without CADISON®
:
4 years
with CADISON®
:
1 year
[ faster to market:cadison.com ]
Coal-mine Zollverein in Essen 1928 - 1932
The Module for Project Manager and Repair & Maintenance Staff
CADISON
®
Project-Navigator
CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 1
Throughout the plant design process an enormous number of data and information will be created. These data are
not only relevant to the most different users in the planning and manufacturing process but also at a later date, i.e.
after completion of the plant. Such data may be of interest to many other persons like the repair and maintenance
staff. Normally, today it is still necessary for information procurement to evaluate heaps of folders or even digital docu-
ments, but not with Project-Navigator.
Viewing of Project Data
CADISON®
Project-Navigator is the module for viewing of project data within the corporate network. The navigator
has been designed for staff members normally not involved in the active planning of a plant but afterwards respon-
sible for operation and maintenance of the plant (i.e. mere data consumers).
Since in a CADISON®
project all logic and functional interrelations are displayed, it is possible, e.g. in case a pump
fails operation, to make visible all plant components affected by this failure. In case problems occur, all components,
safety zones, pipe runs, hazardous areas etc. that might be affected are recognized and/or displayed. The integra-
ted report generator will easily and rapidly issue the list you need.
Entitlement Concept
Of course, the existing entitlement concept is fully
considered even in case of work with the
CADISON®
Project-Navigator. Apart from that, all
information is in principle only readable (Read-Only-
Mode) but cannot be modified.
Easy Operation
The user surface is the one commonly known as
surface of CADISON®
Project-Engineer. Thus very
short training for use of this module is possible. The
existing object inspector is available for easy and
detailed viewing. Objects can be used for zooming
directly to the respective part of the drawing. Thus
users may profit from excellent abstracts about the
existing situation. This access easy for data consu-
mers contributes decisively to your competitiveness.
CADISON
®
Project-Navigator
The Module for Project Manager and Repair & Maintenance Staff
CADISON®
combines the engineering workflow in one system and thus significantly accelerates the planning pro-
cesses. All users can see on their workplaces - either graphically or as schematic, as 3D model or text-based in a
tree structure – the same data and objects in each case so that they can be optionally used and modified on all work-
places through simple Drag & Drop.
Data and/or objects are existing once only. Thus errors as a result of redundant data management are excluded. The
sophisticated right system ensures that tasks are handled selectively. Modifications introduced by other users are
immediately made available to all other users. The continuity of the individual work steps in one object-oriented
database forms the core of the CADISON®
technology. CADISON®
uses the widespread platforms Autodesk AutoCAD
or Microsoft Visio for graphical presentations.
CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 2
All data generated with the CADISON®
modules and available for use within the data base are forming the basis of
the CADISON®
Project-Navigator. Such data might be single object information, schematics, calculations etc.
The different perceptions stored in the data base permit rapid and easy viewing of sear-
ched object information. Data may be presented in several windows in parallel.
Integrated Report Generator
All data created with CADISON®
may be optionally edited through the integrated report
generator. Such data might be a list of valves & fittings or a pipeline list. All reports can
be revised and have release mechanisms. They are directly stored within the CADISON®
project. All documents can be delivered automatically as PDF.
From Quotation to Maintenance …
The CADISON®
Project-Navigator is an important asset for your plant planning and con-
struction efforts even in relation to the future plant operator. You should present the com-
plete project digitally as CADISON®
project to the plant operator. The latter can use the
CADISON®
Project-Navigator for very easy electronic access to all planning data. Thus
the loop of Integrated Digital Plant Model will be closed.
· Central graphics-independent project platform – Key turning point of the project
· Navigation and viewer tool for view of the CADISON®
project data
· For project control and subsequent further processing of project data during plant operation as paperless
documentation
· Search, selection, list and report functions
· Across-trade object navigation with visual highlight function
· Call-up and issue of documents and drawings (plotting) without CAD
· Information for repair & maintenance of the plant
· Ease of utilization even for the plant operator
· Roll and target-specific views of the project
· Generation of most different reports (proposals, calculations, parts lists, apparatus lists, cable lists, lists of
measuring points, lists of valves & fittings, pipeline material lists etc.)
· Automatic preparation of the complete project structure as PDF
· Strengthening of business relations with your customers through provision of project data
Key Features
CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 3
Business Benefits
· One click – All information
· Transparency in all engineering projects
· Complete project survey for the project manager
· Quick finding through selective search for project
information
· Ease of operation
· Evaluation of all relevant project data and drawings
through various viewers
· Early provision of continuously updated information
· Generation of reports for operation and maintenance
of a plant
· Work across locations
· Complete survey of plant structuring
· Multi-Site work of split project groups (all modules)
· Full multi-language capacity through Unicode
(e.g. easy changeover from English to Russian and
vice versa) together with multi-language inscriptions
© ITandFactory GmbH, Layout: ABE/enz, 12/2010
AutodeskAutoCAD,MicrosoftVisioareregisteredtrademarks.
ITandFactory is one of the largest providers of complete solutions in the field of process
engineering. Being a joint venture of the companies Neilsoft Ltd. (India) and TRIPLAN
AG (Germany) – both companies known as reputed engineering undertakings – we
understand ourselves as solution provider supplying our customers with solution and
process-oriented IT tools plus associated concepts.
Higher efficiency in plant planning, integration of plant construction and intelligent plant
documentation with high-efficiency IT tools are in the focus of our CAE solution
CADISON®
. The growing international orientation of our organization creates synergetic
effects with the cross-linked and global way of thinking of our customers. It is our target
to ensure a maximum benefit for the customer through utilization of latest technologies.
Our customers may profit from a maximum return-on-investment.
Information and possibilities to purchase:
ITandFactory GmbH · Auf der Krautweide 32 · 65812 Bad Soden · Germany
Phone: +49 6196 6092-310 · Fax: +49 6196 6092-202
info@cadison.com · www.cadison.com
[ faster to market:cadison.com ]
Media- and Mass-Balances > Basic Flow-Diagram > Tender Planning > Process Flow-Diagram > Equipment List > Prelimary Lay-
out > Specifications and Suppliers > Instrumentation > Ressource Management > Calculation > Revision-Management > Project-Analysis >
Process-Calculation > Pipe-Specification > P&I Diagram > Specification for Inquiry > Structural/Statics > Layout Planning > Installation Plan-
ning > Equipment Planning > Structural and Piping Design > General Arrangement Drawings > Piping Design > Piperack Layout > Electrical
Design > Report Extraction (BOM) > Materials Management > Maintenance and Operations > Post Costing Analysis and Documentation
CADISON®
Project-Navigator– Integrated Digital Plant Model
CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 4

Cadison project-navigator

  • 1.
    without CADISON® : 4 years withCADISON® : 1 year [ faster to market:cadison.com ] Coal-mine Zollverein in Essen 1928 - 1932 The Module for Project Manager and Repair & Maintenance Staff CADISON ® Project-Navigator CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 1
  • 2.
    Throughout the plantdesign process an enormous number of data and information will be created. These data are not only relevant to the most different users in the planning and manufacturing process but also at a later date, i.e. after completion of the plant. Such data may be of interest to many other persons like the repair and maintenance staff. Normally, today it is still necessary for information procurement to evaluate heaps of folders or even digital docu- ments, but not with Project-Navigator. Viewing of Project Data CADISON® Project-Navigator is the module for viewing of project data within the corporate network. The navigator has been designed for staff members normally not involved in the active planning of a plant but afterwards respon- sible for operation and maintenance of the plant (i.e. mere data consumers). Since in a CADISON® project all logic and functional interrelations are displayed, it is possible, e.g. in case a pump fails operation, to make visible all plant components affected by this failure. In case problems occur, all components, safety zones, pipe runs, hazardous areas etc. that might be affected are recognized and/or displayed. The integra- ted report generator will easily and rapidly issue the list you need. Entitlement Concept Of course, the existing entitlement concept is fully considered even in case of work with the CADISON® Project-Navigator. Apart from that, all information is in principle only readable (Read-Only- Mode) but cannot be modified. Easy Operation The user surface is the one commonly known as surface of CADISON® Project-Engineer. Thus very short training for use of this module is possible. The existing object inspector is available for easy and detailed viewing. Objects can be used for zooming directly to the respective part of the drawing. Thus users may profit from excellent abstracts about the existing situation. This access easy for data consu- mers contributes decisively to your competitiveness. CADISON ® Project-Navigator The Module for Project Manager and Repair & Maintenance Staff CADISON® combines the engineering workflow in one system and thus significantly accelerates the planning pro- cesses. All users can see on their workplaces - either graphically or as schematic, as 3D model or text-based in a tree structure – the same data and objects in each case so that they can be optionally used and modified on all work- places through simple Drag & Drop. Data and/or objects are existing once only. Thus errors as a result of redundant data management are excluded. The sophisticated right system ensures that tasks are handled selectively. Modifications introduced by other users are immediately made available to all other users. The continuity of the individual work steps in one object-oriented database forms the core of the CADISON® technology. CADISON® uses the widespread platforms Autodesk AutoCAD or Microsoft Visio for graphical presentations. CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 2
  • 3.
    All data generatedwith the CADISON® modules and available for use within the data base are forming the basis of the CADISON® Project-Navigator. Such data might be single object information, schematics, calculations etc. The different perceptions stored in the data base permit rapid and easy viewing of sear- ched object information. Data may be presented in several windows in parallel. Integrated Report Generator All data created with CADISON® may be optionally edited through the integrated report generator. Such data might be a list of valves & fittings or a pipeline list. All reports can be revised and have release mechanisms. They are directly stored within the CADISON® project. All documents can be delivered automatically as PDF. From Quotation to Maintenance … The CADISON® Project-Navigator is an important asset for your plant planning and con- struction efforts even in relation to the future plant operator. You should present the com- plete project digitally as CADISON® project to the plant operator. The latter can use the CADISON® Project-Navigator for very easy electronic access to all planning data. Thus the loop of Integrated Digital Plant Model will be closed. · Central graphics-independent project platform – Key turning point of the project · Navigation and viewer tool for view of the CADISON® project data · For project control and subsequent further processing of project data during plant operation as paperless documentation · Search, selection, list and report functions · Across-trade object navigation with visual highlight function · Call-up and issue of documents and drawings (plotting) without CAD · Information for repair & maintenance of the plant · Ease of utilization even for the plant operator · Roll and target-specific views of the project · Generation of most different reports (proposals, calculations, parts lists, apparatus lists, cable lists, lists of measuring points, lists of valves & fittings, pipeline material lists etc.) · Automatic preparation of the complete project structure as PDF · Strengthening of business relations with your customers through provision of project data Key Features CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 3
  • 4.
    Business Benefits · Oneclick – All information · Transparency in all engineering projects · Complete project survey for the project manager · Quick finding through selective search for project information · Ease of operation · Evaluation of all relevant project data and drawings through various viewers · Early provision of continuously updated information · Generation of reports for operation and maintenance of a plant · Work across locations · Complete survey of plant structuring · Multi-Site work of split project groups (all modules) · Full multi-language capacity through Unicode (e.g. easy changeover from English to Russian and vice versa) together with multi-language inscriptions © ITandFactory GmbH, Layout: ABE/enz, 12/2010 AutodeskAutoCAD,MicrosoftVisioareregisteredtrademarks. ITandFactory is one of the largest providers of complete solutions in the field of process engineering. Being a joint venture of the companies Neilsoft Ltd. (India) and TRIPLAN AG (Germany) – both companies known as reputed engineering undertakings – we understand ourselves as solution provider supplying our customers with solution and process-oriented IT tools plus associated concepts. Higher efficiency in plant planning, integration of plant construction and intelligent plant documentation with high-efficiency IT tools are in the focus of our CAE solution CADISON® . The growing international orientation of our organization creates synergetic effects with the cross-linked and global way of thinking of our customers. It is our target to ensure a maximum benefit for the customer through utilization of latest technologies. Our customers may profit from a maximum return-on-investment. Information and possibilities to purchase: ITandFactory GmbH · Auf der Krautweide 32 · 65812 Bad Soden · Germany Phone: +49 6196 6092-310 · Fax: +49 6196 6092-202 info@cadison.com · www.cadison.com [ faster to market:cadison.com ] Media- and Mass-Balances > Basic Flow-Diagram > Tender Planning > Process Flow-Diagram > Equipment List > Prelimary Lay- out > Specifications and Suppliers > Instrumentation > Ressource Management > Calculation > Revision-Management > Project-Analysis > Process-Calculation > Pipe-Specification > P&I Diagram > Specification for Inquiry > Structural/Statics > Layout Planning > Installation Plan- ning > Equipment Planning > Structural and Piping Design > General Arrangement Drawings > Piping Design > Piperack Layout > Electrical Design > Report Extraction (BOM) > Materials Management > Maintenance and Operations > Post Costing Analysis and Documentation CADISON® Project-Navigator– Integrated Digital Plant Model CADISON_Module_R10_12_10_EN:Project-Navigator 18.12.2010 14:54 Uhr Seite 4