Civil Engineering
       And
 Land Surveying
Design Technician
5356 Manor Brier Court
Pueblo, Colorado 81005-5541
    Home 719.566.0061
     Cell 719.429.8397
davidrgwartney@yahoo.com

          
Engineering
             Computer Programs
                       
 AutoCAD® 2010

 Civil 3D® 2010

 Eagle Point®

 Land Development Desktop® 2005

 Microsoft Project®
Support
            Computer Programs
                  
 Word

 Excel

 Access

 Outlook

 Power Point
Civil Engineering
   Notable Projects
           
Nike World Campus

East And West Side Light Rail

AT&T Fiber Optics Line
Nike World Headquarters

                    

Site Design                  Drainage Design
Site Grading                 As-Builts
East and West Side Light Rail
           Portland Oregon Area
                        
Track Design
  Downtown Area
  Hollywood Transfer
    Station
  Beaverton Transfer
    Station
  Zoo Station
AT&T
               Fiber Optics Line
                     
 Line Design for Fiber Optics
  Line from Portland Oregon
  To Seattle Washington.

 Right Of Way Acquisition.

 As-Builts.
Land Surveying
      Notable Projects
            
Pueblo Convention Center

Historic Arkansas River Project

Willamette River Dredging Project
Pueblo Convention Center

          
               Construction
                Staking
               As-Builts
               Boundary
                Resolution
Historic Arkansas River Walk

            

                    Construction
                     Staking
                    As-Builts
Willamette River Dredging Project

                    
Marine Surveying
Quantity
 Verification
Project Boundary
 Limits
Other
     Notable Projects
           
Youth Coordinator

Drug Free Zones For The City Of

 Gresham, Oregon
Youth Environmental Coordinator
             for the
    City of Gresham, Oregon
             
               Environmental
               coordinator for youth
               groups from grade and
               middle school along with
               boy and girl scout groups.
               Gave lectures, power
               point presentations and
               led field trips to mark
               storm drains, clean up
               parks and other projects.
Drug Free Zones

                     
Worked with the City
Of Gresham Oregon
police department to
create drug free zones.
Developed GIS data
bases and graphics.
Related Skills
                   and Abilities
                         
 Inspector

 Specifications

 AutoCAD® Trainer

 Marketing

 Public Presentations
Inspector

                      
 Water Lines

 Site Grading

 Roads Including
  Curb and Gutter

 Sanitary Sewer
                                (not me)

 Storm Drains
Specifications

                      
 Subdivisions

 Sanitary Sewers

 Storm Drains

 Roads

 Water Lines
AutoCAD® Instructor

                     
 User Groups.

 Individual Training.

 Standards Creation and Writing.
Marketing

                          
 Power Point Presentations.

 Report and Proposal Covers.

 Report and Proposal Graphics.

 Flip Charts.

 Flyers.

 Newsletters.
Public Presentations

                       
 Power Point Presentations

 AutoCAD® Slide Presentations

 Planning Commission Meetings

 City Council Meetings

 Town Hall Meetings
Education
                    
 Associates Degree in Civil Engineering Technology
 Seminars
     Project Management
     Managing Technical People
     Dealing With Difficult People
     Engineering Marketing
     Construction Management
     Adverse Possession
     Water Rights
Certificates
              
 AutoCAD ® I, II, III
 Civil 3D®
 Land Development Desktop® 2005
 Eagle Point® I, II, III
 Microstation® V8
Personal Interests
           
 Astronomy and Astrophysics
 Auto Racing (Fan Only)
 Soccer
 Cycling
 Miniatures
For Your
Time and Consideration

Engineering Power Point

  • 1.
    Civil Engineering And Land Surveying Design Technician
  • 2.
    5356 Manor BrierCourt Pueblo, Colorado 81005-5541 Home 719.566.0061 Cell 719.429.8397 davidrgwartney@yahoo.com 
  • 3.
    Engineering Computer Programs   AutoCAD® 2010  Civil 3D® 2010  Eagle Point®  Land Development Desktop® 2005  Microsoft Project®
  • 4.
    Support Computer Programs   Word  Excel  Access  Outlook  Power Point
  • 5.
    Civil Engineering Notable Projects  Nike World Campus East And West Side Light Rail AT&T Fiber Optics Line
  • 6.
    Nike World Headquarters  Site Design  Drainage Design Site Grading  As-Builts
  • 7.
    East and WestSide Light Rail Portland Oregon Area  Track Design Downtown Area Hollywood Transfer Station Beaverton Transfer Station Zoo Station
  • 8.
    AT&T Fiber Optics Line   Line Design for Fiber Optics Line from Portland Oregon To Seattle Washington.  Right Of Way Acquisition.  As-Builts.
  • 9.
    Land Surveying Notable Projects  Pueblo Convention Center Historic Arkansas River Project Willamette River Dredging Project
  • 10.
    Pueblo Convention Center  Construction Staking As-Builts Boundary Resolution
  • 11.
    Historic Arkansas RiverWalk  Construction Staking As-Builts
  • 12.
    Willamette River DredgingProject  Marine Surveying Quantity Verification Project Boundary Limits
  • 13.
    Other Notable Projects  Youth Coordinator Drug Free Zones For The City Of Gresham, Oregon
  • 14.
    Youth Environmental Coordinator for the City of Gresham, Oregon  Environmental coordinator for youth groups from grade and middle school along with boy and girl scout groups. Gave lectures, power point presentations and led field trips to mark storm drains, clean up parks and other projects.
  • 15.
    Drug Free Zones  Worked with the City Of Gresham Oregon police department to create drug free zones. Developed GIS data bases and graphics.
  • 16.
    Related Skills and Abilities   Inspector  Specifications  AutoCAD® Trainer  Marketing  Public Presentations
  • 17.
    Inspector   Water Lines  Site Grading  Roads Including Curb and Gutter  Sanitary Sewer (not me)  Storm Drains
  • 18.
    Specifications   Subdivisions  Sanitary Sewers  Storm Drains  Roads  Water Lines
  • 19.
    AutoCAD® Instructor   User Groups.  Individual Training.  Standards Creation and Writing.
  • 20.
    Marketing   Power Point Presentations.  Report and Proposal Covers.  Report and Proposal Graphics.  Flip Charts.  Flyers.  Newsletters.
  • 21.
    Public Presentations   Power Point Presentations  AutoCAD® Slide Presentations  Planning Commission Meetings  City Council Meetings  Town Hall Meetings
  • 22.
    Education   Associates Degree in Civil Engineering Technology  Seminars  Project Management  Managing Technical People  Dealing With Difficult People  Engineering Marketing  Construction Management  Adverse Possession  Water Rights
  • 23.
    Certificates   AutoCAD ® I, II, III  Civil 3D®  Land Development Desktop® 2005  Eagle Point® I, II, III  Microstation® V8
  • 24.
    Personal Interests   Astronomy and Astrophysics  Auto Racing (Fan Only)  Soccer  Cycling  Miniatures
  • 25.
    For Your Time andConsideration