Chapter 4 – Periodic Task Scheduling
In many real-time systems periodic tasks dominate the demand.
Three classic periodic task scheduling algorithms:
– Time Line (Cyclic)
– Rate Monotonic
– Earliest Deadline First
What is the landscape here?
What causes the challenges?
Periodic Task Scheduling Notation
Ti denotes the period of task i
Ci denotes the Computation time for one instance of task i
Periodic Task Scheduling Assumptions
Additional Periodic Task Parameters
Processor Utilization Factor - U
< 1 if set is scheduable
Let be the upper bound of the processor utilization factor for a set under a
given algorithm A. When the set is said to fully utilize the processor.
1
Time Line Scheduling (Cyclic Scheduling)
Time Line Scheduling (Off-line scheduling strategy)– Divide the time line into time
slices for scheduling tasks, e.g. use the Greatest Common Divisor of the Task Periods
as the time slice:
40 Hz
20 Hz
10 Hz
Schedulability is guaranteed if:
Time line scheduling is sensitive to changes in the task parameters.
Can time line scheduling also accommodate aperiodic tasks ?
Rate Monotonic Scheduling
RM is optimal among all fixed Priority assignment schedules.
Why?
How can you how show that it must be optimal?

Which is clearly non-optimal
Rate Monotonic – Calc of ULUB for Two Tasks
Let , the number of
Then the schedule produced by RM satisfies one of two conditions:
for Uub
Since this is the critical time zone
for Uub
0Rate Monotonic – Calc of ULUB for Two Tasks
Rate Monotonic – Calc of ULUB for n Tasks
Sufficient conditions for schedulability of n tasks under Rate monotonic:
Earliest Deadline First
Proof: Assume U > 1 and the task set is schedulable. This leads to a contradiction:
Example: Comparing RM to EDF
Since U > ln 2 = 0.69, Schedulability can’t be guaranteed using Rate Monotonic
Deadline Monotonic
The Deadline Monotonic priority assignment weakens the “period equals
deadline” constraint within a static scheduling scheme. Each periodic task
is characterized by four parameters:
which have the following relationships:
Comparison of Fixed Priority & Dynamic Priority Scheduling
Categories:
Fixed Priority: Time-Line (Cyclic)
Rate Monotonic (RM)
Dynamic: Earliest Deadline First (EDF)
Comparison:
Fixed Priority: Can be done off-line,
Easier to implement.
Dynamic: Can exploit 100% of processor bandwidth
(RM can uses < 69% in the worst case),
Typically uses less context switches (?),
Handles overloads more gracefully
(Fixed Priority breaks down on overload).
Why does Earliest Deadline First work so well? How does it handle
aperiodic tasks? What is its Achilles heel?

More Related Content

Similar to Chap 4.ppt

Real time-embedded-system-lec-02
Real time-embedded-system-lec-02Real time-embedded-system-lec-02
Real time-embedded-system-lec-02
University of Computer Science and Technology
 
multiprocessor real_ time scheduling.ppt
multiprocessor real_ time scheduling.pptmultiprocessor real_ time scheduling.ppt
multiprocessor real_ time scheduling.ppt
naghamallella
 
Scheduling algorithm in real time system
Scheduling algorithm in real time systemScheduling algorithm in real time system
Scheduling algorithm in real time system
VishalPandat2
 
Clock driven scheduling
Clock driven schedulingClock driven scheduling
Clock driven scheduling
Kamal Acharya
 
Scheduling Task-parallel Applications in Dynamically Asymmetric Environments
Scheduling Task-parallel Applications in Dynamically Asymmetric EnvironmentsScheduling Task-parallel Applications in Dynamically Asymmetric Environments
Scheduling Task-parallel Applications in Dynamically Asymmetric Environments
LEGATO project
 
A Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy ManagementA Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy Management
IRJET Journal
 
RTOS
RTOSRTOS
Real time-system
Real time-systemReal time-system
Real time-system
ysush
 
Real time-system
Real time-systemReal time-system
Real time-system
ysush
 
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
Editor IJMTER
 
Scheduling and Scheduler's Process and Premptive
Scheduling and Scheduler's Process and PremptiveScheduling and Scheduler's Process and Premptive
Scheduling and Scheduler's Process and Premptive
choudharyxdevansh
 
Commonly used Approaches to Real Time Scheduling
Commonly used Approaches to Real Time SchedulingCommonly used Approaches to Real Time Scheduling
Commonly used Approaches to Real Time Scheduling
Raaz Karkee
 
Task assignment and scheduling
Task assignment and schedulingTask assignment and scheduling
Task assignment and scheduling
RajalakshmiSermadurai
 
exp 3.docx
exp 3.docxexp 3.docx
exp 3.docx
Ganesh Chavan
 
Temporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware schedulingTemporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware scheduling
ijesajournal
 
Temporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware schedulingTemporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware scheduling
ijesajournal
 
Scheduling algorithms
Scheduling algorithmsScheduling algorithms
Scheduling algorithms
Paurav Shah
 

Similar to Chap 4.ppt (20)

Real time-embedded-system-lec-02
Real time-embedded-system-lec-02Real time-embedded-system-lec-02
Real time-embedded-system-lec-02
 
multiprocessor real_ time scheduling.ppt
multiprocessor real_ time scheduling.pptmultiprocessor real_ time scheduling.ppt
multiprocessor real_ time scheduling.ppt
 
Scheduling algorithm in real time system
Scheduling algorithm in real time systemScheduling algorithm in real time system
Scheduling algorithm in real time system
 
Clock driven scheduling
Clock driven schedulingClock driven scheduling
Clock driven scheduling
 
Scheduling Task-parallel Applications in Dynamically Asymmetric Environments
Scheduling Task-parallel Applications in Dynamically Asymmetric EnvironmentsScheduling Task-parallel Applications in Dynamically Asymmetric Environments
Scheduling Task-parallel Applications in Dynamically Asymmetric Environments
 
slot_shifting
slot_shiftingslot_shifting
slot_shifting
 
A Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy ManagementA Review of Different Types of Schedulers Used In Energy Management
A Review of Different Types of Schedulers Used In Energy Management
 
RTOS
RTOSRTOS
RTOS
 
Real time-system
Real time-systemReal time-system
Real time-system
 
Real time-system
Real time-systemReal time-system
Real time-system
 
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
Comparision of different Round Robin Scheduling Algorithm using Dynamic Time ...
 
Scheduling and Scheduler's Process and Premptive
Scheduling and Scheduler's Process and PremptiveScheduling and Scheduler's Process and Premptive
Scheduling and Scheduler's Process and Premptive
 
Commonly used Approaches to Real Time Scheduling
Commonly used Approaches to Real Time SchedulingCommonly used Approaches to Real Time Scheduling
Commonly used Approaches to Real Time Scheduling
 
Task assignment and scheduling
Task assignment and schedulingTask assignment and scheduling
Task assignment and scheduling
 
Ijariie1161
Ijariie1161Ijariie1161
Ijariie1161
 
exp 3.docx
exp 3.docxexp 3.docx
exp 3.docx
 
Real time system tsp
Real time system tspReal time system tsp
Real time system tsp
 
Temporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware schedulingTemporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware scheduling
 
Temporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware schedulingTemporal workload analysis and its application to power aware scheduling
Temporal workload analysis and its application to power aware scheduling
 
Scheduling algorithms
Scheduling algorithmsScheduling algorithms
Scheduling algorithms
 

More from Tigabu Yaya

ML_basics_lecture1_linear_regression.pdf
ML_basics_lecture1_linear_regression.pdfML_basics_lecture1_linear_regression.pdf
ML_basics_lecture1_linear_regression.pdf
Tigabu Yaya
 
03. Data Exploration in Data Science.pdf
03. Data Exploration in Data Science.pdf03. Data Exploration in Data Science.pdf
03. Data Exploration in Data Science.pdf
Tigabu Yaya
 
MOD_Architectural_Design_Chap6_Summary.pdf
MOD_Architectural_Design_Chap6_Summary.pdfMOD_Architectural_Design_Chap6_Summary.pdf
MOD_Architectural_Design_Chap6_Summary.pdf
Tigabu Yaya
 
MOD_Design_Implementation_Ch7_summary.pdf
MOD_Design_Implementation_Ch7_summary.pdfMOD_Design_Implementation_Ch7_summary.pdf
MOD_Design_Implementation_Ch7_summary.pdf
Tigabu Yaya
 
GER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdfGER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdf
Tigabu Yaya
 
lecture_GPUArchCUDA02-CUDAMem.pdf
lecture_GPUArchCUDA02-CUDAMem.pdflecture_GPUArchCUDA02-CUDAMem.pdf
lecture_GPUArchCUDA02-CUDAMem.pdf
Tigabu Yaya
 
lecture_GPUArchCUDA04-OpenMPHOMP.pdf
lecture_GPUArchCUDA04-OpenMPHOMP.pdflecture_GPUArchCUDA04-OpenMPHOMP.pdf
lecture_GPUArchCUDA04-OpenMPHOMP.pdf
Tigabu Yaya
 
6_RealTimeScheduling.pdf
6_RealTimeScheduling.pdf6_RealTimeScheduling.pdf
6_RealTimeScheduling.pdf
Tigabu Yaya
 
Regression.pptx
Regression.pptxRegression.pptx
Regression.pptx
Tigabu Yaya
 
lecture6.pdf
lecture6.pdflecture6.pdf
lecture6.pdf
Tigabu Yaya
 
lecture5.pdf
lecture5.pdflecture5.pdf
lecture5.pdf
Tigabu Yaya
 
lecture4.pdf
lecture4.pdflecture4.pdf
lecture4.pdf
Tigabu Yaya
 
lecture3.pdf
lecture3.pdflecture3.pdf
lecture3.pdf
Tigabu Yaya
 
lecture2.pdf
lecture2.pdflecture2.pdf
lecture2.pdf
Tigabu Yaya
 
200402_RoseRealTime.ppt
200402_RoseRealTime.ppt200402_RoseRealTime.ppt
200402_RoseRealTime.ppt
Tigabu Yaya
 
matrixfactorization.ppt
matrixfactorization.pptmatrixfactorization.ppt
matrixfactorization.ppt
Tigabu Yaya
 
nnfl.0620.pptx
nnfl.0620.pptxnnfl.0620.pptx
nnfl.0620.pptx
Tigabu Yaya
 
L20.ppt
L20.pptL20.ppt
L20.ppt
Tigabu Yaya
 
The Jacobi and Gauss-Seidel Iterative Methods.pdf
The Jacobi and Gauss-Seidel Iterative Methods.pdfThe Jacobi and Gauss-Seidel Iterative Methods.pdf
The Jacobi and Gauss-Seidel Iterative Methods.pdf
Tigabu Yaya
 
C_and_C++_notes.pdf
C_and_C++_notes.pdfC_and_C++_notes.pdf
C_and_C++_notes.pdf
Tigabu Yaya
 

More from Tigabu Yaya (20)

ML_basics_lecture1_linear_regression.pdf
ML_basics_lecture1_linear_regression.pdfML_basics_lecture1_linear_regression.pdf
ML_basics_lecture1_linear_regression.pdf
 
03. Data Exploration in Data Science.pdf
03. Data Exploration in Data Science.pdf03. Data Exploration in Data Science.pdf
03. Data Exploration in Data Science.pdf
 
MOD_Architectural_Design_Chap6_Summary.pdf
MOD_Architectural_Design_Chap6_Summary.pdfMOD_Architectural_Design_Chap6_Summary.pdf
MOD_Architectural_Design_Chap6_Summary.pdf
 
MOD_Design_Implementation_Ch7_summary.pdf
MOD_Design_Implementation_Ch7_summary.pdfMOD_Design_Implementation_Ch7_summary.pdf
MOD_Design_Implementation_Ch7_summary.pdf
 
GER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdfGER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdf
 
lecture_GPUArchCUDA02-CUDAMem.pdf
lecture_GPUArchCUDA02-CUDAMem.pdflecture_GPUArchCUDA02-CUDAMem.pdf
lecture_GPUArchCUDA02-CUDAMem.pdf
 
lecture_GPUArchCUDA04-OpenMPHOMP.pdf
lecture_GPUArchCUDA04-OpenMPHOMP.pdflecture_GPUArchCUDA04-OpenMPHOMP.pdf
lecture_GPUArchCUDA04-OpenMPHOMP.pdf
 
6_RealTimeScheduling.pdf
6_RealTimeScheduling.pdf6_RealTimeScheduling.pdf
6_RealTimeScheduling.pdf
 
Regression.pptx
Regression.pptxRegression.pptx
Regression.pptx
 
lecture6.pdf
lecture6.pdflecture6.pdf
lecture6.pdf
 
lecture5.pdf
lecture5.pdflecture5.pdf
lecture5.pdf
 
lecture4.pdf
lecture4.pdflecture4.pdf
lecture4.pdf
 
lecture3.pdf
lecture3.pdflecture3.pdf
lecture3.pdf
 
lecture2.pdf
lecture2.pdflecture2.pdf
lecture2.pdf
 
200402_RoseRealTime.ppt
200402_RoseRealTime.ppt200402_RoseRealTime.ppt
200402_RoseRealTime.ppt
 
matrixfactorization.ppt
matrixfactorization.pptmatrixfactorization.ppt
matrixfactorization.ppt
 
nnfl.0620.pptx
nnfl.0620.pptxnnfl.0620.pptx
nnfl.0620.pptx
 
L20.ppt
L20.pptL20.ppt
L20.ppt
 
The Jacobi and Gauss-Seidel Iterative Methods.pdf
The Jacobi and Gauss-Seidel Iterative Methods.pdfThe Jacobi and Gauss-Seidel Iterative Methods.pdf
The Jacobi and Gauss-Seidel Iterative Methods.pdf
 
C_and_C++_notes.pdf
C_and_C++_notes.pdfC_and_C++_notes.pdf
C_and_C++_notes.pdf
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 

Chap 4.ppt

  • 1. Chapter 4 – Periodic Task Scheduling In many real-time systems periodic tasks dominate the demand. Three classic periodic task scheduling algorithms: – Time Line (Cyclic) – Rate Monotonic – Earliest Deadline First What is the landscape here? What causes the challenges?
  • 2. Periodic Task Scheduling Notation Ti denotes the period of task i Ci denotes the Computation time for one instance of task i
  • 5. Processor Utilization Factor - U < 1 if set is scheduable Let be the upper bound of the processor utilization factor for a set under a given algorithm A. When the set is said to fully utilize the processor. 1
  • 6. Time Line Scheduling (Cyclic Scheduling) Time Line Scheduling (Off-line scheduling strategy)– Divide the time line into time slices for scheduling tasks, e.g. use the Greatest Common Divisor of the Task Periods as the time slice: 40 Hz 20 Hz 10 Hz Schedulability is guaranteed if: Time line scheduling is sensitive to changes in the task parameters. Can time line scheduling also accommodate aperiodic tasks ?
  • 7. Rate Monotonic Scheduling RM is optimal among all fixed Priority assignment schedules. Why? How can you how show that it must be optimal?  Which is clearly non-optimal
  • 8. Rate Monotonic – Calc of ULUB for Two Tasks Let , the number of Then the schedule produced by RM satisfies one of two conditions: for Uub Since this is the critical time zone for Uub
  • 9. 0Rate Monotonic – Calc of ULUB for Two Tasks
  • 10. Rate Monotonic – Calc of ULUB for n Tasks Sufficient conditions for schedulability of n tasks under Rate monotonic:
  • 11.
  • 12. Earliest Deadline First Proof: Assume U > 1 and the task set is schedulable. This leads to a contradiction:
  • 13. Example: Comparing RM to EDF Since U > ln 2 = 0.69, Schedulability can’t be guaranteed using Rate Monotonic
  • 14. Deadline Monotonic The Deadline Monotonic priority assignment weakens the “period equals deadline” constraint within a static scheduling scheme. Each periodic task is characterized by four parameters: which have the following relationships:
  • 15. Comparison of Fixed Priority & Dynamic Priority Scheduling Categories: Fixed Priority: Time-Line (Cyclic) Rate Monotonic (RM) Dynamic: Earliest Deadline First (EDF) Comparison: Fixed Priority: Can be done off-line, Easier to implement. Dynamic: Can exploit 100% of processor bandwidth (RM can uses < 69% in the worst case), Typically uses less context switches (?), Handles overloads more gracefully (Fixed Priority breaks down on overload). Why does Earliest Deadline First work so well? How does it handle aperiodic tasks? What is its Achilles heel?