E-Trade, and Prudential.



 Companies can save $1MM by migrating
   from Siebel Sales to SalesForce.com
 www.cloudtp.com              CONFIDENTIAL                        17
Will I have enough control?
                                                               Yes
 Will the provider                                         Do I need a special team
share information?                                          for cloud governance?




 How can I integrate                          What can I do if there is a breach?
   with the cloud?                                  In a foreign country?


                     How can I monitor usage and performance?



  www.cloudtp.com                    CONFIDENTIAL                                   18
Are cloud standards enough?
                                                                 Yes
 Will my internal apps integrate               Inter-cloud interoperability -
     with apps in the cloud?                            fact or fiction




                                                             Can I migrate from
                                                            one cloud to another?




      Will my apps written for one cloud
           work on another cloud?


 www.cloudtp.com                      CONFIDENTIAL                                  19
Success: Open Standards

    …The number and quality of physical security safeguards taken by
     the EC2 and S3 teams were incredibly helpful to solidifying our
     HIPAA compliance.

    Our encrypted communication, access, and storage
     requirements were met with open standards that the AWS team
     easily facilitates.

    “By allowing self-service & management of our infrastructure, we
     had to worry even less about prying eyes against our customers’
     sensitive data.”




     Source: http://aws.amazon.com/solutions/case-studies/ddsweblink   /
www.cloudtp.com                                             CONFIDENTIAL   20
Is there sufficient reliability,
availability and performance?                       Yes
                   99.9%...is that good enough?




                           How fast are we going?




 www.cloudtp.com                     CONFIDENTIAL     21
Agenda
  In 2010, should you care about
  cloud computing?

  Can you get quick wins?

  Can you mitigate risks?


  How do you get there?
www.cloudtp.com    CONFIDENTIAL    22
Where do I want my cloud?

                                                  Cloud Service
                      Enterprise
                                                     Provider
     Private cloud




                                                  Cloud Service
                     Enterprise
                                                     Provider
     Public cloud




                                                  Cloud Service
                     Enterprise
     Hybrid cloud                                    Provider
                                          and




    We recommend hybrid for mid-market enterprises in 2010.
 www.cloudtp.com                   CONFIDENTIAL                   23
Cloud - How do you get there?

Step 1: Get CEO Support

Step 2: Define Your Goals

Step 3: Determine organizational
      core competencies.

Step 4: Leverage qualified partners to deliver the rest.



     Is transitioning to cloud computing a core competency?

www.cloudtp.com               CONFIDENTIAL                    24
―There‖ looks something
like this
                                Cloud
                               Partner #2


                                                         Cloud
                                                       Partner #1
                   Cloud
                  Partner #3
                                  Your Core
                                Competencies

                       Cloud                       Cloud
                     Partner #4                  Partner #N
                                  Cloud
                                Partner #5

www.cloudtp.com                   CONFIDENTIAL                      25
But which cloud partners?
 Infrastructure as a Service [IaaS]                           Platform as a Service [PaaS]




                                            Cloud
                                          Ecosystem
                                          By Cloud Technology Partners
                                                   Jan. 2010




   There are over
  3000 SaaS vendors
              Source: SaaSShowplace.com
 Software as a Service [SaaS]                                  Cloud Tools

 www.cloudtp.com                                 CONFIDENTIAL                                26
Cloud – More best practices

Step 5: Form a cloud task force

Step 6: Establish governance

Step 7: Form a partner management team

                           Cloud Best Practice Handbook 2010
                                        Form Cloud Task Force
                                        Establish Governance
                                Form Partner Management Team
                              Evaluate Current State Architecture
                         Define Cloud Security & Compliance Policy
                             Monitor and Measure Cloud Services
www.cloudtp.com          CONFIDENTIAL                                27
Your cloud task force will
 help you achieve your goals
        improved             cloudburst for        dramatically lower
     speed-to-market        dynamic capacity            TCO



          partner                                    pay-as-you-go /
    interconnectedness                              metered payments



       shift capex to                                virtuous savings
        lower opex                                        cycles



                             universal user
         sustainable /                               low cost / low
                              experience
            green                                      risk pilots



…by lowering costs and enabling business innovation and sustainability
 www.cloudtp.com                CONFIDENTIAL                            28
They will demystify the cloud
                                               Cloud Ecosystem
                                                                  collaboration
                   sample cloud SaaS,
                                                                                  client partnership
                   PaaS, IaaS vendors




                                        >                                          relevant
                                                                                  experience


                                                 Your Cloud
                                                 Task Force

                              best practices
                                                                          sample cloud
                                                                     implementation partners


               ROI
              driven
                                                                                               >
                               empowerment




   Your cloud team must demystify cloud, navigate hype from reality,
   apply best practices, and achieve measurable business results!
www.cloudtp.com                                    CONFIDENTIAL                                        29
They will assess and
 prioritize opportunities
Cost of                                    Iterative
ownership and                              solution
ability to                                refinement
support
revenue                                                            Prioritized
growth               Balance benefit,                              Roadmap
                   cost, risk, complexity
                                                                      selected cloud
         Explore              Cloud               Opportunity            business
                                                                        initiatives,       Implemen
       business & IT        opportunity            ranking &          dependencies,          tation
       opportunities         definition           prioritization       and business
                                                                    value justifications

                       Assess change on
                          operations                               Business
Technology
impact
                                            Iterative
                                                                     and IT
analysis
                                            solution
                                           refinement
                                                                   Initiatives



 www.cloudtp.com                          CONFIDENTIAL                                                30
They will deliver quick wins




                      Identify pilot projects. Validate the ROI.
              Help the Governance team prioritize and approve them.
www.cloudtp.com                       CONFIDENTIAL                    31
They will transform your
enterprise

                                   Cloud
                               Collaboration


                                                         Cloud CRM
                       Cloud
                  Storage/Archival
                                       Your Core
                                     Competencies
                                                                Cloud Task
                          Cloud                      Cloud        Force
                        Computing                   Analytics
                                      Cloud
                                     Marketing

www.cloudtp.com                      CONFIDENTIAL                            32
Need a cloud task force?




www.cloudtp.com    CONFIDENTIAL   33
That is us      



                                   Cloud
                               Collaboration


                                                         Cloud CRM
                       Cloud
                  Storage/Archival
                                       Your Core
                                     Competencies

                          Cloud                      Cloud
                        Computing                   Analytics
                                      Cloud
                                     Marketing

www.cloudtp.com                      CONFIDENTIAL                    34
Let us be your trusted guide 




                  plan
                         navigate
                                    de-risk
                                                transition
                                                             empower
www.cloudtp.com                        CONFIDENTIAL                    35
cloudTP services life cycle
We provide end-to-end advisory, implementation and operational services


                               transformation


                                                                managed
         strategy              implementation
                                                                services


                               empowerment


     cloudTP partners with clients to assess, plan, and implement cloud
               computing solutions for business advantage.




  www.cloudtp.com                    CONFIDENTIAL                          36
Strategy services

                                             transformation


                                                                                             managed
         strategy                            implementation
                                                                                             services


                                             empowerment

  Rapid Opportunity Identification (ROI)
      great starting point for businesses seeking to identify best cloud computing opportunities
      3 week rapid assessment of high-potential areas
      business case and ROI to support identified areas

  Enterprise Cloud Opportunities (ECO)
  -   in-depth application portfolio analysis targeting large enterprises
  -   8-12 week deep-dive assessment of high-impact areas
  -   breadth and depth of analysis to identify quick-win, intermediate and long-term opportunities
  -   strong business case and ROI with estimated annualized savings and business benefit
  -   identify virtuous cycles of investment – use savings to fund subsequent project phases

 www.cloudtp.com                                     CONFIDENTIAL                                       37
Implementation services

                                                 transformation


                                                                                                managed
            strategy                            implementation
                                                                                                services


                                                  empowerment

Software as a Service (SaaS)                                   Vendor evaluation, selection & negotiation
 migrate existing application(s) as-is potentially refactor      identify and prioritize requirements
 migrate / implement new SaaS application(s)                     identify vendor space
                                                                 manage RFP vetting process
Platform as a Service (PaaS)                                     develop integration plan, governance and PMO
 establish Dev / Test / QA sandbox in the cloud
 build and integrate applications using PaaS                   Implementation planning & execution
                                                                 develop program / project plans with dependencies
Infrastructure as a Service (IaaS)                               manage budgets, resources, deliverables, milestones
 migrate systems infrastructure to the cloud                     project risk mitigation plans, pilots and QA
 email, BPM, CMS, servers, storage, DR/BC, cloudbursting

   www.cloudtp.com                                      CONFIDENTIAL                                                   38
Transformation services

                                          transformation


                                                                                                managed
          strategy                          implementation
                                                                                                services


                                          empowerment


Transformation                                              Empowerment
 governance and PMO services                                     provide on-the-job training and mentorship
 process, systems and organizational design services             develop formalized training curriculum
 manage change management program execution                      conduct formalized training workshops
                                                                 establish training programs for staff with metrics
                                                                 provide periodic check points and measurement




 www.cloudtp.com                                  CONFIDENTIAL                                                        39
Managed services

                                           transformation


                                                                                         managed
           strategy                        implementation
                                                                                         services

                                           empowerment

Managed services planning, selection and           Onsite / offsite support, monitoring, reporting
migration                                          & services coordination
 identify and prioritize business and IT            single point of contact for various managed services
 requirements                                       monitor performance and SLA compliance and
 conduct vendor selection, evaluation and           variances
 negotiation                                        proactively monitor performance and issue
 plan transition to managed service with            resolution
 contingency and risk mitigation plan               plan and coordinate scheduled outages and
 conduct pilots to validate and test managed        maintenance
 service                                            establish executive and services dashboards
 establish / integrate with governance and PMO      integrate with governance, PMO and help desk

  www.cloudtp.com                                CONFIDENTIAL                                              40
Q & A / next steps




           Let us guide you to the summit of success!
www.cloudtp.com               CONFIDENTIAL              41
Appendix




www.cloudtp.com   CONFIDENTIAL   42
cloudTP Services Flow

Each service offering provides the guidance needed to make the next step
toward cloud computing.



                             Transformation


                                                             Managed
        Strategy             Implementation
                                                             Services


                             Empowerment




 www.cloudtp.com                  CONFIDENTIAL                             43
ROI results
                                                                  transformation

                                                                                     managed
                                                      strategy   Implementation #1
                                                                                     services

                                                                  empowerment

                                                                  transformation
                   transformation
                                    managed                                          managed
   ROI             implementation                    strategy    Implementation #2
                                    services                                         services

                   empowerment                                    empowerment

                                                                  transformation

 An ROI session is likely to identify                strategy    Implementation #3
                                                                                     managed
                                                                                     services
    multiple strong candidates
        for cloud migration                                       empowerment




 www.cloudtp.com                               CONFIDENTIAL                                     44
Implementation Results

                    transformation

                                       managed
  strategy         Implementation #1
                                       services

                    empowerment
                                                                   Transformation

Migrating from an internal CRM to                       strategy   implementation
                                                                                    managed
                                                                                    services
Salesforce.com will require
user training and new/changed roles.                               empowerment



                                                                   transformation
The same implementation is likely to
require technical training for                         strategy    implementation
                                                                                    managed
                                                                                    services
administration and configuration
                                                                   Empowerment




 www.cloudtp.com                             CONFIDENTIAL                                      45
Implementation Results

                    transformation
                   Implementation #2
                                       managed
  strategy         Implementation #3
                                       services
                   Implementation #4

                    empowerment

                                                                  transformation

Multiple implementations across                        strategy   implementation
                                                                                   Managed
                                                                                   Services
multiple clouds may make it desirable
to outsource the day-to-day                                       empowerment
management and administration




 www.cloudtp.com                             CONFIDENTIAL                                     46
Services Roadmap
                   Phase 1                      Phase 2                          Phase 3


         ROI or ECO          Transformation


                                   Implementation 1


                                                     Empowerment


                                   Implementation 2

                                                         Empowerment


                                   Implementation 3



                                                          ROI or ECO   Implementation 4

                                                                       Implementation 5

                                                                       Implementation 6



                                                                           Managed
                                                                           Services

 www.cloudtp.com                          CONFIDENTIAL                                     47
cloudTP Services Progression

                  • cloudTP Rapid Opportunity Identification strategy
                  • 3 weeks. 3 consultants.
   ROI            • $75K


                  • Siebel to SalesForce migration
                  • 12 weeks. 5 consultants.
Step #1           • Saves up to $1 million over 5 years


                  • Internally-hosted Email to Google Apps Email
                  • 1 month. 1 consultant.
Step #2           • Saves $100-$200 per employee per year



www.cloudtp.com                       CONFIDENTIAL                      48
<Client Name> IT Roadmap
                                           4 months                   8 months                                     16 months                                         24 months
                                                                                    Customer One View
 Analytics




                                                              Report Rationalization within SaaS Business Intelligence

                                                                                         Campaign Mgmt.         Relationship Profitability      Cross-Sell Support

                                                                                                                                               Retire Legacy
Web




                                             Multi-factor         Online Usage                                     Customer Password
                                                                    Analysis         Web Redesign/PaaS             Self-service & SSO            Solution
                                            authentication

                                      Perimeter Security           Network OS Rationalization       SaaS IT Helpdesk
 Infrastructure




                                       Rationalization                                                                                             Remote Access
                                                                   Disaster Mgmt/Business Continuity via Cloud
                                             Data Center
                                                                                        SaaS ID Vault      Password Self Service             Approval Work Flow
                                            Rationalization

                                                                                                            Employee SSO                        Provisioning
                                       Cloudburst Dev/Test

                                                                 HR SaaS             Retire legacy HR, Email, CRM                    Incentive System SaaS
IT Governance Telecom Business Apps




                                            Shift to Email SaaS          SaaS Marketing                                              Recruiting SaaS

                                        Migrate to SaaS CRM                        Enterprise Collaboration SaaS
                                                                                   Migrate to SaaS Service/Call Center Solution

                                             Bilingual VRU            Cell Phone Rat.                     Centralized Customer Phone Contact

                                            Increase Internet Bandwidth

                                        Strengthen IT
                                                                                        IT Governance / PMO (ongoing)
                                      Governance / PMO

                                       IT Dashboard             Vendor Mgmt Office                      Vendor Report Card (ongoing)

                                      Incentive Alignment       Individual Training Plans                 Training (ongoing)
                                      www.cloudtp.com                                               CONFIDENTIAL                                                             49

Cloud Seminar Feb 4 2010

  • 1.
    www.cloudtp.com CONFIDENTIAL 1
  • 2.
    Agenda In2010, should you care about cloud computing? Can you get quick wins? Can you mitigate risks? www.cloudtp.com CONFIDENTIAL 2
  • 3.
    Yes YesYes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes www.cloudtp.com CONFIDENTIAL 3
  • 4.
    CIO in 2010 “If by mid-year you have not developed and begun to execute upon an ambitious and enterprise-wide cloud Bob Evans GlobalCIO.com Information Week strategy, then by year-end the odds are good you'll no longer be a CIO.” www.cloudtp.com CONFIDENTIAL 4
  • 5.
    What are thecloud layers? Who uses them?  Business Analysts Business Users   Developers  Developers  IT Source: David Wells, BeyeNetwork www.cloudtp.com CONFIDENTIAL 5
  • 6.
    Cloud is wherethe best solutions will be found “The single biggest reason public clouds will dominate the next era of IT: The public cloud is where the best and richest variety of business solutions will be found.” Frank Gens IDC Cloud Research Group IDC is telling you the future is cloud. www.cloudtp.com CONFIDENTIAL 6
  • 7.
    Cloud accelerates the paceof innovation "The most interesting aspect of the cloud isn't the cost. It's the pace of innovation" Rajen Sheth Invented Google Apps Cloud solves the 80/20 and is now the suite’s Senior Product Manager maintenance/innovation problem giving enterprises flexibility and speed. www.cloudtp.com CONFIDENTIAL 7
  • 8.
    Cloud also savesmoney Companies that took a disciplined approach to adopting cloud computing reduced costs by an average of 18% and data center power consumption by 16%. Companies that adopted cloud computing haphazardly increased IT costs by 2- 3%. Business Drivers for Cloud Adoption: ◦45% - Reduce cost of IT infrastructure ◦31% - Enhance competitive advantage ◦19% - Inflexibility of current infrastructure ◦13% - Need to support additional users or services www.cloudtp.com CONFIDENTIAL 8
  • 9.
    Cloud gives mid-market enterprisesscale Anyone, anywhere can get access to cost-effective scalable computing resources SMBs now have elastic high-end global computing power at their fingertips, minimizing the competitive advantage of size. www.cloudtp.com CONFIDENTIAL 9
  • 10.
    Cloud is thenext logical step Cloud is evolutionary Cloud frees your resources Cloud is changing the game Cloud computing Internal data center-centric applications www.cloudtp.com CONFIDENTIAL 10
  • 11.
    Cloud success: Government NebulaLaunches – the US Government Gets Cloud Computing Right!  The US government will use 2010 developing and executing pilot cloud-based projects.  Each government agency must consider virtualization and data center consolidation in their IT budget planning.  Each agency can now quickly request, approve, and deploy Software as a Service applications.  The US government projects 6 months of time savings and $1.7 million dollars in procurement and deployment costs per application. If government, which is considered slow, can do it, Source: Cloud you can do it! Achieve a shorter time to market. Computing Journal October 4, 2009 www.cloudtp.com CONFIDENTIAL 11
  • 12.
    Cloud success: Cross-Enterprise Collaboration Eli Lilly is reducing the time it takes to develop new medicines using cloud computing and collaboration.  Lilly is scaling cloud computing environments up and down to meet the changing needs of its researchers' workloads.  Cloud computing has allowed Lilly to establish external collaboration environments in minutes. Source: www.informationweek.com www.cloudtp.com CONFIDENTIAL 12
  • 13.
    Ah, but whatabout risk? Reducing risk is the 3rd most important job of a CIO. Laef Olson CIO, RightNow Technologies www.cloudtp.com CONFIDENTIAL 13
  • 14.
    Is the cloudsecure enough? How secure is my data? Yes How private is my data? Where in the world SaaS Is my data is the cloud? PaaS encrypted? Can I VPN into Read the fine print IaaS the cloud? Who is doing Who is responsible backups? for my data? Is the cloud more or less secure than your current practices? www.cloudtp.com CONFIDENTIAL 14
  • 15.
    Success: Health InfoSecurity WASHINGTON, DC, September 30, 2009 — Harris Corporation, in collaboration with Cisco Systems, has demonstrated the ability to rapidly, safely, and securely exchange healthcare information in a virtual — or cloud — computing environment.  …security and privacy of web-based health information remains protected with a service as data is encrypted in transit and stored securely in the cloud.  ... a standards-based, scalable, open-source gateway solution that enables secure health information exchange between health information organizations across the Nationwide Health Information Network (NHIN) www.cloudtp.com CONFIDENTIAL 15
  • 16.
    Success: Credit CardSecurity  Predictix cloud solutions provide advanced PCI-compliant merchandising solutions to retailers with lower risk and more compelling economics than traditional software alternatives.  Security is the key. Predictix leverages technology from enStratus for a configurable automated encryption system from the file system to backup management to network communications that enables total data security. enStratus also provides intrusion detection and has a "no credentials in the cloud" policy. www.cloudtp.com CONFIDENTIAL 16
  • 17.
    Success: Cloud Adoption Securityconcerns have not stopped major companies from entrusting key client and financial information in the cloud. Salesforce.com has 50,000+ customers, 1.5 million subscribers, $1 billion in annual revenue, 53% market share, and a market capitalization of $8 billion. Example customers include: NBC, Avis, Canon, Chrysler, Deutsche Bank, E-Trade, and Prudential. Companies can save $1MM by migrating from Siebel Sales to SalesForce.com www.cloudtp.com CONFIDENTIAL 17
  • 18.
    Will I haveenough control? Yes Will the provider Do I need a special team share information? for cloud governance? How can I integrate What can I do if there is a breach? with the cloud? In a foreign country? How can I monitor usage and performance? www.cloudtp.com CONFIDENTIAL 18
  • 19.
    Are cloud standardsenough? Yes Will my internal apps integrate Inter-cloud interoperability - with apps in the cloud? fact or fiction Can I migrate from one cloud to another? Will my apps written for one cloud work on another cloud? www.cloudtp.com CONFIDENTIAL 19
  • 20.
    Success: Open Standards  …The number and quality of physical security safeguards taken by the EC2 and S3 teams were incredibly helpful to solidifying our HIPAA compliance.  Our encrypted communication, access, and storage requirements were met with open standards that the AWS team easily facilitates.  “By allowing self-service & management of our infrastructure, we had to worry even less about prying eyes against our customers’ sensitive data.” Source: http://aws.amazon.com/solutions/case-studies/ddsweblink / www.cloudtp.com CONFIDENTIAL 20
  • 21.
    Is there sufficientreliability, availability and performance? Yes 99.9%...is that good enough? How fast are we going? www.cloudtp.com CONFIDENTIAL 21
  • 22.
    Agenda In2010, should you care about cloud computing? Can you get quick wins? Can you mitigate risks? How do you get there? www.cloudtp.com CONFIDENTIAL 22
  • 23.
    Where do Iwant my cloud? Cloud Service Enterprise Provider Private cloud Cloud Service Enterprise Provider Public cloud Cloud Service Enterprise Hybrid cloud Provider and We recommend hybrid for mid-market enterprises in 2010. www.cloudtp.com CONFIDENTIAL 23
  • 24.
    Cloud - Howdo you get there? Step 1: Get CEO Support Step 2: Define Your Goals Step 3: Determine organizational core competencies. Step 4: Leverage qualified partners to deliver the rest. Is transitioning to cloud computing a core competency? www.cloudtp.com CONFIDENTIAL 24
  • 25.
    ―There‖ looks something likethis Cloud Partner #2 Cloud Partner #1 Cloud Partner #3 Your Core Competencies Cloud Cloud Partner #4 Partner #N Cloud Partner #5 www.cloudtp.com CONFIDENTIAL 25
  • 26.
    But which cloudpartners? Infrastructure as a Service [IaaS] Platform as a Service [PaaS] Cloud Ecosystem By Cloud Technology Partners Jan. 2010 There are over 3000 SaaS vendors Source: SaaSShowplace.com Software as a Service [SaaS] Cloud Tools www.cloudtp.com CONFIDENTIAL 26
  • 27.
    Cloud – Morebest practices Step 5: Form a cloud task force Step 6: Establish governance Step 7: Form a partner management team Cloud Best Practice Handbook 2010 Form Cloud Task Force Establish Governance Form Partner Management Team Evaluate Current State Architecture Define Cloud Security & Compliance Policy Monitor and Measure Cloud Services www.cloudtp.com CONFIDENTIAL 27
  • 28.
    Your cloud taskforce will help you achieve your goals improved cloudburst for dramatically lower speed-to-market dynamic capacity TCO partner pay-as-you-go / interconnectedness metered payments shift capex to virtuous savings lower opex cycles universal user sustainable / low cost / low experience green risk pilots …by lowering costs and enabling business innovation and sustainability www.cloudtp.com CONFIDENTIAL 28
  • 29.
    They will demystifythe cloud Cloud Ecosystem collaboration sample cloud SaaS, client partnership PaaS, IaaS vendors > relevant experience Your Cloud Task Force best practices sample cloud implementation partners ROI driven > empowerment Your cloud team must demystify cloud, navigate hype from reality, apply best practices, and achieve measurable business results! www.cloudtp.com CONFIDENTIAL 29
  • 30.
    They will assessand prioritize opportunities Cost of Iterative ownership and solution ability to refinement support revenue Prioritized growth Balance benefit, Roadmap cost, risk, complexity selected cloud Explore Cloud Opportunity business initiatives, Implemen business & IT opportunity ranking & dependencies, tation opportunities definition prioritization and business value justifications Assess change on operations Business Technology impact Iterative and IT analysis solution refinement Initiatives www.cloudtp.com CONFIDENTIAL 30
  • 31.
    They will deliverquick wins Identify pilot projects. Validate the ROI. Help the Governance team prioritize and approve them. www.cloudtp.com CONFIDENTIAL 31
  • 32.
    They will transformyour enterprise Cloud Collaboration Cloud CRM Cloud Storage/Archival Your Core Competencies Cloud Task Cloud Cloud Force Computing Analytics Cloud Marketing www.cloudtp.com CONFIDENTIAL 32
  • 33.
    Need a cloudtask force? www.cloudtp.com CONFIDENTIAL 33
  • 34.
    That is us      Cloud Collaboration Cloud CRM Cloud Storage/Archival Your Core Competencies Cloud Cloud Computing Analytics Cloud Marketing www.cloudtp.com CONFIDENTIAL 34
  • 35.
    Let us beyour trusted guide  plan navigate de-risk transition empower www.cloudtp.com CONFIDENTIAL 35
  • 36.
    cloudTP services lifecycle We provide end-to-end advisory, implementation and operational services transformation managed strategy implementation services empowerment cloudTP partners with clients to assess, plan, and implement cloud computing solutions for business advantage. www.cloudtp.com CONFIDENTIAL 36
  • 37.
    Strategy services transformation managed strategy implementation services empowerment Rapid Opportunity Identification (ROI) great starting point for businesses seeking to identify best cloud computing opportunities 3 week rapid assessment of high-potential areas business case and ROI to support identified areas Enterprise Cloud Opportunities (ECO) - in-depth application portfolio analysis targeting large enterprises - 8-12 week deep-dive assessment of high-impact areas - breadth and depth of analysis to identify quick-win, intermediate and long-term opportunities - strong business case and ROI with estimated annualized savings and business benefit - identify virtuous cycles of investment – use savings to fund subsequent project phases www.cloudtp.com CONFIDENTIAL 37
  • 38.
    Implementation services transformation managed strategy implementation services empowerment Software as a Service (SaaS) Vendor evaluation, selection & negotiation migrate existing application(s) as-is potentially refactor identify and prioritize requirements migrate / implement new SaaS application(s) identify vendor space manage RFP vetting process Platform as a Service (PaaS) develop integration plan, governance and PMO establish Dev / Test / QA sandbox in the cloud build and integrate applications using PaaS Implementation planning & execution develop program / project plans with dependencies Infrastructure as a Service (IaaS) manage budgets, resources, deliverables, milestones migrate systems infrastructure to the cloud project risk mitigation plans, pilots and QA email, BPM, CMS, servers, storage, DR/BC, cloudbursting www.cloudtp.com CONFIDENTIAL 38
  • 39.
    Transformation services transformation managed strategy implementation services empowerment Transformation Empowerment governance and PMO services provide on-the-job training and mentorship process, systems and organizational design services develop formalized training curriculum manage change management program execution conduct formalized training workshops establish training programs for staff with metrics provide periodic check points and measurement www.cloudtp.com CONFIDENTIAL 39
  • 40.
    Managed services transformation managed strategy implementation services empowerment Managed services planning, selection and Onsite / offsite support, monitoring, reporting migration & services coordination identify and prioritize business and IT single point of contact for various managed services requirements monitor performance and SLA compliance and conduct vendor selection, evaluation and variances negotiation proactively monitor performance and issue plan transition to managed service with resolution contingency and risk mitigation plan plan and coordinate scheduled outages and conduct pilots to validate and test managed maintenance service establish executive and services dashboards establish / integrate with governance and PMO integrate with governance, PMO and help desk www.cloudtp.com CONFIDENTIAL 40
  • 41.
    Q & A/ next steps Let us guide you to the summit of success! www.cloudtp.com CONFIDENTIAL 41
  • 42.
  • 43.
    cloudTP Services Flow Eachservice offering provides the guidance needed to make the next step toward cloud computing. Transformation Managed Strategy Implementation Services Empowerment www.cloudtp.com CONFIDENTIAL 43
  • 44.
    ROI results transformation managed strategy Implementation #1 services empowerment transformation transformation managed managed ROI implementation strategy Implementation #2 services services empowerment empowerment transformation An ROI session is likely to identify strategy Implementation #3 managed services multiple strong candidates for cloud migration empowerment www.cloudtp.com CONFIDENTIAL 44
  • 45.
    Implementation Results transformation managed strategy Implementation #1 services empowerment Transformation Migrating from an internal CRM to strategy implementation managed services Salesforce.com will require user training and new/changed roles. empowerment transformation The same implementation is likely to require technical training for strategy implementation managed services administration and configuration Empowerment www.cloudtp.com CONFIDENTIAL 45
  • 46.
    Implementation Results transformation Implementation #2 managed strategy Implementation #3 services Implementation #4 empowerment transformation Multiple implementations across strategy implementation Managed Services multiple clouds may make it desirable to outsource the day-to-day empowerment management and administration www.cloudtp.com CONFIDENTIAL 46
  • 47.
    Services Roadmap Phase 1 Phase 2 Phase 3 ROI or ECO Transformation Implementation 1 Empowerment Implementation 2 Empowerment Implementation 3 ROI or ECO Implementation 4 Implementation 5 Implementation 6 Managed Services www.cloudtp.com CONFIDENTIAL 47
  • 48.
    cloudTP Services Progression • cloudTP Rapid Opportunity Identification strategy • 3 weeks. 3 consultants. ROI • $75K • Siebel to SalesForce migration • 12 weeks. 5 consultants. Step #1 • Saves up to $1 million over 5 years • Internally-hosted Email to Google Apps Email • 1 month. 1 consultant. Step #2 • Saves $100-$200 per employee per year www.cloudtp.com CONFIDENTIAL 48
  • 49.
    <Client Name> ITRoadmap 4 months 8 months 16 months 24 months Customer One View Analytics Report Rationalization within SaaS Business Intelligence Campaign Mgmt. Relationship Profitability Cross-Sell Support Retire Legacy Web Multi-factor Online Usage Customer Password Analysis Web Redesign/PaaS Self-service & SSO Solution authentication Perimeter Security Network OS Rationalization SaaS IT Helpdesk Infrastructure Rationalization Remote Access Disaster Mgmt/Business Continuity via Cloud Data Center SaaS ID Vault Password Self Service Approval Work Flow Rationalization Employee SSO Provisioning Cloudburst Dev/Test HR SaaS Retire legacy HR, Email, CRM Incentive System SaaS IT Governance Telecom Business Apps Shift to Email SaaS SaaS Marketing Recruiting SaaS Migrate to SaaS CRM Enterprise Collaboration SaaS Migrate to SaaS Service/Call Center Solution Bilingual VRU Cell Phone Rat. Centralized Customer Phone Contact Increase Internet Bandwidth Strengthen IT IT Governance / PMO (ongoing) Governance / PMO IT Dashboard Vendor Mgmt Office Vendor Report Card (ongoing) Incentive Alignment Individual Training Plans Training (ongoing) www.cloudtp.com CONFIDENTIAL 49