A bi-monthly meeting to provide construction updates regarding Eglinton and Mount Pleasant Stations . The attached presentation materials were shared with the group.
3. EGLINTON STATION UPDATE
3
CENTRAL WEST WORKS MONTHLY MEETING
Activity Location Approx. Date & Duration
Extended Hours for Station Box
Construction
Rebar, steel, conduit, and formwork installations, and
final grading works.
Beneath Eglinton Avenue and Eglinton TTC
Station
Underway through early 2021
Monday โ Friday, 24 hours
Berwick Portal Construction
โข Structural steel and pre-cast concrete panel
installations, architectural works and roof
construction.
Berwick Avenue and Eglinton TTC Station
โข A mobile crane will be placed at the site on Berwick
Ave between Yonge St and Duplex Ave
Through 2021
Periodic closures of Berwick Ave; subject to TTC approval
Crane mobilization for pre-cast panel installations:
โข March 11 โ March 19, 2021
โข Monday โ Friday; 7:00 a.m. โ 7:00 p.m.
Next Berwick Ave closure scheduled for:
โข April 10, 2021
TTC Eglinton Station Works
โข North platform relocation works, escalator
installations and elevator construction
Eglinton TTC Station
Elevator construction ongoing at 2200 Yonge St โ
former Smokeโs Poutinerie
Periodically through 2021
Next TTC Line 1 closure scheduled for:
April 10 โ April 11, 2021
North Tunnel Ventilation Shaft Construction
โข Requires periodic use of a hydro-vacuum truck.
Center of Yonge St between Eglinton Ave and
Roehampton Ave
Underway through early 2021
Concrete Works Throughout all station areas Through late 2021
Wet Utility Works and Associated Traffic
Configuration Change
โข Manhole and sewer pipe installations
Yonge St south of Eglinton Ave
As early as late March 2021 for approximately
two (2) months
Crane Installation
โข To faciliate station box and east tunnel ventilation
shaft construction
Salvation Army Site
โข South side of Eglinton Ave between Cowbell Lane
and Holly Street
As early as mid March 2021 through December
2021.
10. MOUNT PLEASANT STATION UPDATE
10
Activity Location Approx. Date & Duration
Formwork, waterproofing, rebar, steel
and conduit installations
Throughout all station areas Underway through mid 2021
Utility Reinstatement Works North and south sides of Eglinton Avenue Periodically through 2021
Concrete Works
โข Shotcrete application and concrete pours
Throughout all station areas Underway through late 2021
Structural Steel Installations
โข Welding of structural steel beams above
ground.
Secondary Entrance site
โข Periodic use of the parking lot at 801 Mt
Pleasant Rd
Expected to begin in April 2021 for
approximately three (3) weeks
Overnight King Pile Removals
โข Cutting steel supports (piles) from the station
roof
North side of Eglinton Avenue, east and west
of Mt Pleasant Rd
Expected to begin March 15, 2021 for
approximately six (6) weeks.
โข Monday-Friday; 7:00 p.m. โ 5:00
a.m.
11. OVERNIGHT PILE REMOVAL AT MOUNT PLEASANT STATION
11
โข In March 2021, crews at Mt Pleasant Station will start to work overnight to remove the king
piles from the station roof.
โข Work will take place in two stages, on the north side of Eglinton Avenue west and east of
Mt Pleasant Rd.
โข This work will take place overnight Monday - Friday between 7:00 p.m. โ 5:00 a.m. for
approximately six (6) weeks.
โข Eglinton Avenue will be reduced to one lane only, alternating traffic in each direction.
โข Sidewalk closures on the north side of Eglinton Avenue will be required.
โข Traffic control personnel, signage, traffic barrels, and fencing will be present to direct the
travelling public and delineate the work zone.
โข Periodic overnight noise from construction activity including use of a hydro-vacuum truck,
excavator, and hand tools, can expected.
โข Noise mitigation measures will be implemented to reduce disruption caused by this work.
INSERT FOOTER
PILE INSTALLATION
13. TRAFFIC CONFIGURATION PILE REMOVALS โ STAGE 1
13
CENTRAL WEST WORKS MONTHLY MEETING
As early as March 15, 2021 for approximately three (3) weeks
โข Monday โ Friday; 7:00 p.m. โ 5:00 a.m.
AREA OF
WORK
14. TRAFFIC CONFIGURATION PILE REMOVALSโ STAGE 2
14
CENTRAL WEST WORKS MONTHLY MEETING
Early April 2021 for approximately three (3) weeks
โข Monday โ Friday; 7:00 p.m. โ 5:00 a.m.
AREA
OF
WORK