Water treatment involves removing impurities from water through physical, chemical, and biological processes to make it safe for human use. It aims to remove contaminants and improve water quality. The key processes are physical treatments like screening and sedimentation that use physical forces, chemical treatments like coagulation and disinfection that rely on chemical reactions, and biological treatments like aeration that use microorganisms. Sedimentation is an important process where suspended particles are removed from water by gravitational settling in tanks called sedimentation basins or clarifiers.
Here you will get all information about sewer design, its type & various tests carried out on it for any leakage or any obstruction present and of improper joints.
Hydraulic Design of Sewer:
Hydraulic formulae, maximum and minimum velocities in sewer, hydraulic
characteristics of circular sewer in running full and partial full conditions,
laying and testing of sewer, sewer appurtenances and network.
Here you will get all information about sewer design, its type & various tests carried out on it for any leakage or any obstruction present and of improper joints.
Hydraulic Design of Sewer:
Hydraulic formulae, maximum and minimum velocities in sewer, hydraulic
characteristics of circular sewer in running full and partial full conditions,
laying and testing of sewer, sewer appurtenances and network.
Components of Water Treatment Plant, Methods of Water Treatment, Process of Water Treatment such as Aeration, Sedimentation, Filtration and Disinfection etc.
WATER & WASTE WATER ENGINEERING - water treatment process & unitsEddy Ankit Gangani
This presentation is made with a view to introduce various units & processes carried out in water treatment plant with various trains or say chains of units to meet Indian Standard criteria.
water demand, types of demand, factors affecting per capita demand, design periods, losses in wastes & thefts, varion in demand, coincident draft,effect of variations on components of water supply schemes, factors affecting design periods, population forecasting methods, problems on population forecasting, etc
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Filtration unit in water treatment plantAamir Patni
This document explains deeply about the filtration unit of the water treatment plant. Here we have tried our best to give brief about the types, working, construction and comparison of different filters used in water treatment plant. Hope this will help you.
Components of Water Treatment Plant, Methods of Water Treatment, Process of Water Treatment such as Aeration, Sedimentation, Filtration and Disinfection etc.
WATER & WASTE WATER ENGINEERING - water treatment process & unitsEddy Ankit Gangani
This presentation is made with a view to introduce various units & processes carried out in water treatment plant with various trains or say chains of units to meet Indian Standard criteria.
water demand, types of demand, factors affecting per capita demand, design periods, losses in wastes & thefts, varion in demand, coincident draft,effect of variations on components of water supply schemes, factors affecting design periods, population forecasting methods, problems on population forecasting, etc
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Lecture notes of Environmental Engineering-II as per Solapur university syllabus of TE CIVIL.
Prepared by
Prof S S Jahagirdar,
Associate Professor,
N K Orchid college of Engg and Technology,
Solapur
Filtration unit in water treatment plantAamir Patni
This document explains deeply about the filtration unit of the water treatment plant. Here we have tried our best to give brief about the types, working, construction and comparison of different filters used in water treatment plant. Hope this will help you.
This presentation provides with information regarding the processes , methods , applications of Water Treatment and simple design of water treatment filters. It incorporates chlorination, aeration, and other miscellaneous methods for water treatment
International Journal of Engineering Research and Applications (IJERA) is an open access online peer reviewed international journal that publishes research and review articles in the fields of Computer Science, Neural Networks, Electrical Engineering, Software Engineering, Information Technology, Mechanical Engineering, Chemical Engineering, Plastic Engineering, Food Technology, Textile Engineering, Nano Technology & science, Power Electronics, Electronics & Communication Engineering, Computational mathematics, Image processing, Civil Engineering, Structural Engineering, Environmental Engineering, VLSI Testing & Low Power VLSI Design etc.
This ppt explains the Soild-Liquid Seperation process and the interceptors used for them.The whole presentations explains the introduction of Solid Waste Management with the help of interceptors.
06 Treatment of water -Filtration and Water Softeningakashpadole
The presentation has prepared as per the syllabus of Mumbai University.
Go through the presentation, if you like it then share it with your friends and classmates.
Thank you :)
Tidal Flow Constructed Wetland: An Overviewinventy
Research Inventy : International Journal of Engineering and Science is published by the group of young academic and industrial researchers with 12 Issues per year. It is an online as well as print version open access journal that provides rapid publication (monthly) of articles in all areas of the subject such as: civil, mechanical, chemical, electronic and computer engineering as well as production and information technology. The Journal welcomes the submission of manuscripts that meet the general criteria of significance and scientific excellence. Papers will be published by rapid process within 20 days after acceptance and peer review process takes only 7 days. All articles published in Research Inventy will be peer-reviewed.
Similar to CE3303 UNIT 2 WATER TREATMENT PPT.pptx (20)
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
Presented at NUS: Fuzzing and Software Security Summer School 2024
This keynote talks about the democratization of fuzzing at scale, highlighting the collaboration between open source communities, academia, and industry to advance the field of fuzzing. It delves into the history of fuzzing, the development of scalable fuzzing platforms, and the empowerment of community-driven research. The talk will further discuss recent advancements leveraging AI/ML and offer insights into the future evolution of the fuzzing landscape.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Cosmetic shop management system project report.pdfKamal Acharya
Buying new cosmetic products is difficult. It can even be scary for those who have sensitive skin and are prone to skin trouble. The information needed to alleviate this problem is on the back of each product, but it's thought to interpret those ingredient lists unless you have a background in chemistry.
Instead of buying and hoping for the best, we can use data science to help us predict which products may be good fits for us. It includes various function programs to do the above mentioned tasks.
Data file handling has been effectively used in the program.
The automated cosmetic shop management system should deal with the automation of general workflow and administration process of the shop. The main processes of the system focus on customer's request where the system is able to search the most appropriate products and deliver it to the customers. It should help the employees to quickly identify the list of cosmetic product that have reached the minimum quantity and also keep a track of expired date for each cosmetic product. It should help the employees to find the rack number in which the product is placed.It is also Faster and more efficient way.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
CE3303 UNIT 2 WATER TREATMENT PPT.pptx
1. Unit 2 Water Treatment
CE3303 water supply and waste
water engineering
Department of civil engineering
1
PREPARED BY M.Vinitha AP/Civil
2. Water Treatment :-
1) It is the removal impurities from the water, which are harmful the human health
(Environment).
2) It is the process for enhancing the quality of water so that it meets water quality
criteria for its fitness for particularpurpose.
3) Water treatment is processes that makes water more acceptable for an end-use,
which may be used for drinking, industry, or medicine.
2
PREPARED BY M.Vinitha AP/Civil
3. Water Treatments :-
Water treatment is a combination of physical, chemical & biological processes.
These are three types of unit operation and unit processes.
1) Physical Unit Operation: in which physical forces are predominate for removal
of impurities. (screening, equalization, mixing, flocculation, sedimentation,
floatation, etc.)
2) Chemical Unit Processes: in which removal of contamination are brought about
by chemical activity. (chemical precipitation, disinfection, gas transfer,
adsorption, etc.)
3) Biological Unit Processes: : in which removal of contamination are brought
about by biological activity. (Aerobic, Anaerobic & Aerobic-anaerobic
Biological Unit processes)
3
PREPARED BY M.Vinitha AP/Civil
4. Biological Unit Processes:
in which removal of contamination are brought about by biological activity.
(Aerobic , Anaerobic & Aerobic-anaerobic Biological Unit processes)
1) Aerobic Biological Unit Processes: removal of impurities or decomposition of
organic matter in presence of oxygen (RSF, Trickling filter, aerated lagoons, etc)
2) Anaerobic Biological Unit Processes: removal impurities or decomposition of
organic matter in absence of oxygen (anaerobic lagoons, etc)
3) Aerobic-Anaeerobic Biological Unit Processes: combination of above two
(stabilization pond etc)
4
PREPARED BY M.Vinitha
5. Methods of Water Treatment :-
1) Screening
2) Aeration
3) Plain Sedimentation or Primary Sedimentation.
4) Coagulation & Flocculation
5) Secondary Sedimentation or Sedimentation with Coagulant (Clarifier,
Clariflocculator)
6) Filtration
7) Disinfection
8) Softening etc.
5
PREPARED BY M.Vinitha
9. Treatment Units & Function :-
1) Screens : To remove large size floating matter like debris, fish, vegetation,
garbage, etc. from the raw water by protective bar screen.
2) Aeration: To add dissolved oxygen in water.
3) Plain sedimentation: To remove settleable suspended solids & other matter by
passing water through large volume tanks where the flow speed slowsdown.
4) Coagulation: To Add coagulant in water.
5) Flocculation: To form floc in water.
6) Secondary sedimentation (Clarifier, Clariflocculator): water is applied to
large volume tanks where the flow speed slows down and the suspended solids
or floc are removed.
7) Filtration: To trap remaining impurities by physical straining.
8) Disinfection: To kill pathogens.
9) Softening: To remove hardness of water.
9
PREPARED BY M.Vinitha
10. Screens :-
1) Screening devices are the 1st unit operation in treatmentplant
2) To remove large size floating particles such as debris, animals, bushes, pieces of
woods, plastics, leaves, aquatic plants, rags, solids, lumber, tree, branches, roots,
etc.
3) It consists of parallel bars, rods or wire, grating, wire mesh or perforated plate,
having opening of any shape but circular & rectangular arecommon.
4) The materials removed by these devices are termed as screening.
5) The screenings are usually no biodegradable materials & can be used for land
filling purposes.
6) To prevent the pump, pipe, other equipment from getting damage or clogging.
7) To increase the efficiency of other treatment process.
10
PREPARED BY M.Vinitha
11. Screens :-
1) To prevent the pump, pipe, other equipment from getting damage or clogging.
2) To increase the efficiency of other treatment process.
Types of Screens:-
1) Fine Screens (Opening < 25 mm)
2) Medium Screens (Opening = 25 to 50 mm)
3) Coarse Screens (Opening = 50 to 150 mm)
11
PREPARED BY M.Vinitha
12. Coarse Screens :-
1) Are classified as either bar racks (trash racks) or bar screen.
2) It consists of parallel bars or rods of steel or stainlesssteel.
3) It can be used to entrap the coarse materials to protect the damaging of pumping
units.
4) Bar racks are used as pretreatment applications. These bar racks may be hand
cleaned if small in size or mechanical cleaned if large sizes.
5) To prevent the settling of coarse materials in the channel, the velocity inthe
approach channel must be in range of 0.3 m/sec to 0.6 m/sec.
6) Width of the bar 5 mm to 15 mm.
7) Allowable headloss 150 mm.
12
PREPARED BY M.Vinitha
15. Aeration :-
1) Aeration is the process of exchange of gases by creating good interfacebetween
liquid phase and gas phase.
2) It is the process of bringing water in intimate contact with air, while doing sothe
water absorbs oxygen from the air.
3) CO2 can remove upto 60%.
4) Iron, Manganese.
5) H2S & other gases are also removed up-to certain extent from thewater.
15
PREPARED BY M.Vinitha
16. Objectives of Aeration :-
1) To add the oxygen, to impart freshness to water.
2) To remove or decrease the CO2 content of water & thereby raises its pH value.
3) To remove H2S content of water & thereby removal ofodor.
4) To remove CH4 & taste caused due to organicdecomposition.
5) To convert iron & manganese from their soluble states to their insoluble states,
so that these can be precipitated & removed and thereby we can remove color,
taste & odor.
6) To add oxygen, to oxidize organic matter & thereby removal of volatile
substances.
16
PREPARED BY M.Vinitha
17. Factors Affecting Aeration Process :-
1) If the partial pressure is more, more will be the solubility & rate of exchange of gas &
thereby more will be aeration.
2) If the temperature of water is less, less will be the solubility & less will be aeration.
3) If the concentration of impurities is more then solubility will be less & thereby aeration
will be less.
4) If the surface area of interface is more, more will be the rate of exchange of gases &
thereby aeration will be more.
5) If the thickness of interface is more, less will be the rate of exchange of gas & thereby
aeration will be less.
6) If time of contact is more then more will be exchange of gas & thereby aeration will be
more.
7) If degree of under saturation is more then fast will be rate of exchange & thereby
aeration will be more.
17
PREPARED BY M.Vinitha
18. Limitation of Aerations :-
1) It is not an efficient process for removal of tastes & odors caused by relatively non-
volatile substances such as oils, algae & industrial wastewater.
2) Odor removal is 50% when symura bacteria is present.
3) Aeration may add more oxygen in water & making it more corrosive.
4) Fe & Mn can not be precipitated by aeration when organic matter is present.
5) Possibility of air borne contamination is there.
6) Additional lime may be required to neutralize the CO2 that would be removed byaeration
7) Aeration is not economical in colder months or state or area.
18
PREPARED BY M.Vinitha
19. Types of Aerators :-
1) Spray Aerators.
2) Diffused Air Aerators.
3) Gravity Aerators:
a) Cascade Aerator
b) Multiple Tray Aerator
c) Inclined ApronAerator
d) Slopping TrayAerator.
19
PREPARED BY M.Vinitha
20. Cascade Aerators :-
1) Simplest free fall aerator.
2) Waterfalls & weirs of any kind are cascade aerator.
3) Water allowed to fall through a certain height of 1 to 3 m due to this water comes into
close contact with air.
4) It consist of 3 to 9 steps of concrete or metal.
5) Rise of steps should be 20 to 50 cm.
20
PREPARED BY M.Vinitha
22. Inclined Apron Aerators :-
1) Water allowed to fall along an inclined apron which is usually studded with riffle plates.
2) Due to the riffle plates water jumps into the atmosphere causing more aeration.
22
PREPARED BY M.Vinitha
23. Multiple Tray Aerators :-
1) Consists of closely stack perforated trays or panel.
2) Water is allowed to fall freely from tray to tray due to which water comes in contact with
air.
23
PREPARED BY M.Vinitha
24. Spray Aerators :-
1) Spray aerator divide the water flow into fine streams & small droplets which come into
intimates contact with the air in their trajectory.
2) Water is sprinkled into atmosphere in the form of fine spray or jets or droplets through
nozzles.
3) It requires considerable head (0.75 to 1.5 Kg/cm2) 2 to 9m.
4) Reduces CO2 by 70 % or more & H2S by 90% or more.
24
PREPARED BY M.Vinitha
25. Diffused Air Aerator:-
1) Perforated pipe network is installed at the bottom of tank & compressed air is blown
through these pipes.
2) The air bubbles travel upward through water, thus causing aeration.
3) Air diffuser basins have a retention period of about 10 to 30 minutes, depth of 3 to 5m &
width of 3 to 9m..
25
PREPARED BY M.Vinitha
26. Design Criteria for Design of Cascade Aerator:-
Area required for Design of Aerator = 0.015 – 0.045m2/m3/hr.
No. of cascade = 3 to 9.
Height of aerator = 1 to 3m.
Rise of each step = 20 to 50 cm.
Velocity of inlet pipe = 0.3 to 0.9 m/s
26
PREPARED BY M.Vinitha
27. Sedimentation
1) Discrete or granular particle are those which do not change their size, shape & weight.
2) The other type of particles are those which change their size, shape & weight and thus
loose their identity.
3) Settling- process by which particulates settle to the bottom of a liquid and form a
sediment.
4) Sedimentation is process by which the suspended particles that are heavier than water
are removed by gravitational settling.
5) The basin in which the flow of water is retarded or storage is offered is called the settling
tank or sedimentation tank or basin or clarifier.
6) The average time theoretically for which the water is detained in the tank is called
detention period.
7) Sedimentation process can remove 60% of S.S. & 75% of Bacteria.
8) Floatation is a process by which lighter particles can remove.
27
PREPARED BY M.Vinitha AP/Civil
28. Factors Affecting Sedimentation:
1) Flow velocity
2) Viscosity of water
3) Temperature
4) Size of particle
5) Shape of particle
6) Specific gravity of particle
Characteristics of the particles
Size and shape
Specific gravity
Properties of the water
Specific gravity
Viscosity
Physical environment of the particle
Velocity of the water
Inlet and outlet arrangements of the structure
28
PREPARED BY M.Vinitha AP/Civil
29. Advantages of Sedimentation:-
Simplest technologies
Little energy input
Relatively inexpensive to install and operate
No specialized operational skills
Easily incorporated into new or existing facilities
Disadvantages of Sedimentation:-
Low hydraulic loading rates
Poor removal of small suspended solids
Large floor space requirements
Re-suspension of solids.
29
PREPARED BY M.Vinitha AP/Civil
30. Types of Sedimentation Tank
A. Depending upon shape:
1) Circular
2) Rectangular
3) Square
B. Depending on process of operation:
1) Continuous Tank:
Raw water continuously admitted into the tank and allowed to flow slowly to settle
down particles which is suspension. Flow velocity of water is reduced by providing
sufficient length of travel. This tank is designed such that the time taken by the
water particle to travel from one end to another end is kept slightly more than the
time required for settling of suspended particles in water.
2) Intermittent Tank: (Quiescent Type or Fill & Draw Type)
In this tank, water is completely brought to rest. This type of tank works
intermittently. 30
PREPARED BY M.Vinitha AP/Civil
31. 1) Horizontal Flow Tanks:
a) Rectangular Tanks with Longitudinal Flow
b) Circular Tanks with Radial Flow
2) Vertical Flow Tanks: ( Tube Settlers or Plate Settlers)
Series of very small tubes is known ass tube settlers. Tubes may be square,
circular, rectangular, triangular, hexagonal, etc.
Doubling the surface area by inserting tray in a settling tank would double the
settling capacity of the tank. Tubes provides laminar flow condition.
31
PREPARED BY M.Vinitha AP/Civil
32. SEDIMENTATION BASIN ZONES
1) Inlet Zone: The inlet or influent zone should distribute flow uniformly across the
inlet to the tank. The normal design includes baffles that gently spread the flow
across the total inlet of the tank and prevent short circuiting in the tank.
2) Settling Zone: The settling zone is the largest portion of the sedimentation basin.
This zone provides the calm area necessary for the suspended particles to settle.
3) Sludge Zone: The sludge zone, located at the bottom of the tank, provides a
storage area for the sludge before it is removed for additional treatment or
disposal. Sludge is removed for further treatment from the sludge zone by scraper
or vacuum devices which move along the bottom.
4) Outlet Zone : The basin outlet zone (or launder) should provide a smooth
transition from the sedimentation zone to the outlet from the tank. This area of the
tank also controls the depth of water in the basin.
32
PREPARED BY M.Vinitha AP/Civil
41. Types of Settling:-
Depending upon the concentration of solids and the tendency of a particle to interact the following
types of settling may occur
Type I: Discrete Settling:
1) This corresponds to the sedimentation of discrete particle in a suspension of low solids
concentration.
2) No interaction between particles
3) Settling velocity is constant for individual particles
Type II: Hindered Settling:
1) This type of settling refers to dilute suspension of particles that flocculate during
sedimentation process.
2) Highest settling velocity occurs in this zone.
41
PREPARED BY M.Vinitha AP/Civil
42. Type III: Zone of Settling:
1) Refers to flocculent suspension of Intermediate solids concentration
2) Solids move as a block rather than individual particles
3) Mass of particles subside as whole
Type IV: Compression settling
1) Flocculent suspension of high concentration.
2) Volume of solids may decrease
42
PREPARED BY M.Vinitha AP/Civil
43. Inlet & Outlet Arrangement for Sedimentation Tank
43
PREPARED BY M.Vinitha AP/Civil
45. Design Concept of Sedimentation:
1) Flow Velocity, vH = (Q/(B x H))
2) Over Flow Rate = Surface Loading, vO = (Q/(B x L))
3) Settling Velocity, vs :- (vH / vS ) = (L / H)
4) Particles with settling velocity ‘vS’ equal to or greater than vO will settle down.
5) Over flow rate = 500 to 750 lit/Hr/m2 ( Plain Sedimentation)
6) Over flow rate = 1000 to 1250 lit/Hr/m2 ( Sedimentation with coagulation)
7) Length of Tank (L) greater than 4B (Width of tank, B should not exceed 12 m)
45
PREPARED BY M.Vinitha AP/Civil
46. Design Concept of Sedimentation:
4) Flow velocity = 0.15 to 0.9 m/min.
5) Detention Time = 4 to 8 Hrs
6) Length of Tank = L = vH x DT
7) Volume of Tank, V = Q x DT
8) Depth of Tank = 3 to 4.5 m
9) Flow Velocity, vH = (Q/(B x H))
10) C/S Area of Tank = V / L
11)C/S Area = Q / vH vH = (Q / (B x H))
12) C/S Area of Tank = B x H
13)Provision for Sludge = 0.3 to 1.2 m & F.B. = 0.3 to 0.5m 46
PREPARED BY M.Vinitha AP/Civil
49. sedimentation
A circular sedimentation tank is generally provided with its bottom cone
shaped with a slope of 1 vertical to 12 horizontal. Under this condition, its
diameter is given by:
V = D2 (0.011 D + 0.785 H)
49
PREPARED BY M.Vinitha AP/Civil
50. 2) Design a plain sedimentation tank for max. daily demand of water 9.5 x 106 lit / day.
Assume the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit / day = 395833.33 lit / Hr
50
PREPARED BY M.Vinitha AP/Civil
51. 2) Design a plain sedimentation tank for daily demand of water 9.5 x 106 lit / day. Assume
the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit / day = 395833.33 lit / Hr = 395.83 m3/Hr
Capacity of Sedimentation tank required = V = Q x DT = 395.83 x 8
= 3167 m3
51
PREPARED BY M.Vinitha AP/Civil
52. 2) Design a plain sedimentation tank for max. daily demand of water 9.5 x 106 lit / day.
Assume the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit / day = 395833.33 lit / Hr = 395.83 m3/Hr
Capacity of Sedimentation tank required = V = Q x DT = 395.83 x 8
= 3167 m3
Velocity of flow to be maintained through the tank, v = 20 cm / min = 0.2 m / min.
The length of tank required, L = v x DT = 0.2 x 8 x 60 = 96 m
52
PREPARED BY M.Vinitha AP/Civil
53. 2) Design a plain sedimentation tank for max. daily demand of water 9.5 x 106 lit / day.
Assume the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit / day = 395833.33 lit / Hr = 395.83 m3/Hr
Capacity of Sedimentation tank required = V = Q x DT = 395.83 x 8
= 3167 m3
Velocity of flow to be maintained through the tank, v = 20 cm / min = 0.2 m / min.
The length of tank required, L = v x DT = 0.2 x 8 x 60 = 96 m
The c/s area of the tank is required = ( Capacity of tank / Length of Tank )
= 3167 / 96 = 32.99 m2
53
PREPARED BY M.Vinitha AP/Civil
54. 2) Design a plain sedimentation tank for max. daily demand of water 9.5 x 106 lit / day.
Assume the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit / day = 395833.33 lit / Hr = 395.83 m3/Hr
Capacity of Sedimentation tank required = V = Q x DT = 395.83 x 8
= 3167 m3
Velocity of flow to be maintained through the tank, v = 20 cm / min = 0.2 m / min.
The length of tank required, L = v x DT = 0.2 x 8 x 60 = 96 m
The c/s area of the tank is required = ( Capacity of tank / Length of Tank )
= 3167 / 96 = 32.99 m2
Assuming the water depth in the tank is 4 m.
The width of tank , B = C/S Area / Depth = 32.99 / 4 = 8.25 m (< 12m)
54
PREPARED BY M.Vinitha AP/Civil
55. 2) Design a plain sedimentation tank for max. daily demand of water 9.5 x 106 lit /
day. Assume the velocity of flow to be 20 cm / minute and detention time 8 hours.
Ans: Quantity of water to be treated = 9.5 x 106 lit/day = 395833.33 lit/Hr = 395.83 m3/Hr
Capacity of Sedimentation tank required = V = Q x DT = 395.83 x 8
= 3167 m3
Velocity of flow to be maintained through the tank, v = 20 cm / min = 0.2 m / min.
The length of tank required, L = v x DT = 0.2 x 8 x 60 = 96 m
The c/s area of the tank is required = ( Capacity of tank / Length of Tank )
= 3167 / 96 = 32.99 m2
Assuming the water depth in the tank is 4 m.
The width of tank , B = C/s area / Depth = 32.99/4 = 8.25 m (< 12m)
FB = 0.3m
Depth for sludge = 0.3 m
Overall Depth of Tank = 4 + 0.3 + 0.3 = 4.6 m
Dimension of Tank = 96 x 8.25 x 4.6m 55
PREPARED BY M.Vinitha AP/Civil
56. 3) Design a plain sedimentation tank for a population of 100000 with water
supply rate 135 lpcd.
56
PREPARED BY M.Vinitha AP/Civil
57. 3) Design a plain sedimentation tank for a population of 100000 with average
water supply rate 135 LPCD.
Ans: Quantity of water to be treated = 100000 x 135 x 1.8 = 1012.5 m3/ Hr
Assuming Detention Time = 6 Hours
Capacity of Sedimentation tank required = V = Q x DT = 1012.5 x 6
= 6075 m3
57
PREPARED BY M.Vinitha AP/Civil
58. 3) Design a plain sedimentation tank for a population of 100000 with water
supply rate 135 LPCD.
Ans: Quantity of water to be treated = 100000 x 135 x 1.8 = 1012.5 m3/ Hr
Assuming Detention Time = 6 Hours
Capacity of Sedimentation tank required = V = Q x DT = 1012.5 x 6
= 6075 m3
Assuming Velocity of flow through the tank, v = 0.6 m / min.
The length of tank required, L = v x DT = 0.6 x 6 x 60 = 216 m
58
PREPARED BY M.Vinitha AP/Civil
59. 3) Design a plain sedimentation tank for a population of 100000 with water supply
rate 135 LPCD.
Ans: Quantity of water to be treated = 100000 x 135 x 1.8 = 1012.5 m3/ Hr
Assuming Detention Time = 6 Hours
Capacity of Sedimentation tank required = V = Q x DT = 1012.5 x 6
= 6075 m3
Assuming Velocity of flow through the tank, v = 0.6 m / min.
The length of tank required, L = v x DT = 0.6 x 6 x 60 = 216 m
The c/s area of the tank is required = ( Capacity of tank / Length of Tank )
= 6025 / 216 = 28.125 m2
Assuming the water depth in the tank is 4 m.
The width of tank , B = C/s area / Depth = 28.125/4 = 7.03 m (< 12m)
FB = 0.3m
Depth for sludge = 0.3m
Overall Depth of Tank = 4 + 0.3 + 0.3 = 4.6 m
Dimension of Tank = 216 x 7.03 x 4.6m 59
PREPARED BY M.Vinitha AP/Civil
60. Over Flow Rate = Surface Loading, vO = (Q / (B x L))
Over flow rate = 500 to 750 lit / Hr /m2 ( Plain Sedimentation)
Check for Que. 02 :-
vO = (Q / (B x L))
vO = (395834 / (8.25 x 96))
vO = 500 Lit / Hr /m2
Check for Que. 03 :-
vO = (Q / (B x L))
vO = (1012.5 / (7.03 x 216))
vO = 666.78 Lit / Hr /m2
60
PREPARED BY M.Vinitha AP/Civil
61. Coagulation:-
1) Process of mixing or adding certain chemicals to form insoluble precipitate
for absorbing suspended & colloidal matter
2) Certain chemicals is called Coagulant. Ex. Alum
3) Finely divided impurities not removed in plain sedimentation without
longer detention periods
4) To Remove turbidity up to 20 NTU & bacterial load by 70%
5) Adopted when turbidity more than 40 NTU
6) Coagulant produces thick gelatinous precipitate & has the property of
arresting & attracting the suspended matter
7) Floc posses +ve charge & impurities has – ve charge
61
PREPARED BY M.Vinitha
62. Why Coagulation :-
1) Even after sedimentation, some finely divided particles such as clay and
coloring matter are held in suspension.
2) These are removed only if their size is increased by using some chemical
compounds.
3) In coagulation, coagulants are added and particles are made to settle down by
neutralization.
62
PREPARED BY M.Vinitha
63. Factors Affecting Coagulation:-
1) Dose of coagulant
2) Type of coagulant
3) Form of coagulant
4) Type of mixing
5) Type of feeding
6) pH value
7) Temperature
8) Impurities
9) Time
63
PREPARED BY M.Vinitha
65. Alum:-
1) Widely used due to easy availability and minimum cost
2) Recovery is possible and recovery cost is just ¼ th of cost of alum
3) Dose of alum = 10 to 30mg/l
4) Effective when pH = 6.5 to 8.5
5) Requires presence of alkalinity in water
6) Many water have bicarbonate alkalinity naturally
Al2(SO4)3.18H2O + 3Ca(HCO3)2 = 2Al(OH)3 + 3 CaSO4 + 6CO2 + 18H2O
Above reaction indicate that 1 mg of Al3+, reacting with 5.56 mg of alkalinity as
CaCO3, Form 2.89 mg of aluminium hydroxide flocs.
If insufficient alkalinity in water then lime will be added in water then reaction will be
Al2(SO4)3.18H2O + 3Ca(OH)2 = 2Al(OH)3 + CaSO4 + 18H2O
Sometimes soda also added into water
Al2(SO4)3.18H2O + 3NaCO2 = 2Al(OH)3 + 3 NaSO4 + 3CO2 + 18H2O
Soda ash doesn’t cause hardness but expansive than lime
65
PREPARED BY M.Vinitha
66. Advantages of Alum:-
1) Reduces taste and odor in addition to turbidity
2) Cheap and easily available
3) Simple in working
4) Doesn’t required skilled labor
5) Crystal clear water
6) Heavy and better floc
7) Quite tough to broken down
66
PREPARED BY M.Vinitha
67. Disadvantages of Alum:-
1) Difficult to dewater the sludge
2) Sludge is not easy to dispose off
3) Imparts permanent hardness CaSO4
4) Produces CO2 and can causecorrosion
5) Effective pH range is very small (6.5 to 8.5)
67
PREPARED BY M.Vinitha
68. Iron compounds as a coagulant:-
1) Ferrous Sulphate, Ferric Chloride and Ferric Sulphate
2) Ferrous sulphate is known as Copperas used as coagulant in conjunction with lime.
FeSO4. 7H2O + Ca (HCO3)2 = Fe (HCO3)2 + CaSO4 + 7 H2O
Fe (HCO3)2 + 2 Ca (OH)2 = Fe (OH)2 + 2 CaCO3 + 2 H2O
1) Further Fe (OH)2 Ferrous Hydroxide is converted to Fe (OH)3 Ferric Hydroxide.
2) Dose of Iron salt depend upon on turbidity, natural alkalinity & CO2 in water.
3) Because of addition of lime, color of water may be permanently set.
4) Moreover iron salt are less expensive than alum but skilled supervision is required.
68
PREPARED BY M.Vinitha
69. Advantages of Iron compounds as a coagulant:-
1) Floc produced is heavy and readily settles under favorable conditions.
2) They are more efficient & requires less time for reaction.
3) Active over a pH range of 3.8 to 10.
4) Cost of treatment is usually low.
5) Widely used for industrial purpose but less often forpotable.
6) Removes H2S, taste, odor etc
69
PREPARED BY M.Vinitha
70. Disadvantages of Iron salt as coagulant:-
1) Iron salt causes staining.
2) Iron salt are difficult to store and handle.
3) Lime is required to be added which increases cost of treatment.
4) Promotes growth of iron bacteria & adversely affect the RSFprocess.
5) Imparts more corrosiveness than alum.
6) To maintain proper dosage skilled labor is required.
7) Ferrous fluoride introduces fluorine in supply which can cause ‘mottledteeth.
8) By Addition of lime, the color of water may be permanently set.
70
PREPARED BY M.Vinitha
71. Coagulants Aids:-
Certain chemicals added to increase rate of reaction, to reduce the coagulant
dose, to extend the optimum pH range, to produce faster and tougherflocs.
1) Activated silica.
2) Bentonite clay.
3) Lime.
4) Soda ash.
5) Polyelectrolyte.
71
PREPARED BY M.Vinitha
72. Jar Test :-
Consists of jar test assembly.
Used to determine optimum coagulant dose.
Sample (1L) has to placed into number of beaker.
Various amounts of dose in each beaker is added.
Paddle speed = 100 rpm for 1 minute then make it slow for next 10 to25
minutes with 40 rpm.
After fast & slow mixing allow it to settle down for 30 minutes.
Smallest dose that produces a more floc is optimum coagulant dose.
This is trial and error method.
One factor is varying and others are constant. 72
PREPARED BY M.Vinitha
74. Feeding Methods for Coagulant:-
1) There are two methods: Dry feeding and Wet feeding.
2) Choice between dry & wet feeding depends on characterization of coagulants,
convenience of its application, dosage of coagulant and size of plant.
3) Alum being uniform in grain size and not affected by atmospheric moisture can
be fed by dry feeding.
4) Iron salt can not be fed by dry feeding due to hygroscopic property.
5) If dose of coagulant is small and accuracy is needed then coagulant must be fed
in a solution form.
6) Generally for large treatment plant wet feeding is adopted and for small treatment
plant dry feeding is adopted because of more cost of wet feeding device.
74
PREPARED BY M.Vinitha
75. 1) Dry feeding:-
Simple in operation
Requires less space
Feeding machine is cheaper
Control of dose is difficult
Old method
Powder form
75
PREPARED BY M.Vinitha
76. 2) Wet feeding:-
Equipment can be adjusted more readily and easily controlled. Solution is prepared and
stored in tank. Corrosive chemicals creates problems in wet feeding
Water level in mixing channel increases, water level in float chamber also increases,
thereby float rises and pinion rotates pulley which lifts the plug and more quantity of
coagulant solution is supplied.
76
PREPARED BY M.Vinitha
77. Mixing Devices:-
Floc formation depends on the mixing of coagulant.
Point of turbulence.
Methods of mixing:-
1. Centrifugal pump
2. Compressed air agitation
3. Narrow mixing channel with flume
4. Mixing basin with baffle wall
5. Mixing with mechanical devices
77
PREPARED BY M.Vinitha
78. 1) Centrifugal pump
Used to raise the water to settling tank
Dose can be added to the suction pipe
Water with coagulant passes through the impeller of the pump, mixing by
agitation
2) Compressed air agitation:-
Water with coagulant is agitated by compressed air frombottom
78
PREPARED BY M.Vinitha
79. 3) Narrow mixing channel with flume (Hydraulic jump)
Coagulant fed from feeding tank.
Turbulence caused by vertical baffle mixes the chemical.
Flume provided to develop the hydraulic jump for turbulence.
79
PREPARED BY M.Vinitha
80. 4) Mixing basin with baffle wall:-
Water flows horizontally for short distance complete turns & continuous back&
forth around the ends of baffle. This cause turbulence &mixing
80
PREPARED BY M.Vinitha
81. 5) Mixing with mechanical device:-
1) Most of WTP have mechanical devices ie Flash Mixer
2) Coagulant agitated vigorously by paddle
3) Propeller type impeller in flash mixer with speed of 100 to 1400 rpm
4) Detention time , t = 30 to 60 sec.
5) Velocity gradient, G = 300 to 600 sec-1
6) Power requirements = 1 to 3 watts per m3/hr
81
PREPARED BY M.Vinitha
82. Flash Mixer:-
Typical mixing with mechanical driven impeller or paddle.
Impeller provided at lower end of vertical shaft driven by motor in a deep circular
or rectangular tank.
Impeller is rotated more than 100 RPM.
82
PREPARED BY M.Vinitha
84. Flocculation:
The process of floc formation. After mixing, slow and gentle stirring is permitted to
agglomerate the floc.
84
PREPARED BY M.Vinitha
86. Clariflocculator :-
1) Consists of feeding devices, mixing devices, flocculator & settlingbasin.
2) Coagulant fed through feeding devices
3) Mixed and agitated in the mixing basin
4) Allowed to agglomerate in flocculation tank
5) Flocculated water passed into sedimentation tank
6) Clarified water taken out through outlet to RSF
7) Removes turbidity up to 20 NTU and 70 % of bacterial load
86
PREPARED BY M.Vinitha
91. Design criteria for flash mixer:-
1) Temporal mean velocity gradient, G = 300 to 600 sec.-1
2) Power requirements = 1 to 3 watts per m3 per hour
3) RPM of Impeller = 100 to 1400 rpm
4) Ratio of tank dia. To impeller dia. = 5:1 to 3:1
5) Tangential velocity of impeller = 3 m/s at blade tip
6) Ratio of tank ht to tank dia. = 1:1 to 3:1
7) Product, G.t =18000
8) G = (P/uV)1/2
91
PREPARED BY M.Vinitha
92. Design Criteria For Flocculator :-
1) Temporal mean velocity gradient, G = 10 to 75 sec.-1
2) Power requirements = 10 to 36 Killo watts per MLD
3) RPM of Impeller = 4.5 rpm
4) Velocity of blades = 0.2 to 0.6 m/s
5) Velocity of flow = 0.2 to 0.8 m/s
6) Outlet flow velocity = 0.15 to 0.25 m/s
7) Ratio of tank ht to tank dia. = 1:1 to 3:1
8) Product, G.t = 10000 to 100000
9) G = (P/uV)1/2
10) Area of paddles = 10 to 25 % of c/s area of tank
11) Velocity ratio, k = 0.25
12) Kinematic viscosity, u= 1.0087x10-3 at200c
13) Density, ρ = 998 kg/m3 at 200c
14) Dept of tank = 3 to 4.5m 92
PREPARED BY M.Vinitha
93. Filtration
1) Process of removal of impurities like very fine suspended particles,
bacteria, color, taste, etc. by passing the water thorough bed of granular
materials.
2) Types of filter:
1) SSF
2) RSF
3) Pressure Filter
93
PREPARED BY M.Vinitha AP/Civil
96. Slow Sand Filter
Construction:-
1) Open basin rectangular in size
2) Watertight shallow tank constructed in stone or brick masonry
3) Depth of tank 2.5 to 4m
4) Surface area 100 to 2000 sq. m
5) Filtration rate 100 to 200 liters per hour per sq. m.
6) Total depth of media 90 to 110 cm.
7) Sand depth 60 to 90 cm and Gravel bed 30 to 60 cm
8) Bed slope 1 in 100 to 1 in 200 towards central drain
9) Finer sand better bacterial removal efficiency but slower filtration rate
10) Effective size of sand (D10) 0.2 to 0.35
11) Uniformity coefficient (D60/D10) 2 to 3
96
PREPARED BY M.Vinitha AP/Civil
97. Slow Sand Filter
Operation:-
1) Waters should not be coagulated.
2) Filter is filled with a raw water to a depth of 1 to 1.5 m above the
surface of sand.
3) Water is passed with filtration rate 100 to 200 liters/hr/sq. m.
4) Loss of head 60 cm.
5) For cleaning 20 to 30 cm top sand is scraped & replaced.
6) First filter water is collected by under drainage system.
97
PREPARED BY M.Vinitha AP/Civil
98. Slow Sand Filter
1) Removes about 98 to 99 % of bacterial load
2) Removes turbidity.
3) Less efficient in removal of color about 20 to 25 %
4) Not highly efficient in the removal of colloidal matter.
98
PREPARED BY M.Vinitha AP/Civil
103. Rapid Sand Filter
Construction:-
1) Open basin rectangular in size
2) Watertight shallow tank constructed in stone or brick or concrete masonry
3) Surface area 10 to 100 sq. m
4) Length to width ratio 1.25 to 1.35
5) Filtration rate 3000 to 6000 liters/hr/sq. m.
6) Depth of tank 2.5 to 3.5m
7) Total depth of media 90 to 130 cm.
8) Sand depth 60 to 70 cm & Gravel bed 60 to 70 cm
9) Effective size of sand (D10) 0.35 to 0.6
10) Uniformity coefficient (D60/D10) 1.2 to 1.7
103
PREPARED BY M.Vinitha AP/Civil
104. Rapid Sand Filter
Operation:-
1) Enters filter through inlet pipe
2) Uniformly distributed on the sand bed
3) After passing through bed collected by UDS
4) Initially head loss very small as increases beyond limit bed requires
washing (30 cm to 3m)
Back washing:-
1) Back flow of water
2) First water drained out form filter
3) All valves are closed & compressed air is passed for 2-3 minutes
4) Water passes thorough drain, gravel & sand.
5) Sand expands and all impurities are carried away with water drain.
6) After 24 hr & requires 10 minutes
104
PREPARED BY M.Vinitha AP/Civil
108. 4) Design a slow sand filter for 40000 Population & 200 lpcd max. water supply rate:-
Water to be treated per day = max. daily demand x population
= 200x40000 = 8000000 lit/day
108
PREPARED BY M.Vinitha AP/Civil
109. 4) Design a slow sand filter for 40000 Population & 200 lpcd max. water supply rate:-
Water to be treated per day = max. daily demand x population
= 200x40000 = 8000000 lit/day
Assuming rate of filtration = 200 lit/hr/m2 = 200x24 = 4800 lit/day/m2
109
PREPARED BY M.Vinitha AP/Civil
110. 4) Design a slow sand filter for 40000 Population & 200 lpcd max. water supply rate:-
Water to be treated per day = max. daily demand x population
= 200x40000 = 8000000 lit/day
Assuming rate of filtration = 200 lit/hr/m2 = 200x24 = 4800 lit/day/m2
Total surface area of filter reqd = (water reqd to be treated per day / rate of filtration)
= (8000000/ 4800) = 1667 m2
110
PREPARED BY M.Vinitha AP/Civil
111. 4) Design a slow sand filter for 40000 Population & 200 lpcd max. water supply rate:-
Water to be treated per day = max. daily demand x population
= 200x40000 = 8000000 lit/day
Assuming rate of filtration = 200 lit/hr/m2 = 200x24 = 4800 lit/day/m2
Total surface area of filter reqd = (water reqd to be treated per day / rate of filtration)
= (8000000/ 4800) = 1667 m2
Provide four units, out of four keep one stand by while repairing and hence only three
units provide the necessary filter area reqd.
The area of each filter unit = (1667/3) = 556 m2
111
PREPARED BY M.Vinitha AP/Civil
112. 4) Design a SSF for 40000 Population & 200 lpcd max. water supply rate.
Water to be treated per day = max. daily demand x population
= 200x40000 = 8000000 lit/day
Assuming rate of filtration = 200 lit/hr/m2 = 200x24 = 4800 lit/day/m2
Total surface area of filter reqd = (water reqd to be treated per day / rate of filtration)
= (8000000/ 4800) = 1667 m2
Provide four units, out of four keep one stand by while repairing and hence only three
units provide the necessary filter area reqd.
The area of each filter unit = (1667/3) = 556 m2
Assuming L= 2B
Area of each filter unit = 556 = L x B = 2 B x B
B = 16.7 m & L = 33.4 m
112
PREPARED BY M.Vinitha AP/Civil
113. Assuming thickness of sand filter media = 0.9 m
Assuming thickness of gravel filter media = 0.5 m
Depth of water = 1.2 m
Free board = 0.3 m
Under drainage system = 0.6 m
Overall Depth of Filter = 0.9 + 0.5 + 1.2 + 0.3 + 0.6 = 3.5 m
Dimension of filter = 33.4 x 16.7 x 3.5 m
113
PREPARED BY M.Vinitha AP/Civil
114. Rapid Sand Filter
1) Water reqd to treat per day in liter
2) Rate of filtration = 3000 to 6000 lit/hr/m2
3) Total surface area of filter required
4) No. Of units
5) Area of each unit (10 to 100 m2)
6) L=1.5 B (1.25 to 1.35)
7) Thickness of sand bed = 60 to 70 cm
8) Thickness of gravel bed = 60 to 70 cm
9) Depth of water = 0.9 to 1.6m
10) FB = 0.5m
11) UDS = 0.6m
114
PREPARED BY M.Vinitha AP/Civil
116. Pressure Filter
1) Vertical and horizontal
2) Similar to RSF
3) Filtration rate = 6000 to 15000 lit/hr/m2
4) Pressure = 3 to 7 kg/cm2
5) Few houses, private estate, industries, swimming pools, railway station,
etc.
6) Least efficient in removal of bacteria & turbidity
7) Difficult to inspect, clean & replace
8) Effectiveness of backwashing is not visible.
9) Good quality of water
116
PREPARED BY M.Vinitha AP/Civil
119. Filter Troubles or Problems
1) Formation of Mud Balls: Mud & other arrested impurities sticks to sand grain
and formation of mud balls. Improper washing of bed leads to formation more
mud balls. Compress air along with backwashing for 4 minutes, also supported
by manual surface racking or caustic soda.
2) Cracking of filter beds: Fine sand in top layers shrinks & forming cracks
3) Air Binding: Negative pressure making bubbles to stick to sand and reducing
filtration rate.
4) Sand Incrustation: It is due to accumulation of sticky gelatinous material. Sand
grains enlarge in size and effective size changes. carbonization of water can
prevent this problem. 119
PREPARED BY M.Vinitha AP/Civil
120. Filter Troubles or Problems
5) Jetting & Sand Boils: It occurs when backwashing water follows path of least
resistance and break through to the scattered points due to small differences in
porosity and permeability. Use of 8 cm thick layer of coarse garnet is also
recommended.
6) Sand Leakage: It results when smallest gravels are displaced during
backwashing. Water will enter the under-drainage system unfiltered. It can be
reduced by properly proportioning of sand and gravel layer. In between sand and
gravel garnet layer can be used to tackle this type of problem.
120
PREPARED BY M.Vinitha AP/Civil
122. Disinfection:-
1) Killing of pathogens
2) Sterilization is the process of killing of all bacteria
3) Materials or agent used are called disinfectant
4) Disinfectant destroys microorganism by damaging cell wall of and
inactivation of critical enzyme system responsible for metabolic activity.
Necessity:-
Water may contain bacteria & other micro-organism which may be pathogenic. It
is therefore necessary to disinfect water to kill bacteria and other micro-organism
and thus prevent water borne diseases.
122
PREPARED BY M.Vinitha AP/Civil
124. Requirements of Good Disinfectant:-
1) Effective in killing all the harmful pathogens
2) Readily available at reasonable cost
3) Safe to handle
4) Simple method of application
5) Harmless, unobjectionable, economical & easily available
6) Not required skilled labor
7) Not required costly equipment for its application
8) Kill all pathogens in reasonable time at a normal temperature
9) Protect against recontamination
124
PREPARED BY M.Vinitha AP/Civil
125. Methods of Disinfection:-
Physical Methods
1. Disinfection by Heat: Boiling of water
2. Disinfection by light: UV light
3. Sunlight is a natural disinfectant
Chemical Methods
1. Chlorine
2. Bromine
3. Iodine
4. Ozone
5. Potassium Permanganate
6. Metal ions such as copper & silver
7. Treatment with excess lime 125
PREPARED BY M.Vinitha AP/Civil
126. Boiling of Water
1) Bacteria killed by increasing temp. 800C
2) Most effective methods
3) Impracticable to boiled large quantity of water
4) In case of epidemic consumers may boiled water for drinking
5) Cant take care of future contaminations
126
PREPARED BY M.Vinitha AP/Civil
127. Ultra Violet Ray Treatment
1) Very costly & effective method.
2) Sun is most powerful source of UV rays but it requires a large exposure area &
long time.
3) Hence generated by machines consisting of mercury vapour lamps enclosed in a
quartz globe.
4) Effective disinfection water should be flow in a thin clear layer.
5) Depth water should not exceeds 10 cm.
6) Colorless & turbidity should not more.
7) No residual effects against re-contamination.
8) Unsuitable for large scale treatment plant.
9) Private building, institutes, hospitals, swimming pools, etc.
10) No color & taste developed.
127
PREPARED BY M.Vinitha AP/Civil
130. Treatment With Excess Lime:-
1) Enough lime to bring pH to 9.5 to kill bacteria
2) Removal up to 99 to 100 %
3) Re-corbonation is necessary
130
PREPARED BY M.Vinitha AP/Civil
131. Iodine & Bromine Treatment
1) Dose = 8 mg/L.
2) Contact period = 5 minutes.
3) In the form of small pills.
4) More costly than chlorine hence used for small water supply.
5) Ex. Swimming pools, army, private plants etc.
6) Less irritating to the eyes than chlorine when used in swimming tank.
7) Provides longer lasting protection.
8) Reduced offensive taste and odors.
131
PREPARED BY M.Vinitha AP/Civil
133. Ozone
1) More powerful as well as costly than chlorine.
2) Doesn't provide residual protection against recontamination.
3) Cant be stored.
4) Used on small scale.
5) Dose = 2 to 3 ppm.
6) Contact period = 10 minutes.
7) France and Russia on large scale.
8) Required skilled labor.
9) Gives pleasant and appealing appearance.
133
PREPARED BY M.Vinitha AP/Civil
137. Potassium Permanganate
1) Good for well water supply or water which is less contaminated .
2) 98 % removal of bacteria.
3) 100 % removal of cholera causing bacteria.
4) Rural areas.
5) Oxidizes organic matter and iron.
6) Pink color means organic matter present.
7) Dose = 1 to 2 mg/L.
8) Contact period = 4 to 6 hrs.
9) Cheap and quite useful.
137
PREPARED BY M.Vinitha AP/Civil
139. Silver & Copper Treatment
1) Removes algae.
2) Take care of future pollution.
3) Contact period = 15 minutes to 3 hrs.
4) No taste and no odor.
5) No harmful effect on human body.
6) Use of silver is very costly.
7) Generally not used for treating public water supplies.
139
PREPARED BY M.Vinitha AP/Civil
140. Chlorination
1) Universally adopted.
2) Cheap, reliable & easy to handle.
3) Capable of providing residual disinfecting effects for long periods.
4) Ideal disinfectants.
5) Imparts bad taste.
6) Doesn’t affect pH.
7) Not effective when water is alkaline.
140
PREPARED BY M.Vinitha AP/Civil
141. Purpose of Chlorination
1) To prevent the spread of diseases.
2) To remove bacteria, fungus, and other pathogens.
3) Oxidation of Iron, Fe and H2S.
4) Removal of taste and odor.
5) Oxidation of organic matter.
141
PREPARED BY M.Vinitha AP/Civil
143. Action of Chlorine
Cl2 + H2O HOCl + H+ + Cl-
HOCl H+ + OCl-
1) When chlorine added it forms hypochlorus acid or hypochlorite ions.
2) HOCL & OCl accomplish disinfection.
3) It has an effect on micro-organism.
4) pH = 10 only OCl ions are found.
5) pH = 7 to 5 HOCL exist.
6) Chlorine doesn’t reacts below pH = 5 & remains as elemental chlorine.
7) HOCl is 80 times more powerful than OCL.
8) Hence pH is maintained above 5 & near to or less than 7. 143
PREPARED BY M.Vinitha AP/Civil
144. Free Available Chlorine:-
1) Together HOCl and OCl is known as Free Available Chlorine
2) Free Cl2 reacts with compounds such as ammonia, proteins, amino acids &
phenols and form chloramines & chloro-derivatives which are called Combined
Chlorine.
3) Combined chlorine also posses some disinfecting properties but less effective
compared to free available chlorine.
144
PREPARED BY M.Vinitha AP/Civil
145. Break Point Chlorination
Two action:-
I. Killing of bacteria.
II. Oxidation of organic matter.
Pure water has no chlorine demand.
Raw water has chlorine demand.
1) First stage :- killing of bacteria, oxidation of organic matter and metals.
2) Second stage :- forming of combined residual chlorine will gradually increases.
Chloramines (Mono-chloramine, Di-chloramine & Tri-chloramine) have been
recorded as a combined residual chlorine.
3) Third Stage:- decrease in combined residual chlorine indicate the breakdown of
chloramines.
145
PREPARED BY M.Vinitha AP/Civil
147. Break Point Chlorination
1) At point C, gives bad taste & odor (oxidation started or breakdown of
chloramines started).
2) At point D, bad smell & taste suddenly disappear. (oxidation completed)
3) Point D represent the Break Point Chlorination
4) After this point, addition of chlorine results in increase in residual chlorine
represented by line E with slope 450
5) At break point true residual free chlorine is revealed.
6) Addition of chlorine beyond point D is break point chlorination
7) Gives ideas to ensure the desired amount of residual chlorine.
147
PREPARED BY M.Vinitha AP/Civil
149. Significance of Break Point Chlorination:
1) Removes taste and odor.
2) Have adequate effect on bacteria or pathogens.
3) Leave desired chlorine residual.
4) Removes Fe & Mn.
5) Oxidation of organic, ammonia & other compounds.
6) Removes color.
149
PREPARED BY M.Vinitha AP/Civil
150. Forms of Chlorination
1) Plain chlorination
2) Pre-chlorination
3) Post chlorination
4) Double Chlorination
5) Multiple Chlorination
6) Super Chlorination
7) Dechlorination
150
PREPARED BY M.Vinitha AP/Civil
151. Plain Chlorination
1) 0.5 to 1 mg/l.
2) Only chlorine treatment & no other treatment.
3) To remove bacteria, color, odor, etc.
4) Controls growth algae.
5) Clear water (turbidity less than 20 NTU)
6) In case of emergency.
151
PREPARED BY M.Vinitha AP/Civil
152. Pre Chlorination
1) Application before treatment specially filtration.
2) Reduces the quantity of coagulants.
3) Reduces taste & odor.
4) Controls growth of algae.
5) Reduces bacterial load on filters.
6) Prevents decomposition of sludge in settling tanks.
152
PREPARED BY M.Vinitha AP/Civil
154. Post Chlorination
1. Compulsory treatment.
2. Application of chlorine to water.
3. Standard forms of chlorination.
4. After filter and before it enters the distribution system.
5. Residual chlorine = 0.2 mg/l (1mg/L)
154
PREPARED BY M.Vinitha AP/Civil
155. Multiple Chlorination
1) Application of chlorine at two or more points.
2) Consists of pre & post chlorination.
3) Highly contaminated water.
4) Large amount of bacteria.
155
PREPARED BY M.Vinitha AP/Civil
156. Super Chlorination
1) Application of chlorine beyond the stage of break point.
2) At the end of filtration.
3) Whenever breakout of water borne diseases.
4) Dose = 10 to 15 mg/l.
5) Residual chlorine = 1 to 3 mg/L.
6) Necessary to remove the excess chlorine by dechlorination before supplied to the
consumers.
156
PREPARED BY M.Vinitha AP/Civil
157. De-Chlorination
Removal of excess chlorine from water before supplying to consumers.
Some residual chlorine should remains in water.
I. Dechlorination by Aearation.
II. Addition of some chemicals such as:
1) Sodium thio-sulphate,
2) Sodium bio-sulphate,
3) Sodium sulphite,
4) Activated carbon,
5) Pottassium permanganate,
6) Ammonia,
7) Sulphur dioxide
157
PREPARED BY M.Vinitha AP/Civil
159. DPD Test
(Diethylene-P-Phenylene Diamine)
1) Widely used in modern days.
2) DPD reagents used.
3) Comparators to compare the color.
4) 10 ml of sample in tube.
5) Add reagent and compare the color.
159
PREPARED BY M.Vinitha AP/Civil
160. Orthotolidine Test
1) Commonly used to determine the residual chlorine.
2) 0.1 ml of orthotolidine & 0.2 ml Sodium Arsenite solution is added to 10 ml of
sample.
3) Compare the color with colored glass standard.
160
PREPARED BY M.Vinitha AP/Civil