1) Multi-Purpose Holdings Berhad owns a vacant 450m2 lot behind Taylor's Lakeside University halls that they plan to develop.
2) They propose developing an outdoor multipurpose hall on the lot with facilities like an aquarium, rock climbing area, performance stage, and seating for 200 people.
3) The development aims to provide students a place to relax and enjoy activities. It could also benefit the university by becoming a landmark and raising its profile with tourists, potentially increasing student enrollment and revenue.
Client & project manager as a team player in construction industry
1. 1
Foundation In Natural & Built Environment
January Intake 2012
Semester 1
Introduction To Construction Industry (FNBE0125)
Lecturer : Pn. Hasmanira
Project 2 – Client/Project Manager as a Team Player in Construction
Industry
GROUP 15
Name Student ID no.
Yam Yih Hwan 0305861
Chew Wen Lin 1007C10646
Janice Kong Yin Ying 0308798
Cromwell Augustine Jubili 0306595
2. 2
Table Content
CONTENT Page no.
1) Cover Page 1
2) Table Content 2
3) Introduction of Company 3
4) Introduction ofLand 5
5) Pictures/Photos of land 6
6) The Development 13
7) Consequences (Advantages & Disadvantages) 16
8) Conclusion 18
3. 3
Introduction of Company
MULTI-PURPOSE HOLDINGS BERHAD (MPHB)
Multi-Purpose Holdings Berhad (MPHB), the investment holding company for the Multi-
Purpose Group of companies (the Multi-Purpose Group), was incorporated in 1975 and listed
on the Bursa Malaysia Securities Berhad in 1982.DatukRazman Md. Hashim, aged 72, was
appointed Chairman of Multi-Purpose Holdings Berhad (MPHB) on 7 May 2002. MPHB is
headquartered at Menara Multi-Purpose, part of the CapSquare development in Kuala Lumpur,
Malaysia.
The Multi-Purpose Group is involved in the core businesses of Financial Services (Multi-Purpose
InsuransBerhad), Stock Broking (A. A. Anthony Securities SendirianBerhad), Gaming (Magnum
Corporation SendirianBerhad), Hospitality (Flamingo Hotels and Management Services) and
Property business division.
PRINCIPAL ACTIVITIES
The principal activities of the Group consist of:
- Investment holding and trading
- Operation of general insurance business
- Provision of leasing, hire purchase and general loan financing services
- Operation and management of a licensed four digit numbers forecast betting game
- Operation of hotels
- Securities broking and dealing
- Property development and property investment
- Provision of computer software and other related services
4. 4
CONTACT US
Address: Multi-Purpose HoldingsBerhad (24127-4), 39th
Floor, Menara Multi-Purpose,
Capital Square, No.8, JalanMunshi Abdullah, 50100 Kuala Lumpur, Malaysia.
Telephone : 603-2694833
Fax : 603-26941380
Email : info@mphb.com.my
5. 5
Introduction of Land
LAND
Location:Behind Taylor’s Lakeside University Multipurpose Hall, in between Block A and B,
Level 2.
Size:30m x 15m (approximately 450m²) vacant lot.
Market price:It worth RM150, 000 market prices.
Surrounding area:
Indoor Multipurpose Hall
Music Hall
Library
Open Space Corridor
8. 8
The Development
Types of building:
Outdoor Multipurpose Open Hall
Project:
Aquarium
Surrounding Home Theater System
Rock Climbing
Performance Stage
Marketing Target :
Taylor’s Students/Lecturers (Taylorian’s)
Local Tourists
Foreign Tourists
Budgetrequire:
Aquarium RM30,000
Surrounding Home Theater System RM50,000
Rock Climbing RM20,000
Land Price RM150,000
Workers Pay RM20,000
Seats RM5,000
Total RM275,000
Deadlineof project:8 months (duration)
Duration to complete the project :April 2012 till December 2012, will be open on 2013
for new SPM leavers.
Mission:
A place where students can release their stress and tension.
A place where students can show their talents.
A place for students to relax and enjoy.
A place for students to exercise.
Improve the school’s facilities.
Make a difference compare to other campus.
9. 9
Vision:
In order to increase the numbers of student enrolled into Taylor’s Lakeside University.
In order to fill up the virgin lot into something useful and more spectacular.
In order to turn something useful out of nothing.
In order to gain trust and confident from parents for their child study environment.
Advantage of the location:
School site
Unused space
Eye capturing site
Beside a hall way
Big space
Problems encountered :
Students might not able notice that place because it is not used often.
Hot weather
Might get wet if rain
Ways to overcome the problems:
Make signboard to introduce this new area.
A glass roof to block out the rain but enable some sunlight to pass through.
Install some cooling system around the area.
10. 10
Requirements
Multipurpose Stage :
A large open space.
Nicely decorated.
Red Curtain.
Surrounding theatre system.
70-inch LCD Television.
Rooftop covered by silicon glass.
A switch that allow to pull out the rock climbing from the ground.
Aquarium :
2 big areas beside Multipurpose Stage.
Starphire glass, which provide clearer view.
Installed with water filter tank.
Aquatic plants, for example, Sea grass, Aqua Planta.
Requires Aquascape.
Nature style, Dutch style, Jungle style, Reef style.
Aquatic animal.
Seats :
Able to contain a large amount of people.
Seats for 200 people.
With comfortable cushion on each seats.
A small caption in between every seat.
Allow students to put their belongings.
No shoes allowed.
11. 11
Consequences (Advantages & Disadvantages)
Advantage:
Landmark :
As the popularity increases, the Outdoor Multipurpose Hall become famous with the
modern facilities will make students and lecturers happy.
Students can enjoy outdoor theater which Malaysia’s college seldom has it.
Tourists will definitely visit the place once they are at Taylor’s Lakeside Campus.
In the end, the Outdoor Multipurpose Hall will become the landmark of the college.
Economy :
Tourists will attract by the activities and facilities provided.
Charges for every live performance or event held.
Entrance fees.
Number of tourists visited increased (Popularity increased).
Earn profit and improve the facilities.
Recreation place :
During weekends and free periods, everyone can come together with family or friends
to enjoy themselves.
Activities such as rock climbing, outdoor presentation or live event can be carried out.
Pollution free.
Relaxation place to release stress and clear your thoughts.
Experience life fish close up.
12. 12
Disadvantage:
Air Pollution :
Construction process.
Affect human body in negative ways.
Those with asthma or heart disorders are under additional risk.
Excessive sulphur dioxide released from construction site will killnearby plants and
trees.
Sound Pollution :
Students won’t pay attention in their studies.
Distraction for some students.
Disturbance for those who are staying in Taylor’s Hostel.
Water Pollution :
Students or tourists might dirty the water by throwing rubbish into the aquarium that
will kill aquatic animals and plants.
Loss of habitat for certain creatures.
13. 13
Conclusion
As a conclusion, the vacant lot has the potential to be developed into outdoor
multipurpose hall. The land has the strategic location because of it big space which located
beside a hallway thatcan catch attention from every particle.
Besides that, this project can bring benefits to Taylor’s University Lakeside Campus by turning
an unused space into an outdoor multipurpose hall. For example, become the landmark for the
university and raise the economy. Therefore, we have decided to start the project as soon as
possible.
In addition, we haveto discuss with the design team, consultants and contractorsin order
to prevent from hot/rainy weather and the ways that can minimize the negative effect.
(Nature’s force = rain and heat)