 A bulldozer is a crawler (continuous
tracked tractor) equipped with a substantial
metal plate (known as a blade) used to push
large quantities of soil, sand, rubble, or other
such material during construction or conversion
work and typically equipped at the rear with a
claw-like device (known as a ripper) to loosen
densely compacted materials.
 A bulldozer is a crawler (Continuous tracked
tractor) used to push large quantities of soil,
sand, rubble, during construction work.
• The term “bulldozer” is often used to mean any heavy
equipment (sometimes a loader and sometimes an
excavator), but precisely, the term refers only to a
tractor fitted with a dozer blade.
 The bulldozer's primary tools are
the blade and the ripper.
 Dozers, tractors
equipped with a blade
are standard equipment
for excavating.
 The first bulldozers were adapted from Holt farm tractors
that were used to plough fields. The versatility of the
bulldozers in soft ground for logging and road building led
directly to their becoming the armored tank in World War I.
In 1923, a young farmer
named James Cummings and
a draftsman named J. Earl
McLeod made the first
designs for a bulldozer. A
replica is on display at the
city park in Morrowville,
Kansas where the two built
the first bulldozer.
 Bulldozers can be found on a wide range of
sites, mines and quarries, military bases, heavy
industry factories, engineering projects and farms.
 The tracks give them excellent ground holding
capability and mobility through very rough terrain.
Wide tracks help distribute the bulldozer's weight
over a large area (decreasing ground pressure), thus
preventing it from sinking
in sandy or muddy ground. Extra wide tracks are
known as swamp tracks or LGP (low ground
pressure) tracks. Bulldozers have transmission
systems designed to take advantage of the track
system and provide excellent tractive force.
 Most often, bulldozers are large and powerful tracked heavy equipment.
The tracks give them excellent ground hold and mobility through very
rough terrain.
 Wide tracks help distribute the bulldozer's weight over a large area thus
preventing it from sinking in sandy or muddy ground.
The bulldozer's primary tools are the blade and the ripper.
Bulldozer
Sketch
 The bulldozer blade is a heavy metal plate on
the front of the tractor, used to push objects,
and shove sand, soil and debris.
 Three Types:
1. A straight blade ("S blade") which is short and has no
lateral curve and no side wings and can be used for
fine grading.
2. A universal blade ("U blade") which is tall and very
curved, and has large side wings to carry more
material.
3. An "S-U" combination blade which is shorter, has less
curvature, and smaller side wings. This blade is
typically used for pushing piles of large rocks, such as
at a quarry.
 The ripper is the long claw-like device on the back of the
bulldozer. Rippers can come as a single (single shank/giant
ripper) or in groups of two or more (multi shank rippers).
 Usually, a single shank is preferred for heavy ripping. The
ripper shank is fitted with a replaceable tungsten steel alloy
tip
Ripping rock lets the ground surface rock
be broken into small rubble easy to handle
and transport, which can then be removed
so grading can take place.
Agricultural ripping lets rocky or very hard
earth be broken up so otherwise unploughable
land can be farmed.
For example, much of the best land in the
California wine country consists of old lava flows.
With heavy bulldozers the lava is shattered,
allowing agriculture.
 Also, hard earth can be ripped and broken up to
allow planting of orchards where trees could not
otherwise grow.
 Moisture Content –
1. Moisture falls below the optimum moisture content value,
particles will adhere to each other and more – effect – it make it
diffcult to break material out of its natural state.
2. If moisture content increases above the optimum, material
becomes heavy and will have a negative effect on dozeing
performance.
 Particle size -
1. Specific size of material has a direct bearing on the ability of
dozer blade to penetrate and loosen materials. Large particles
resist penetration more than smaller ones, requires more dozing
power.
2. Sharp-edged particles exert more force against the curl
movement of blade. Material consisting of irregularly and sharp-
edged particles is more difficult to doze than material
composed of round-edged particles.
 Voids –
 1. More force is required to break up the tightly bonded
materials. Also such materials is generally heavy, making
additional demands on the available horse power of the dozer.
In military use, dozer blades are fixed on combat
engineering vehicles and can optionally be fitted
on other vehicles, such as artillery tractors like
the Type 73 or M8 Tractor.
 Dozer blades can also be mounted on Main
battle tanks, where it can be used to clear
antitank obstacles, mines, and dig improvised
shelters.
Combat applications for dozer blades include
clearing battlefield obstacles and preparing fire
positions.
 Bulldozers are large and heavy vehicles
making them a good choice for demolition
and clearing sites.
 Caterpillar tracks give bulldozers a distinct
advantage allowing them to be surprisingly
maneuverable for their extreme weight.
 The tracks are also quite wide which helps to
distribute their heavy weight preventing them
from sinking in sandy or muddy ground.
 Bulldozers are renowned for holding their
ground which gives them phenomenal strength
for pushing and dragging obstructions in their
path.
 Some models of tanks can even tow up to 70
tons of weight and are used for moving written
off vehicles and military purposes as well as in
construction and demolition projects.
 Bulldozers are often used in road building,
construction, mining, forestry, land clearing,
infrastructure development, and any other
projects requiring highly mobile, powerful, and
stable earth-moving equipment.
 The bottom edge of the blade can be
sharpened, e.g. to cut tree stumps.
 Loads – Fully heaped blade
 Engine Speed – Full rpm / full capacity
 Travel – 1 to 8 km/hr,
haul distance- 60 to 90m etc.
 Spreading – Time being wasted?
 Mechanical – All adjustment to power unit
maintained
 General – Right machine for job?
Right operator?
Right procedure?
Machine proper maintained?

More Related Content

What's hot

Ripper
RipperRipper
Ripper
Anand Kumar
 
Bulldozer
BulldozerBulldozer
Bulldozer
Jenil Patel
 
Scraper
ScraperScraper
Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipment
Pritesh Parmar
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
Tulsi Makwana
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Construction Tech. and Mgmt., VNIT Nagpur
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavator
Shahid Akram
 
grader
gradergrader
GRADERS
GRADERSGRADERS
GRADERS
Arslan1000
 
Earthmoving equipments
Earthmoving equipmentsEarthmoving equipments
Earthmoving equipments
Samay Attara
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
A Makwana
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
Shivananda Roy
 
Mining dumper
Mining dumperMining dumper
Mining dumper
VIJAY KUMAR
 
Power shovel
Power shovelPower shovel
Power shovel
Anand Kumar
 
Construction equipment ppt
Construction equipment pptConstruction equipment ppt
Construction equipment ppt
DINESH TAMBE
 
Bulldozer
BulldozerBulldozer
Bulldozer
ismail khan
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
Ulimella Siva Sankar
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavator
Parth Desani
 
Dragline
DraglineDragline
Dragline
Malay Talaviya
 

What's hot (20)

Ripper
RipperRipper
Ripper
 
Bulldozer
BulldozerBulldozer
Bulldozer
 
Scraper
ScraperScraper
Scraper
 
Heavy construction equipment
Heavy construction equipmentHeavy construction equipment
Heavy construction equipment
 
Excavating Equipments
Excavating EquipmentsExcavating Equipments
Excavating Equipments
 
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
Excavators: Power Shovel, Backhoe an Front Shovel (by Faisal VA and Karthik V)
 
Hydraulic excavator
Hydraulic excavatorHydraulic excavator
Hydraulic excavator
 
grader
gradergrader
grader
 
GRADERS
GRADERSGRADERS
GRADERS
 
Earthmoving equipments
Earthmoving equipmentsEarthmoving equipments
Earthmoving equipments
 
Tunnel boring machine
Tunnel boring machineTunnel boring machine
Tunnel boring machine
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
Mining dumper
Mining dumperMining dumper
Mining dumper
 
Power shovel
Power shovelPower shovel
Power shovel
 
Construction equipment ppt
Construction equipment pptConstruction equipment ppt
Construction equipment ppt
 
Bulldozer
BulldozerBulldozer
Bulldozer
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Drag line excavator
Drag line excavatorDrag line excavator
Drag line excavator
 
Dragline
DraglineDragline
Dragline
 

Similar to Bulldozer

презентация бульдозер и скрепер
презентация  бульдозер и скреперпрезентация  бульдозер и скрепер
презентация бульдозер и скрепер
Erbolat Adildabekovich
 
Equipment for earth work (for civil engineering)
Equipment for earth work (for civil engineering) Equipment for earth work (for civil engineering)
Equipment for earth work (for civil engineering)
laxman singh
 
Types of soil excavation tools and machines in construction
Types of soil excavation tools and machines in constructionTypes of soil excavation tools and machines in construction
Types of soil excavation tools and machines in construction
RanaGhafran
 
Material handling, Bulldozer
Material handling, BulldozerMaterial handling, Bulldozer
Material handling, Bulldozer
Tushar Patel
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
swetha110
 
Heavy equipments for site work civil Engineering
Heavy equipments for site work civil Engineering Heavy equipments for site work civil Engineering
Heavy equipments for site work civil Engineering
Anas Adel
 
bulldozers.pptx
bulldozers.pptxbulldozers.pptx
bulldozers.pptx
megha desai
 
Road equipments
Road equipmentsRoad equipments
Road equipments
Dhrubajyoti Majumdar
 
earth moving equipments
earth moving equipmentsearth moving equipments
earth moving equipments
rafiyaparveen1994
 
BULLDOZER (Building Construction & Material)
BULLDOZER (Building Construction & Material)BULLDOZER (Building Construction & Material)
BULLDOZER (Building Construction & Material)
ABDURRAB ANSARI
 
ppt%20act.pptx
ppt%20act.pptxppt%20act.pptx
ppt%20act.pptx
ModiDeep2
 
PCM-crawler loaders
PCM-crawler loadersPCM-crawler loaders
PCM-crawler loaders
As Per Design
 
Earthmover.ppt
Earthmover.pptEarthmover.ppt
Earthmover.ppt
TanyaKhanna26
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2AhmedZL
 
EARTHWORKS MACHINERIES
EARTHWORKS MACHINERIES EARTHWORKS MACHINERIES
EARTHWORKS MACHINERIES
Adel Ba Wazir
 
Pile Foundation
Pile FoundationPile Foundation
Pile Foundation
Vikas Vaibhav
 
Construction Road Equipments
Construction Road EquipmentsConstruction Road Equipments
Construction Road Equipments
Arnab Paul
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment
debasdessie
 
Everything you need to know about Earthmovers.pdf
Everything you need to know about Earthmovers.pdfEverything you need to know about Earthmovers.pdf
Everything you need to know about Earthmovers.pdf
AmritaShastri2
 

Similar to Bulldozer (20)

презентация бульдозер и скрепер
презентация  бульдозер и скреперпрезентация  бульдозер и скрепер
презентация бульдозер и скрепер
 
Equipment for earth work (for civil engineering)
Equipment for earth work (for civil engineering) Equipment for earth work (for civil engineering)
Equipment for earth work (for civil engineering)
 
Types of soil excavation tools and machines in construction
Types of soil excavation tools and machines in constructionTypes of soil excavation tools and machines in construction
Types of soil excavation tools and machines in construction
 
Material handling, Bulldozer
Material handling, BulldozerMaterial handling, Bulldozer
Material handling, Bulldozer
 
Earth work equipment
Earth work equipmentEarth work equipment
Earth work equipment
 
Heavy equipments for site work civil Engineering
Heavy equipments for site work civil Engineering Heavy equipments for site work civil Engineering
Heavy equipments for site work civil Engineering
 
bulldozers.pptx
bulldozers.pptxbulldozers.pptx
bulldozers.pptx
 
Road equipments
Road equipmentsRoad equipments
Road equipments
 
earth moving equipments
earth moving equipmentsearth moving equipments
earth moving equipments
 
BULLDOZER (Building Construction & Material)
BULLDOZER (Building Construction & Material)BULLDOZER (Building Construction & Material)
BULLDOZER (Building Construction & Material)
 
ppt%20act.pptx
ppt%20act.pptxppt%20act.pptx
ppt%20act.pptx
 
PCM-crawler loaders
PCM-crawler loadersPCM-crawler loaders
PCM-crawler loaders
 
Earthmover.ppt
Earthmover.pptEarthmover.ppt
Earthmover.ppt
 
Road construction equipment.pptx 2
Road construction equipment.pptx 2Road construction equipment.pptx 2
Road construction equipment.pptx 2
 
HEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENTHEAVY MACHINERIES ASSINGMENT
HEAVY MACHINERIES ASSINGMENT
 
EARTHWORKS MACHINERIES
EARTHWORKS MACHINERIES EARTHWORKS MACHINERIES
EARTHWORKS MACHINERIES
 
Pile Foundation
Pile FoundationPile Foundation
Pile Foundation
 
Construction Road Equipments
Construction Road EquipmentsConstruction Road Equipments
Construction Road Equipments
 
Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment Classification of heavy duty and construction equipment
Classification of heavy duty and construction equipment
 
Everything you need to know about Earthmovers.pdf
Everything you need to know about Earthmovers.pdfEverything you need to know about Earthmovers.pdf
Everything you need to know about Earthmovers.pdf
 

Recently uploaded

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
ssuser9bd3ba
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
LIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.pptLIGA(E)11111111111111111111111111111111111111111.ppt
LIGA(E)11111111111111111111111111111111111111111.ppt
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

Bulldozer

  • 1.
  • 2.  A bulldozer is a crawler (continuous tracked tractor) equipped with a substantial metal plate (known as a blade) used to push large quantities of soil, sand, rubble, or other such material during construction or conversion work and typically equipped at the rear with a claw-like device (known as a ripper) to loosen densely compacted materials.  A bulldozer is a crawler (Continuous tracked tractor) used to push large quantities of soil, sand, rubble, during construction work.
  • 3. • The term “bulldozer” is often used to mean any heavy equipment (sometimes a loader and sometimes an excavator), but precisely, the term refers only to a tractor fitted with a dozer blade.  The bulldozer's primary tools are the blade and the ripper.  Dozers, tractors equipped with a blade are standard equipment for excavating.
  • 4.  The first bulldozers were adapted from Holt farm tractors that were used to plough fields. The versatility of the bulldozers in soft ground for logging and road building led directly to their becoming the armored tank in World War I. In 1923, a young farmer named James Cummings and a draftsman named J. Earl McLeod made the first designs for a bulldozer. A replica is on display at the city park in Morrowville, Kansas where the two built the first bulldozer.
  • 5.  Bulldozers can be found on a wide range of sites, mines and quarries, military bases, heavy industry factories, engineering projects and farms.  The tracks give them excellent ground holding capability and mobility through very rough terrain. Wide tracks help distribute the bulldozer's weight over a large area (decreasing ground pressure), thus preventing it from sinking in sandy or muddy ground. Extra wide tracks are known as swamp tracks or LGP (low ground pressure) tracks. Bulldozers have transmission systems designed to take advantage of the track system and provide excellent tractive force.  Most often, bulldozers are large and powerful tracked heavy equipment. The tracks give them excellent ground hold and mobility through very rough terrain.  Wide tracks help distribute the bulldozer's weight over a large area thus preventing it from sinking in sandy or muddy ground. The bulldozer's primary tools are the blade and the ripper.
  • 7.
  • 8.  The bulldozer blade is a heavy metal plate on the front of the tractor, used to push objects, and shove sand, soil and debris.  Three Types: 1. A straight blade ("S blade") which is short and has no lateral curve and no side wings and can be used for fine grading. 2. A universal blade ("U blade") which is tall and very curved, and has large side wings to carry more material. 3. An "S-U" combination blade which is shorter, has less curvature, and smaller side wings. This blade is typically used for pushing piles of large rocks, such as at a quarry.
  • 9.  The ripper is the long claw-like device on the back of the bulldozer. Rippers can come as a single (single shank/giant ripper) or in groups of two or more (multi shank rippers).  Usually, a single shank is preferred for heavy ripping. The ripper shank is fitted with a replaceable tungsten steel alloy tip Ripping rock lets the ground surface rock be broken into small rubble easy to handle and transport, which can then be removed so grading can take place. Agricultural ripping lets rocky or very hard earth be broken up so otherwise unploughable land can be farmed.
  • 10. For example, much of the best land in the California wine country consists of old lava flows. With heavy bulldozers the lava is shattered, allowing agriculture.  Also, hard earth can be ripped and broken up to allow planting of orchards where trees could not otherwise grow.
  • 11.  Moisture Content – 1. Moisture falls below the optimum moisture content value, particles will adhere to each other and more – effect – it make it diffcult to break material out of its natural state. 2. If moisture content increases above the optimum, material becomes heavy and will have a negative effect on dozeing performance.  Particle size - 1. Specific size of material has a direct bearing on the ability of dozer blade to penetrate and loosen materials. Large particles resist penetration more than smaller ones, requires more dozing power. 2. Sharp-edged particles exert more force against the curl movement of blade. Material consisting of irregularly and sharp- edged particles is more difficult to doze than material composed of round-edged particles.  Voids –  1. More force is required to break up the tightly bonded materials. Also such materials is generally heavy, making additional demands on the available horse power of the dozer.
  • 12. In military use, dozer blades are fixed on combat engineering vehicles and can optionally be fitted on other vehicles, such as artillery tractors like the Type 73 or M8 Tractor.  Dozer blades can also be mounted on Main battle tanks, where it can be used to clear antitank obstacles, mines, and dig improvised shelters. Combat applications for dozer blades include clearing battlefield obstacles and preparing fire positions.
  • 13.  Bulldozers are large and heavy vehicles making them a good choice for demolition and clearing sites.  Caterpillar tracks give bulldozers a distinct advantage allowing them to be surprisingly maneuverable for their extreme weight.  The tracks are also quite wide which helps to distribute their heavy weight preventing them from sinking in sandy or muddy ground.
  • 14.  Bulldozers are renowned for holding their ground which gives them phenomenal strength for pushing and dragging obstructions in their path.  Some models of tanks can even tow up to 70 tons of weight and are used for moving written off vehicles and military purposes as well as in construction and demolition projects.
  • 15.  Bulldozers are often used in road building, construction, mining, forestry, land clearing, infrastructure development, and any other projects requiring highly mobile, powerful, and stable earth-moving equipment.  The bottom edge of the blade can be sharpened, e.g. to cut tree stumps.
  • 16.  Loads – Fully heaped blade  Engine Speed – Full rpm / full capacity  Travel – 1 to 8 km/hr, haul distance- 60 to 90m etc.  Spreading – Time being wasted?  Mechanical – All adjustment to power unit maintained  General – Right machine for job? Right operator? Right procedure? Machine proper maintained?