Time allowed 1 hour.
Use the answer sheet provided.
Completing the answer sheet
Use HB pencil to complete the answer sheet.
Provide only one answer per question.
Each entry is to be made with a HORIZONTAL line in the spaces indicated.
Errors must be removed using a good quality eraser.
Enter the Test Code and your Candidate Number (which can be found on your examination card) on to your
answer sheet, following the example set out below.
Answer all 60 multiple choice questions
Do not open this paper until instructed by the invigilator.
This question paper must not be removed from the examination room.
Candidate Number
Exam Date
Exam Location
Test Code
Reference
IPMA Level D
Examination Sample Paper
Project Management
DM Sample Paper v1.0
S
A
M
P
L
E
2
IPMA Level D Examination Sample Paper
Question 1
A project manager can take responsibility for their actions by:
A	 amending contractual terms with a supplier.
B	 consulting with senior internal stakeholders.
C	 realigning their job description to actual task.
D	 taking ownership of both positive and negative results.
Question 2
Which of the following is not a benefit of producing a high-level project overview?
A	 Uniform roles and responsibilities
B	 Limited planning
C	 Consistent terminology
D	 Standard documentation
Question 3
Which of the following is the best way in which a project manager could develop and get
agreement on the project plan?
A	 Use effective communication
B	 Use transition management
C	 Adopt a proactive management style
D	 Adopt a reactive management style
Question 4
When assessing the use of critical success factors, which one of the following would demonstrate
they are being used correctly?
A	 Critical success factors remain fixed throughout the project
B	 Critical success dactors are measuring if the project is leading and/or lagging in performance
C	 Critical success factors are derived from key performance indicators to measure if the project is achieving
strategic goals
D	 Critical success factors are directly aligned to both organisational and project objectives
Question 5
Which of the following project manager behaviours is most likely to facilitate open communication?
A	 Engaging in two-way communication with stakeholders
B	 Creating a project communication plan
C	 Conducting project team briefings
D	 Talking with members of a project team
S
A
M
P
L
E
3
IPMA Level D Examination Sample Paper
Question 6
Configuration management contributes to the scope configuration by:
A	 ensuring that project costs are controlled.
B	 minimising deficiencies, errors and unintended scope creep.
C	 preventing changes to the project scope.
D	 controlling changes to the project management plan.
Question 7
Which of the following must a project manager do when prioritising and deciding a project’s
requirements and acceptance criteria?
A	 Document and agree the project goal hierarchy
B	 Document and agree the sponsor’s needs and requirements
C	 Document and agree stakeholder needs and requirements
D	 Document and agree lessons learned
Question 8
Which of the following best explains why a project manager should address personal and
professional shortcomings?
A	 Addressing personal and professional shortcomings will always result in the completion of tasks
B	 Addressing personal and professional shortcomings should remove barriers to professional success
C	 Addressing personal and professional shortcomings will always result in professional success
D	 Addressing personal and professional shortcomings should demonstrate ownership of problems
Question 9
What might the project manager do to best get early buy in to the project?
A	 Organise and facilitate a project start-up workshop
B	 Tell all team members their roles
C	 Produce a risk register
D	 Start as soon as possible to save time
Question 10
Which of the following statements concerning how a responsible individual evaluates and selects
potential suppliers is true?
A	 They ensure the first response scores the highest
B	 They ensure the cheapest proposal scores the highest
C	 They define and apply a set of logical steps in the selection process
D	 They develop selection criteria on receipt of tender responses
S
A
M
P
L
E
4
IPMA Level D Examination Sample Paper
Question 11
Alignment of a project to an organisation’s mission and vision and compliance with organisational
constraints and objectives can be effectively achieved by:
A	 establishing a detailed project budget.
B	 using diagnostic management control systems.
C	 developing a balanced scorecard.
D	 writing a project communication strategy.
Question 12
Which of the following questions is the most appropriate one which a project manager should ask
when evaluating decisions and actions?
A	 Will the decision or action improve communication?
B	 Will the decision or action inform the project’s strategy?
C	 Will the decision or action explain how to meet targets?
D	 Will the decision or action threaten the project’s objective?
Question 13
If the cost of implementing the response is not an issue, what is the best strategy to take the
opportunities associated with a positive risk?
A	 To mitigate the opportunity
B	 To accept the opportunity
C	 To exploit the opportunity
D	 To transfer the opportunity
Question 14
When determining key performance indicators, which statement best describes how they can be
used?
A	 Key performance indicators can only be used for project delivery timeliness
B	 Key performance indicators can be leading or lagging measures, either preceding or following an event
C	 Key performance indicators must remain fixed for the duration of the project
D	 Key performance indicators can be used to define critical success factors
Question 15
Which of the following is not a feature of a negotiation strategy?
A	 Best Alternative to a Negotiated Agreement
B	 Budgetary conditions and politics
C	 What-if scenarios and power-balance
D	 Negotiating team, their roles and responsibilities
S
A
M
P
L
E
5
IPMA Level D Examination Sample Paper
Question 16
Which of the following would be the most likely way a project manager would review the project’s
success criteria?
A	 By scheduling meetings monthly to review progress to date
B	 By scheduling meetings at regular intervals for sponsor and stakeholders
C	 By reviewing workload weekly with the project team
D	 By regularly checking the project’s progress against the formal and informal success criteria
Question 17
Which of the following statements is false? When identifying the need to procure a product or
service, the project manager:
A	 prepares, produces or collects necessary information as input.
B	 defines tender documents and selection criteria based on needs.
C	 defines which supplier will be awarded the work.
D	 defines reasons (based on needs) for procurement or partnership.
Question 18
What should be considered when planning a project activity where the general public could be put
at risk?
A	 Health and safety regulations
B	 Planning regulations
C	 Environmental legislation
D	 Employment legislation
Question 19
What would be the best approach for a project manager when identifying areas for personal
learning and development?
A	 Ignore feedback from the team but seek discussion with project sponsor
B	 Measure own performance, use feedback and then review
C	 Identify training courses and then discuss with line manager
D	 Wait to hear from line manager if improvement is necessary
Question 20
Reporting on progress by exception would usually be used when:
A	 the project team has no leader.
B	 the project team has external contractors.
C	 the project team is experienced.
D	 the project team is newly formed.
S
A
M
P
L
E
6
IPMA Level D Examination Sample Paper
Question 21
As a project manager you have identified a high impact commercial risk suitable for mitigation
through transfer. Which of the following is the most appropriate action to address this risk?
A	 Handover ownership of the risk to the health and safety manager
B	 Escalate the risk ownership to the sponsor and steering committee
C	 Arrange for the risk to be owned by an insurance company
D	 Arrange for the risk ownership be taken over by the risk manager
Question 22
Identifying the social and environmental consequences of a project will help to ensure a project:
A	 complies with sustainability principles and objectives.
B	 aligns to appropriate codes of conduct.
C	 establishes relevant professional standards.
D	 develops required health and safety protocols.
Question 23
Which of the following is most likely to facilitate open, honest and frank communication?
A	 A reward and retribution system
B	 Permitting disagreement and conflict
C	 A mutually respectful atmosphere
D	 A strong approach to leadership
Question 24
When prioritising and deciding a project’s requirements and acceptance criteria, a project manager
should document and agree:
A	 lessons learned.
B	 stakeholder needs and requirements.
C	 the project plan and financial budget.
D	 the project goal hierarchy.
Question 25
Which one of the following statements best describes how agreement can be reached from a
negotiation process?
A	 It always makes use of best practice tools and techniques
B	 It can be reached over an extended time-frame and may proceed in phases
C	 It can be reached by focussing on short term gains for both parties
D	 It always makes use of the Best Alternative to a Negotiated Agreement (BATNA)
S
A
M
P
L
E
7
IPMA Level D Examination Sample Paper
Question 26
Preparing and implementing a contingency plan will most likely help to:
A	 assure stakeholder risk is controlled.
B	 improve schedule and cost accuracy.
C	 reduce cost of risk mitigation.
D	 address risks and opportunities.
Question 27
Which of the following would help a project manager to control performance against the project
plan and take remedial action where necessary?
A	 An integrated work breakdown structure
B	 An integrated lessons learned log
C	 An integrated project reporting system
D	 An integrated communication plan
Question 28
When defining and developing the project goal hierarchy, a project manager should:
A	 create an appropriate work breakdown structure and work packages.
B	 establish the relationship between the organisational and project goals.
C	 establish the needs of key internal stakeholders only.
D	 create and communicate the project charter with all stakeholders.
Question 29
When seeking to overcome resistance to change from those most affected by the change initiative,
a project manager should:
A	 collaborate with the sponsor.
B	 design manageable work packages.
D	 communicate with all stakeholders.
C	 design a coherent intervention plan.
Question 30
Which of the following is most likely to help a project manager define work packages?
A	 The purpose of the goal hierarchy
B	 The resources required and their duration
C	 The aims and objectives of the project
D	 The environment in which the project is located
S
A
M
P
L
E
8
IPMA Level D Examination Sample Paper
Question 31
Which of the following should be done by the project manager when selecting a supplier for the
project?
A	 Make a choice of supplier from those previously used when allocating work as they will know the requirements
B	 Always use the cheapest quote as projects are cost driven, as long as it satisfies the contract conditions
C	 Allocate on recommendation from others within the company as long as contract conditions are generally
satisfied
D	 Go out to tender and evaluate the bids checking the detail and allocating to the supplier that satisfies all of
the requirement
Question 32
A project manager seeking to identify how to influence organisational strategy must:
A	 use their network to influence the board about their opinions.
B	 show stakeholders that failing projects reflect poorly defined strategy.
C	 reflect on pre-set strategic goals and the tools and methods needed to question these goals.
D	 apply theoretical strategy models to the organisation.
Question 33
Which of the following statements is false when preparing for a negotiation?
A	 The best alternative to a negotiated solution should be identified
B	 Trade-offs should be developed during preparation and shouldn’t change
C	 Trade-offs should be developed during preparation and modified as needed
D	 Alternative solutions should be developed before the process begins
Question 34
Which of the following would best help the project manager to select an overall project
management approach?
A	 Assessment of the constraints and complexity of the project
B	 Understand the strengths of the project team and work accordingly
C	 Identify the approach used on a previous project and copy it
D	 Discuss what would best suit the project suppliers
Question 35
What of the following would be the best way for a project manager to show responsibility for own
personal learning and development?
A	 By seeking new roles within the organisation
B	 By never accepting criticism and seeking others to blame
C	 By discussion with line manager to identify training courses
D	 By accepting feedback and focussing on improving own work and capacities
S
A
M
P
L
E
9
IPMA Level D Examination Sample Paper
Question 36
Assessing and prioritising project requirements will help a project manager to:
A	 focus on continuous improvement.
B	 promote the project to all stakeholders.
C	 optimise project outcomes and success.
D	 demonstrate an ability to get things done.
Question 37
Tools and techniques such as scenario planning, probabilistic impacts, Monte Carlo analysis
and decision trees are most closely associated with which of the following disciplines in project
management?
A	 Risk assessment
B	 Planning and scheduling
C	 Budgets and cost control
D	 Tracking and controls
Question 38
Establishment of the project deliverables is best achieved by the use of:
A	 scope definition techniques.
B	 using expert judgement.
C	 the available resources.
D	 stakeholder wish lists.
Question 39
Which of the following would help a project manager to choose an appropriate communication
style?
A	 Taking a unilateral decision
B	 Use an organisational template
C	 Adopting a previous project style
D	 Establishing the target audience
Question 40
When initiating and managing the transition to a new phase of the project, a project manager would
usually:
A	 facilitate a start-up workshop.
B	 reconfirm the project management plans.
C	 change the communication plan.
D	 control project performance.
S
A
M
P
L
E
10
IPMA Level D Examination Sample Paper
Question 41
Which of the following is the best way a project manager could maintain effective communication
with virtual teams?
A	 Hold regular face to face meetings
B	 Provide reliable communication equipment
C	 Hold regular tele-conferences
D	 Establish clear lines of communication
Question 42
When managing deviation from contracts, the first thing a project manager must do is to:
A	 take action within their organisation.
B	 issue a penalty as soon as possible.
C	 request a renegotiation as soon as possible.
D	 take legal action as soon as possible.
Question 43
How would a project manager most likely evaluate and monitor risk responses?
A	 Request a report of progress from the project team
B	 Perform a review of the project risk with the risk owner periodically
C	 Evaluate the risk register at project gate reviews
D	 Check with senior management to ensure buy in
Question 44
Which of the following would best explain how project managers could establish their contribution
to the success of a project?
A	 Produce a personal reflection which includes a general overview of the contribution
B	 Produce a personal reflection which focuses on the work allocated by the sponsor
C	 Produce a personal reflection on the areas where the project manager has influenced decisions
D	 Produce a personal reflection on input in all areas and identify how value has been added
Question 45
When identifying and assessing project stakeholder needs and requirements, a project manager
must understand that needs and expectations are:
A	 not the same as stated requirements.
B	 the same as stated requirements.
C	 internal considerations.
D	 external considerations.
S
A
M
P
L
E
11
IPMA Level D Examination Sample Paper
Question 46
Any changes to the project scope should be evaluated against which one of the following?
A	 The project manager’s availability
B	 The project’s objectives and agreed outcomes
C	 The views of the project team
D	 The disruption to work already completed
Question 47
Which of the following would be the best way for a project manager to identify and reflect on
personal motivations to set goals and maintain focus?
A	 Identify professional goals during annual appraisal
B	 Identify long term and short-term goals with management influence
C	 Set personal and professional goals and priorities
D	 Discuss personal and professional goals with mentor
Question 48
When establishing and maintaining scope configuration, it is important for a project manager to
know that scope configuration management is a:
A	 continuous process.
B	 time bound process.
C	 feature of a work breakdown structure.
D	 work package boundary.
Question 49
A project manager seeking to ensure the ongoing validity of the business justification for their
project must:
A	 identify how the scope will shape the success criteria.
B	 identify the project objectives to shape the benefits.
C	 await the development of the business case by the project sponsors.
D	 reflect on and define the business justification in a formal document.
Question 50
Which of the following best describes why it is important for a project manager to complete tasks
thoroughly?
A	 Project managers have responsibility
B	 Demonstrates correct actions to be taken
C	 Meets quality requirement
D	 Gives others confidence in the project manager’s ability
S
A
M
P
L
E
12
IPMA Level D Examination Sample Paper
Question 51
In preparing for a negotiation, the best way an individual can understand the interests of all
involved parties, is to:
A	 ensure they get to know the relevant parties before the negotiation begins and conduct analysis later.
B	 collect, document and analyse relevant hard and soft information about the parties.
C	 gather facts on individual’s interests as the negotiation progresses.
D	 use formal means to collect and analyse information they have found during the negotiation.
Question 52
Which of the following best explains what a project manager should do to understand the impact of
change on an organisation to ensure the project’s continuing success?
A	 Establish new key performance indicators based on the change
B	 Adopt a flexible approach to change
C	 Review the requirements of the change
D	 Assess the organisation’s ability to change
Question 53
Which of the following is a project manager most likely to do when seeking to overcome continued
resistance to change once the change initiative has been implemented?
A	 Collaborate with the sponsor
B	 Communicate with all stakeholders
C	 Redesign the work packages
D	 Use reinforcement techniques
Question 54
Which of the following best explains what a project manager should do to identify and ensure a
project complies with codes of conduct and professional regulation?
A	 Identify relevant codes of conduct and professional regulation and ensure they are complied with
B	 Identify all codes of conduct and professional regulation and ensure they are complied with
C	 Identify breaches to relevant codes of conduct and professional regulation and ensure they are corrected
D	 Identify breaches to all codes of conduct and professional regulation and ensure they are corrected
Question 55
Which of the following best explains what a project manager should do to help ensure a project
complies with health, safety, security and environmental (HSSE) regulations?
A	 Know the professional standards which apply to all projects
B	 Know all of the HSSE regulations and policies
C	 Know the HSSE risks associated with a project
D	 Know which of the HSSE regulations are relevant to the project
S
A
M
P
L
E
13
IPMA Level D Examination Sample Paper
Question 56
Which of the following is not a likely benefit, to a project manager, of having a change or
transformation strategy?
A	 Organisational capacity can be increased
B	 Selected interventions can be planned
C	 Resistance to change can be addressed at an early stage
D	 Reinforcement techniques can be planned
Question 57
Which of the following best explains how a project manager could demonstrate an ability to act,
take decisions and communicate in a consistent way?
A	 Resisting a flexible approach to the situation
B	 Completing tasks thoroughly despite the situation
C	 Making sure that words, behaviours and actions match
D	 Taking responsibility for own actions in a situation
Question 58
Which of the following best explains when a project manager should evaluate the current project’s
approach and lessons learned?
A	 Periodically and at the end of the project
B	 Periodically during the project
C	 At the end of the project
D	 When instructed by the sponsor
Question 59
Which of the following best explains what a project manager should do to use professional
standards for a new project?
A	 Adopt top professional standards and develop improvements where necessary
B	 Implement a set of wide ranging standards for the project team
C	 Implement benchmarks to measure compliance with standards
D	 Implement the standards used in previous projects
Question 60
What would best help a project manager balance the needs and means of the project?
A	 Awareness of planned quality audits
B	 Understanding the sponsor’s bonus targets
C	 Availability of a preferred supplier
D	 Clarity on the priorities of the project
S
A
M
P
L
E
14
IPMA Level D Examination Sample Paper
Answer Key
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
D B C D A B C B A C B D C B A
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
D C A B C C A C B B B C B D B
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
D C B A D C A A D B C A B D A
46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
B C A D D B D D A D A C A B C
S
A
M
P
L
E
15
IPMA Level D Examination Sample Paper
Notes
S
A
M
P
L
E
Ibis House, Regent Park
Summerleys Road
Princes Risborough
Buckinghamshire HP27 9LE
Copyright © 2018 APM
Tel. (UK)	 0845 458 1944
Tel. (Int.)	+44 1844 271 640
Email	 info@apm.org.uk
Web	 apm.org.uk
Association for Project Management
S
A
M
P
L
E

More Related Content

What's hot

Mechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioMechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioNIKHIL KULKARNI
 
Iso 9001 version 2015 en arabe
Iso 9001 version 2015 en arabeIso 9001 version 2015 en arabe
Iso 9001 version 2015 en arabe
Atti Aziz
 
Guide six sigma
Guide six sigmaGuide six sigma
Guide six sigma
Rachid Berkani
 
Fiche contenu note de cadrage
Fiche contenu note de cadrageFiche contenu note de cadrage
Fiche contenu note de cadrage
Chef De Projet Détendu
 
Démarrer un projet BIM avec Revit
Démarrer un projet BIM avec RevitDémarrer un projet BIM avec Revit
Démarrer un projet BIM avec Revit
Geomap GIS America
 
SST MEDECINE DE TRAVAIL HAMMANI.pptx
SST MEDECINE DE TRAVAIL   HAMMANI.pptxSST MEDECINE DE TRAVAIL   HAMMANI.pptx
SST MEDECINE DE TRAVAIL HAMMANI.pptx
hammani bachir
 
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMSRapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
Zouhair Boufakri
 
Exposé amdec
Exposé amdecExposé amdec
Exposé amdec
Arwa Mohamed Baccouche
 
Mise en oeuvre d'une politique qhse dans une tpe pme
Mise en oeuvre d'une politique qhse dans une tpe pmeMise en oeuvre d'une politique qhse dans une tpe pme
Mise en oeuvre d'une politique qhse dans une tpe pme
Géraud TSEROKO-OSSETE
 
Formulaire de soumission 2019 - 2020
Formulaire de soumission 2019 - 2020Formulaire de soumission 2019 - 2020
Formulaire de soumission 2019 - 2020
LandCam
 
Presentation bureau-etudes-tap
Presentation bureau-etudes-tapPresentation bureau-etudes-tap
Presentation bureau-etudes-tap
tap-france
 
Maîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
Maîtrise de la qualité opérationnelle avec le Lean et le Six SigmaMaîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
Maîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
XL Groupe
 
La_Maintenance_Industrielle.ppt
La_Maintenance_Industrielle.pptLa_Maintenance_Industrielle.ppt
La_Maintenance_Industrielle.ppt
minoungouconstant
 
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUXPRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
laurentlamothe
 
Méthode pert
Méthode pertMéthode pert
Méthode pert
Kevin Ratsimbazafy
 
Le soudage
Le soudageLe soudage
Le soudagekayta11
 
La gpao
La gpaoLa gpao
La gpao
naima almahdi
 
Démarche qualité slideshare
Démarche qualité slideshareDémarche qualité slideshare
Démarche qualité slideshare
Béatrice BRINET
 

What's hot (20)

Mechanical Design Engineering Portfolio
Mechanical Design Engineering PortfolioMechanical Design Engineering Portfolio
Mechanical Design Engineering Portfolio
 
Iso 9001 version 2015 en arabe
Iso 9001 version 2015 en arabeIso 9001 version 2015 en arabe
Iso 9001 version 2015 en arabe
 
Guide six sigma
Guide six sigmaGuide six sigma
Guide six sigma
 
Fiche contenu note de cadrage
Fiche contenu note de cadrageFiche contenu note de cadrage
Fiche contenu note de cadrage
 
Démarrer un projet BIM avec Revit
Démarrer un projet BIM avec RevitDémarrer un projet BIM avec Revit
Démarrer un projet BIM avec Revit
 
SST MEDECINE DE TRAVAIL HAMMANI.pptx
SST MEDECINE DE TRAVAIL   HAMMANI.pptxSST MEDECINE DE TRAVAIL   HAMMANI.pptx
SST MEDECINE DE TRAVAIL HAMMANI.pptx
 
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMSRapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
Rapport PFE | Eolane | Amélioration de la productivité de l'atelier CMS
 
Exposé amdec
Exposé amdecExposé amdec
Exposé amdec
 
Mise en oeuvre d'une politique qhse dans une tpe pme
Mise en oeuvre d'une politique qhse dans une tpe pmeMise en oeuvre d'une politique qhse dans une tpe pme
Mise en oeuvre d'une politique qhse dans une tpe pme
 
Formulaire de soumission 2019 - 2020
Formulaire de soumission 2019 - 2020Formulaire de soumission 2019 - 2020
Formulaire de soumission 2019 - 2020
 
Qualite ishikawa
Qualite ishikawaQualite ishikawa
Qualite ishikawa
 
Presentation bureau-etudes-tap
Presentation bureau-etudes-tapPresentation bureau-etudes-tap
Presentation bureau-etudes-tap
 
Maîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
Maîtrise de la qualité opérationnelle avec le Lean et le Six SigmaMaîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
Maîtrise de la qualité opérationnelle avec le Lean et le Six Sigma
 
La_Maintenance_Industrielle.ppt
La_Maintenance_Industrielle.pptLa_Maintenance_Industrielle.ppt
La_Maintenance_Industrielle.ppt
 
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUXPRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
PRESENTATION DE L’ETAT D’AVANCEMENT DES TRAVAUX GOUVERNEMENTAUX
 
Méthode pert
Méthode pertMéthode pert
Méthode pert
 
rapport final - Copie
rapport final - Copierapport final - Copie
rapport final - Copie
 
Le soudage
Le soudageLe soudage
Le soudage
 
La gpao
La gpaoLa gpao
La gpao
 
Démarche qualité slideshare
Démarche qualité slideshareDémarche qualité slideshare
Démarche qualité slideshare
 

Similar to ipma-level-d-mcq-sample-paper.pdf

Liberty university busi 313 quiz 4 complete solutions correct answers slideshare
Liberty university busi 313 quiz 4 complete solutions correct answers slideshareLiberty university busi 313 quiz 4 complete solutions correct answers slideshare
Liberty university busi 313 quiz 4 complete solutions correct answers slideshare
Song Love
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
Project Cubicle
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
MoncefMakni1
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC Questions
Monica Waters
 
Pmp test 05
Pmp test 05Pmp test 05
Pmp test 05
Mohamed Saeed
 
Pmp Questions and Answers series #1
Pmp Questions and Answers series #1Pmp Questions and Answers series #1
Pmp Questions and Answers series #1
Knowledge Max
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64
Skillogic Solutions
 
Question 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docxQuestion 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docx
IRESH3
 
Liberty university busi 313 quiz 1 complete solutions correct answers key
Liberty university busi 313 quiz 1 complete solutions correct answers keyLiberty university busi 313 quiz 1 complete solutions correct answers key
Liberty university busi 313 quiz 1 complete solutions correct answers key
Harry White
 
PgMP
PgMP PgMP
Itpm question bank
Itpm   question bankItpm   question bank
Itpm question bank
Hussain111321
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
Mohamed Saeed
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
Nour Alsoori, MArch, PMP
 
BICSI Registered Communications Distribution Designer RCDDv14 Study Guide
BICSI Registered Communications Distribution Designer RCDDv14 Study GuideBICSI Registered Communications Distribution Designer RCDDv14 Study Guide
BICSI Registered Communications Distribution Designer RCDDv14 Study Guide
williamLeo13
 
Pmp questions and answers series #2
Pmp questions and answers series #2Pmp questions and answers series #2
Pmp questions and answers series #2
Knowledge Max
 
Project ManagementECE 326 Exam 2Description Exam 2 question.docx
Project ManagementECE 326 Exam 2Description Exam 2 question.docxProject ManagementECE 326 Exam 2Description Exam 2 question.docx
Project ManagementECE 326 Exam 2Description Exam 2 question.docx
wkyra78
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
newway85
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
IRESH3
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
Mohamed Saeed
 

Similar to ipma-level-d-mcq-sample-paper.pdf (20)

Liberty university busi 313 quiz 4 complete solutions correct answers slideshare
Liberty university busi 313 quiz 4 complete solutions correct answers slideshareLiberty university busi 313 quiz 4 complete solutions correct answers slideshare
Liberty university busi 313 quiz 4 complete solutions correct answers slideshare
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC Questions
 
Pmp test 05
Pmp test 05Pmp test 05
Pmp test 05
 
Pmp sample qa3
Pmp sample qa3Pmp sample qa3
Pmp sample qa3
 
Pmp Questions and Answers series #1
Pmp Questions and Answers series #1Pmp Questions and Answers series #1
Pmp Questions and Answers series #1
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64
 
Question 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docxQuestion 1  Doing procurement functions electronically is termed.docx
Question 1  Doing procurement functions electronically is termed.docx
 
Liberty university busi 313 quiz 1 complete solutions correct answers key
Liberty university busi 313 quiz 1 complete solutions correct answers keyLiberty university busi 313 quiz 1 complete solutions correct answers key
Liberty university busi 313 quiz 1 complete solutions correct answers key
 
PgMP
PgMP PgMP
PgMP
 
Itpm question bank
Itpm   question bankItpm   question bank
Itpm question bank
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
 
BICSI Registered Communications Distribution Designer RCDDv14 Study Guide
BICSI Registered Communications Distribution Designer RCDDv14 Study GuideBICSI Registered Communications Distribution Designer RCDDv14 Study Guide
BICSI Registered Communications Distribution Designer RCDDv14 Study Guide
 
Pmp questions and answers series #2
Pmp questions and answers series #2Pmp questions and answers series #2
Pmp questions and answers series #2
 
Project ManagementECE 326 Exam 2Description Exam 2 question.docx
Project ManagementECE 326 Exam 2Description Exam 2 question.docxProject ManagementECE 326 Exam 2Description Exam 2 question.docx
Project ManagementECE 326 Exam 2Description Exam 2 question.docx
 
Pmp sample questions
Pmp sample questionsPmp sample questions
Pmp sample questions
 
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docxQuestion 1 Artifacts” in the Scrum terminology are the equiva.docx
Question 1 Artifacts” in the Scrum terminology are the equiva.docx
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 

Recently uploaded

Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

ipma-level-d-mcq-sample-paper.pdf

  • 1. General Notes Time allowed 1 hour. Use the answer sheet provided. Completing the answer sheet Use HB pencil to complete the answer sheet. Provide only one answer per question. Each entry is to be made with a HORIZONTAL line in the spaces indicated. Errors must be removed using a good quality eraser. Enter the Test Code and your Candidate Number (which can be found on your examination card) on to your answer sheet, following the example set out below. Answer all 60 multiple choice questions Do not open this paper until instructed by the invigilator. This question paper must not be removed from the examination room. Candidate Number Exam Date Exam Location Test Code Reference IPMA Level D Examination Sample Paper Project Management DM Sample Paper v1.0 S A M P L E
  • 2. 2 IPMA Level D Examination Sample Paper Question 1 A project manager can take responsibility for their actions by: A amending contractual terms with a supplier. B consulting with senior internal stakeholders. C realigning their job description to actual task. D taking ownership of both positive and negative results. Question 2 Which of the following is not a benefit of producing a high-level project overview? A Uniform roles and responsibilities B Limited planning C Consistent terminology D Standard documentation Question 3 Which of the following is the best way in which a project manager could develop and get agreement on the project plan? A Use effective communication B Use transition management C Adopt a proactive management style D Adopt a reactive management style Question 4 When assessing the use of critical success factors, which one of the following would demonstrate they are being used correctly? A Critical success factors remain fixed throughout the project B Critical success dactors are measuring if the project is leading and/or lagging in performance C Critical success factors are derived from key performance indicators to measure if the project is achieving strategic goals D Critical success factors are directly aligned to both organisational and project objectives Question 5 Which of the following project manager behaviours is most likely to facilitate open communication? A Engaging in two-way communication with stakeholders B Creating a project communication plan C Conducting project team briefings D Talking with members of a project team S A M P L E
  • 3. 3 IPMA Level D Examination Sample Paper Question 6 Configuration management contributes to the scope configuration by: A ensuring that project costs are controlled. B minimising deficiencies, errors and unintended scope creep. C preventing changes to the project scope. D controlling changes to the project management plan. Question 7 Which of the following must a project manager do when prioritising and deciding a project’s requirements and acceptance criteria? A Document and agree the project goal hierarchy B Document and agree the sponsor’s needs and requirements C Document and agree stakeholder needs and requirements D Document and agree lessons learned Question 8 Which of the following best explains why a project manager should address personal and professional shortcomings? A Addressing personal and professional shortcomings will always result in the completion of tasks B Addressing personal and professional shortcomings should remove barriers to professional success C Addressing personal and professional shortcomings will always result in professional success D Addressing personal and professional shortcomings should demonstrate ownership of problems Question 9 What might the project manager do to best get early buy in to the project? A Organise and facilitate a project start-up workshop B Tell all team members their roles C Produce a risk register D Start as soon as possible to save time Question 10 Which of the following statements concerning how a responsible individual evaluates and selects potential suppliers is true? A They ensure the first response scores the highest B They ensure the cheapest proposal scores the highest C They define and apply a set of logical steps in the selection process D They develop selection criteria on receipt of tender responses S A M P L E
  • 4. 4 IPMA Level D Examination Sample Paper Question 11 Alignment of a project to an organisation’s mission and vision and compliance with organisational constraints and objectives can be effectively achieved by: A establishing a detailed project budget. B using diagnostic management control systems. C developing a balanced scorecard. D writing a project communication strategy. Question 12 Which of the following questions is the most appropriate one which a project manager should ask when evaluating decisions and actions? A Will the decision or action improve communication? B Will the decision or action inform the project’s strategy? C Will the decision or action explain how to meet targets? D Will the decision or action threaten the project’s objective? Question 13 If the cost of implementing the response is not an issue, what is the best strategy to take the opportunities associated with a positive risk? A To mitigate the opportunity B To accept the opportunity C To exploit the opportunity D To transfer the opportunity Question 14 When determining key performance indicators, which statement best describes how they can be used? A Key performance indicators can only be used for project delivery timeliness B Key performance indicators can be leading or lagging measures, either preceding or following an event C Key performance indicators must remain fixed for the duration of the project D Key performance indicators can be used to define critical success factors Question 15 Which of the following is not a feature of a negotiation strategy? A Best Alternative to a Negotiated Agreement B Budgetary conditions and politics C What-if scenarios and power-balance D Negotiating team, their roles and responsibilities S A M P L E
  • 5. 5 IPMA Level D Examination Sample Paper Question 16 Which of the following would be the most likely way a project manager would review the project’s success criteria? A By scheduling meetings monthly to review progress to date B By scheduling meetings at regular intervals for sponsor and stakeholders C By reviewing workload weekly with the project team D By regularly checking the project’s progress against the formal and informal success criteria Question 17 Which of the following statements is false? When identifying the need to procure a product or service, the project manager: A prepares, produces or collects necessary information as input. B defines tender documents and selection criteria based on needs. C defines which supplier will be awarded the work. D defines reasons (based on needs) for procurement or partnership. Question 18 What should be considered when planning a project activity where the general public could be put at risk? A Health and safety regulations B Planning regulations C Environmental legislation D Employment legislation Question 19 What would be the best approach for a project manager when identifying areas for personal learning and development? A Ignore feedback from the team but seek discussion with project sponsor B Measure own performance, use feedback and then review C Identify training courses and then discuss with line manager D Wait to hear from line manager if improvement is necessary Question 20 Reporting on progress by exception would usually be used when: A the project team has no leader. B the project team has external contractors. C the project team is experienced. D the project team is newly formed. S A M P L E
  • 6. 6 IPMA Level D Examination Sample Paper Question 21 As a project manager you have identified a high impact commercial risk suitable for mitigation through transfer. Which of the following is the most appropriate action to address this risk? A Handover ownership of the risk to the health and safety manager B Escalate the risk ownership to the sponsor and steering committee C Arrange for the risk to be owned by an insurance company D Arrange for the risk ownership be taken over by the risk manager Question 22 Identifying the social and environmental consequences of a project will help to ensure a project: A complies with sustainability principles and objectives. B aligns to appropriate codes of conduct. C establishes relevant professional standards. D develops required health and safety protocols. Question 23 Which of the following is most likely to facilitate open, honest and frank communication? A A reward and retribution system B Permitting disagreement and conflict C A mutually respectful atmosphere D A strong approach to leadership Question 24 When prioritising and deciding a project’s requirements and acceptance criteria, a project manager should document and agree: A lessons learned. B stakeholder needs and requirements. C the project plan and financial budget. D the project goal hierarchy. Question 25 Which one of the following statements best describes how agreement can be reached from a negotiation process? A It always makes use of best practice tools and techniques B It can be reached over an extended time-frame and may proceed in phases C It can be reached by focussing on short term gains for both parties D It always makes use of the Best Alternative to a Negotiated Agreement (BATNA) S A M P L E
  • 7. 7 IPMA Level D Examination Sample Paper Question 26 Preparing and implementing a contingency plan will most likely help to: A assure stakeholder risk is controlled. B improve schedule and cost accuracy. C reduce cost of risk mitigation. D address risks and opportunities. Question 27 Which of the following would help a project manager to control performance against the project plan and take remedial action where necessary? A An integrated work breakdown structure B An integrated lessons learned log C An integrated project reporting system D An integrated communication plan Question 28 When defining and developing the project goal hierarchy, a project manager should: A create an appropriate work breakdown structure and work packages. B establish the relationship between the organisational and project goals. C establish the needs of key internal stakeholders only. D create and communicate the project charter with all stakeholders. Question 29 When seeking to overcome resistance to change from those most affected by the change initiative, a project manager should: A collaborate with the sponsor. B design manageable work packages. D communicate with all stakeholders. C design a coherent intervention plan. Question 30 Which of the following is most likely to help a project manager define work packages? A The purpose of the goal hierarchy B The resources required and their duration C The aims and objectives of the project D The environment in which the project is located S A M P L E
  • 8. 8 IPMA Level D Examination Sample Paper Question 31 Which of the following should be done by the project manager when selecting a supplier for the project? A Make a choice of supplier from those previously used when allocating work as they will know the requirements B Always use the cheapest quote as projects are cost driven, as long as it satisfies the contract conditions C Allocate on recommendation from others within the company as long as contract conditions are generally satisfied D Go out to tender and evaluate the bids checking the detail and allocating to the supplier that satisfies all of the requirement Question 32 A project manager seeking to identify how to influence organisational strategy must: A use their network to influence the board about their opinions. B show stakeholders that failing projects reflect poorly defined strategy. C reflect on pre-set strategic goals and the tools and methods needed to question these goals. D apply theoretical strategy models to the organisation. Question 33 Which of the following statements is false when preparing for a negotiation? A The best alternative to a negotiated solution should be identified B Trade-offs should be developed during preparation and shouldn’t change C Trade-offs should be developed during preparation and modified as needed D Alternative solutions should be developed before the process begins Question 34 Which of the following would best help the project manager to select an overall project management approach? A Assessment of the constraints and complexity of the project B Understand the strengths of the project team and work accordingly C Identify the approach used on a previous project and copy it D Discuss what would best suit the project suppliers Question 35 What of the following would be the best way for a project manager to show responsibility for own personal learning and development? A By seeking new roles within the organisation B By never accepting criticism and seeking others to blame C By discussion with line manager to identify training courses D By accepting feedback and focussing on improving own work and capacities S A M P L E
  • 9. 9 IPMA Level D Examination Sample Paper Question 36 Assessing and prioritising project requirements will help a project manager to: A focus on continuous improvement. B promote the project to all stakeholders. C optimise project outcomes and success. D demonstrate an ability to get things done. Question 37 Tools and techniques such as scenario planning, probabilistic impacts, Monte Carlo analysis and decision trees are most closely associated with which of the following disciplines in project management? A Risk assessment B Planning and scheduling C Budgets and cost control D Tracking and controls Question 38 Establishment of the project deliverables is best achieved by the use of: A scope definition techniques. B using expert judgement. C the available resources. D stakeholder wish lists. Question 39 Which of the following would help a project manager to choose an appropriate communication style? A Taking a unilateral decision B Use an organisational template C Adopting a previous project style D Establishing the target audience Question 40 When initiating and managing the transition to a new phase of the project, a project manager would usually: A facilitate a start-up workshop. B reconfirm the project management plans. C change the communication plan. D control project performance. S A M P L E
  • 10. 10 IPMA Level D Examination Sample Paper Question 41 Which of the following is the best way a project manager could maintain effective communication with virtual teams? A Hold regular face to face meetings B Provide reliable communication equipment C Hold regular tele-conferences D Establish clear lines of communication Question 42 When managing deviation from contracts, the first thing a project manager must do is to: A take action within their organisation. B issue a penalty as soon as possible. C request a renegotiation as soon as possible. D take legal action as soon as possible. Question 43 How would a project manager most likely evaluate and monitor risk responses? A Request a report of progress from the project team B Perform a review of the project risk with the risk owner periodically C Evaluate the risk register at project gate reviews D Check with senior management to ensure buy in Question 44 Which of the following would best explain how project managers could establish their contribution to the success of a project? A Produce a personal reflection which includes a general overview of the contribution B Produce a personal reflection which focuses on the work allocated by the sponsor C Produce a personal reflection on the areas where the project manager has influenced decisions D Produce a personal reflection on input in all areas and identify how value has been added Question 45 When identifying and assessing project stakeholder needs and requirements, a project manager must understand that needs and expectations are: A not the same as stated requirements. B the same as stated requirements. C internal considerations. D external considerations. S A M P L E
  • 11. 11 IPMA Level D Examination Sample Paper Question 46 Any changes to the project scope should be evaluated against which one of the following? A The project manager’s availability B The project’s objectives and agreed outcomes C The views of the project team D The disruption to work already completed Question 47 Which of the following would be the best way for a project manager to identify and reflect on personal motivations to set goals and maintain focus? A Identify professional goals during annual appraisal B Identify long term and short-term goals with management influence C Set personal and professional goals and priorities D Discuss personal and professional goals with mentor Question 48 When establishing and maintaining scope configuration, it is important for a project manager to know that scope configuration management is a: A continuous process. B time bound process. C feature of a work breakdown structure. D work package boundary. Question 49 A project manager seeking to ensure the ongoing validity of the business justification for their project must: A identify how the scope will shape the success criteria. B identify the project objectives to shape the benefits. C await the development of the business case by the project sponsors. D reflect on and define the business justification in a formal document. Question 50 Which of the following best describes why it is important for a project manager to complete tasks thoroughly? A Project managers have responsibility B Demonstrates correct actions to be taken C Meets quality requirement D Gives others confidence in the project manager’s ability S A M P L E
  • 12. 12 IPMA Level D Examination Sample Paper Question 51 In preparing for a negotiation, the best way an individual can understand the interests of all involved parties, is to: A ensure they get to know the relevant parties before the negotiation begins and conduct analysis later. B collect, document and analyse relevant hard and soft information about the parties. C gather facts on individual’s interests as the negotiation progresses. D use formal means to collect and analyse information they have found during the negotiation. Question 52 Which of the following best explains what a project manager should do to understand the impact of change on an organisation to ensure the project’s continuing success? A Establish new key performance indicators based on the change B Adopt a flexible approach to change C Review the requirements of the change D Assess the organisation’s ability to change Question 53 Which of the following is a project manager most likely to do when seeking to overcome continued resistance to change once the change initiative has been implemented? A Collaborate with the sponsor B Communicate with all stakeholders C Redesign the work packages D Use reinforcement techniques Question 54 Which of the following best explains what a project manager should do to identify and ensure a project complies with codes of conduct and professional regulation? A Identify relevant codes of conduct and professional regulation and ensure they are complied with B Identify all codes of conduct and professional regulation and ensure they are complied with C Identify breaches to relevant codes of conduct and professional regulation and ensure they are corrected D Identify breaches to all codes of conduct and professional regulation and ensure they are corrected Question 55 Which of the following best explains what a project manager should do to help ensure a project complies with health, safety, security and environmental (HSSE) regulations? A Know the professional standards which apply to all projects B Know all of the HSSE regulations and policies C Know the HSSE risks associated with a project D Know which of the HSSE regulations are relevant to the project S A M P L E
  • 13. 13 IPMA Level D Examination Sample Paper Question 56 Which of the following is not a likely benefit, to a project manager, of having a change or transformation strategy? A Organisational capacity can be increased B Selected interventions can be planned C Resistance to change can be addressed at an early stage D Reinforcement techniques can be planned Question 57 Which of the following best explains how a project manager could demonstrate an ability to act, take decisions and communicate in a consistent way? A Resisting a flexible approach to the situation B Completing tasks thoroughly despite the situation C Making sure that words, behaviours and actions match D Taking responsibility for own actions in a situation Question 58 Which of the following best explains when a project manager should evaluate the current project’s approach and lessons learned? A Periodically and at the end of the project B Periodically during the project C At the end of the project D When instructed by the sponsor Question 59 Which of the following best explains what a project manager should do to use professional standards for a new project? A Adopt top professional standards and develop improvements where necessary B Implement a set of wide ranging standards for the project team C Implement benchmarks to measure compliance with standards D Implement the standards used in previous projects Question 60 What would best help a project manager balance the needs and means of the project? A Awareness of planned quality audits B Understanding the sponsor’s bonus targets C Availability of a preferred supplier D Clarity on the priorities of the project S A M P L E
  • 14. 14 IPMA Level D Examination Sample Paper Answer Key 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 D B C D A B C B A C B D C B A 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 D C A B C C A C B B B C B D B 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 D C B A D C A A D B C A B D A 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 B C A D D B D D A D A C A B C S A M P L E
  • 15. 15 IPMA Level D Examination Sample Paper Notes S A M P L E
  • 16. Ibis House, Regent Park Summerleys Road Princes Risborough Buckinghamshire HP27 9LE Copyright © 2018 APM Tel. (UK) 0845 458 1944 Tel. (Int.) +44 1844 271 640 Email info@apm.org.uk Web apm.org.uk Association for Project Management S A M P L E