CASE STUDY ON
TEMPORARY STRUCTURE
RAHUL GANDHI
SHRUTI KATALE
DHIRAJ PATIL
SHIVANI SONAVANE
NIDHI THIGALE
LOCATION AND FUNCTION
oTHE SELECTED TEMPORARY STRUTURE IS LOCATED ON THE
FOOTHILLS OF SINHGAD FORT, PUNE.
oIT FUNCTIONS AS A TYPICAL DHABA.
oIT HAS A SMALL PANTRY AND SEATING AREA FOR 20 PEOPLE.
PLAN
MATERIALS USED
oTIMBER
oPLASTIC SHEETS
INTERNAL VIEW EXTERNAL VIEW
STRUCTURAL DETAILS
oHORIZONTAL MEMBERS - TIMBER RAFTERS AND TIMBER PURLINS
oVERTICAL MEMBER - POST
oROOFING MATERIAL - THATCH AND PLASTIC SHEETS
oFLOORING - MUD FLOORING
JOINERY DETAILS
THE TIMBER MEMBERS ARE JOINED TO EACH OTHER BY HALF LAP JOINTS, TONGUE AND
GROOVE JOINT OR BY USING ROPES.
JOINTS BETWEEEN PURLIN, RAFTER AND POST
HALF LAP JOINT IS USED TO
CONNECT PURLINS.
NAILING IS DONE FOR FIXITY.
MORTICE AND TENON JOINT
IS USED TO FIX THE PURLIN
AND POST.
ROOFING MATERIAL
 ROOFING IS DONE BY USING PLASTIC SHEETS.
 PLASTIC SHEETS ARE PREFFERED OVER OTHER MATERIALS AS THEY ARE
CHEAP AND LONG LASTING.
 THEY ARE THE BEST SUITABLE ECONOMIC MATERIAL IN RAINY
CONDITIONS AND CAN BE EASILY REPLACED.
 THEY ARE FIXED TO THE RAFTERS BY USING ROPES.
LIGHT, VENTILATION AND VIEW
 THERE IS A VALLEY ON THE BACK SIDE OF THE DHABA HENCE
MAJOR SOURCE OF LIGHT AND VENTILATION IS FROM THE SAME.
 DUE TO THIS, TWO OPPOSITE SIDES THE DHABA HAVE OPENINGS,
THUS FAVOURING CROSS VENTILATION.
 THE SAME ROOFING MATERIAL IS USED TO CLOSE THE OPENINGS,
WHEN NOT IN USE.
 THE NUMBER AND SIZE OF
OPENINGS IS APPROPRIATE FOR
THE PROPER FUNCTIONING.

Case study on temporary structure

  • 1.
    CASE STUDY ON TEMPORARYSTRUCTURE RAHUL GANDHI SHRUTI KATALE DHIRAJ PATIL SHIVANI SONAVANE NIDHI THIGALE
  • 2.
    LOCATION AND FUNCTION oTHESELECTED TEMPORARY STRUTURE IS LOCATED ON THE FOOTHILLS OF SINHGAD FORT, PUNE. oIT FUNCTIONS AS A TYPICAL DHABA. oIT HAS A SMALL PANTRY AND SEATING AREA FOR 20 PEOPLE.
  • 3.
  • 4.
  • 5.
    STRUCTURAL DETAILS oHORIZONTAL MEMBERS- TIMBER RAFTERS AND TIMBER PURLINS oVERTICAL MEMBER - POST oROOFING MATERIAL - THATCH AND PLASTIC SHEETS oFLOORING - MUD FLOORING
  • 6.
    JOINERY DETAILS THE TIMBERMEMBERS ARE JOINED TO EACH OTHER BY HALF LAP JOINTS, TONGUE AND GROOVE JOINT OR BY USING ROPES.
  • 7.
    JOINTS BETWEEEN PURLIN,RAFTER AND POST
  • 8.
    HALF LAP JOINTIS USED TO CONNECT PURLINS. NAILING IS DONE FOR FIXITY. MORTICE AND TENON JOINT IS USED TO FIX THE PURLIN AND POST.
  • 9.
    ROOFING MATERIAL  ROOFINGIS DONE BY USING PLASTIC SHEETS.  PLASTIC SHEETS ARE PREFFERED OVER OTHER MATERIALS AS THEY ARE CHEAP AND LONG LASTING.  THEY ARE THE BEST SUITABLE ECONOMIC MATERIAL IN RAINY CONDITIONS AND CAN BE EASILY REPLACED.  THEY ARE FIXED TO THE RAFTERS BY USING ROPES.
  • 10.
    LIGHT, VENTILATION ANDVIEW  THERE IS A VALLEY ON THE BACK SIDE OF THE DHABA HENCE MAJOR SOURCE OF LIGHT AND VENTILATION IS FROM THE SAME.  DUE TO THIS, TWO OPPOSITE SIDES THE DHABA HAVE OPENINGS, THUS FAVOURING CROSS VENTILATION.  THE SAME ROOFING MATERIAL IS USED TO CLOSE THE OPENINGS, WHEN NOT IN USE.  THE NUMBER AND SIZE OF OPENINGS IS APPROPRIATE FOR THE PROPER FUNCTIONING.