This document provides a resume for Carl Doucette, who has over 30 years of experience in construction management, project management, quality control, and estimating. He has managed projects for the Army Corps of Engineers, VA hospitals, airports, universities, and other government agencies. Notable past projects include building renovations at JBLM worth $1.4-1.7 million, a $17.6 million project at Beal AFB, and VA hospital projects totaling over $25 million. He is proficient in estimating and scheduling software and seeks a position utilizing his skills and extensive experience.
Brian Szostak Field Service Technician ResumeBrian Szostak
Field Service Technician position within a dynamic and fast-paced company and environment. Looking to utilize complex project management skills – fostered by over five years of successful, part-time self-employment and management of multiple concurrent projects.
Brian Szostak Field Service Technician ResumeBrian Szostak
Field Service Technician position within a dynamic and fast-paced company and environment. Looking to utilize complex project management skills – fostered by over five years of successful, part-time self-employment and management of multiple concurrent projects.
This file just provides a small portion of some of my projects and work experience, from public speaking, site assessments and reports, other various projects and documentation.
James Daisa PE (transportation planning traffic engineering).rev 5.14jdaisa
Generic resume that summarizes broad categories of the type of work in my practice, plus highlights of technical specializations. The resume contains an attached compendium of specific projects by category.
This file just provides a small portion of some of my projects and work experience, from public speaking, site assessments and reports, other various projects and documentation.
James Daisa PE (transportation planning traffic engineering).rev 5.14jdaisa
Generic resume that summarizes broad categories of the type of work in my practice, plus highlights of technical specializations. The resume contains an attached compendium of specific projects by category.
Kineticom is an ISO certified, award-winning technical talent firm with a 13-year history of strong recruitment in technology. We are specialized agents who focus on finding critical talent in the Telecommunications and Emerging Information Technology markets for contract to direct hire opportunities.
Courier management system project report.pdfKamal Acharya
It is now-a-days very important for the people to send or receive articles like imported furniture, electronic items, gifts, business goods and the like. People depend vastly on different transport systems which mostly use the manual way of receiving and delivering the articles. There is no way to track the articles till they are received and there is no way to let the customer know what happened in transit, once he booked some articles. In such a situation, we need a system which completely computerizes the cargo activities including time to time tracking of the articles sent. This need is fulfilled by Courier Management System software which is online software for the cargo management people that enables them to receive the goods from a source and send them to a required destination and track their status from time to time.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
Maintaining high-quality standards in the production of TMT bars is crucial for ensuring structural integrity in construction. Addressing common defects through careful monitoring, standardized processes, and advanced technology can significantly improve the quality of TMT bars. Continuous training and adherence to quality control measures will also play a pivotal role in minimizing these defects.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfKamal Acharya
The College Bus Management system is completely developed by Visual Basic .NET Version. The application is connect with most secured database language MS SQL Server. The application is develop by using best combination of front-end and back-end languages. The application is totally design like flat user interface. This flat user interface is more attractive user interface in 2017. The application is gives more important to the system functionality. The application is to manage the student’s details, driver’s details, bus details, bus route details, bus fees details and more. The application has only one unit for admin. The admin can manage the entire application. The admin can login into the application by using username and password of the admin. The application is develop for big and small colleges. It is more user friendly for non-computer person. Even they can easily learn how to manage the application within hours. The application is more secure by the admin. The system will give an effective output for the VB.Net and SQL Server given as input to the system. The compiled java program given as input to the system, after scanning the program will generate different reports. The application generates the report for users. The admin can view and download the report of the data. The application deliver the excel format reports. Because, excel formatted reports is very easy to understand the income and expense of the college bus. This application is mainly develop for windows operating system users. In 2017, 73% of people enterprises are using windows operating system. So the application will easily install for all the windows operating system users. The application-developed size is very low. The application consumes very low space in disk. Therefore, the user can allocate very minimum local disk space for this application.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Carl doucette res 2015
1. Carl Doucette
Project Manager / Quality Control Manager / Superintendent / Estimator
DuPont WA 98327
Cell: 916-710-2815 Alt Cell: 916-496-7431
cdouce1254@comcast.net
Objective
Seeking a position where my excellent job skills and experience can be utilized to the fullest.
(Refer to Project List at end of resume)
Work Experience
Superintendent / Quality Control Manager
10/2014 to Present. Northcon INC. Construction, JBLM WA
Job Order Contract, USACE
Job Order Contracts on warehouses and multi-purpose field.
Supervise and manage all Job contractors. Responsible for all construction activities of
construction personnel/subcontractors.
Perform Quality Control inspections daily. Ensure reports are processed properly.
Responsible for staff organization and coordination, developing owner and architect
relationships, budget tracking and control, coordination of safety efforts and creating
schedules.
Manage and process monthly billings.
Order all job related materials.
Lead project planning and constructability analysis and implementation, risk
management and other duties necessary for a successful project.
Project Manager/Estimator
7/2009 to 10/2014. Mark Scott Construction, Sacramento, CA
JOC, Government, State, County, Post Office, VA, Military, USACE, Insurance work,
Schools and more. Large Custom homes
Estimate and manage all Job Order Contracts with projects from $1,000.00 to $15,000,000.00
each.
JOCs are for Federal Government, County, USPS, Veterans Administration and Army
Corps of Engineers.
Responsible for all work, subcontractors and personnel.
Responsible for staff organization and coordination, developing owner and architect
relationships, budget tracking and control, quality control, coordination of safety efforts
and creating schedules.
Ordering any and all job related material, project planning and constructability analysis
and implementation, risk management and other duties necessary for a successful
project.
Project Manager/Estimator
5/2007 – 7/2009. Total Team Construction, West Sacramento, CA
Government, State, County, Post Office, VA Hospitals, Military, USACE, Travis Air Force
Base and more.
Estimate and manage all Job Order Contracts with projects from $1,000,000.00 to
$17,000,000.00 each.
Line item estimating projects from $200.00 to $17,000,000.00.
Responsible for all work and personnel.
JOCs are for Federal Government, State, County, USPS, Veterans Administration
Hospitals, Army Corps of Engineers and at Travis AFB, Beal AFB
2. Responsible for staff organization and coordination, developing owner and architect
relationships, budget tracking and control, quality control, coordination of safety efforts
and creating schedules.
Ordering any and all job related material, project planning and constructability analysis
and implementation, risk management and other duties necessary for a successful
project.
Operations Manager/Project Estimator
2/2004 - 5/2007 V&M Restoration, Sacramento, CA
Oversaw the construction department and personnel leading a team of 15-20 carpenters and
three superintendents. The construction department is generated generating $5 million dollars in
revenue annually.
Responsible for creating schedules, ordering any and all job related materials,
maintaining on-going communication with sub-contractors to ensure timely and cost
efficient completion of all jobs.
Managed both commercial and residential jobs.
Also responsible for maintaining highest quality of customer satisfaction.
Managed and ran jobs from start to finish.
Have excellent knowledge of most building codes.
Managed residential and commercial jobs from the foundation to the roof.
Excellent knowledge of trade work and how most trades get the job done.
Established an excellent working relationship with many of the major insurance
companies.
After working for the company for over a year, was promoted to Project Manager/
Estimator.
Project Manager/Estimator
3/2001 - 2/2004 Tudor Construction-Restorations, Sacramento, CA
Bid both residential and commercial jobs from small jobs to $1,000,000.00.
Sales consisted of $1,400,000.00 a year.
Managed jobs from start to finish.
Worked with and know most building codes and have worked on residential and
commercial jobs from the foundation to the roof.
Established an excellent working relationship with many of the major insurance
companies.
Area Branch Manager
2/1997 - 3/2001 CRS Construction Rental Services - Gray lift
Responsible for all sales, bids and operations of the branch.
Supervised a crew of 6 to 8 employees and all jobs in the field.
Territory covered from Livingston to Woodland as the Bay Area Branch Manager.
Branch Manager
11/1994 - 2/1997 American-Rent-A-Fence
Started this branch for the company.
Duties included bid all jobs, supervisor of crews, order all materials, and maintain
schedules.
Territory covered from Tulare to Modesto.
Branch Manager
6/1986 - 8/1992 Sacramento Insulation, Fresno, CA/Bakersfield, CA
Instrumental in establishing a branch in Fresno, and. while there, was responsible for the day-
to-day operations of the branch.
Supervised 30-40 employees.
3. Responsible for estimates of commercial bids, some residential tracks as well as single
residential jobs.
While operating the branch, also established a new branch in Bakersfield, CA.
Territory consisted of Bakersfield to Merced.
Education:
Modesto Jr. College, Modesto, CA
Some College Coursework Completed
Software Skills:
Gordian & RS Means Estimating, Microsoft Project. Word, Excel. (Primavera 6.Some) Expert:
More than 15 years.
References:
Randy Davis 916-574-3039 Post Office CA
Karen Joy Turley 425-651-2207 Construction
William Munt 209-988-1690 Construction
Bill Vosler 253-244-4240 or 253-343-3103 Safety
Military:
21 Years in National Guard not active at this time
4. Carl Doucette
Representative Project List
Relevant Project References completed:
Army Core of Engineers Assigned Projects:
Elevator Dam CA $17.1 Mil
Office Sacramento Improvements $186.000.00
Relocate Offices - Folsom Dam $432,000.00
Metal Buildings (Two) JBLM $1.7 Mil
Multi-Purpose Field JBLM 1.4 Mil
Building 880 Travis AFB 12.85 Mil
Building 427 at Beal AFB 17.6 Mil
VA Hospitals Assigned Projects:
HVAC replacement Martinez $6.2 Mil
Pet scanner TI $254,950.00
MRI TI $638.900.00
Podiatry TI $178.600.00
Pain scanner clinic $285,750.00
1st floor remodel $2.3 Mil
2nd floor addition $16.85.Mil
Demo of interior of Building 712 $2.7 Mil
Travis Air Force Base Assigned Projects:
Stem pumps replacement $198.800.00
Painting and repair of air handlers $284.000.00
Alameda Coast Guard:
Building 50-4,50-1, 54-1 TI $2.3 mil
Sacramento Airport JOC Assigned Projects:
SMF Underground Storage Tank $74,796.86
SMF Underground Oil Tank $65,461.64
West Vault Tank Removal & Installation $158,769.00
Contra Costa JOC Assigned Projects:
50 Douglas St.VA Hospital $386,900.00
Pittsburg Health Center 1st Floor 683,770.00
Pittsburg Health Center 2nd Floor $765,980.00
Sally Port Martinez Detention Facility Shower Upgrade $378,900.00
Solano County JOC Assigned Projects:
311 Call Center TI $15,105,566.74
4300 SF T.I. 311 $389,875.00
Kit Remold 1st Floor $286,000
Women’s/ Men’s Restrooms Library 13,180.86
240 SF bathroom upgrade $86,980.00
Juvenile Detention Facility $90,362.44
Juvenile Hall – New Foundations Cell Refurnishing $147,559.76
Nut Tree Airport Tile Flooring $23,062.11
Jail Inmate Elevators Modernization $114,451.73
Hall of Justice Elevators Modernization $140,987.22
5. Veterans Memorial Roof Replacement & Repairs $90,581.36
Remove Old Gas tank Down Town 385,000.00
CSU Sacramento JOC Assigned Projects:
HVAC, Kameda Hall – Hood & Snorkel 31,179.06
Stadium Telecom Extension $42,910.99
Throwing venue $389,780.00
Metal Building $289,980,00
United States Postal Service Assigned Projects:
West Sacramento Covered Storage $325.000.00
West Sacramento Inspector General’s Office $189,750.00
Stockton Log Demolition & reconstruction $210.800.00
Stockton Electrical/Communications $889,800.00
Patterson Restrooms ADA upgrades $254,800.00
Lathrop Modular Installation $86,800.00
Roseville HVAC replacement $123.580.00
Citrus Heights HVAC replacement $326.500.00
Gyserville Post office TI $449.750.00
Royal Oak Security $324,750.00
Royal Oaks Air handler stairs and support 189.500.00
Vacaville Restrooms $235.00.00
West Land Restrooms $185.000.00
West Sacramento Restrooms $365.200.00
Arden Retail $245.600.00
Discovery bay Retail $228.200.00
Metro Station Retail $245.000.00
Paskenta Retail $145.600.00
ADA upgrades for the parking lot in Granville
ADA upgrades on the parking lot at West Sacramento South
Redding Life Safety $202.000.00
CSU Chico
Replacement of library roof. 104,000 Sq Ft. $356.500.00
ADA upgrades of restrooms Delta hall
ADA upgrade of Restrooms Student hall
Replacement of carpet in Library and paint 420 YD
Upgrade of lighting 12 building
Install of gate and ADA upgrades for maintenance yard
CSU Stanford
Dorm Room remodel and addition $3.4 Mil
Dorm Room #2 remodel $2.8 Mil
Dorm Room #3 Remodel $3.2 mil
Dorm Room #4 Remodel $2.4 Mil
Sonoma County
Upgrade of Restrooms in the court house ADA upgrade
ADA upgrades of the wellness center kitchen
ADA ramps for the county of Sonoma About 12
ADA upgrades on 14 restrooms at the fairgrounds.
ADA upgrade on 128 ADA stall at the fairgrounds.
ADA ramps for Cal trans and county 8
Install metal building at sheriff office