March 10, 2021
Eglinton Crosstown LRT
Eglinton โ€“ Mt Pleasant CLC
Eglinton Station
EGLINTON STATION UPDATE
3
CENTRAL WEST WORKS MONTHLY MEETING
Activity Location Approx. Date & Duration
Extended Hours for Station Box
Construction
Rebar, steel, conduit, and formwork installations, and
final grading works.
Beneath Eglinton Avenue and Eglinton TTC
Station
Underway through early 2021
Monday โ€“ Friday, 24 hours
Berwick Portal Construction
โ€ข Structural steel and pre-cast concrete panel
installations, architectural works and roof
construction.
Berwick Avenue and Eglinton TTC Station
โ€ข A mobile crane will be placed at the site on Berwick
Ave between Yonge St and Duplex Ave
Through 2021
Periodic closures of Berwick Ave; subject to TTC approval
Crane mobilization for pre-cast panel installations:
โ€ข March 11 โ€“ March 19, 2021
โ€ข Monday โ€“ Friday; 7:00 a.m. โ€“ 7:00 p.m.
Next Berwick Ave closure scheduled for:
โ€ข April 10, 2021
TTC Eglinton Station Works
โ€ข North platform relocation works, escalator
installations and elevator construction
Eglinton TTC Station
Elevator construction ongoing at 2200 Yonge St โ€“
former Smokeโ€™s Poutinerie
Periodically through 2021
Next TTC Line 1 closure scheduled for:
April 10 โ€“ April 11, 2021
North Tunnel Ventilation Shaft Construction
โ€ข Requires periodic use of a hydro-vacuum truck.
Center of Yonge St between Eglinton Ave and
Roehampton Ave
Underway through early 2021
Concrete Works Throughout all station areas Through late 2021
Wet Utility Works and Associated Traffic
Configuration Change
โ€ข Manhole and sewer pipe installations
Yonge St south of Eglinton Ave
As early as late March 2021 for approximately
two (2) months
Crane Installation
โ€ข To faciliate station box and east tunnel ventilation
shaft construction
Salvation Army Site
โ€ข South side of Eglinton Ave between Cowbell Lane
and Holly Street
As early as mid March 2021 through December
2021.
CURRENT TRAFFIC CONFIGURATION
4
CENTRAL WEST WORKS MONTHLY MEETING
Through approximately late-March 2021
UPCOMING TRAFFIC CONFIGURATION - BERWICK AVENUE
5
CENTRAL WEST WORKS MONTHLY MEETING
March 11 โ€“ March 19, 2021
โ€ข Monday โ€“ Friday; 7:00 a.m. โ€“ 7:00 p.m.
CRANE LOCATION
6
CENTRAL WEST WORKS MONTHLY MEETING
As early as mid-March 2021
PRELIMINARY UPCOMING TRAFFIC CONFIGURATION
7
CENTRAL WEST WORKS MONTHLY MEETING
As early as late-March 2021 for approximately two (2) months.
CONSTRUCTION PROGRESS PHOTOS
8
COMPLETED ROOF DECK -
BERWICK PORTAL SITE
FORMWORK INSTALLATIONS โ€“
STATION BOX
Mount Pleasant Station
MOUNT PLEASANT STATION UPDATE
10
Activity Location Approx. Date & Duration
Formwork, waterproofing, rebar, steel
and conduit installations
Throughout all station areas Underway through mid 2021
Utility Reinstatement Works North and south sides of Eglinton Avenue Periodically through 2021
Concrete Works
โ€ข Shotcrete application and concrete pours
Throughout all station areas Underway through late 2021
Structural Steel Installations
โ€ข Welding of structural steel beams above
ground.
Secondary Entrance site
โ€ข Periodic use of the parking lot at 801 Mt
Pleasant Rd
Expected to begin in April 2021 for
approximately three (3) weeks
Overnight King Pile Removals
โ€ข Cutting steel supports (piles) from the station
roof
North side of Eglinton Avenue, east and west
of Mt Pleasant Rd
Expected to begin March 15, 2021 for
approximately six (6) weeks.
โ€ข Monday-Friday; 7:00 p.m. โ€“ 5:00
a.m.
OVERNIGHT PILE REMOVAL AT MOUNT PLEASANT STATION
11
โ€ข In March 2021, crews at Mt Pleasant Station will start to work overnight to remove the king
piles from the station roof.
โ€ข Work will take place in two stages, on the north side of Eglinton Avenue west and east of
Mt Pleasant Rd.
โ€ข This work will take place overnight Monday - Friday between 7:00 p.m. โ€“ 5:00 a.m. for
approximately six (6) weeks.
โ€ข Eglinton Avenue will be reduced to one lane only, alternating traffic in each direction.
โ€ข Sidewalk closures on the north side of Eglinton Avenue will be required.
โ€ข Traffic control personnel, signage, traffic barrels, and fencing will be present to direct the
travelling public and delineate the work zone.
โ€ข Periodic overnight noise from construction activity including use of a hydro-vacuum truck,
excavator, and hand tools, can expected.
โ€ข Noise mitigation measures will be implemented to reduce disruption caused by this work.
INSERT FOOTER
PILE INSTALLATION
CURRENT TRAFFIC CONFIGURATION
12
Through summer 2021
TRAFFIC CONFIGURATION PILE REMOVALS โ€“ STAGE 1
13
CENTRAL WEST WORKS MONTHLY MEETING
As early as March 15, 2021 for approximately three (3) weeks
โ€ข Monday โ€“ Friday; 7:00 p.m. โ€“ 5:00 a.m.
AREA OF
WORK
TRAFFIC CONFIGURATION PILE REMOVALSโ€“ STAGE 2
14
CENTRAL WEST WORKS MONTHLY MEETING
Early April 2021 for approximately three (3) weeks
โ€ข Monday โ€“ Friday; 7:00 p.m. โ€“ 5:00 a.m.
AREA
OF
WORK
CONSTRUCTION PROGRESS PHOTOS
15
CENTRAL WEST WORKS MONTHLY MEETING
CONCOURSE SLAB POUR โ€“
STATION BOX
FORMWORK INSTALLATION โ€“
STATION BOX INTERIOR WALLS
CONSTRUCTION PROGRESS PHOTOS
16
CENTRAL WEST WORKS MONTHLY MEETING
FORMWORK INSTALLATIONS โ€“
SECONDARY ENTRANCE
WATERPROOFING โ€“
MAIN ENTRANCE
Eglinton and Mount Pleasant CLC - March 10, 2021

More Related Content

What's hot

Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Crosstown TO
ย 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleCrosstown TO
ย 
Western works final
Western works final Western works final
Western works final Crosstown TO
ย 
CLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCrosstown TO
ย 
Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Crosstown TO
ย 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCrosstown TO
ย 
Leaside and Laird CLC - January 11, 2021
Leaside and Laird CLC - January 11, 2021Leaside and Laird CLC - January 11, 2021
Leaside and Laird CLC - January 11, 2021Crosstown TO
ย 
Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Crosstown TO
ย 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020Crosstown TO
ย 
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Crosstown TO
ย 
Pharmacy to Kennedy CLC meeting
Pharmacy to Kennedy  CLC meetingPharmacy to Kennedy  CLC meeting
Pharmacy to Kennedy CLC meetingCrosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021Crosstown TO
ย 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Crosstown TO
ย 
Eglinton & Mount Pleasant CLC - 14July2021
Eglinton & Mount Pleasant CLC - 14July2021Eglinton & Mount Pleasant CLC - 14July2021
Eglinton & Mount Pleasant CLC - 14July2021Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
ย 
Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Crosstown TO
ย 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Crosstown TO
ย 
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018Crosstown TO
ย 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 Crosstown TO
ย 

What's hot (20)

Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019
ย 
Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021
ย 
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to Cedarvale
ย 
Western works final
Western works final Western works final
Western works final
ย 
CLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy January
ย 
Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021
ย 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House Presentation
ย 
Leaside and Laird CLC - January 11, 2021
Leaside and Laird CLC - January 11, 2021Leaside and Laird CLC - January 11, 2021
Leaside and Laird CLC - January 11, 2021
ย 
Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)
ย 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
ย 
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
ย 
Pharmacy to Kennedy CLC meeting
Pharmacy to Kennedy  CLC meetingPharmacy to Kennedy  CLC meeting
Pharmacy to Kennedy CLC meeting
ย 
Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021Avenue & Chaplin CLC - Construction Update: May 5, 2021
Avenue & Chaplin CLC - Construction Update: May 5, 2021
ย 
Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018Public Meeting of Facility Services Building at Eglinton Station - May 2018
Public Meeting of Facility Services Building at Eglinton Station - May 2018
ย 
Eglinton & Mount Pleasant CLC - 14July2021
Eglinton & Mount Pleasant CLC - 14July2021Eglinton & Mount Pleasant CLC - 14July2021
Eglinton & Mount Pleasant CLC - 14July2021
ย 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020
ย 
Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021Eglinton - Mount Pleasant CLC 13 Jan 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021
ย 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020
ย 
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
Eglinton - Mount Pleasant Construction Liaison Committee - July 2018
ย 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021
ย 

Similar to Eglinton and Mount Pleasant CLC - March 10, 2021

Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)Crosstown TO
ย 
Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: July 7, 2021
Avenue & Chaplin CLC - Construction Update: July 7, 2021Avenue & Chaplin CLC - Construction Update: July 7, 2021
Avenue & Chaplin CLC - Construction Update: July 7, 2021Crosstown TO
ย 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
ย 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Crosstown TO
ย 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Crosstown TO
ย 
Leaside-Laird CLC Meeting - Presentation - November 8, 2021
Leaside-Laird CLC Meeting - Presentation - November 8, 2021Leaside-Laird CLC Meeting - Presentation - November 8, 2021
Leaside-Laird CLC Meeting - Presentation - November 8, 2021Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
ย 
Cedarvale & Forest Hill Construction Update (July 30, 2021)
Cedarvale & Forest Hill Construction Update (July 30, 2021)Cedarvale & Forest Hill Construction Update (July 30, 2021)
Cedarvale & Forest Hill Construction Update (July 30, 2021)Crosstown TO
ย 
Fairbank-Oakwood Construction Update - March 2021
Fairbank-Oakwood Construction Update - March 2021Fairbank-Oakwood Construction Update - March 2021
Fairbank-Oakwood Construction Update - March 2021Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Crosstown TO
ย 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Crosstown TO
ย 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Crosstown TO
ย 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Crosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
ย 
Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021Crosstown TO
ย 
Brentcliffe to Victoria Park - CLC construction update January 2021
Brentcliffe to Victoria Park - CLC construction update January 2021Brentcliffe to Victoria Park - CLC construction update January 2021
Brentcliffe to Victoria Park - CLC construction update January 2021Crosstown TO
ย 
Avenue & Chaplin CLC - Construction Update: January 6, 2021
Avenue & Chaplin CLC - Construction Update: January 6, 2021Avenue & Chaplin CLC - Construction Update: January 6, 2021
Avenue & Chaplin CLC - Construction Update: January 6, 2021Crosstown TO
ย 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
ย 

Similar to Eglinton and Mount Pleasant CLC - March 10, 2021 (20)

Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)Cedarvale & Forest Hill Construction Update (January 27, 2021)
Cedarvale & Forest Hill Construction Update (January 27, 2021)
ย 
Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November Eglinton & Mt pleasant CLC - November
Eglinton & Mt pleasant CLC - November
ย 
Avenue & Chaplin CLC - Construction Update: July 7, 2021
Avenue & Chaplin CLC - Construction Update: July 7, 2021Avenue & Chaplin CLC - Construction Update: July 7, 2021
Avenue & Chaplin CLC - Construction Update: July 7, 2021
ย 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
ย 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021
ย 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
ย 
Leaside-Laird CLC Meeting - Presentation - November 8, 2021
Leaside-Laird CLC Meeting - Presentation - November 8, 2021Leaside-Laird CLC Meeting - Presentation - November 8, 2021
Leaside-Laird CLC Meeting - Presentation - November 8, 2021
ย 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
ย 
Cedarvale & Forest Hill Construction Update (July 30, 2021)
Cedarvale & Forest Hill Construction Update (July 30, 2021)Cedarvale & Forest Hill Construction Update (July 30, 2021)
Cedarvale & Forest Hill Construction Update (July 30, 2021)
ย 
Fairbank-Oakwood Construction Update - March 2021
Fairbank-Oakwood Construction Update - March 2021Fairbank-Oakwood Construction Update - March 2021
Fairbank-Oakwood Construction Update - March 2021
ย 
Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021Avenue & Chaplin CLC - Construction Update: March 3, 2021
Avenue & Chaplin CLC - Construction Update: March 3, 2021
ย 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021
ย 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
ย 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021
ย 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
ย 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
ย 
Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021Fairbank-Oakwood Construction Update - July 2021
Fairbank-Oakwood Construction Update - July 2021
ย 
Brentcliffe to Victoria Park - CLC construction update January 2021
Brentcliffe to Victoria Park - CLC construction update January 2021Brentcliffe to Victoria Park - CLC construction update January 2021
Brentcliffe to Victoria Park - CLC construction update January 2021
ย 
Avenue & Chaplin CLC - Construction Update: January 6, 2021
Avenue & Chaplin CLC - Construction Update: January 6, 2021Avenue & Chaplin CLC - Construction Update: January 6, 2021
Avenue & Chaplin CLC - Construction Update: January 6, 2021
ย 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
ย 

More from Crosstown TO

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfCrosstown TO
ย 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023Crosstown TO
ย 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Crosstown TO
ย 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfCrosstown TO
ย 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
ย 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
ย 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
ย 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
ย 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
ย 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
ย 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
ย 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
ย 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
ย 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
ย 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
ย 
Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfCrosstown TO
ย 

More from Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
ย 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
ย 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
ย 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
ย 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
ย 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
ย 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
ย 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
ย 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
ย 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
ย 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
ย 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
ย 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
ย 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
ย 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
ย 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
ย 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
ย 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
ย 
Leaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdfLeaside-Laird CLC - Nov 14, 2022.pdf
Leaside-Laird CLC - Nov 14, 2022.pdf
ย 

Recently uploaded

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
ย 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Sareena Khatun
ย 
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort ServicePremium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Servicevershagrag
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
ย 
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...vershagrag
ย 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.Christina Parmionova
ย 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationCuyahoga County Planning Commission
ย 
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Sareena Khatun
ย 
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Sareena Khatun
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...kumargunjan9515
ย 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Partito democratico
ย 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...Sareena Khatun
ย 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32JSchaus & Associates
ย 
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Call Girls Mumbai
ย 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
ย 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...HyderabadDolls
ย 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Menggugurkan Kandungan 087776558899
ย 

Recently uploaded (20)

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
ย 
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
Call Girls Koregaon Park - 8250092165 Our call girls are sure to provide you ...
ย 
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort ServicePremium  Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
Premium Prayagraj โค๏ธ๐Ÿ‘ 6378878445 ๐Ÿ‘„๐ŸซฆIndependent Escort Service
ย 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
ย 
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...Erotic  Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
Erotic Meerut Call Girls ๐Ÿ’ฏCall Us ๐Ÿ” 6378878445 ๐Ÿ” ๐Ÿ’ƒ Top Class Call Girl Servi...
ย 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
ย 
Lorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final PresentationLorain Road Business District Revitalization Plan Final Presentation
Lorain Road Business District Revitalization Plan Final Presentation
ย 
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
Call girls Service Budhwar Peth - 8250092165 Our call girls are sure to provi...
ย 
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
Fun all Day Call Girls in Erode { 9332606886 } VVIP NISHA Call Girls Near 5 S...
ย 
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
Delivery in 20 Mins Call Girls Malappuram { 9332606886 } VVIP NISHA Call Girl...
ย 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
ย 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
ย 
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...Genuine Call Girls in Salem  9332606886 HOT & SEXY Models beautiful and charm...
Genuine Call Girls in Salem 9332606886 HOT & SEXY Models beautiful and charm...
ย 
2024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 322024: The FAR, Federal Acquisition Regulations, Part 32
2024: The FAR, Federal Acquisition Regulations, Part 32
ย 
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
Bhubaneswar Call Girls Bhubaneswar ๐Ÿ‘‰๐Ÿ‘‰ 9777949614 Top Class Call Girl Service ...
ย 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
ย 
AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024AHMR volume 10 number 1 January-April 2024
AHMR volume 10 number 1 January-April 2024
ย 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
ย 
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
Cara Gugurkan Pembuahan Secara Alami Dan Cepat ABORSI KANDUNGAN 087776558899
ย 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
ย 

Eglinton and Mount Pleasant CLC - March 10, 2021

  • 1. March 10, 2021 Eglinton Crosstown LRT Eglinton โ€“ Mt Pleasant CLC
  • 3. EGLINTON STATION UPDATE 3 CENTRAL WEST WORKS MONTHLY MEETING Activity Location Approx. Date & Duration Extended Hours for Station Box Construction Rebar, steel, conduit, and formwork installations, and final grading works. Beneath Eglinton Avenue and Eglinton TTC Station Underway through early 2021 Monday โ€“ Friday, 24 hours Berwick Portal Construction โ€ข Structural steel and pre-cast concrete panel installations, architectural works and roof construction. Berwick Avenue and Eglinton TTC Station โ€ข A mobile crane will be placed at the site on Berwick Ave between Yonge St and Duplex Ave Through 2021 Periodic closures of Berwick Ave; subject to TTC approval Crane mobilization for pre-cast panel installations: โ€ข March 11 โ€“ March 19, 2021 โ€ข Monday โ€“ Friday; 7:00 a.m. โ€“ 7:00 p.m. Next Berwick Ave closure scheduled for: โ€ข April 10, 2021 TTC Eglinton Station Works โ€ข North platform relocation works, escalator installations and elevator construction Eglinton TTC Station Elevator construction ongoing at 2200 Yonge St โ€“ former Smokeโ€™s Poutinerie Periodically through 2021 Next TTC Line 1 closure scheduled for: April 10 โ€“ April 11, 2021 North Tunnel Ventilation Shaft Construction โ€ข Requires periodic use of a hydro-vacuum truck. Center of Yonge St between Eglinton Ave and Roehampton Ave Underway through early 2021 Concrete Works Throughout all station areas Through late 2021 Wet Utility Works and Associated Traffic Configuration Change โ€ข Manhole and sewer pipe installations Yonge St south of Eglinton Ave As early as late March 2021 for approximately two (2) months Crane Installation โ€ข To faciliate station box and east tunnel ventilation shaft construction Salvation Army Site โ€ข South side of Eglinton Ave between Cowbell Lane and Holly Street As early as mid March 2021 through December 2021.
  • 4. CURRENT TRAFFIC CONFIGURATION 4 CENTRAL WEST WORKS MONTHLY MEETING Through approximately late-March 2021
  • 5. UPCOMING TRAFFIC CONFIGURATION - BERWICK AVENUE 5 CENTRAL WEST WORKS MONTHLY MEETING March 11 โ€“ March 19, 2021 โ€ข Monday โ€“ Friday; 7:00 a.m. โ€“ 7:00 p.m.
  • 6. CRANE LOCATION 6 CENTRAL WEST WORKS MONTHLY MEETING As early as mid-March 2021
  • 7. PRELIMINARY UPCOMING TRAFFIC CONFIGURATION 7 CENTRAL WEST WORKS MONTHLY MEETING As early as late-March 2021 for approximately two (2) months.
  • 8. CONSTRUCTION PROGRESS PHOTOS 8 COMPLETED ROOF DECK - BERWICK PORTAL SITE FORMWORK INSTALLATIONS โ€“ STATION BOX
  • 10. MOUNT PLEASANT STATION UPDATE 10 Activity Location Approx. Date & Duration Formwork, waterproofing, rebar, steel and conduit installations Throughout all station areas Underway through mid 2021 Utility Reinstatement Works North and south sides of Eglinton Avenue Periodically through 2021 Concrete Works โ€ข Shotcrete application and concrete pours Throughout all station areas Underway through late 2021 Structural Steel Installations โ€ข Welding of structural steel beams above ground. Secondary Entrance site โ€ข Periodic use of the parking lot at 801 Mt Pleasant Rd Expected to begin in April 2021 for approximately three (3) weeks Overnight King Pile Removals โ€ข Cutting steel supports (piles) from the station roof North side of Eglinton Avenue, east and west of Mt Pleasant Rd Expected to begin March 15, 2021 for approximately six (6) weeks. โ€ข Monday-Friday; 7:00 p.m. โ€“ 5:00 a.m.
  • 11. OVERNIGHT PILE REMOVAL AT MOUNT PLEASANT STATION 11 โ€ข In March 2021, crews at Mt Pleasant Station will start to work overnight to remove the king piles from the station roof. โ€ข Work will take place in two stages, on the north side of Eglinton Avenue west and east of Mt Pleasant Rd. โ€ข This work will take place overnight Monday - Friday between 7:00 p.m. โ€“ 5:00 a.m. for approximately six (6) weeks. โ€ข Eglinton Avenue will be reduced to one lane only, alternating traffic in each direction. โ€ข Sidewalk closures on the north side of Eglinton Avenue will be required. โ€ข Traffic control personnel, signage, traffic barrels, and fencing will be present to direct the travelling public and delineate the work zone. โ€ข Periodic overnight noise from construction activity including use of a hydro-vacuum truck, excavator, and hand tools, can expected. โ€ข Noise mitigation measures will be implemented to reduce disruption caused by this work. INSERT FOOTER PILE INSTALLATION
  • 13. TRAFFIC CONFIGURATION PILE REMOVALS โ€“ STAGE 1 13 CENTRAL WEST WORKS MONTHLY MEETING As early as March 15, 2021 for approximately three (3) weeks โ€ข Monday โ€“ Friday; 7:00 p.m. โ€“ 5:00 a.m. AREA OF WORK
  • 14. TRAFFIC CONFIGURATION PILE REMOVALSโ€“ STAGE 2 14 CENTRAL WEST WORKS MONTHLY MEETING Early April 2021 for approximately three (3) weeks โ€ข Monday โ€“ Friday; 7:00 p.m. โ€“ 5:00 a.m. AREA OF WORK
  • 15. CONSTRUCTION PROGRESS PHOTOS 15 CENTRAL WEST WORKS MONTHLY MEETING CONCOURSE SLAB POUR โ€“ STATION BOX FORMWORK INSTALLATION โ€“ STATION BOX INTERIOR WALLS
  • 16. CONSTRUCTION PROGRESS PHOTOS 16 CENTRAL WEST WORKS MONTHLY MEETING FORMWORK INSTALLATIONS โ€“ SECONDARY ENTRANCE WATERPROOFING โ€“ MAIN ENTRANCE