Current scenario of construction industry -
 Unorganized industry
 Labour oriented work procedures
 Gap between theory learnt and its
practical application
 Big project life cycle
 Less practical exposure during education
years
Need for training fresh civil engineers
for practical project management
 Fast Globalization
 Need of leadership
 Customer service & quality emphasis
 New technology
 High performance model at work
systems
 Economic changes
Enhance the capabilities of
a civil engineer
related to
practical knowledge
“Civil Engineering Informatics (CEI) “
VISION
 Practical Guidance from industry experts , right
from inception of a real estate project to hand
over
 Teaching best practices adopted by industry
 Personality development of student to become a
successful engineer
 Make engineer proud to become an asset to the
organization , after completing the course
 Enhance the practical application of theoretical
knowledge
 Helping student to increase employability
 Mock interview sessions
 Helping student in project reports
 Improved evaluation methods after completion of
course
Why “Civil Engineering Informatics (CEI) “ ?
Construction Processes
Pre During Post
Real Estate project Cycle
NO PARTICULARS
1
Architectural Design & Development - planning as per D C rules, Study of
Architectural & all types of drawings etc.
2
Engineering Design & Development
3 Estimation & Costing of Projects
Pre Construction
{
Design and Development.
(Pre construction activity)
 What is design & development process ?
 Stakeholders involved in this process.
 Role of each Stakeholder
 Points considered at the time of designing .
 General description of D. C. Rules, NBC, I.S. code referred
for design.
 Inputs required by all Stakeholders, involved in design
process.
 Output of all Stakeholders of design process.
 D&D presentation on design of project , to execution team.
 Points required to be considered before starting execution
of work. (Material handling plan, temp. Structures. etc.)
 Study of all types of drawings
Design development concept introduction.
NO PARTICULARS
1
Explaining in details - all processes from excavation to handover for resource
planning , control on incoming materials , quality checks , post inspection etc.
During Construction
NO PARTICULARS
1
Processes like DLP
maintenance , AMC ,
managing plants and
services
Post Construction
 Practical exposure through
classroom studies
 Enhance the technical skills
through case studies
 Study materials
 Evaluation and assessments
Teaching Methodology
Quality engineers
Working civil engineers – in
office jobs or site jobs
Engineers with 1 or 2 years
experience
Fresh civil engineers
Final year students of civil
Engg. Diploma & Degree
Useful for
Course module
Code Courses Hrs.
CEI/A - 001 Pre construction process 56
CEI/A – 002 Estimation & Costing 6
CEI/A – 003 During Construction process 54
CEI/A – 004 Post Construction process 18
CEI/A – 005 F-01-Full course -Pre + During + Estimation 116
CEI/A – 006 F-02-Full course -Pre + During + Estimation + Post
Construction
134
Daily Regular evening Courses
Code Courses Hrs.
CEI/B - 001 Architectural design & development 6
CEI/B - 002 RCC Design & development 6
CEI/B - 003 Services design & development 6
CEI/B - 004 Plumbing design for high rise building 3
CEI/B - 005 Quality management - QAQC 6
CEI/B - 006 Stores & inventory management 6
CEI/B - 007 Environment & Safety 18
CEI/B - 008 Risk Management in construction sector 6
CEI/B - 009 Productivity Improvement 6
CEI/B - 010 Tendering & contracts 6
CEI/B - 011 Construction Materials 6
Special weekend courses
Build Your
Future
CONTACT
97652 60504
70301 10172
Thank You

Civil engineering informatics a practical project management courses for civil engineers

  • 2.
  • 3.
    Current scenario ofconstruction industry -  Unorganized industry  Labour oriented work procedures  Gap between theory learnt and its practical application  Big project life cycle  Less practical exposure during education years
  • 4.
    Need for trainingfresh civil engineers for practical project management  Fast Globalization  Need of leadership  Customer service & quality emphasis  New technology  High performance model at work systems  Economic changes
  • 5.
    Enhance the capabilitiesof a civil engineer related to practical knowledge “Civil Engineering Informatics (CEI) “ VISION
  • 6.
     Practical Guidancefrom industry experts , right from inception of a real estate project to hand over  Teaching best practices adopted by industry  Personality development of student to become a successful engineer  Make engineer proud to become an asset to the organization , after completing the course  Enhance the practical application of theoretical knowledge  Helping student to increase employability  Mock interview sessions  Helping student in project reports  Improved evaluation methods after completion of course Why “Civil Engineering Informatics (CEI) “ ?
  • 7.
    Construction Processes Pre DuringPost Real Estate project Cycle
  • 8.
    NO PARTICULARS 1 Architectural Design& Development - planning as per D C rules, Study of Architectural & all types of drawings etc. 2 Engineering Design & Development 3 Estimation & Costing of Projects Pre Construction
  • 9.
    { Design and Development. (Preconstruction activity)
  • 10.
     What isdesign & development process ?  Stakeholders involved in this process.  Role of each Stakeholder  Points considered at the time of designing .  General description of D. C. Rules, NBC, I.S. code referred for design.  Inputs required by all Stakeholders, involved in design process.  Output of all Stakeholders of design process.  D&D presentation on design of project , to execution team.  Points required to be considered before starting execution of work. (Material handling plan, temp. Structures. etc.)  Study of all types of drawings Design development concept introduction.
  • 11.
    NO PARTICULARS 1 Explaining indetails - all processes from excavation to handover for resource planning , control on incoming materials , quality checks , post inspection etc. During Construction
  • 12.
    NO PARTICULARS 1 Processes likeDLP maintenance , AMC , managing plants and services Post Construction
  • 13.
     Practical exposurethrough classroom studies  Enhance the technical skills through case studies  Study materials  Evaluation and assessments Teaching Methodology
  • 14.
    Quality engineers Working civilengineers – in office jobs or site jobs Engineers with 1 or 2 years experience Fresh civil engineers Final year students of civil Engg. Diploma & Degree Useful for
  • 15.
  • 16.
    Code Courses Hrs. CEI/A- 001 Pre construction process 56 CEI/A – 002 Estimation & Costing 6 CEI/A – 003 During Construction process 54 CEI/A – 004 Post Construction process 18 CEI/A – 005 F-01-Full course -Pre + During + Estimation 116 CEI/A – 006 F-02-Full course -Pre + During + Estimation + Post Construction 134 Daily Regular evening Courses
  • 17.
    Code Courses Hrs. CEI/B- 001 Architectural design & development 6 CEI/B - 002 RCC Design & development 6 CEI/B - 003 Services design & development 6 CEI/B - 004 Plumbing design for high rise building 3 CEI/B - 005 Quality management - QAQC 6 CEI/B - 006 Stores & inventory management 6 CEI/B - 007 Environment & Safety 18 CEI/B - 008 Risk Management in construction sector 6 CEI/B - 009 Productivity Improvement 6 CEI/B - 010 Tendering & contracts 6 CEI/B - 011 Construction Materials 6 Special weekend courses
  • 18.
  • 19.
  • 20.