The Engineering Knowledge-smiths
CADISON_Broschu?re_R9_12-09_EN:Layout 1          13.11.2009     9:46 Uhr    Seite 2




  The Engineering Knowledge-smiths




        Enhance your competitive edge
                 CADISON: an object-oriented and data based plant engineering solution



                 As plant engineers well know, numerous information interface and transmission errors translate into higher costs and
                 lower margins. Managing such situations successfully is a challenge faced by engineering departments on a daily
                 basis.



                                                                                        cess is the way to break out of this vicious
                                                                                        Integration of the entire engineering pro-

                                                                                        circle and optimize project profitability like
                                                                                        never before. Although until recently CAD
                                                                                        systems were the best way to ensure com-
                                                                                        petitiveness, the time has come to migrate
                                                                                        to the next stage of optimization, namely the
                                                                                        integration of all project data. Completing
                                                                                        your projects in less time enables you to use
                                                                                        today’s strategic (but limited) engineering
                                                                                        resources even more efficiently. And this in
                                                                                        turn allows your customers to bring their pro-
                                                                                        ducts to market sooner.

                                                                                        CADISON has devised an integrated engi-
                                                                                        neering solution that addresses all of these
                                                                                        issues by streamlining and expediting pro-
                                                                                        ject planning processes.


                                                                                       CADISON’s object-oriented data model for
                                                                                       the various application domains (plant engi-
                                                                                       neering, ET I&C technology and so on) saves
                                                                                       you time and money by allowing for the inte-
                                                                                       gration of all planning phases. And what’s
                                                                                       more, CADISON allows you to capture valu-
                 able information during the marketing phase, thus making this information available to project team members in all
                 ensuing phases.

                 CADISON’s simple, modular architecture allows the system to be configured for specific user tasks. And thanks
                 to today’s advanced IT technologies, implementation of the CADISON solution is risk free, and your investment in
                 the product is protected well into the future.
CADISON_Broschu?re_R9_12-09_EN:Layout 1        13.11.2009    9:46 Uhr     Seite 3




                                                                                                 “The CADISON solution makes it very
                                                                                                 easy to adapt machines and systems to
              All application domains are based on an integrated object data model. Whene-       the customer’s space. The solution’s
              ver a change is made, CADISON automatically implements it in any “views” de-       compatibility with other software tools
              sired and performs any project data updating that is needed. This obviates the     such as SolidWorks and SAP is also
              need to enter the same data numerous times, thus reducing project costs and        extremely useful.”
              eliminating what is often a major source of errors.                                Hartmut Claussen
                                                                                                 Head of Project Management and
              The true strength of CADISON technology is the seamlessness, consistency and       Mechanical Engineering
              completeness of all project elements – including Bid, Piping and Instrumentation
              Diagrams (P&ID), 3D Piping, and ET I&C Electronics. This translates into opti-
              mized process management for plant engineering projects of all sizes. And
              what’s more, it makes no difference whether technical engineering data or gra-
              phic data is generated first for any specific project. With CADISON technology,    “CADISON is our global Engineering-
              project configuration takes only a few hours – one of the many competitive         Tool for standardisation across all E&S
              advantages you get with CADISON.                                                   sites, the reuse of engineering data and
                                                                                                 the continuous improvement of project
              Many of our customers have discovered (to their delight) – and documented –        data quality.”
              that the CADISON solution reduces project planning time and costs by up to 50      Ottar Grande, Engineering Manager,
              percent.                                                                           AlfaLaval Copenhagen AS,
                                                                                                 Engineering & Supply




              The quality of your planning output and processes is enhanced by elaborate
              component and material category lists. Our practice-tested CADISON MATPIPE         “CADISON with its database driven
              catalogues integrate dimensional symbols, data sheet information, and fully con-   approach is our common solution for
              figured three dimensional versions of these elements.                              Process & Plant Design.”
                                                                                                 Mikhail Arlievsky, General Director
                                                                                                 Giprochim Technolog S.Ltd., Russia




                 · The CADISON solution optimizes your competitiveness and increases the value of your planning processes.
                 Advantages:

                 · Complete engineering solution for all phases of plant engineering.
                 · The CADISON system allows for data interchange with other systems.
                 · Maximum investment security thanks to CADISON’s strong market position.
CADISON_Broschu?re_R9_12-09_EN:Layout 1          13.11.2009     9:46 Uhr     Seite 4




       Integrated Digital Plant Model
          CADISON is a modular CAE solution that can be easily configured for specific scenarios.
          Thanks to the solution’s use of integrated databases, all project data is automatically and in-
          stantaneously available in its entirety within the various application domains such as P&IDs, 3D
          piping planning, isometric drawing generation, automatic report generation and so on.




       CADISON Project-Engineer: This tool allows multiple users
       to work on the same project concurrently. This means that you
       can design and perform all the calculations for a project using
       a kind of data object building method without the need of CAD. You
       can then do the detail work in stages during the next steps. We call this
       conceptual engineering.



       CADISON Project-Navigator: This tool provides
       views of project data within a global enterprise net-
       work and is extremely well suited for plant operation
       and maintenance processes. For example, you can in-
       stantly see which distribution field is responsible for a plant’s
       power supply and which plant elements are affected by a
       breakdown.



       CADISON P&ID-Designer: This tool allows project
       planning processes and diagrams to be merged
       seamlessly in such a way that all project related data
       is dynamically available to users. This in turn allows all
       project preliminary planning to be integrated with basic and
       detail engineering, and then merged with two dimensional
       layout planning.



       CADISON 3D-Designer: A complete suite of 3D mo-
                                                                                        CAD




       deling tools is fully integrated into the AutoCad 3D
       platform, one of whose most outstanding features is
       that it allows for plant specific expansions. The solution also
       provides numerous extremely helpful and time saving wizards.
       The P&ID-Designer automatically generates isometric draw-
                                                                                            ISO




       ings from 3D models. In addition, fully visualized representati-
       ons allow for outstanding orientation in 3D models.
                                                                                                N  wo




       CADISON Electric-Designer: This planning tool allows for the
       creation and management of documentation related to Con-
       trols, Installations and ET I&C technology, as well as for direct
                                                                                                      rks




       access to media and connection parameters from R&I diagrams nee-
       ded for the production of layout plans and hookups.
                                                                                                         ta
                                                                                                             tio




       CADISON MATPIPE: CADISON MATPIPE is a platform for the creation and
                                                                                                               n
       integration of vendor catalogues, pipe category elaboration and updating, the
                                                                                                                   to
       definition of configured 3D variants, data exporting and importing, and for
                                                                                                                      ols
       verifying that existing catalogue data has been updated.
                                                                                                                                  © Julius Montz GmbH
                                                                                                                        – generated using CADISON techn
CADISON_Broschu?re_R9_12-09_EN:Layout 1   13.11.2009     9:46 Uhr     Seite 5




                                              CADISON Engineer2Web: This technology gives you direct online access to CADISON object data.
                                              With CADISON Engineer2Web, the data and structures generated using CADISON can be viewed,
                                  CA          edited and/or re-integrated using a simple Web browser.

                                    D
                                                               CADISON Archiver: This tool allows you to store entire projects from the CADISON
                                    IS
                                                               object database on the server in read-only mode. The CADISON Archive Browser
                                      ON
                                          ad                   enables you to view archived projects quickly and easily.




                                                                           CADISON ERP-Interface: The CADISON ERP-Interface allows you to
                                             d-o
                                                                           manage engineering processes efficiently within business process
                                                                           flows, and in so doing include individual enterprise specific standards.
                                                n  mod


                                                                                   CADISON ROHR2-Interface: With CADISON technology, all re-
                                                                                   levant properties of designed 3D piping can be exported to an
                                                                                   NTR file containing the described analysis data and then auto-
                                                       ules



                                                                                   matically transferred to the ROHR2 stress calculation program.




                                                                                     CADISON Application Programming Interface (API): This
                                                                                     application programming interface tool greatly enhances
                                                                                     database openness and accessibility by allowing for outstan-
                                                                                     ding flexibility when it comes to external access for data,
                                                                                     content, structures and views. The tool also enables you to
                                                                                     generate new objects, and edit or delete existing ones secu-
                                                                                     rely.




                                                                                    CADISON Maintenance: This tool is designed to provide an
                                                                                    ideal lifecycle management solution for plant operations and
                                                                                    maintenance which can be used as a standalone add-on mo-
                                                                                    dule for technicians and fitters. The tool is also ideal for auto-
                                                                                    matically generating maintenance lists and reports.




                                                                                 CADISON Steel: Allows for rapid and simple 3D modeling of
                                                                                 structural steel designs using a variety of delivered component
                                                                                 libraries such as sections, staircases and banisters. The module
                                                                                 also includes facilities for 2D drawing generation.




                                                                        CADISON Material Designer: Allows for extremely rapid generation of
                                                                        component and pipe category data (e.g. DIN, ASME, PAS). The tool also
                                                                        allows for transparent documentation and visualization of component and
                                                                        pipe category data for plant builders and operators.




                                                       CADISON Navisworks: This is a high performance 3D viewer whose compatibility with va-
                                                       rious graphic formats, photo-realistic visualizations, online collision checks, and 4D design
                                                       simulations are aimed to help all project stakeholders avoid errors and save time.
   © Julius Montz GmbH
ated using CADISON technology –
CADISON_Broschu?re_R9_12-09_EN:Layout 1       13.11.2009    9:47 Uhr    Seite 6




       CADISON – the digital process chain
              Standardization of data usage modality saves time and money



              Our modular system allows for the efficient and seamless integration of all project stakeholders based on a
              shared object database and using the following task specific tools:

                 · Process and project engineers use the CADISON Project-Engineer for plant structuring and management
                   of both technical and commercial data
                 · Project and plant/system managers view planning data via the CADISON Project-Navigator or CADISON
                   Engineer2Web
                 · P&ID draftsmen and engineers work with the CADISON P&ID-Designer for creating flow charts and
                   detailed R&I diagrams
                 · Assembly and piping planners use CADISON 3D-Designer for 3D planning and generation of isometry
                 · ICA electrical engineers work with CADISON Electric-Designer for a complete instrumentation from rou-
                   ting to control cabinet planning
                 · Catalogue and pipe category technicians work with CADISON MATPIPE when developing projects and
                   company standards
                 · Operators carry out their maintenance coordination and scheduling tasks using CADISON Maintenance

              CADISON is the ultimate complete system thanks to the add-on modules that are available for the following pro-
              cesses: documentation and object management; visualization; interfaces with calculation procedures; ET I&C;
              catalogue management; isometric modules; and steel structure design.

                                                                             CADISON’s highly efficient data management
                                                                             mechanisms and tools allow you to make
                                                                             changes across an entire project very quickly,
                                                                             since all related drawings and reports are up-
                                                                             dated automatically when an associated ele-
                                                                             ment is modified. The system always displays
                                                                             data in exactly the right “modality” for the user’s
                                                                             purposes, and is thus user friendly and readily
                                                                             accepted. This in turn saves valuable work time
                                                                             and substantially increases productivity.

                                                                             Our Check-IN/Check-OUT platform is a highly
                                                                             efficient technology for collaborative plant engi-
                                                                             neering projects. The platform enables all users
                                                                             to check out specific logical or other component
                                                                             elements based on any criteria desired so that
                                                                             they can work with the element across the net-
                                                                             work or on their personal computer.

              CADISON understands that each enterprise has its own “standards”. Our rule based object models allow you to
              create virtually any design desired, without modifying the delivered standard. If needed however, you can im-
              plement this enterprise specific customization process yourself or have one of our IT engineers do it for you.

              Continuous enhancement of CADISON technology based on customer suggestions and the strategic vision of
              ITandFactory will allow your organization to benefit from new functionalities and process optimizations. These
              developments are bundled into updates, which are then integrated into the latest version of CADISON. This new
              version is provided annually, automatically, and free of charge to all of our service customers.

              Our close partnership with AutoDesk ensures that you have access to a modern CAE integration solution for the
              various AutoCAD platforms – a solution that is extremely user friendly and optimally interoperable. And what’s
              more, virtually every AutoCAD user is able to work with CADISON right away.

              Easy-in-use and widespread Microsoft Office Visio platforms can alternatively be applied when working with
              CADISON Visio P&ID-Designer, thus bringing you further cost benefits.
CADISON_Broschu?re_R9_12-09_EN:Layout 1      13.11.2009    9:47 Uhr    Seite 7




                                                                                                                 The Engineering Knowledge-smiths
        ITandFactory Group
               The people behind CADISON



               With more than 6500 installations worldwide and over 3000 employees in the corporate group, ITandFactory
               Group is one of the world’s largest providers of complete processing industry solutions. As a joint venture with
               the renowned engineering providers Neilsoft Ltd. in India and Triplan AG in Germany, we are uniquely positio-
               ned to provide our customers with solutions comprised of software and process oriented IT tools and the asso-
               ciated design concepts.

               Our core areas of activity are plant engineering efficiency optimization, plant engineering integration, and intel-
               ligent plant documentation through the use of powerful IT tools. The increasingly global orientation of our acti-
               vities dovetails productively with the network and international mindset of our customers. We aim to help our
               customers create maximum value through the use of cutting edge technologies, which in conjunction with our
               commitment to reliability and continuity, ensures our customers of a maximum return on investment.




        Contact information
               Our locations and international marketing partners


                H     Head office: ITandFactory GmbH · Auf der Krautweide 32 · 65812 Bad Soden
                      Phone: +49 6196 6092-310 · Fax: +49 6196 6092-202 · info@ITandFactory.com
                      Krefeld: ITandFactory GmbH · Alte Friedhofstraße / Building L222 · 47829 Krefeld
                      Phone: +49 2151 5163 277 · Fax: +49 2151 5134 434 · krefeld@ITandFactory.com
                      St. Poelten: ITandFactory GmbH · Heinrich-Schneidmadl-Straße 15 · 3100 St. Poelten
                      Phone: +43 2742 9001 3110 · Fax: +43 2742 9001 3111 · st.poelten@ITandFactory.com
                      Head office: ITandFactory AG · Quellenstrasse 37 · 4310 Rheinfelden
                      Phone: +41 61 833 3050 · Fax: +41 61 833 3051· rheinfelden@ITandFactory.com
                      Basel: Phone: +41 61 338 3232 · basel@ITandFactory.com


                      Neilsoft India:
                      Pune: Neilsoft Ltd · Pride Parmar Galaxy 8th Floor, 10/10 + A Sadhu Vaswani chowk. 411001
                      Phone: +91 20 2605 3003 · Fax: +91 20 2613 1755 · pune.sales@neilsoft.com
                      Bangalore: Neilsoft Ltd · 406 Embassy Centre, 11 Crescent Road, Kumara Park (E). 560001
                      Phone: +91 80 2226 7786 · Fax: +91 80 2237 4189 · bangalore.sales@neilsoft.com
                      Chennai: Phone: +91 44 2811 4247· chennai.sales@neilsoft.com
                      Mumbai: Phone: +91 22 6770 2737 · mumbai.sales@neilsoft.com
                      Delhi: Phone: +91 11 3088 3174 77 · delhi.sales@neilsoft.com

                      Canton: Phone: +1 734 459 1100 · sales.usa@ITandFactory.com

                      Luton: Phone: +44 1582 455 559 · sales.uk@ITandFactory.com




                    Advantages:
                    · Work with an international partner that has an impressive track record in all plant engineering domains.
                    · Complete solutions from one vendor for all phases of plant engineering, and outstanding IT and engineering expertise.
                    · Innovative products for the integration of complete plant solutions.
                    · A vendor that has a strong market position and is part of a corporate group with over 3000 employees.
CADISON_Broschu?re_R9_12-09_EN:Layout 1   13.11.2009   9:47 Uhr   Seite 8




                                                                            © ITandFactory GmbH, Layout: ABE/enz, 12/2009

CADISON Brochure

  • 1.
  • 2.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:46 Uhr Seite 2 The Engineering Knowledge-smiths Enhance your competitive edge CADISON: an object-oriented and data based plant engineering solution As plant engineers well know, numerous information interface and transmission errors translate into higher costs and lower margins. Managing such situations successfully is a challenge faced by engineering departments on a daily basis. cess is the way to break out of this vicious Integration of the entire engineering pro- circle and optimize project profitability like never before. Although until recently CAD systems were the best way to ensure com- petitiveness, the time has come to migrate to the next stage of optimization, namely the integration of all project data. Completing your projects in less time enables you to use today’s strategic (but limited) engineering resources even more efficiently. And this in turn allows your customers to bring their pro- ducts to market sooner. CADISON has devised an integrated engi- neering solution that addresses all of these issues by streamlining and expediting pro- ject planning processes. CADISON’s object-oriented data model for the various application domains (plant engi- neering, ET I&C technology and so on) saves you time and money by allowing for the inte- gration of all planning phases. And what’s more, CADISON allows you to capture valu- able information during the marketing phase, thus making this information available to project team members in all ensuing phases. CADISON’s simple, modular architecture allows the system to be configured for specific user tasks. And thanks to today’s advanced IT technologies, implementation of the CADISON solution is risk free, and your investment in the product is protected well into the future.
  • 3.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:46 Uhr Seite 3 “The CADISON solution makes it very easy to adapt machines and systems to All application domains are based on an integrated object data model. Whene- the customer’s space. The solution’s ver a change is made, CADISON automatically implements it in any “views” de- compatibility with other software tools sired and performs any project data updating that is needed. This obviates the such as SolidWorks and SAP is also need to enter the same data numerous times, thus reducing project costs and extremely useful.” eliminating what is often a major source of errors. Hartmut Claussen Head of Project Management and The true strength of CADISON technology is the seamlessness, consistency and Mechanical Engineering completeness of all project elements – including Bid, Piping and Instrumentation Diagrams (P&ID), 3D Piping, and ET I&C Electronics. This translates into opti- mized process management for plant engineering projects of all sizes. And what’s more, it makes no difference whether technical engineering data or gra- phic data is generated first for any specific project. With CADISON technology, “CADISON is our global Engineering- project configuration takes only a few hours – one of the many competitive Tool for standardisation across all E&S advantages you get with CADISON. sites, the reuse of engineering data and the continuous improvement of project Many of our customers have discovered (to their delight) – and documented – data quality.” that the CADISON solution reduces project planning time and costs by up to 50 Ottar Grande, Engineering Manager, percent. AlfaLaval Copenhagen AS, Engineering & Supply The quality of your planning output and processes is enhanced by elaborate component and material category lists. Our practice-tested CADISON MATPIPE “CADISON with its database driven catalogues integrate dimensional symbols, data sheet information, and fully con- approach is our common solution for figured three dimensional versions of these elements. Process & Plant Design.” Mikhail Arlievsky, General Director Giprochim Technolog S.Ltd., Russia · The CADISON solution optimizes your competitiveness and increases the value of your planning processes. Advantages: · Complete engineering solution for all phases of plant engineering. · The CADISON system allows for data interchange with other systems. · Maximum investment security thanks to CADISON’s strong market position.
  • 4.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:46 Uhr Seite 4 Integrated Digital Plant Model CADISON is a modular CAE solution that can be easily configured for specific scenarios. Thanks to the solution’s use of integrated databases, all project data is automatically and in- stantaneously available in its entirety within the various application domains such as P&IDs, 3D piping planning, isometric drawing generation, automatic report generation and so on. CADISON Project-Engineer: This tool allows multiple users to work on the same project concurrently. This means that you can design and perform all the calculations for a project using a kind of data object building method without the need of CAD. You can then do the detail work in stages during the next steps. We call this conceptual engineering. CADISON Project-Navigator: This tool provides views of project data within a global enterprise net- work and is extremely well suited for plant operation and maintenance processes. For example, you can in- stantly see which distribution field is responsible for a plant’s power supply and which plant elements are affected by a breakdown. CADISON P&ID-Designer: This tool allows project planning processes and diagrams to be merged seamlessly in such a way that all project related data is dynamically available to users. This in turn allows all project preliminary planning to be integrated with basic and detail engineering, and then merged with two dimensional layout planning. CADISON 3D-Designer: A complete suite of 3D mo- CAD deling tools is fully integrated into the AutoCad 3D platform, one of whose most outstanding features is that it allows for plant specific expansions. The solution also provides numerous extremely helpful and time saving wizards. The P&ID-Designer automatically generates isometric draw- ISO ings from 3D models. In addition, fully visualized representati- ons allow for outstanding orientation in 3D models. N wo CADISON Electric-Designer: This planning tool allows for the creation and management of documentation related to Con- trols, Installations and ET I&C technology, as well as for direct rks access to media and connection parameters from R&I diagrams nee- ded for the production of layout plans and hookups. ta tio CADISON MATPIPE: CADISON MATPIPE is a platform for the creation and n integration of vendor catalogues, pipe category elaboration and updating, the to definition of configured 3D variants, data exporting and importing, and for ols verifying that existing catalogue data has been updated. © Julius Montz GmbH – generated using CADISON techn
  • 5.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:46 Uhr Seite 5 CADISON Engineer2Web: This technology gives you direct online access to CADISON object data. With CADISON Engineer2Web, the data and structures generated using CADISON can be viewed, CA edited and/or re-integrated using a simple Web browser. D CADISON Archiver: This tool allows you to store entire projects from the CADISON IS object database on the server in read-only mode. The CADISON Archive Browser ON ad enables you to view archived projects quickly and easily. CADISON ERP-Interface: The CADISON ERP-Interface allows you to d-o manage engineering processes efficiently within business process flows, and in so doing include individual enterprise specific standards. n mod CADISON ROHR2-Interface: With CADISON technology, all re- levant properties of designed 3D piping can be exported to an NTR file containing the described analysis data and then auto- ules matically transferred to the ROHR2 stress calculation program. CADISON Application Programming Interface (API): This application programming interface tool greatly enhances database openness and accessibility by allowing for outstan- ding flexibility when it comes to external access for data, content, structures and views. The tool also enables you to generate new objects, and edit or delete existing ones secu- rely. CADISON Maintenance: This tool is designed to provide an ideal lifecycle management solution for plant operations and maintenance which can be used as a standalone add-on mo- dule for technicians and fitters. The tool is also ideal for auto- matically generating maintenance lists and reports. CADISON Steel: Allows for rapid and simple 3D modeling of structural steel designs using a variety of delivered component libraries such as sections, staircases and banisters. The module also includes facilities for 2D drawing generation. CADISON Material Designer: Allows for extremely rapid generation of component and pipe category data (e.g. DIN, ASME, PAS). The tool also allows for transparent documentation and visualization of component and pipe category data for plant builders and operators. CADISON Navisworks: This is a high performance 3D viewer whose compatibility with va- rious graphic formats, photo-realistic visualizations, online collision checks, and 4D design simulations are aimed to help all project stakeholders avoid errors and save time. © Julius Montz GmbH ated using CADISON technology –
  • 6.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:47 Uhr Seite 6 CADISON – the digital process chain Standardization of data usage modality saves time and money Our modular system allows for the efficient and seamless integration of all project stakeholders based on a shared object database and using the following task specific tools: · Process and project engineers use the CADISON Project-Engineer for plant structuring and management of both technical and commercial data · Project and plant/system managers view planning data via the CADISON Project-Navigator or CADISON Engineer2Web · P&ID draftsmen and engineers work with the CADISON P&ID-Designer for creating flow charts and detailed R&I diagrams · Assembly and piping planners use CADISON 3D-Designer for 3D planning and generation of isometry · ICA electrical engineers work with CADISON Electric-Designer for a complete instrumentation from rou- ting to control cabinet planning · Catalogue and pipe category technicians work with CADISON MATPIPE when developing projects and company standards · Operators carry out their maintenance coordination and scheduling tasks using CADISON Maintenance CADISON is the ultimate complete system thanks to the add-on modules that are available for the following pro- cesses: documentation and object management; visualization; interfaces with calculation procedures; ET I&C; catalogue management; isometric modules; and steel structure design. CADISON’s highly efficient data management mechanisms and tools allow you to make changes across an entire project very quickly, since all related drawings and reports are up- dated automatically when an associated ele- ment is modified. The system always displays data in exactly the right “modality” for the user’s purposes, and is thus user friendly and readily accepted. This in turn saves valuable work time and substantially increases productivity. Our Check-IN/Check-OUT platform is a highly efficient technology for collaborative plant engi- neering projects. The platform enables all users to check out specific logical or other component elements based on any criteria desired so that they can work with the element across the net- work or on their personal computer. CADISON understands that each enterprise has its own “standards”. Our rule based object models allow you to create virtually any design desired, without modifying the delivered standard. If needed however, you can im- plement this enterprise specific customization process yourself or have one of our IT engineers do it for you. Continuous enhancement of CADISON technology based on customer suggestions and the strategic vision of ITandFactory will allow your organization to benefit from new functionalities and process optimizations. These developments are bundled into updates, which are then integrated into the latest version of CADISON. This new version is provided annually, automatically, and free of charge to all of our service customers. Our close partnership with AutoDesk ensures that you have access to a modern CAE integration solution for the various AutoCAD platforms – a solution that is extremely user friendly and optimally interoperable. And what’s more, virtually every AutoCAD user is able to work with CADISON right away. Easy-in-use and widespread Microsoft Office Visio platforms can alternatively be applied when working with CADISON Visio P&ID-Designer, thus bringing you further cost benefits.
  • 7.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:47 Uhr Seite 7 The Engineering Knowledge-smiths ITandFactory Group The people behind CADISON With more than 6500 installations worldwide and over 3000 employees in the corporate group, ITandFactory Group is one of the world’s largest providers of complete processing industry solutions. As a joint venture with the renowned engineering providers Neilsoft Ltd. in India and Triplan AG in Germany, we are uniquely positio- ned to provide our customers with solutions comprised of software and process oriented IT tools and the asso- ciated design concepts. Our core areas of activity are plant engineering efficiency optimization, plant engineering integration, and intel- ligent plant documentation through the use of powerful IT tools. The increasingly global orientation of our acti- vities dovetails productively with the network and international mindset of our customers. We aim to help our customers create maximum value through the use of cutting edge technologies, which in conjunction with our commitment to reliability and continuity, ensures our customers of a maximum return on investment. Contact information Our locations and international marketing partners H Head office: ITandFactory GmbH · Auf der Krautweide 32 · 65812 Bad Soden Phone: +49 6196 6092-310 · Fax: +49 6196 6092-202 · info@ITandFactory.com Krefeld: ITandFactory GmbH · Alte Friedhofstraße / Building L222 · 47829 Krefeld Phone: +49 2151 5163 277 · Fax: +49 2151 5134 434 · krefeld@ITandFactory.com St. Poelten: ITandFactory GmbH · Heinrich-Schneidmadl-Straße 15 · 3100 St. Poelten Phone: +43 2742 9001 3110 · Fax: +43 2742 9001 3111 · st.poelten@ITandFactory.com Head office: ITandFactory AG · Quellenstrasse 37 · 4310 Rheinfelden Phone: +41 61 833 3050 · Fax: +41 61 833 3051· rheinfelden@ITandFactory.com Basel: Phone: +41 61 338 3232 · basel@ITandFactory.com Neilsoft India: Pune: Neilsoft Ltd · Pride Parmar Galaxy 8th Floor, 10/10 + A Sadhu Vaswani chowk. 411001 Phone: +91 20 2605 3003 · Fax: +91 20 2613 1755 · pune.sales@neilsoft.com Bangalore: Neilsoft Ltd · 406 Embassy Centre, 11 Crescent Road, Kumara Park (E). 560001 Phone: +91 80 2226 7786 · Fax: +91 80 2237 4189 · bangalore.sales@neilsoft.com Chennai: Phone: +91 44 2811 4247· chennai.sales@neilsoft.com Mumbai: Phone: +91 22 6770 2737 · mumbai.sales@neilsoft.com Delhi: Phone: +91 11 3088 3174 77 · delhi.sales@neilsoft.com Canton: Phone: +1 734 459 1100 · sales.usa@ITandFactory.com Luton: Phone: +44 1582 455 559 · sales.uk@ITandFactory.com Advantages: · Work with an international partner that has an impressive track record in all plant engineering domains. · Complete solutions from one vendor for all phases of plant engineering, and outstanding IT and engineering expertise. · Innovative products for the integration of complete plant solutions. · A vendor that has a strong market position and is part of a corporate group with over 3000 employees.
  • 8.
    CADISON_Broschu?re_R9_12-09_EN:Layout 1 13.11.2009 9:47 Uhr Seite 8 © ITandFactory GmbH, Layout: ABE/enz, 12/2009