• Utilities relocation works (Sanitary sewer & water main) are ongoing at
Park Hill Rd and Eglinton Ave W
• Crews will soon be on Everden Rd and Winnett Ave to continue the
relocation of utilities
• Invert tunnel concrete pour is ongoing at both the east and west side of
Allen Rd
• Shoring and construction for the east entrance (at Allen Rd North and
Eglinton Ave) is underway
– Waterproofing and Formwork underway
• Ongoing noise and vibration monitoring
• Traffic flip for Eglinton Rd scheduled mid-July
• Shoring on the south side of Eglinton Ave to start as early as July
4. 4
Outdoor Bicycle
Parking
Cedarvale Station Aerial Rendering
Accessible
Entrance
Outdoor Bicycle
Parking
Accessible
Entrance
Outdoor Bicycle
Parking
Eglinton West
TTC Station
6. Forest Hill Station Construction Update
Complete
Demolition of 842, 874, 875 and 876 Eglinton Ave W
Installation of geotechnical monitoring equipment
Bell utilities relocation
Hydro utilities relocation
Installation of temporary traffic signals
Watermain servicing
Sanitary and storm sewer relocation
Piling the southwest side at the station box
Summer 2017
• Continue piling at the southeast side of the station box
• Continue shallow excavation at the southwest side of the station box
• Continue piling at the Secondary Entrance
• Piling at the Main Entrance
7. Forest Hill Station Concept Aerial View
Main
Entrance
Secondary
Entrance
*60% rendering
8. Forest Hill Station Construction Progress
8
PILING
SOUTHEAST
WORK ZONE
SOUTHWEST
SHALLOW
EXCAVATION
9. Forest Hill Station Construction Progress
9
PILING AT
SECONDARY
ENTRANCE
OVERNIGHT
SEWER WORK