cKenney’s replaced nine
chilled water coils in 34-year-
old air handling units (AHUs)
located in an operation center for a large,
public service company.
THE CHALLENGE
The facility required zero downtime during
occupied hours, which gave the team
only 30 hours on weekends to complete
the project. The AHUs overhaul took place
in small, 200-square-foot mechanical rooms
and the team knew it had to act quickly
and decisively as it worked alongside other
trades. In addition, an awkward piping
configuration restricted prefabrication work
and the condition of the area under the coils
was unknown.
THE SOLUTION
With design plans and detailed schedules
in place, the McKenney’s team accelerated
AHU replacements. New custom-built
stainless steel drain pans were also fabricated
to fit inside the existing pan to support the
weight of the replacement coils.
THE RESULTS
The project was completed on time and
on budget. The AHUs are now running
more efficiently, saving energy and opera-
tional costs.
Team Accelerates Coil Refit
PROJECT NAME
žž Chilled Water Coil
Replacement Project
PROJECT LOCATION
žž Charlotte, North Carolina
PROJECT TEAM
žž Owner: Utility Holding Company
žž Contractor: McKenney’s, Inc.
SPECIALIZATIONS
	Design/Build
	 Pipe Shop Prefab
MARKETS
žž Mission Critical
žž Commercial Office
žž Central Plants
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

Chilled Water Coil Replacement Project

  • 1.
    M cKenney’s replaced nine chilledwater coils in 34-year- old air handling units (AHUs) located in an operation center for a large, public service company. THE CHALLENGE The facility required zero downtime during occupied hours, which gave the team only 30 hours on weekends to complete the project. The AHUs overhaul took place in small, 200-square-foot mechanical rooms and the team knew it had to act quickly and decisively as it worked alongside other trades. In addition, an awkward piping configuration restricted prefabrication work and the condition of the area under the coils was unknown. THE SOLUTION With design plans and detailed schedules in place, the McKenney’s team accelerated AHU replacements. New custom-built stainless steel drain pans were also fabricated to fit inside the existing pan to support the weight of the replacement coils. THE RESULTS The project was completed on time and on budget. The AHUs are now running more efficiently, saving energy and opera- tional costs. Team Accelerates Coil Refit PROJECT NAME žž Chilled Water Coil Replacement Project PROJECT LOCATION žž Charlotte, North Carolina PROJECT TEAM žž Owner: Utility Holding Company žž Contractor: McKenney’s, Inc. SPECIALIZATIONS Design/Build Pipe Shop Prefab MARKETS žž Mission Critical žž Commercial Office žž Central Plants The content of this document is not intended as an endorsement. www.mckenneys.com © 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214