We are here to provide you the latest and updated dumps and helping material for Certified Associate in Project Management. Visit us @ here https://www.selfexamengine.com/pmi-ca0-001.htm.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document provides a sample question and answer from the PMP exam. The question asks which process should be performed next after the project charter has been approved for a project investigating the feasibility of constructing a hydroelectric dam. The correct answer is to identify stakeholders. Identifying stakeholders is part of the initiating process group, which should be completed before planning processes. The hint also states that all initiating processes need to be completed before moving to planning.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your CAPM exam preparation and answer this Free CAPM® Exam Sample Question of the week. For more of this free CAPM exam sample question visit: https://free.pm-exam-simulator.com/free-capm-exam-simulator.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document provides a sample question and answer from the PMP exam. The question asks which process should be performed next after the project charter has been approved for a project investigating the feasibility of constructing a hydroelectric dam. The correct answer is to identify stakeholders. Identifying stakeholders is part of the initiating process group, which should be completed before planning processes. The hint also states that all initiating processes need to be completed before moving to planning.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your CAPM exam preparation and answer this Free CAPM® Exam Sample Question of the week. For more of this free CAPM exam sample question visit: https://free.pm-exam-simulator.com/free-capm-exam-simulator.
Hello everyone! Test your CAPM exam preparation and answer this Free CAPM® Exam Sample Question of the week. For more of this free CAPM exam sample question visit: https://free.pm-exam-simulator.com/free-capm-exam-simulator.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document discusses a sample PMP exam question about planning for a large, complex project that requires an extensive project management plan. The first step in initial project planning should be to review the project charter to understand the high-level information about the project, as the charter provides the foundational details before detailed planning begins. The question tests knowledge about using the project charter from initiation to guide early planning efforts.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document contains sample questions and answers from a PMP exam about project management processes. The first question describes leading a project to develop a new web application which involves reprioritizing tasks, determining iteration velocity, and holding retrospectives. The correct answer is that this describes controlling the project schedule using an agile approach. The follow up explanation notes that agile projects use short iterations to adapt plans based on feedback from retrospectives, backlog reprioritization, and iteration performance.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document provides evaluation criteria for a business plan, including steps to develop the plan and test a product or solution. Students are evaluated on including details of required resources, logical steps and timelines in their plan. Higher scores are earned by plans with numerous detailed steps describing resources and time, as well as critical evaluation and justification of any design modifications. The highest level plans also include testing the product against criteria like appeal, file size, consumer profile consideration, originality and quality.
The project manager reviewed the draft requirements management plan submitted by a team member. The project manager noticed that it included a process for preparing a project scope statement, which is actually a component of the scope management plan, not the requirements management plan. The requirements management plan describes how requirements will be analyzed, documented, and managed.
The document contains a multiple choice test with 39 questions about project management concepts. The questions cover topics such as project integration, requirements definition, quality management, scheduling tools, and earned value analysis. The test aims to be completed within 30 seconds per question by selecting the single best answer out of four options.
A quick introduction about PMP certificate, how to obtain one and what is process groups and knowledge areas, PDUs and other certificates offered by PMI.
PMI - Project Management
Hello everyone! Test your CAPM exam preparation and answer this Free CAPM® Exam Sample Question of the week. For more of this free CAPM exam sample question visit: https://free.pm-exam-simulator.com/free-capm-exam-simulator.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document discusses a sample PMP exam question about planning for a large, complex project that requires an extensive project management plan. The first step in initial project planning should be to review the project charter to understand the high-level information about the project, as the charter provides the foundational details before detailed planning begins. The question tests knowledge about using the project charter from initiation to guide early planning efforts.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document contains sample questions and answers from a PMP exam about project management processes. The first question describes leading a project to develop a new web application which involves reprioritizing tasks, determining iteration velocity, and holding retrospectives. The correct answer is that this describes controlling the project schedule using an agile approach. The follow up explanation notes that agile projects use short iterations to adapt plans based on feedback from retrospectives, backlog reprioritization, and iteration performance.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document provides evaluation criteria for a business plan, including steps to develop the plan and test a product or solution. Students are evaluated on including details of required resources, logical steps and timelines in their plan. Higher scores are earned by plans with numerous detailed steps describing resources and time, as well as critical evaluation and justification of any design modifications. The highest level plans also include testing the product against criteria like appeal, file size, consumer profile consideration, originality and quality.
The project manager reviewed the draft requirements management plan submitted by a team member. The project manager noticed that it included a process for preparing a project scope statement, which is actually a component of the scope management plan, not the requirements management plan. The requirements management plan describes how requirements will be analyzed, documented, and managed.
The document contains a multiple choice test with 39 questions about project management concepts. The questions cover topics such as project integration, requirements definition, quality management, scheduling tools, and earned value analysis. The test aims to be completed within 30 seconds per question by selecting the single best answer out of four options.
A quick introduction about PMP certificate, how to obtain one and what is process groups and knowledge areas, PDUs and other certificates offered by PMI.
PMI - Project Management
This document contains 10 multiple choice exam questions related to project management topics:
1. The questions cover types of project management offices, characteristics of projects, distinguishing between projects and programs/portfolios, responsibilities of a project manager, interpersonal skills, portfolio management, use of earned value analysis, identifying project constraints, and improving personal skills.
2. Core topics include the differences between projects, programs and portfolios, responsibilities and skills of a project manager, and techniques for tracking project performance and identifying risks and constraints.
3. The questions are multiple choice intended to test knowledge of foundational project management concepts.
Are you gearing up for the Project Management Professional (PMP) exam? Feeling a tad overwhelmed by the sheer volume of information you need to absorb? Well, fear not, because we've got you covered! In this comprehensive guide, we'll delve into 100 WATERFALL PMP Questions and Answers that will help you ace the exam with confidence. So, grab your coffee, get comfy, and let's dive right in!
The document contains questions about PRINCE2 project management concepts and processes. It tests knowledge in areas such as roles and responsibilities, principles, themes, processes, and management products. Correct answers demonstrate an understanding of how PRINCE2 defines and applies these different components of project management.
This document contains sample exam questions for the Project Management Professional (PMP) certification exam. The questions cover topics such as project organization structures, motivation theories, risk mitigation techniques, quality management processes, and earned value management formulas.
The document provides free sample questions to help study for the PMP exam. It includes questions in various topics like estimating costs, work breakdown structure, scheduling, and more. For each question, it provides the answer and a brief explanation. The goal is to help guide users in preparing for the PMP certification exam by giving them practice questions and explaining the reasoning behind the answers. It directs users to additional free sample questions and exam simulators on their website.
Hello everyone! Test your PMP exam preparation and answer this Free PMP® Exam Sample Question of the week. For more of this free PMP exam sample question visit: https://free.pm-exam-simulator.com/free-pmp-exam-simulator
The document provides instructions and questions for a sample exam on project management. It begins by noting the time allowed, use of an answer sheet, and instructions for completing the answer sheet. It then lists 60 multiple choice questions on various topics in project management.
Question 1 Doing procurement functions electronically is termed.docxIRESH3
Question 1
Doing procurement functions electronically is termed e-procurement. What type of e-procurement facilitates purchasing goods and services from a number of known or unknown suppliers?
a.
e-tendering
b.
e-marketsites
c.
e-sourcing
d.
e-reverse auctioning
Question 2
In the planning stage of a project, the project manager decides that procurement management is not required in the project. What was the reason for this decision?
a.
Bad experience in working with outside suppliers
b.
All resource requirements are already met internally
c.
Environment is not suitable for procurement
d.
Team members do not like to get outside help
Question 3
Power is the ability to influence behavior to get people to do things they would not otherwise do. With reference to French and Raven’s classification of the five types of power, which type is used by a project manager who gets a task done using the position of authority?
a.
Expert power
b.
Legitimate power
c.
Referent power
d.
Coercive power
Question 4
Your project is expected to give your organization a competitive edge. You decide to use internal staff, instead of outsourced employees, in this project. Why do you not want to use staff from outside suppliers?
a.
To locate the staff in the same
b.
To keep costs under control
c.
To reduce the risk of losing key staff
d.
To protect the strategic information
Question 5
You are considering opening a restaurant. Before you plan the project you want to do a SWOT analysis to determine if it is a good move. Which one of the following should be categorized as opportunity?
a.
You are trained as a master chef
b.
This is your first business venture
c.
A restaurant is for sale in a heavy foot traffic area
d.
Other restaurants in the area offer similar cuisine
Question 6
Which one of the following is not a tool used for controlling project schedules?
a.
Resource leveling
b.
Earned value analysis
c.
Performance reviews
d.
Cause-and-effect diagrams
Question 7
A project requires testing to be carried out with special tools. The project manager decides to outsource the testing. Why?
a.
To reduce the recurrent testing costs
b.
To access specific skills and technologies that are temporarily required
c.
To allow the project team to focus on development and correcting problems
d.
To ensure that all the tests are carried out as specified in the contract
Question 8
The Earned Value (EV) of a project at its current stage is 4,000 and its corresponding Planned Value (PV) is 3,000. If the original schedule of the project was 12 months, what is the current estimated time to complete?
a.
6 months
b.
9 months
c.
10 months
d.
16 months
Question 9
Resource leveling is a technique for resolving resource conflicts by delaying tasks. Which one of the following is a direct benefit of resource leveling?
a.
Faster completion
b.
Lower cost
c.
Higher quality
d.
Improved morale
Question 10
A responsibility assignment matrix maps the work ...
This document provides sample questions to help prepare for the PMP certification exam. It includes sample questions in various topics like project scope, communication, cost management, and presenting project progress. For each question, it provides an explanation of the correct answer. The goal is to help guide study for the PMP exam by providing free practice questions and explanations.
1
Marks: 1
Many people consider project integration management the key to overall pr= oject success.
Answer:
Question 2
Marks: 1
The ____ section of the project plan should describe the major project functions and activities and identify those individuals who are responsible for them.
Choose one answer.
a. organizational charts
b. other organizational or process-related informatio= n
c. project responsibilities
d. management objectives
Question 3
Marks: 1
____ should result in improvements in project performance.
Choose one answer.
a. Corrective actions
b. Corrective reports
c. Preventive actions
d. Proactive methods
Question 4
Marks: 1
The majority of time on a project is usually spent on ____, as is most of= the project’s budget.
Choose one answer.
a. execution
b. planning
c. closing
d. monitoring and controlling </= label>
Question 5
Marks: 1
A ____ is a document that includes details related to the identified proj= ect stakeholders.
Choose one answer.
a. stakeholder register
b. stakeholder list
c. stakeholder directory
d. stakeholder contact list
Question 6
Marks: 1
Key outcomes of the executing process group are formal acceptance of the = work and creation of closing documents.
Answer:
Question 7
Marks: 1
____ provide information on how project execution is going.
Choose one answer.
a. Performance reports
b. Change requests
c. Deliverables
d. Contracts
Question 8
Marks: 1
Decisions and actions taken in one knowledge area at a certain time rarel= y affect other knowledge areas.
Answer:
Question 9
Marks: 1
____ is a planning process falling under the Project Integration Manageme= nt knowledge area.
Choose one answer.
a. Schedule development
b. Develop project management plan =
c. Create WBS
d. Quality planning
Question 10
Marks: 1
Project integration management must occur just within the context of a pa= rticular project.
Answer:
Question 11
Marks: 1
During ____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition.
Choose one answer.
a. initiating
b. planning
c. opening
d. controlling
Question 12
Marks: 1
Author ____, who developed the concept of the strategic value of competitive advantage, has written several books and articles on strategic planning and competition.
Choose one answer.
a. James Bacon
b. Michael Porter
c. Robert Cooper
d. Carol Matlack
Question 13
Marks: 1
Opportunities and directives are essentially the same thing.
Answer:
Question 14
Marks: 1
____ tools track the execution of business process flows and expose how the state of supporting IT systems and resources is impacting end-to-end business process performance in real time.
Choose one answer.
a. BSM
b. CCB
c. CCA
d. BSC
Question 15
Marks: 1
____ analysis is a method of calculating the expected net monetary gain or loss from a project by discounting all expected future cash inflows .
This document summarizes a workshop on ITIL V3 Foundation that included quizzes on various ITIL concepts. The quizzes covered topics like the primary elements that create customer value, characteristics of processes, responsibilities of a process owner, ITIL complementary guidance publications, stages of the service lifecycle focused on goals, testing, learning and improvement, and defining how services are delivered. Additional quizzes addressed benefits of public frameworks, aspects considered during service design, service assets, and roles important for successful service management processes.
This document provides 160 sample questions for the Project Management Professional (PMP) exam. The questions cover topics such as project management processes, tools and techniques, leadership and management, and global considerations. Sample questions are multiple choice and include the question, possible answers, and the correct answer. The questions range from basic to more advanced.
This document provides 200 sample questions for the Project Management Professional (PMP) certification exam based on the 5th edition of the PMBOK Guide. The questions cover topics like project constraints, risk management, quality management, procurement, and the five process groups. Each question includes an answer and a brief hint explaining the rationale. The questions are designed to help PMP exam candidates understand the type of questions that may be asked and prepare for the multiple choice format of the real exam.
Question 17 The internal and external environmental factors that su.pdfezzi552
Making a Case for Microsoft\'s SharePoint
Increasingly more and more organizations are attempting to make information more accessible
and shareable among employees. While earlier versions introduced by Microsoft included SP
200 I, SP 2003, and SP 2007, that latest version of SharePoint offers a number of new features
and functionality over previous editions. Although Microsoft Office sales have been declining,
SharePoint® sales have been increasing. More specifically, Microsoft reported that SharePoint®
sales have seen 20 percent growth and revenues topping $1.3 billion. In addition, Microsoft
claims it has shipped over 85 million seat licenses to approximately 17,000 customers since SP
2001. As Alan Pelz-Sharpe points out, \"If there was ever any lingering doubt that SharePoint®
was having an impact on the market, these numbers put that argument to rest.\"
The popularity of SharePoint® is that it makes it easier for people to work together. The latest
version of SharePoint@, for example, allows individuals to set up their own web sites to share
information, manage documents, and publish reports, According to Microsoft\'s web site,
SharePoint® provides the following capabilities:
• Sites: allows for a single infrastructure to support all of an organization\'s web sites. People can
share documents, manage projects, and publish information.
• Communities: provides enterprise collaboration tools found on the most popular social
networking sites. Users can locate key contacts and information, join groups, and create wikis,
• Composites-supports: the use of tools and components that allow individuals to build business
applications without having to write code.
• Content-supports: content management with features like document types, retention policies,
and automatic content sorting that works seamlessly with Microsoft Office.
• Search: allows users to search for information and documents based on a combination of
relevance, refinement, and social cues.
•Insights: gives people access to information stored in the organization\'s databases, reports, and
business applications.
Large companies like Sony Electronics (a division of Sony Corporation) use SharePoint® to take
advantage of its improved search, social networking, and document sharing features. The
improved search capabilities of SharePoint® provide results by document type, author, or within
a specific time period that can narrow thousands of documents down to a relevant dozen. In
addition, the new search features provide results for search terms such as a company expert\'s
profile.
With the hiring of younger workers and the popularity of social media sites, Sony wanted to
encourage the use of My Sites to allow for a more progressive work style. This reduces many
problems when employees have to work in different parts of the world by increasing social
connections through online chats, wikis, and posts to discussion boards. The use of SharePoint®
has allowed Sony to communicate more effectivel.
1.A cumulative effort curve for a project generally has an S-shap.docxjackiewalcutt
1. A cumulative effort curve for a project generally has an S-shape because of:
Answer :
a. The large financial costs associated with ending a project
b. Various hurdles that prevent progress when beginning a project
c. Team member burnout
d. Higher resource utilization during the middle of a project
2. A manager getting further into a project and obtaining a better understanding of what needs to be done to accomplish a project is an example of:
Answer
a. Hidden interaction costs
b. Things going wrong on a project
c. Normal conditions not applying
d. Changes in project scope
e. None of these are correct
3. A project team has been assigned to research and develop a new product to compete with its competitor’s latest product launch. The product is needed quickly because the company is losing market share. The team consists of 6 members, located throughout the country. Each one has a role in sales, marketing, manufacturing, or engineering, and will be performing this project in addition to his or her full-time position. Which of the following project team considerations is most likely to pose a threat to achieving success?
Answer
a. Not enough time available for the team members.
b. Not the correct team size.
c. Poor team member representation that does not include a diverse set of stakeholders.
d. Inadequate knowledge and technical skills of the team members.
4. All of the following are usually included in a work package except
Answer
a. What will be done?
b. The time needed to complete the work.
c. A single person who is responsible for its completion.
d. All the costs for the work package.
e. All of these are included in a work package.
5. An advantage of factor rating for project selection is that it:
Answer
a. Involves no arithmetic calculations
b. Allows for comparisons on several weighted criteria
c. Offers objective measures that eliminate human bias
d. Is focused solely on financial outcomes
6. An organization that allows functions to exist on the vertical dimension of the organizational chart, with projects running on the horizontal dimension is described as a:
Answer
a. Matrix organization
b. Projectized organization structure
c. Functional organization
d. Networked organization
7. After a team of software development engineers completed the requirements phase for a major new system, members learned the client no longer needed several of the features initially requested. Which of the following project management models would help avoid this kind of communication challenge?
Answer
a. Silo approach
b. Economic approach
c. Waterfall approach
d. Concurrent approach
8. Companies like Boeing, Kodak, and IBM are using which of the following for improving the estimating process?
Answer
a. Adjusting estimates based on individual forecasting abilities
b. Benchmarking using the experience of other companies
c. Using time and motion studies
d. Creating historical databases o ...
This document contains 20 multiple choice questions related to project scope management. The questions cover topics such as inputs and outputs of scope management processes, tools and techniques used in scope planning and control, and differences between scope documentation in waterfall and agile project approaches. Correct answers are provided for each question.
RH202 CertMagic Exam contains all the questions and answers to pass RH202 IT Exam on first try. The Questions & answers are verified and selected by professionals in the field and ensure accuracy and efficiency throughout the whole Product
1Z0-550 CertMagic Exam contains all the questions and answers to pass 1Z0-550 IT Exam on first try. The Questions & answers are verified and selected by professionals in the field and ensure accuracy and efficiency throughout the whole Product . .
9A0-386 CertMagic Exam contains all the questions and answers to pass 9A0-386 IT Exam on first try. The Questions & answers are verified and selected by professionals in the field and ensure accuracy and efficiency throughout the whole Product . .
PMI-ACP CertMagic Exam contains all the questions and answers to pass PMI-ACP IT Exam on first try. The Questions & answers are verified and selected by professionals in the field and ensure accuracy and efficiency throughout the whole Product . .
Are you searching for easy and 100% original dumps and study material for Oracle Database 11g: Administration II? Visit@https://www.certmagic.com/1Z0-053-certification-practice-exams.html
#IT #Trainingmaterial #learningmaterial #oracle #oracledatabase #database11g #administration11 #oracleadministration #exam #dumps #discount
9A0-384 CertMagic Exam contains all the questions and answers to pass 9A0-384 IT Exam on first try. The Questions & answers are verified and selected by professionals in the field and ensure accuracy and efficiency throughout the whole Product . .
Are you searching for easy dumps for CompTIA Mobility+? Use the coupon Code “whatagood1” For 50% Discount. Visit us @ here https://www.selfexamengine.com/comptia-mb0-001.htm
If you are looking for easy and accurate dumps for Private Cloud Monitoring and Operations with System Center 2012. Use the coupon Code “whatagood1” For 50% Discount. Visit us @ here https://www.selfexamengine.com/microsoft-70-246.htm.
Are you fed up of fake Q/A and dumps for the preparation of Architecting HP Flex Network Solutions. Visit us @ here https://www.selfexamengine.com/hp-hp0-y50.htm.
How to Add Chatter in the odoo 17 ERP ModuleCeline George
In Odoo, the chatter is like a chat tool that helps you work together on records. You can leave notes and track things, making it easier to talk with your team and partners. Inside chatter, all communication history, activity, and changes will be displayed.
हिंदी वर्णमाला पीपीटी, hindi alphabet PPT presentation, hindi varnamala PPT, Hindi Varnamala pdf, हिंदी स्वर, हिंदी व्यंजन, sikhiye hindi varnmala, dr. mulla adam ali, hindi language and literature, hindi alphabet with drawing, hindi alphabet pdf, hindi varnamala for childrens, hindi language, hindi varnamala practice for kids, https://www.drmullaadamali.com
Assessment and Planning in Educational technology.pptxKavitha Krishnan
In an education system, it is understood that assessment is only for the students, but on the other hand, the Assessment of teachers is also an important aspect of the education system that ensures teachers are providing high-quality instruction to students. The assessment process can be used to provide feedback and support for professional development, to inform decisions about teacher retention or promotion, or to evaluate teacher effectiveness for accountability purposes.
How to Build a Module in Odoo 17 Using the Scaffold MethodCeline George
Odoo provides an option for creating a module by using a single line command. By using this command the user can make a whole structure of a module. It is very easy for a beginner to make a module. There is no need to make each file manually. This slide will show how to create a module using the scaffold method.
Main Java[All of the Base Concepts}.docxadhitya5119
This is part 1 of my Java Learning Journey. This Contains Custom methods, classes, constructors, packages, multithreading , try- catch block, finally block and more.
Strategies for Effective Upskilling is a presentation by Chinwendu Peace in a Your Skill Boost Masterclass organisation by the Excellence Foundation for South Sudan on 08th and 09th June 2024 from 1 PM to 3 PM on each day.
Thinking of getting a dog? Be aware that breeds like Pit Bulls, Rottweilers, and German Shepherds can be loyal and dangerous. Proper training and socialization are crucial to preventing aggressive behaviors. Ensure safety by understanding their needs and always supervising interactions. Stay safe, and enjoy your furry friends!
Executive Directors Chat Leveraging AI for Diversity, Equity, and InclusionTechSoup
Let’s explore the intersection of technology and equity in the final session of our DEI series. Discover how AI tools, like ChatGPT, can be used to support and enhance your nonprofit's DEI initiatives. Participants will gain insights into practical AI applications and get tips for leveraging technology to advance their DEI goals.
This presentation was provided by Steph Pollock of The American Psychological Association’s Journals Program, and Damita Snow, of The American Society of Civil Engineers (ASCE), for the initial session of NISO's 2024 Training Series "DEIA in the Scholarly Landscape." Session One: 'Setting Expectations: a DEIA Primer,' was held June 6, 2024.
How to Manage Your Lost Opportunities in Odoo 17 CRMCeline George
Odoo 17 CRM allows us to track why we lose sales opportunities with "Lost Reasons." This helps analyze our sales process and identify areas for improvement. Here's how to configure lost reasons in Odoo 17 CRM
বাংলাদেশের অর্থনৈতিক সমীক্ষা ২০২৪ [Bangladesh Economic Review 2024 Bangla.pdf] কম্পিউটার , ট্যাব ও স্মার্ট ফোন ভার্সন সহ সম্পূর্ণ বাংলা ই-বুক বা pdf বই " সুচিপত্র ...বুকমার্ক মেনু 🔖 ও হাইপার লিংক মেনু 📝👆 যুক্ত ..
আমাদের সবার জন্য খুব খুব গুরুত্বপূর্ণ একটি বই ..বিসিএস, ব্যাংক, ইউনিভার্সিটি ভর্তি ও যে কোন প্রতিযোগিতা মূলক পরীক্ষার জন্য এর খুব ইম্পরট্যান্ট একটি বিষয় ...তাছাড়া বাংলাদেশের সাম্প্রতিক যে কোন ডাটা বা তথ্য এই বইতে পাবেন ...
তাই একজন নাগরিক হিসাবে এই তথ্য গুলো আপনার জানা প্রয়োজন ...।
বিসিএস ও ব্যাংক এর লিখিত পরীক্ষা ...+এছাড়া মাধ্যমিক ও উচ্চমাধ্যমিকের স্টুডেন্টদের জন্য অনেক কাজে আসবে ...
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
Certified Associate in Project Management
1. Exam Name: Certified Associate in Project Management
Exam Type: PMI Exam Code: CA0-001
Certification: CAPM Total Questions: 518
Page 1 of 119
Question: 1
On what is project baseline development established?
A. Approved product requirements
B. Estimated project cost and schedule
C. Actual project cost and schedule
D. Revised project cost and schedule
Answer: B
Question: 2
Identifying major deliverables, deciding if adequate cost estimates can be developed, and
identifying tangible components of each deliverable are all part of which of the following?
A. Work breakdown structure
B. Organizational breakdown structure
C. Resource breakdown structure
D. Bill of materials
Answer: A
Question: 3
What is the definition of project plan execution?
A. Integrating all planned activities.
B. Performing the activities included in the plan.
C. Developing and maintaining the plan.
D. Execution of deliverables.
Answer: B
Question: 4
What is a tool to improve team performance?
A. Staffing plan
B. External feedback
C. Performance reports
D. Co-Location
Answer: D
Question: 5
Which type of analysis is used to develop the communications management plan?
A. Product
B. Cost benefit
C. Stakeholder
D. Research
Answer: C