ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
!
BUILDING STRUCTURES
[ARC 2213]
FETTUCCINE TRUSS BRIDGE ANALYSIS REPORT
LIM JIAN JUN 0316867
LOO MEI CHUEN 0316379
TEH GIE ENG 0316179
JOANNE BERNICE CHUA YUNN TZE 0315905
EVIN LOOI JYNN 0311852
TAN CUI ZHI 0320826
1
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
TABLE OF CONTENTS
1. INTRODUCTION
2.METHODLODY
2.1.PRECEDENT STUDY
2.2.MAKING OF FETTUCCINE BRIDGE
2.3.REQUIREMENT
3.PRECEDENT STUDY
4.MATERIALS & EQUIPMENTS
4.1.STRENGTH OF MATERIAL
4.1.1. PROPERTIES OF FETTUCCINE
4.1.2. TESTING OF FETTUCCINE
4.1.3.EXPERIMENTS
4.1.4.CONCLUSION
4.2.ADHESIVE ANALYSIS
5.BRIDGE TESTING AND LOAD ANALYSIS
5.1. TIMELINE
5.2. FIRST BRIDGE
5.3. SECOND BRIDGE
5.4. THIRD BRIDGE
5.5. FOURTH BRIDGE
6.FINAL BRIDGE
6.1. AMENDMENTS
6.2. FINAL MODEL MAKING
2
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3. JOINT ANALYSIS
6.3.1. JOINT A
6.3.2. JOINT B
6.3.3. JOINT C
6.3.4. JOINT D
6.3.5. JOINT E
6.3.6. JOINT F
6.3.7.JOINT G
6.4. FINAL BRIDGE TESTING AND LOAD ANALYSIS
6.5. CALCULATIONS
6.6. DESIGN SOLUTIONS
6.6.1. 1ST SOLUTION: FINGER JOINTS
6.6.2. 2ND SOLUTION: CROSS BRACING
6.6.3. 3RD SOLUTION: LOWER SUPPORT
7.CONCLUSION
8.APPENDIX
8.1. CASE STUDY 1
8.2. CASE STUDY 2
8.3. CASE STUDY 3
8.4. CASE STUDY 4
9.REFERENCES
3
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
1.0 INTRODUCTION
This project aims to develop our understanding of tensile and compressive
strength of construction materials by understanding the distribution of
force in a truss.
In order to achieve that, in a group of 6 we were required carry out a
precedent study on a truss bridge of our choice, analyzing the
connections, arrangements and orientations of the members. Once that
was completed, we were required to design and construct a truss bridge
made out of fettuccine.
The requirements for this bridge include it having a 750mm clear span and
a maximum weight of 200g. this bridge will then be tested to fail and we
were required to analyse the reason of its failure and calculate its efficiency
4
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
2.0 METHODOLOGY
2.1 PRECEDENT STUDY
By looking through precedent studies to have a better understanding of
the types of trusses available. Next , understanding the forces that would
be exerted to the trusses ; compression and tension, would allow us to
make adjustment to our bridge, that would best suit the given material ;
fettuccine.
2.2 MAKING OF FETTUCCINE BRIDGE
PHASE 01 : STRENGTH OF MATERIAL
Understanding the properties of the fettuccine is important in order to
build one bridge that can carry maximum load. For the tensile strength in
the fettuccine is considerable low when compare to aluminium which has
the same amount of stiffness to the fettuccine.
PHASE 02 : ADHESIVE
Choosing the tight type of adhesive is important as it plays a huge role in
this assignment. As there are many types of adhesive in the market that
each has their own function and characteristics. Not only the type of
adhesive is important but the brand of adhesive is important as well, for
different brand has different quality and choosing one that suits
constructing the fettuccine bridge is primary.
PHASE 03 : MODEL MAKING
5
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
To ensure precision in our model making, AutoCad drawings are drawn in
1:1 scale and plotted out to ensure precision and ease our process. And in
order to strengthen our bridge as much as possible, each pasta is marked
individually as each has their own location of placement and length, and
are glued accordance.
PHASE 04 : MODEL TESTING
Finished models are being tested after placing aside to allow the adhesive
to sit on the model. By placing weight on the middle of intermediate
member to ensure that load is evenly distributed. All these are being
recorded to allow us to fix and analysis our bridge.
2.3 REQUIREMENTS
• To have a clear span of 750mm
• Not exceeding the weight of 200g
• Only material allowed is fettuccine pasta and adhesive
• Allowed to use any type of adhesive possible
• Workmanship is put to consideration as part of aesthetic
6
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
3.0 PRECEDENT STUDY
Historic name
Waddell “A” Truss Bridge
Other name
Linn Branch Creek Bridge
Location
English Landing Park, Parkville, Missouri
History
The Waddell “A” Truss Bridge, currently located in English Landing Park in Parkville was
designed by engineer John Alexander Low Waddell. It was originally built in 1898 as a railroad
bridge across Linn Branch Creek before being abandoned in 1939, and was relocated in 1987
7
Fig 3.0.1 Linn Branch Creek Bridge in 1898
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
to make way for the construction of Smithville Lake. As of now, it crosses Rush Creek carrying a
pedestrian path between a day-use recreational area and two isolated ball fields.
The single span bridge is a U.S. National Register of Historic Place with a patented design,
consisting of triangular ‘A’ trusses and its structural members are pin-connected. Despite its
relocation, the bridge retains its integrity of design due to its reliability, ease of erection, cost
efficient and structural rigidity in all directions.
Comparison and Components of Bridge

8
Fig 3.0.2 Bridge constructed across Linn Branch Creek in 1898
Fig 3.0.3 Bridge relocated to English Landing Park, Parkville, Missouri in
1987
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report


9
Portal'bracing
Fig 3.0.4 Portal View
Hip'ver1cal
Upper'
Bo4om'
Guard'rails
Diagonal'
Strut
Fig 3.0.5 Perspective Elevation View
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Force Distribution Diagram of Bridge under Load Pressure
Arrangement, Orientation and Connection of Bridge Members
(Drawings by John Alexander Waddell)
10
In'tension
Under'compression
Fig 3.0.6 Force Distribution Diagram
Connec1on'of'strut'
and'upper'chord
Connec1on'of'
members
Load
Fig 3.0.6 Connection of Members
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
11
Eleva1on'of'
portal'bracing
Pin'joint'
connec1on
Sec1on'view'
of'pin'joint'
(line'6E6'in'Fig'
Sec1on'view'of'
middle'chord'
(line'7E7'in'Fig'
Fig 3.0.9 View of bracing below deck of bridge
Fig 3.0.7 Detailed truss connection of members
Fig 3.0.8 Detailed Drawing of Portal Bracing and Pin joint connection
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
4.0 MATERIALS & EQUIPMENTS
12
Equipments
Pen Knife
• used to cut the fettuccine in model
making
Camera
• make recordings of the bridge testing
• photograph the process
Bag • carry the load
Hook • hook the bag on the bridge
Sand Paper
• sand the edges of the components of
the bridge to fit
Mineral Water • used as load
Weighing Machine
• measure the weight of the load placed
inside the bag
Super Glue • adhesive for material bridge
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
4.1 STRENGTH OF MATERIAL
Fettuccine was the only material approved to be used for this project. Thus, research and
analysis of Fettuccine was conducted before model making session.
4.1.1 PROPERTIES OF FETTUCCINE
The fettuccine used in the making of the truss bridge model has the thickness 1 mm and the
width of 4 mm. It is brittle and thus is stronger under tension. However, fettuccine has a low
compressive strength
1. Ultimate tensile strength : 2 000 psi
2. Stiffness (Young’s Modulus) E: 10, 000, 000 psi ( E= stress/ strain)
13
Figure 4.1.1 Fettuccine used in model making.
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
4.1.2 TESTING OF FETTUCCINE
Before the testing, we made sure the fettuccine are glued with the proper technique to prevent
uneven surface and to ensure the ease of building with modular units.
4.1.3 EXPERIMENTS:
The fettuccine beams were formed using the staggered arrangement to ensure that the
breaking points are not aligned and thus minimising the the number of weak spots.
To understand its efficiency and the maximum load each can carry, we tested several types of
beam with different orientations to understand which is the best to be implemented in our
bridge building.
14
Figure 4.1.2.1 Wrong glueing technique Figure 4.1.2.2 Correct glueing technique
Figure 4.1.3.1 Staggered arrangement of
fettuccine in beam
Figure 4.1.3.2 Horizontal FacingFigure 4.1.3.2 Vertical Facing
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
4.1.4 CONCLUSION
Based on the testings, it can be concluded that the I-beam made up of 5 pieces of fettuccine is
the strongest among all as it could withstand the heaviest load. The 4 layered fettuccine is also
quite strong. For the 1 layered and 2 layered fettuccine, it shows that the the horizontal facing
fettuccine is much stronger compared to the vertical facing ones.
15
Layers of
Members
Length of
fettuccine (cm)
Clear Span
(cm)
Load Sustained
(Vertical Facing) (g)
Load Sustained
(Horizontal Facing) (g)
1 Layer 26 15 420 205
2 Layer 26 15 500 320
3 Layer 26 15 770 630
4 Layer 26 15 1300 1110
5 Layer ( I-beam) 26 15 - 1700
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
4.2 ADHESIVE ANALYSIS
Three different kinds of glue used to ensure the joints are strong and thus strengthen the
bridge.
V-Tech Super Glue was used the most while constructing our fettuccine bridge. It has high
efficiency and it dried faster compared to the other adhesives, as it is more concentrated when
compare to UHU glue as well as epoxy. To make sure the glue worked as its best, allow the
glue to settle in the bridge to make sure it is dry before the testing it. This is to ensure the
bridge perform at its best.
UHU glue is avoided if possible, as it causes the joints to be flexible. It also requires longer
time to dry, making it the less appropriate option, for joints should be rigid.
Epoxy, even though it is stronger, it is less efficient as it requires a lot more time to solidify and
is difficult to use. It requires the mixing of epoxy and hardener in small batches.
Hence, the bridge is at its optimum condition after at least 4 hours of drying using the super
glue.

Type of Adhesive Advantage Disadvantage Rank
V-Tech Super
Glue
• High Efficiency
• Fast Solidifying Time
• Easy to Use
• Makes fettuccine
brittle
• Causes joints to crack
1
UHU glue
• Easy to Use • Low Efficiency
• Slow Solidifying Time
2
Epoxy
• Stronger • Low Efficiency
• Slow Solidifying Time
• Difficult to use (needs
to be mixed)
3
16
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
5.0 BRIDGE TESTING AND LOAD ANALYSIS
5.1 TIMELINE
Date Work Progress
13th April 2015 - Testing of strength of fettucine by using 1,2
and 3 layers and using I-beam design
- Discussion and research on suitable truss for
precedent study
15th April 2015 - Testing different ways of fettucine joints and
using different kinds of adhesive to test the
strength
16th April 2015 - Discussing and making decision on which
truss design to proceed and construct
- Making of first bridge model
18th April 2015 - Load testing of first bridge and proceeded
with making the second bridge model.
22rd April 2015 - Load testing of second bridge and
proceeded with making the third bridge
model
24th April 2015 - Load testing of third bridge and proceeded
with making the fourth bridge model
25th April 2015 - Load testing of the fourth bridge and
proceeded with making the final bridge
model
26th April 2015 - Continue session with the making and
refining final bridge
27th April 2015 - Final submission and load testing of final
fettucine bridge
17
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
5.2 FIRST BRIDGE
We used the precedent study, the Waddle “A” Truss Bridge, as a guideline for our first
bridge. In this first trial, we did not restrain ourselves too much on the weight of the
bridge, but more on reinforcement, adhesive, joints and orientation of the trusses.
The failure only occur at the horizontal member (Figure 5.2.2), because the member is bearing
the highest load and are too thin and weak to carry the load by itself without distributing the
load around (figure 5.2.3).
18
Figure 5.2.2 Our bridge before testing Figure 5.2.3 Horizontal member failed
Figure 5.2.1 The design of our first bridge
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Bridge weight: 215g
Load: 1813g
Efficiency: (1.813)2 = 15.3%

0.215
Failed Components : Horizontal member
Failing Reasons : Member is too thin, poor load distribution
19
Figure 5.2.4 Diagram showing poor load distribution of the horizontal member
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
5.3 SECOND BRIDGE
After consideration, we decided to use waffle slab to replace the broken member of our first
bridge. Gussets and joining methods are further explored and applied into the bridge. Refining
using sandpaper is done and the second test is performed.
In Figure 5.3.1, it shows the transition of load acting on the bridge is from the middle of the
bridge to the sides of the bridge, to improve the load distribution. The bottom chord and all
the connecting members are in tension, whereas the top chord and all the diagonals are in
compression.
20
Figure 5.3.1 Load distribution diagram
Figure 5.3.2 Load distribution diagram of the
waffle slab
Figure 5.3.3 Top elevation of the waffle slab
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
21
Figure 5.3.4 Top chord failed
Figure 5.3.5 Bottom chord failed
Figure 5.3.6 Waffle still intact after testing Figure 5.3.7 Bridge after load test
Figure 5.3.8 Top chords are curved upward and downward caused by rough workmanship
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
The failures occur at the top chords, because they are too thin and were not able to
withstand the compression force, causing them to buckle (Figure 5.3.4). Hence, the top
chord layer should be thickened by adding more fettuccine.
Other than that, the top chords are not properly constructed (Figure 5.3.8) and have
caused uneven members, joining and force distribution.
After the load test, the waffle slab is still intact (Figure 5.3.6) and was able to withstand
more load than the first design. This shows the waffle slab is a better and improved
design.
Bridge weight: 229g
Load: 5120g
Efficiency: (5.120)2 = 114.5%

0.229
22
Figure 5.3.9 Failed component
Failed Components : Top chord due to buckling
Failing Reasons : Thin top chord member, uneven load distribution caused
by rough workmanship
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
5.4 THIRD BRIDGE
The load distribution of the Baltimore Truss Bridge we did for our third bridge (figure
5.4.1) works the similar way with our first and second bridge (figure 5.3.1), where all the
top chord and diagonal members are under compression while all the vertical members
are under tension.
After analyzing our first two bridges, we have decided to make these improvements to
increase our efficiency of the bridge.
Amendments made:
1. Lowering the height of the bridge from 165mm to 70mm (to decrease the bridge
weight)
2. Place each of the center vertical member of each triangle on top of the horizontal
member (to increase even force distribution) (Figure 5.4.2 and Figure 5.4.3)''
23
Figure 5.4.1 Load distribution diagram
Figure 5.4.2 Placement of each member on our second
bridge (left) and on our third bridge (right)
Figure 5.4.3 Joint on third bridge
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
24
Figure 5.4.4 Bridge before testing
Figure 5.4.5 Bridge shows the downward bending causing the bottom chord to break first
Figure 5.4.6 The bridge failed due to the downward
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
In this design, the breaking first occurs at the bottom chords (Figure 5.4.5). The compression
and tension is too great compared to the first design due to its height, and the bottom chords
are not strong enough to sustain the force thus they break first.
Placement of each of the center vertical member of each triangle on top of the horizontal
member has caused the joints to have a smaller and unstable joining contact point (Figure
5.4.3). This has caused the vertical member to slip out of the original position after testing due
to the compression and has contributed to the breaking of the bridge.
Other than that, when load is applied, the bridge started to bend downwards at one side of
the bridge due to the uneven force distribution caused by the uneven sizes of the trusses and
inconsistent distances between joints (Figure 5.4.5). This is caused by the difficulty of
maintaining the workmanship when there are too many joints in this bridge.
'
Bridge weight: 205g
Load: 4222g
Efficiency: (4.222)2 = 87.0%

0.205

25
Figure 5.4.4 Failed component
Failed Components : Top chord and bottom chords
Failing Reasons : Too many joints, uneven load distribution caused by
rough workmanship
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
5.5 FOURTH BRIDGE
After testing and analyzing the second and third bridge, we decided to improvise a new design
by improving it but still using our precedent as a guideline.
Amendments made:
1. Rising the height of the bridge (increase bending resistance)
2. Place every vertical and diagonal member on top of the bottom beam (for direct joining
contact point and more surface area for more stable joining)
3. Making one whole triangle instead of few triangles (to decrease the number of joints)
''
26
Figure 6.4.4 Failed Component
Figure 5.5.1 Load Distribution Diagram for the 4th Bridge
Figure 5.5.2 Bridge design before testing
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
27
Figure 5.5.3 Picture shows the sliding of the bridge.
Figure 5.5.4 Bridge flips due to the torsion, height, breaking of the bottom chord and the narrow base
Torsion
Figure 5.5.5 Top view diagram shows torsion, causing the two main facades to slide against each other
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Failure occurs due to the torsion of the two bridge main façades sliding left and right
against each other. Other than that, the height of the bridge and a narrow base
ultimately have also caused the whole bridge to flip over.
The absence of the diagonal and cross bracing has lead to the torsion and caused our
bridge to fail. Thus, we have applied the diagonal bracing in our next bridge.
Bridge weight: 254g
Load: 4732g
Efficiency: (4.732)2 = 88.2%

0.254
28
Figure 5.5.6 Failed component
Failed Components : Bottom chords connecting members
Failing Reasons : Torsion, bottom chords (the two main bridge facades)
are not connecte with each other with cross bracing to
prevent torsion
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.0 FINAL BRIDGE
6.1 AMENDMENTS
The figure below (figure 6.1.1) shows the design and construction method of our final
fettuccine bridge. This type of truss bridge had been chosen for our final model design as it
reaches the highest efficiency among all the truss bridges we have tested. Referring to the test
result, in depth analysis was conducted for further development in order to achieve higher
efficiency.
Amendments made:
1. Amendments of dimension
Dimension of distance in between each vertical member had slightly been changed (figure??).
The length of each distance was changed from ??mm to ??mm, to enable the vertical members
rest on the edge of tables (allow force from the edge of table transfer directly to the vertical
member, and to prevent failure of the horizontal member)
29
Figure 6.1.1 Amendments of dimension of final bridge model
790
Figure 6.1.2 Dimension of the first bridge model
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.2 FINAL MODEL MAKING
Firstly, an accurate Autocad drawing of the bridge is printed out as a guide for the
bridge construction. Then, the two I-beams are constructed:
30
Figure 6.2.1 Diagram showing first step of erection, the I-beam.
6.2.2 Picture showing staggered I-beam
construction
6.2.2 Picture showing staggered I-beam construction
Figure 6.2.4 A close up picture of the I-beam showing the construction and orientation
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Secondly,'the'outline'of'the'three'triangles'are'constructed:'
31
Figure 6.2.5 Diagram showing second step of erection, the outline of the triangles.
Figure 6.2.6 Picture showing the joining of the
triangle
Figure 6.2.7 Picture showing the joining of the
triangle to the I-beam
Figure 6.2.8 Picture showing us securing the joints using
masking tape
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Thirdly, the vertical members and the top horizontal members are constructed. These vertical
members serve as vertical posts for the fettuccine bridge to resist the compression force that
was created:


32
Figure 6.2.9 Diagram showing third step of erection, the vertical members and top horizontal chord
Figure 6.2.10 Picture showing the vertical and top horizontal chord are joined to the triangles
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
The forth step is carried out immediately, the diagonal and the small vertical members are
constructed. The diagonal members were located at gaps in between vertical members and
they functioned as bracing of truss which is able to resist shear force.
'


33
Figure 6.2.11 Diagram showing forth step of erection, the vertical members and top horizontal
chord
Figure 6.2.12 Picture showing two main facades of the bridge
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Lastly, a series of members having 60mm in length is served to connect the bottom and
top chords two main facades (Figure 6.2.14). The position is determined to be at the
bottom of each vertical member and rested well above the bottom chord. Other than
that, another series of members with the same length are placed above the top chord
of the bridge with horizontal facing (Figure 6.2.17). Diagonal bracing at the bottom
chord is constructed (Figure 6.2.16). Waffle slab is constructed in this step too (figure
6.2.15), same time with the joining of the two facades.
'
34
Figure 6.2.13 Diagram showing last step of erection, the vertical members and top horizontal chord
Figure 6.2.14 Pictures showing the joining of the two main bridge facades
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report


35
Figure 6.2.15 Picture showing the construction of the waffle slab
Figure 6.2.16 Pictures showing the diagonal bracings
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
36
Figure 6.2.17 Picture shows connecting members of vertical facing at bottom chord and horizontal facing
at top chord
Figure 6.2.18 Final bridge before testing
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3 JOINT ANALYSIS
Joining method is one important factor in a bridge design as the joints will affect the efficiency
and failure of Fettuccine bridge. The joints are further tested and studied to achieve the
optimum joining of every single member at different part of connections. Therefore, respective
methods of joint are designated according to requirement of each part.
37
A B C
D E
F G
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3.1 JOINT A
It was studied that the vertical member at the joint A experiences compression forces when
load is applied to the design. From the previous design, we analyzed that the jointed members
carrying the compressive internal are causing stress to the structure member while connecting
to one another. Action is taken to separate the joints and the joining method of two members
is designed so that the vertical member is supporting the upper diagonal member and not
affecting the internal force of other members.
38
Previous Joint Design
Improvised Joint Design
Figure 6.3.1 Joint A Connection Amendment
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3.2 JOINT B
The middle most diagonal members are joined with butt joint, leaning again each other
with a fixed angle of 45 degree. The rigidity of the triangle structure provides stability
and strength to force acting on it, and distributing evenly from member to members.
Reinforcement of the joint is introduced with the use of gusset. The gussets hold the
members together to prevent gliding of members due to the brittleness of the
adhesive material used when load is added to the structure.
39
45°
Figure 6.2.1 Joint B Gusset Reinforcement
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3.3 JOINT C
The top chord horizontal chords are designed in segments to accommodate the compressive stress of
the structure. The segmented members are preferable rather than one long strip of horizontal member.
This is because the longer stretched member is more fragile than a shorter one when a load is applied to
the structure. The segmented members allow better resistance on compressive stress. The end of the
segment members are carefully shaped to sit firmly to the side of the diagonal members.
40
Figure 6.3.3 Top Horizontal Member Connection
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3.4 JOINT D
T-lock joint is a design connection acting like a steel plate in steel construction. The T-shape
member is slotted into the I-beam and holds the beams up right to prevent downward bending
force from the load itself. The connection gives better structural strength to connect both
vertical and horizontal members perpendicularly.
41
Figure 6.3.4.1 T-lock Connection
Figure 6.3.4.1 Example of a slotted steel plate
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3.5 JOINT E

The vertical facing connecting members is one critical design to evenly distribute the load
along the entire structure of the bridge. The improvement was made from the very first design
of the member, which was attaching to the vertical member. The design was not efficient as it
does not spread the load along the bridge but acting as a load itself, giving more stress to the
structure. Furthermore the load is actually depending all by the adhesive material (glue) only.
The 2nd improvised design was made better because the members lay on the I-beam. But the
vertical members joining the vertical facing connecting members are not strong due to its poor
42
Fig 6.3.5.2 Photos of Divergence of the Vertical Facing the Connecting
Fig 6.3.5.1 Improvement on Vertical Member
1st Design 2nd Design 3rd Design
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
contact surface area of both vertical and vertical facing connecting members. The 3rd design
was considered to transfer the vertical facing connecting members to the sides, diverting load
stress to the other part of the bridge with less concentration of members.
6.3.6 JOINT F
This vertical facing connecting beam is simply laid perpendicularly to the long bottom chord of
the I-beams. These short members are glued in stacks and then fixed on top of the stretch.
These members function as the load distribution member to channel and balance out
downward loads along the stretch of the bridge.
6.3.6 JOINT G
43
Fig'6.3.6''Connec1on'of'ver1cal'facing'connec1ng'members.
Fig'6.3.7''Connec1on'of'bracing
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
The connection joint G is placed diagonally on the I-beams to resist shear force as well as
torsion force acted on the structure by the load. These bracings are fixed in between the
vertical facing connecting members at the lower part of the bridge. The bracings rest against
the other members to prevent movement and distortion of other structural members of the
bridge.
44
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.4 FINAL BRIDGE TESTING AND LOAD ANALYSIS
The picture below (figure 6.4.1) shows the design our final fettuccine bridge and the
load distribution.
In this final bridge, the main amendments made are size and height of the bridge (to
provide better downward bending resistance and stable force distribution), and the use
of diagonal bracing at the bottom chord (to prevent the bridge from torsion).
45
Figure 6.4.1 Design of our final bridge and members in tension and compression diagram
Figure 6.4.2 Top view of our previous bridges (without diagonal bracing)
Figure 6.4.3 Top view of our final model (with diagonal bracing)
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report


46
Figure 6.4.4 Bridge before testing
Figure 6.4.5 Bridge showing torsion at the top chord before breaking
Figure 6.4.6 Top chords break and caused the bridge to fail
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report


47
Figure 6.4.7 Bridge before load is applied
Figure 6.4.8 Bridge showing downward bending after load is applied
Figure 6.4.9 Top chord breaks due to torsion and has caused the whole bridge to fail
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
After observing, calculating and analyzing our bridge, we have concluded that in this
final design, the failure occurs due to the torsion at the top chord (Figure 6.4.5). When
the load is applied, the top chord of the bridge experienced torsion due to the uneven
forces distribution caused by the design of the trusses.
By referring to Joints E, I, M, E1, I1 (top chord), we can conclude (from observation and
calculation) that Joints E, M and E1 are in equilibrium, whereas Joint I and I1 are not in
equilibrium.
At Joint I and I1 (which their resultant forces are not in equilibrium), they are
experiencing a large upward force at their Y-vector, with a magnitude of 204.82N.
Whereas the others points are in equilibrium.
With this great upward force, they have contributed to the torsion at the top chord in
this pattern shown in the figure 6.5.11 and caused failure to the bridge.


48
Figure 6.4.10 Picture showing torsion pattern at the top chord
Figure 6.4.11 Top view diagram showing torsion and statues of each joints
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
The diagram above shows Joints in red bubble (I and I1) experiencing torsion and are
not in equilibrium, whereas Joints in blue bubble (E, M and E1) are in equilibrium, thus
remained in position.
The bridge testing results do tally with the calculation.
Other than that, when load is applied, the bridge started to bend downwards due to
the uneven force distribution caused by the design of the trusses.
By referring to Joint K and Joint C/G (after calculation):
In Joint K, it is experiencing a downward force at its Y-vector, with a magnitude of
123.41N.
When compared to the adjacent weaker joints, Joint G and C, they experience an
equivalent lesser downward force at its Y-vector, a magnitude of 42.09N and 42.17N,
The big difference of magnitude between these joints has caused the downward
bending of the bridge, and ultimately causing the bridge to fail.
49
Figure 6.4.12 Diagram shows big difference in magnitude of force between the joints, causing downward
bending
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
Bridge weight: 203g
Load: 4170g
Efficiency: (4.17)2 = 85.7%

0.203
The efficiency of the final bridge did not meet our expectation as the bridge
should be able to carry more loads and have higher efficiency. Due to the great
torsion at the top chord and the adhesive is not fully dry, our final model was
only able to have a 86% efficiency.
50
Figure 6.4.14 Failed component
Failed Components : Top chords
Failing Reasons : Torsion at the top chord, glue is not fully dried
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.5 CALCULATIONS$
4.17 kg= 4.2
= 42N
1) Determine perfect truss
2J = 2(24)
= 48
M + 3 = 45+3
=48
Therefore 2J = M + 3, it is a perfect truss
2) Determine reaction force
∑MA= 0
( 42 x 0.39) - (Ra x 0.78) = 0
16.38 - 0.78Ra = 0
Ra = 21N
∑Fy= 0
42N – 21N- RA = 0
RA = 21 N
51
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
3 ) Determine internal forces of main structural member

At joint A,
∑Fy= 0
21-FAB sin Q = 0
FAB sin 47.12 = 21
FAB = 21/ 0.73
FAB = 28.77 ( C)
∑Fx= 0
FAB cos θ – FAC = 0
-FAC = cos 42.12 x 28.77
FAC = - 19.58 ( T )
tan θ = 0.07/ 0.065
θ = 47.12°
At joint C,
∑Fx= 0
-19.58 + FCD = 0
FCD = 19.58 (T)
At joint B,
!
∑Fy= 0
(-FBE sin θ ) +(-21) + (+FBC)+ (+21) = 0
F=FBC – FBE sin θ = 0 °
FBC = 42.1697
FBC = 42.17 (C)
∑Fx= 0
52
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
(-FBE cos θ) + (+19.58) + (+19.58) = 0
-0.6805 FBE = - 39.16
FBE = 57.5459 = 57.55 (C)
At joint D,
∑Fx= 0
(-19.58)+(-21)+(21)+(19.58)=0
∑Fy= 0
(+19.58)+(-FED) + (+19.58)=0
FED = 39.16 (C)
At joint E,
∑Fy= 0
(57.55 sin θ ) + (39.16) + (- FEF sin θ) = 0
42.17 + 39.16 – FEF 0.7328 = 0
FEF = 110.99 ( T)
∑FX= 0
(57.55cos θ) + (- FEI ) + ( FEF cos θ ) = 0
39.1608 + FEI + (110.99 X 0.6805)= 0
FEI = 114.69 (C)
At joint F,
∑Fy = 0
(-21) + (81.33)+ (-FFH sin θ ) + ( FFQ) = 0
60.33 – 0.7328 FFH + FFG =0
FFG = 42.09 (C)
∑FX= 0
(-19.58)+(-75.53) + ( FFH cos θ) =0
FFH 0.6805= 95.11
FFH = 139.76 (T)

53
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.6 DESIGN SOLUTIONS
6.6.1 1ST SOLUTION: FINGER JOINTS
By using Finger Joints, this maximises the areas to be glued for joining compared to our
previous joint which is the Butt Joint. This increases the the strength and durability of the joint
as it requires a lot of force to separate the parts.
6.2 2ND SOLUTION: CROSS BRACES
Cross braces pushes the the two top chords against one another, thereby increasing the
structure’s stability. It also holds the two chords in place by resisting torsion caused by the load.
54
Figure 6.1.1 Proposed improvement on joint method
Figure 6.2.1 Proposed addition of strong cross bracing at top chords
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
6.3 3RD SOLUTION : LOWER SUPPORT
By adding supports below the bridge, the load is distributed to the supporting objects; the
table. This also reduces the chance of buckling of the lower chord as it transfers the load away
from the vertical hip that is in compression.

55
Figure 6.3.1 Proposed lower support for bridge
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
7.0 CONCLUSION
We had constructed a total of 5 fettuccine bridges experimented its efficiency in withstanding
loads. The precedent study we chose to study on is Waddell A ‘Truss bridge’. We had
concluded on using Waddell A ‘Truss bridge’ because of the single span bridge with a
patented design, consisting of triangular ‘A’ trusses and its structural members are pin-
connected. Despite its relocation, the bridge retains its integrity of design due to its reliability,
ease of erection, cost efficient and structural rigidity in all directions
In our final model testing, we achieved the highest efficiency compared to the previous 4
models we have done. Our fettuccine bridge achieved an efficiency of 114.5% withstanding a
total of load of 5120g and its weight is only 229g. This project has made us understand load
distribution in a structure deeper, compared to the previous semester, as we are now able to
calculate the type of force applying in each structure member. We explored different
arrangement of structural members and realized it is important to identify the force (tension/
compression/zero/critical) in structural members in order to achieve a high efficient bridge
design.
We also realized the importance of proper planning, in terms of work delegation and the time
interval between completion of bridge and load testing. It is due to the efficiency of
completing the bridge on time and giving an adequate time for the adhesives to dry out and
maintain its strength until load testing.
In conclusion, it has been a great experience working on this project. Using household goods
to construct a bridge and gaining so much knowledge after that have amazed us how strong a
structure can be if it is properly designed and constructed . As an architecture students, we will
be the leader in the construction industry in future, we need to think critically and pay attention
to details so that a structure can function efficiently without failure for the safety and well being
of the people.
56
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
8.0 APPENDIX
As for our individual part, we were assigned to further analyse total of 5 trusses. Each were
distributed to following :
8.1 FIRST CASE
8.2 SECOND CASE
8.3 THIRD CASE
8.4 FOURTH CASE
8.5 FIFTH CASE
The analysis and calculation of trusses are attached after this page.
57
ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report
9.0 REFERENCES
National Register of Historic Places. (n.d.). Retrieved May 6, 2015, from http://
dnr.mo.gov/shpo/nps-nr/90002173.pdf
Patent US529220 - Truss-bridge. (1894, November 13). Retrieved May 6, 2015, from
http://www.google.com/patents/US529220
Ching, Francis D.K (2008) Building Construction Illustrated Fourth Edition. New Jersey:
John Wiley & Sons, Inc.
58

More Related Content

What's hot

BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSS
miranazrin
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
Joanne Yunn Tze
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
Ivy Yee
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
Adelinetingg
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Report
kimberlywjs
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report Soh Shing
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Report
kimberleyee95
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
Garnette Robert
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
JoyeeLee0131
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridgenadiacbass
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEChuah Say Yin
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridgeAh Jun
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
Gertrude Lee
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Josia Tannos, EIT
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
jose bonifacio de souza leite cuadros
 
Fettucine
FettucineFettucine
Building construction report
Building construction reportBuilding construction report
Building construction reportmiranazrin
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
Jason Juen
 

What's hot (19)

BUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSSBUILDING STRUCTURE BRIDGE TRUSS
BUILDING STRUCTURE BRIDGE TRUSS
 
Fettucine Bridge Report
Fettucine Bridge ReportFettucine Bridge Report
Fettucine Bridge Report
 
Fettuccine truss bridge report
Fettuccine truss bridge reportFettuccine truss bridge report
Fettuccine truss bridge report
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Fettucine Truss Bridge Report
Fettucine Truss Bridge ReportFettucine Truss Bridge Report
Fettucine Truss Bridge Report
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
Fettucine truss bridge
Fettucine truss bridgeFettucine truss bridge
Fettucine truss bridge
 
Building Structure Project 1 Report
Building Structure Project 1 ReportBuilding Structure Project 1 Report
Building Structure Project 1 Report
 
Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Building Structure Project 1 Analysis Report
Building Structure Project 1 Analysis ReportBuilding Structure Project 1 Analysis Report
Building Structure Project 1 Analysis Report
 
Building Structures - Fettucine Bridge
Building Structures - Fettucine BridgeBuilding Structures - Fettucine Bridge
Building Structures - Fettucine Bridge
 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
 
Project 1 fettucine truss bridge
Project 1 fettucine truss bridgeProject 1 fettucine truss bridge
Project 1 fettucine truss bridge
 
Building Structure Project 1
Building Structure Project 1Building Structure Project 1
Building Structure Project 1
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Bridge construction methods aug 2007
Bridge construction methods aug 2007Bridge construction methods aug 2007
Bridge construction methods aug 2007
 
Fettucine
FettucineFettucine
Fettucine
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 

Viewers also liked

Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314
donpata
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridge
Ana Carvalho
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridgerajdutt1111
 
Final report
Final reportFinal report
Final report
Garnette Robert
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
Jannah Jailani
 
T.G.
T.G.T.G.
T.G.
roehsco
 
Auston and Tim
Auston and TimAuston and Tim
Auston and Timroehsco
 
School4you Spaghetti Challenge
School4you Spaghetti ChallengeSchool4you Spaghetti Challenge
School4you Spaghetti Challenge
Prolympia Virserum
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)
Soh Shing
 
Building structures report
Building structures report Building structures report
Building structures report Soh Shing
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
Space frames1
Space frames1Space frames1
Space frames1
Akshay Bhatia
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
sooricivil
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
Ar Naveen Naveen
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Types of bridges.pptx 1
Types of bridges.pptx 1Types of bridges.pptx 1
Types of bridges.pptx 1
Girish Dhareshwar
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 

Viewers also liked (20)

Spaghetti bridge project description 1314
Spaghetti bridge project description 1314Spaghetti bridge project description 1314
Spaghetti bridge project description 1314
 
How to do your own spaghetti bridge
How to do your own spaghetti bridgeHow to do your own spaghetti bridge
How to do your own spaghetti bridge
 
project report on truss bridge
project report on truss bridgeproject report on truss bridge
project report on truss bridge
 
Final report
Final reportFinal report
Final report
 
Building structure [arc 2523]
Building structure [arc 2523]Building structure [arc 2523]
Building structure [arc 2523]
 
T.G.
T.G.T.G.
T.G.
 
Auston and Tim
Auston and TimAuston and Tim
Auston and Tim
 
School4you Spaghetti Challenge
School4you Spaghetti ChallengeSchool4you Spaghetti Challenge
School4you Spaghetti Challenge
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)
 
Building structures report
Building structures report Building structures report
Building structures report
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
Space frames1
Space frames1Space frames1
Space frames1
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Space frame
Space frameSpace frame
Space frame
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
types of bridges
types of bridgestypes of bridges
types of bridges
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Types of bridges.pptx 1
Types of bridges.pptx 1Types of bridges.pptx 1
Types of bridges.pptx 1
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 

Similar to Building structuresproject1 fettuccinnefinalm

Bstructure report
Bstructure reportBstructure report
Bstructure report
Megan Chung
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
Esther Lau
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
Nur Zaas
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
Pengeneee Peng
 
Building structure report
Building structure reportBuilding structure report
Building structure report
Chenyi Teo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
Jason Juen
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
Anthony Chew
 
B.structure report
B.structure reportB.structure report
B.structure report
Christiody Lim
 
building structures 1 fettuccine report
building structures 1 fettuccine reportbuilding structures 1 fettuccine report
building structures 1 fettuccine report
Yaseen Syed
 
Fettuccine bridge Full report
Fettuccine bridge Full reportFettuccine bridge Full report
Fettuccine bridge Full report
Teo Kean Hui
 
bridge report
bridge reportbridge report
bridge report
abc def
 
building Structure
building Structurebuilding Structure
building Structure
amee16
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
Felicia Novera
 
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET Journal
 
Stress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridgesStress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridgesMasum Majid
 

Similar to Building structuresproject1 fettuccinnefinalm (16)

Bstructure report
Bstructure reportBstructure report
Bstructure report
 
Building Structure Analysis Report
Building Structure Analysis ReportBuilding Structure Analysis Report
Building Structure Analysis Report
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
FETTICCINE BRIDGE
FETTICCINE BRIDGEFETTICCINE BRIDGE
FETTICCINE BRIDGE
 
Fettucine recipe
Fettucine recipeFettucine recipe
Fettucine recipe
 
Building structure report
Building structure reportBuilding structure report
Building structure report
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
B.structure report
B.structure reportB.structure report
B.structure report
 
building structures 1 fettuccine report
building structures 1 fettuccine reportbuilding structures 1 fettuccine report
building structures 1 fettuccine report
 
Fettuccine bridge Full report
Fettuccine bridge Full reportFettuccine bridge Full report
Fettuccine bridge Full report
 
bridge report
bridge reportbridge report
bridge report
 
building Structure
building Structurebuilding Structure
building Structure
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
IRJET- Flexural Strength of Reinforced Concrete Beam with Hollow Core at Vari...
 
Stress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridgesStress ribbon and cable supported pedestrian bridges
Stress ribbon and cable supported pedestrian bridges
 

More from J.j. Hayashi

Building service project1
Building service project1Building service project1
Building service project1
J.j. Hayashi
 
Aa Presentation slides
Aa Presentation slides Aa Presentation slides
Aa Presentation slides
J.j. Hayashi
 
Vernacular as a model for contemporary design
Vernacular as a model for contemporary designVernacular as a model for contemporary design
Vernacular as a model for contemporary design
J.j. Hayashi
 
Jj bstructure individual
Jj bstructure individual Jj bstructure individual
Jj bstructure individual
J.j. Hayashi
 
bstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfbstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfJ.j. Hayashi
 
Bstructure project2
Bstructure project2 Bstructure project2
Bstructure project2
J.j. Hayashi
 
Hypatia - Invisible Cities
Hypatia - Invisible CitiesHypatia - Invisible Cities
Hypatia - Invisible Cities
J.j. Hayashi
 
Reflective essay
Reflective essayReflective essay
Reflective essay
J.j. Hayashi
 
Site analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-LakeSite analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-Lake
J.j. Hayashi
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and ProcessJ.j. Hayashi
 
Final history report
Final history reportFinal history report
Final history reportJ.j. Hayashi
 

More from J.j. Hayashi (13)

Building service project1
Building service project1Building service project1
Building service project1
 
Aa Presentation slides
Aa Presentation slides Aa Presentation slides
Aa Presentation slides
 
Vernacular as a model for contemporary design
Vernacular as a model for contemporary designVernacular as a model for contemporary design
Vernacular as a model for contemporary design
 
Jj bstructure individual
Jj bstructure individual Jj bstructure individual
Jj bstructure individual
 
bstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdfbstructureproject2-150706142716-lva1-app6892.pdf
bstructureproject2-150706142716-lva1-app6892.pdf
 
Bstructure project2
Bstructure project2 Bstructure project2
Bstructure project2
 
Hypatia - Invisible Cities
Hypatia - Invisible CitiesHypatia - Invisible Cities
Hypatia - Invisible Cities
 
ESD
ESD ESD
ESD
 
Reflective essay
Reflective essayReflective essay
Reflective essay
 
ESD Report
ESD ReportESD Report
ESD Report
 
Site analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-LakeSite analysis at Kuala Selangor-Lake
Site analysis at Kuala Selangor-Lake
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
Final history report
Final history reportFinal history report
Final history report
 

Recently uploaded

原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
gpffo76j
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
n0tivyq
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
h7j5io0
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
boryssutkowski
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
ameli25062005
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
madhavlakhanpal29
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
fastfixgaragedoor
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
ameli25062005
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
garcese
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
asuzyq
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
Alan Dix
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
ResDraft
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
fabianavillanib
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
TeeFusion
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 

Recently uploaded (20)

原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
原版定做(penn毕业证书)美国宾夕法尼亚大学毕业证文凭学历证书原版一模一样
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
一比一原版(Glasgow毕业证书)格拉斯哥大学毕业证成绩单如何办理
 
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
一比一原版(UCB毕业证书)伯明翰大学学院毕业证成绩单如何办理
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
Borys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior designBorys Sutkowski portfolio interior design
Borys Sutkowski portfolio interior design
 
Research 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdfResearch 20 slides Amelia gavryliuks.pdf
Research 20 slides Amelia gavryliuks.pdf
 
Common Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid themCommon Designing Mistakes and How to avoid them
Common Designing Mistakes and How to avoid them
 
Exploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdfExploring the Future of Smart Garages.pdf
Exploring the Future of Smart Garages.pdf
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
Коричневый и Кремовый Деликатный Органический Копирайтер Фрилансер Марке...
 
Portfolio.pdf
Portfolio.pdfPortfolio.pdf
Portfolio.pdf
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
一比一原版(Columbia毕业证)哥伦比亚大学毕业证如何办理
 
Can AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI preludeCan AI do good? at 'offtheCanvas' India HCI prelude
Can AI do good? at 'offtheCanvas' India HCI prelude
 
Expert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting ServicesExpert Accessory Dwelling Unit (ADU) Drafting Services
Expert Accessory Dwelling Unit (ADU) Drafting Services
 
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdfPORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
PORTFOLIO FABIANA VILLANI ARCHITECTURE.pdf
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Let's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons ShirtLet's Summon Demons Shirt Let's Summon Demons Shirt
Let's Summon Demons Shirt Let's Summon Demons Shirt
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 

Building structuresproject1 fettuccinnefinalm

  • 1. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report ! BUILDING STRUCTURES [ARC 2213] FETTUCCINE TRUSS BRIDGE ANALYSIS REPORT LIM JIAN JUN 0316867 LOO MEI CHUEN 0316379 TEH GIE ENG 0316179 JOANNE BERNICE CHUA YUNN TZE 0315905 EVIN LOOI JYNN 0311852 TAN CUI ZHI 0320826 1
  • 2. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report TABLE OF CONTENTS 1. INTRODUCTION 2.METHODLODY 2.1.PRECEDENT STUDY 2.2.MAKING OF FETTUCCINE BRIDGE 2.3.REQUIREMENT 3.PRECEDENT STUDY 4.MATERIALS & EQUIPMENTS 4.1.STRENGTH OF MATERIAL 4.1.1. PROPERTIES OF FETTUCCINE 4.1.2. TESTING OF FETTUCCINE 4.1.3.EXPERIMENTS 4.1.4.CONCLUSION 4.2.ADHESIVE ANALYSIS 5.BRIDGE TESTING AND LOAD ANALYSIS 5.1. TIMELINE 5.2. FIRST BRIDGE 5.3. SECOND BRIDGE 5.4. THIRD BRIDGE 5.5. FOURTH BRIDGE 6.FINAL BRIDGE 6.1. AMENDMENTS 6.2. FINAL MODEL MAKING 2
  • 3. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3. JOINT ANALYSIS 6.3.1. JOINT A 6.3.2. JOINT B 6.3.3. JOINT C 6.3.4. JOINT D 6.3.5. JOINT E 6.3.6. JOINT F 6.3.7.JOINT G 6.4. FINAL BRIDGE TESTING AND LOAD ANALYSIS 6.5. CALCULATIONS 6.6. DESIGN SOLUTIONS 6.6.1. 1ST SOLUTION: FINGER JOINTS 6.6.2. 2ND SOLUTION: CROSS BRACING 6.6.3. 3RD SOLUTION: LOWER SUPPORT 7.CONCLUSION 8.APPENDIX 8.1. CASE STUDY 1 8.2. CASE STUDY 2 8.3. CASE STUDY 3 8.4. CASE STUDY 4 9.REFERENCES 3
  • 4. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 1.0 INTRODUCTION This project aims to develop our understanding of tensile and compressive strength of construction materials by understanding the distribution of force in a truss. In order to achieve that, in a group of 6 we were required carry out a precedent study on a truss bridge of our choice, analyzing the connections, arrangements and orientations of the members. Once that was completed, we were required to design and construct a truss bridge made out of fettuccine. The requirements for this bridge include it having a 750mm clear span and a maximum weight of 200g. this bridge will then be tested to fail and we were required to analyse the reason of its failure and calculate its efficiency 4
  • 5. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 2.0 METHODOLOGY 2.1 PRECEDENT STUDY By looking through precedent studies to have a better understanding of the types of trusses available. Next , understanding the forces that would be exerted to the trusses ; compression and tension, would allow us to make adjustment to our bridge, that would best suit the given material ; fettuccine. 2.2 MAKING OF FETTUCCINE BRIDGE PHASE 01 : STRENGTH OF MATERIAL Understanding the properties of the fettuccine is important in order to build one bridge that can carry maximum load. For the tensile strength in the fettuccine is considerable low when compare to aluminium which has the same amount of stiffness to the fettuccine. PHASE 02 : ADHESIVE Choosing the tight type of adhesive is important as it plays a huge role in this assignment. As there are many types of adhesive in the market that each has their own function and characteristics. Not only the type of adhesive is important but the brand of adhesive is important as well, for different brand has different quality and choosing one that suits constructing the fettuccine bridge is primary. PHASE 03 : MODEL MAKING 5
  • 6. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report To ensure precision in our model making, AutoCad drawings are drawn in 1:1 scale and plotted out to ensure precision and ease our process. And in order to strengthen our bridge as much as possible, each pasta is marked individually as each has their own location of placement and length, and are glued accordance. PHASE 04 : MODEL TESTING Finished models are being tested after placing aside to allow the adhesive to sit on the model. By placing weight on the middle of intermediate member to ensure that load is evenly distributed. All these are being recorded to allow us to fix and analysis our bridge. 2.3 REQUIREMENTS • To have a clear span of 750mm • Not exceeding the weight of 200g • Only material allowed is fettuccine pasta and adhesive • Allowed to use any type of adhesive possible • Workmanship is put to consideration as part of aesthetic 6
  • 7. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 3.0 PRECEDENT STUDY Historic name Waddell “A” Truss Bridge Other name Linn Branch Creek Bridge Location English Landing Park, Parkville, Missouri History The Waddell “A” Truss Bridge, currently located in English Landing Park in Parkville was designed by engineer John Alexander Low Waddell. It was originally built in 1898 as a railroad bridge across Linn Branch Creek before being abandoned in 1939, and was relocated in 1987 7 Fig 3.0.1 Linn Branch Creek Bridge in 1898
  • 8. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report to make way for the construction of Smithville Lake. As of now, it crosses Rush Creek carrying a pedestrian path between a day-use recreational area and two isolated ball fields. The single span bridge is a U.S. National Register of Historic Place with a patented design, consisting of triangular ‘A’ trusses and its structural members are pin-connected. Despite its relocation, the bridge retains its integrity of design due to its reliability, ease of erection, cost efficient and structural rigidity in all directions. Comparison and Components of Bridge
 8 Fig 3.0.2 Bridge constructed across Linn Branch Creek in 1898 Fig 3.0.3 Bridge relocated to English Landing Park, Parkville, Missouri in 1987
  • 9. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 
 9 Portal'bracing Fig 3.0.4 Portal View Hip'ver1cal Upper' Bo4om' Guard'rails Diagonal' Strut Fig 3.0.5 Perspective Elevation View
  • 10. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Force Distribution Diagram of Bridge under Load Pressure Arrangement, Orientation and Connection of Bridge Members (Drawings by John Alexander Waddell) 10 In'tension Under'compression Fig 3.0.6 Force Distribution Diagram Connec1on'of'strut' and'upper'chord Connec1on'of' members Load Fig 3.0.6 Connection of Members
  • 11. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 11 Eleva1on'of' portal'bracing Pin'joint' connec1on Sec1on'view' of'pin'joint' (line'6E6'in'Fig' Sec1on'view'of' middle'chord' (line'7E7'in'Fig' Fig 3.0.9 View of bracing below deck of bridge Fig 3.0.7 Detailed truss connection of members Fig 3.0.8 Detailed Drawing of Portal Bracing and Pin joint connection
  • 12. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 4.0 MATERIALS & EQUIPMENTS 12 Equipments Pen Knife • used to cut the fettuccine in model making Camera • make recordings of the bridge testing • photograph the process Bag • carry the load Hook • hook the bag on the bridge Sand Paper • sand the edges of the components of the bridge to fit Mineral Water • used as load Weighing Machine • measure the weight of the load placed inside the bag Super Glue • adhesive for material bridge
  • 13. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 4.1 STRENGTH OF MATERIAL Fettuccine was the only material approved to be used for this project. Thus, research and analysis of Fettuccine was conducted before model making session. 4.1.1 PROPERTIES OF FETTUCCINE The fettuccine used in the making of the truss bridge model has the thickness 1 mm and the width of 4 mm. It is brittle and thus is stronger under tension. However, fettuccine has a low compressive strength 1. Ultimate tensile strength : 2 000 psi 2. Stiffness (Young’s Modulus) E: 10, 000, 000 psi ( E= stress/ strain) 13 Figure 4.1.1 Fettuccine used in model making.
  • 14. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 4.1.2 TESTING OF FETTUCCINE Before the testing, we made sure the fettuccine are glued with the proper technique to prevent uneven surface and to ensure the ease of building with modular units. 4.1.3 EXPERIMENTS: The fettuccine beams were formed using the staggered arrangement to ensure that the breaking points are not aligned and thus minimising the the number of weak spots. To understand its efficiency and the maximum load each can carry, we tested several types of beam with different orientations to understand which is the best to be implemented in our bridge building. 14 Figure 4.1.2.1 Wrong glueing technique Figure 4.1.2.2 Correct glueing technique Figure 4.1.3.1 Staggered arrangement of fettuccine in beam Figure 4.1.3.2 Horizontal FacingFigure 4.1.3.2 Vertical Facing
  • 15. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 4.1.4 CONCLUSION Based on the testings, it can be concluded that the I-beam made up of 5 pieces of fettuccine is the strongest among all as it could withstand the heaviest load. The 4 layered fettuccine is also quite strong. For the 1 layered and 2 layered fettuccine, it shows that the the horizontal facing fettuccine is much stronger compared to the vertical facing ones. 15 Layers of Members Length of fettuccine (cm) Clear Span (cm) Load Sustained (Vertical Facing) (g) Load Sustained (Horizontal Facing) (g) 1 Layer 26 15 420 205 2 Layer 26 15 500 320 3 Layer 26 15 770 630 4 Layer 26 15 1300 1110 5 Layer ( I-beam) 26 15 - 1700
  • 16. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 4.2 ADHESIVE ANALYSIS Three different kinds of glue used to ensure the joints are strong and thus strengthen the bridge. V-Tech Super Glue was used the most while constructing our fettuccine bridge. It has high efficiency and it dried faster compared to the other adhesives, as it is more concentrated when compare to UHU glue as well as epoxy. To make sure the glue worked as its best, allow the glue to settle in the bridge to make sure it is dry before the testing it. This is to ensure the bridge perform at its best. UHU glue is avoided if possible, as it causes the joints to be flexible. It also requires longer time to dry, making it the less appropriate option, for joints should be rigid. Epoxy, even though it is stronger, it is less efficient as it requires a lot more time to solidify and is difficult to use. It requires the mixing of epoxy and hardener in small batches. Hence, the bridge is at its optimum condition after at least 4 hours of drying using the super glue.
 Type of Adhesive Advantage Disadvantage Rank V-Tech Super Glue • High Efficiency • Fast Solidifying Time • Easy to Use • Makes fettuccine brittle • Causes joints to crack 1 UHU glue • Easy to Use • Low Efficiency • Slow Solidifying Time 2 Epoxy • Stronger • Low Efficiency • Slow Solidifying Time • Difficult to use (needs to be mixed) 3 16
  • 17. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 5.0 BRIDGE TESTING AND LOAD ANALYSIS 5.1 TIMELINE Date Work Progress 13th April 2015 - Testing of strength of fettucine by using 1,2 and 3 layers and using I-beam design - Discussion and research on suitable truss for precedent study 15th April 2015 - Testing different ways of fettucine joints and using different kinds of adhesive to test the strength 16th April 2015 - Discussing and making decision on which truss design to proceed and construct - Making of first bridge model 18th April 2015 - Load testing of first bridge and proceeded with making the second bridge model. 22rd April 2015 - Load testing of second bridge and proceeded with making the third bridge model 24th April 2015 - Load testing of third bridge and proceeded with making the fourth bridge model 25th April 2015 - Load testing of the fourth bridge and proceeded with making the final bridge model 26th April 2015 - Continue session with the making and refining final bridge 27th April 2015 - Final submission and load testing of final fettucine bridge 17
  • 18. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 5.2 FIRST BRIDGE We used the precedent study, the Waddle “A” Truss Bridge, as a guideline for our first bridge. In this first trial, we did not restrain ourselves too much on the weight of the bridge, but more on reinforcement, adhesive, joints and orientation of the trusses. The failure only occur at the horizontal member (Figure 5.2.2), because the member is bearing the highest load and are too thin and weak to carry the load by itself without distributing the load around (figure 5.2.3). 18 Figure 5.2.2 Our bridge before testing Figure 5.2.3 Horizontal member failed Figure 5.2.1 The design of our first bridge
  • 19. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Bridge weight: 215g Load: 1813g Efficiency: (1.813)2 = 15.3%
 0.215 Failed Components : Horizontal member Failing Reasons : Member is too thin, poor load distribution 19 Figure 5.2.4 Diagram showing poor load distribution of the horizontal member
  • 20. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 5.3 SECOND BRIDGE After consideration, we decided to use waffle slab to replace the broken member of our first bridge. Gussets and joining methods are further explored and applied into the bridge. Refining using sandpaper is done and the second test is performed. In Figure 5.3.1, it shows the transition of load acting on the bridge is from the middle of the bridge to the sides of the bridge, to improve the load distribution. The bottom chord and all the connecting members are in tension, whereas the top chord and all the diagonals are in compression. 20 Figure 5.3.1 Load distribution diagram Figure 5.3.2 Load distribution diagram of the waffle slab Figure 5.3.3 Top elevation of the waffle slab
  • 21. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 21 Figure 5.3.4 Top chord failed Figure 5.3.5 Bottom chord failed Figure 5.3.6 Waffle still intact after testing Figure 5.3.7 Bridge after load test Figure 5.3.8 Top chords are curved upward and downward caused by rough workmanship
  • 22. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report The failures occur at the top chords, because they are too thin and were not able to withstand the compression force, causing them to buckle (Figure 5.3.4). Hence, the top chord layer should be thickened by adding more fettuccine. Other than that, the top chords are not properly constructed (Figure 5.3.8) and have caused uneven members, joining and force distribution. After the load test, the waffle slab is still intact (Figure 5.3.6) and was able to withstand more load than the first design. This shows the waffle slab is a better and improved design. Bridge weight: 229g Load: 5120g Efficiency: (5.120)2 = 114.5%
 0.229 22 Figure 5.3.9 Failed component Failed Components : Top chord due to buckling Failing Reasons : Thin top chord member, uneven load distribution caused by rough workmanship
  • 23. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 5.4 THIRD BRIDGE The load distribution of the Baltimore Truss Bridge we did for our third bridge (figure 5.4.1) works the similar way with our first and second bridge (figure 5.3.1), where all the top chord and diagonal members are under compression while all the vertical members are under tension. After analyzing our first two bridges, we have decided to make these improvements to increase our efficiency of the bridge. Amendments made: 1. Lowering the height of the bridge from 165mm to 70mm (to decrease the bridge weight) 2. Place each of the center vertical member of each triangle on top of the horizontal member (to increase even force distribution) (Figure 5.4.2 and Figure 5.4.3)'' 23 Figure 5.4.1 Load distribution diagram Figure 5.4.2 Placement of each member on our second bridge (left) and on our third bridge (right) Figure 5.4.3 Joint on third bridge
  • 24. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 24 Figure 5.4.4 Bridge before testing Figure 5.4.5 Bridge shows the downward bending causing the bottom chord to break first Figure 5.4.6 The bridge failed due to the downward
  • 25. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report In this design, the breaking first occurs at the bottom chords (Figure 5.4.5). The compression and tension is too great compared to the first design due to its height, and the bottom chords are not strong enough to sustain the force thus they break first. Placement of each of the center vertical member of each triangle on top of the horizontal member has caused the joints to have a smaller and unstable joining contact point (Figure 5.4.3). This has caused the vertical member to slip out of the original position after testing due to the compression and has contributed to the breaking of the bridge. Other than that, when load is applied, the bridge started to bend downwards at one side of the bridge due to the uneven force distribution caused by the uneven sizes of the trusses and inconsistent distances between joints (Figure 5.4.5). This is caused by the difficulty of maintaining the workmanship when there are too many joints in this bridge. ' Bridge weight: 205g Load: 4222g Efficiency: (4.222)2 = 87.0%
 0.205
 25 Figure 5.4.4 Failed component Failed Components : Top chord and bottom chords Failing Reasons : Too many joints, uneven load distribution caused by rough workmanship
  • 26. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 5.5 FOURTH BRIDGE After testing and analyzing the second and third bridge, we decided to improvise a new design by improving it but still using our precedent as a guideline. Amendments made: 1. Rising the height of the bridge (increase bending resistance) 2. Place every vertical and diagonal member on top of the bottom beam (for direct joining contact point and more surface area for more stable joining) 3. Making one whole triangle instead of few triangles (to decrease the number of joints) '' 26 Figure 6.4.4 Failed Component Figure 5.5.1 Load Distribution Diagram for the 4th Bridge Figure 5.5.2 Bridge design before testing
  • 27. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 27 Figure 5.5.3 Picture shows the sliding of the bridge. Figure 5.5.4 Bridge flips due to the torsion, height, breaking of the bottom chord and the narrow base Torsion Figure 5.5.5 Top view diagram shows torsion, causing the two main facades to slide against each other
  • 28. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Failure occurs due to the torsion of the two bridge main façades sliding left and right against each other. Other than that, the height of the bridge and a narrow base ultimately have also caused the whole bridge to flip over. The absence of the diagonal and cross bracing has lead to the torsion and caused our bridge to fail. Thus, we have applied the diagonal bracing in our next bridge. Bridge weight: 254g Load: 4732g Efficiency: (4.732)2 = 88.2%
 0.254 28 Figure 5.5.6 Failed component Failed Components : Bottom chords connecting members Failing Reasons : Torsion, bottom chords (the two main bridge facades) are not connecte with each other with cross bracing to prevent torsion
  • 29. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.0 FINAL BRIDGE 6.1 AMENDMENTS The figure below (figure 6.1.1) shows the design and construction method of our final fettuccine bridge. This type of truss bridge had been chosen for our final model design as it reaches the highest efficiency among all the truss bridges we have tested. Referring to the test result, in depth analysis was conducted for further development in order to achieve higher efficiency. Amendments made: 1. Amendments of dimension Dimension of distance in between each vertical member had slightly been changed (figure??). The length of each distance was changed from ??mm to ??mm, to enable the vertical members rest on the edge of tables (allow force from the edge of table transfer directly to the vertical member, and to prevent failure of the horizontal member) 29 Figure 6.1.1 Amendments of dimension of final bridge model 790 Figure 6.1.2 Dimension of the first bridge model
  • 30. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.2 FINAL MODEL MAKING Firstly, an accurate Autocad drawing of the bridge is printed out as a guide for the bridge construction. Then, the two I-beams are constructed: 30 Figure 6.2.1 Diagram showing first step of erection, the I-beam. 6.2.2 Picture showing staggered I-beam construction 6.2.2 Picture showing staggered I-beam construction Figure 6.2.4 A close up picture of the I-beam showing the construction and orientation
  • 31. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Secondly,'the'outline'of'the'three'triangles'are'constructed:' 31 Figure 6.2.5 Diagram showing second step of erection, the outline of the triangles. Figure 6.2.6 Picture showing the joining of the triangle Figure 6.2.7 Picture showing the joining of the triangle to the I-beam Figure 6.2.8 Picture showing us securing the joints using masking tape
  • 32. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Thirdly, the vertical members and the top horizontal members are constructed. These vertical members serve as vertical posts for the fettuccine bridge to resist the compression force that was created: 
 32 Figure 6.2.9 Diagram showing third step of erection, the vertical members and top horizontal chord Figure 6.2.10 Picture showing the vertical and top horizontal chord are joined to the triangles
  • 33. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report The forth step is carried out immediately, the diagonal and the small vertical members are constructed. The diagonal members were located at gaps in between vertical members and they functioned as bracing of truss which is able to resist shear force. ' 
 33 Figure 6.2.11 Diagram showing forth step of erection, the vertical members and top horizontal chord Figure 6.2.12 Picture showing two main facades of the bridge
  • 34. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Lastly, a series of members having 60mm in length is served to connect the bottom and top chords two main facades (Figure 6.2.14). The position is determined to be at the bottom of each vertical member and rested well above the bottom chord. Other than that, another series of members with the same length are placed above the top chord of the bridge with horizontal facing (Figure 6.2.17). Diagonal bracing at the bottom chord is constructed (Figure 6.2.16). Waffle slab is constructed in this step too (figure 6.2.15), same time with the joining of the two facades. ' 34 Figure 6.2.13 Diagram showing last step of erection, the vertical members and top horizontal chord Figure 6.2.14 Pictures showing the joining of the two main bridge facades
  • 35. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 
 35 Figure 6.2.15 Picture showing the construction of the waffle slab Figure 6.2.16 Pictures showing the diagonal bracings
  • 36. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 36 Figure 6.2.17 Picture shows connecting members of vertical facing at bottom chord and horizontal facing at top chord Figure 6.2.18 Final bridge before testing
  • 37. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3 JOINT ANALYSIS Joining method is one important factor in a bridge design as the joints will affect the efficiency and failure of Fettuccine bridge. The joints are further tested and studied to achieve the optimum joining of every single member at different part of connections. Therefore, respective methods of joint are designated according to requirement of each part. 37 A B C D E F G
  • 38. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3.1 JOINT A It was studied that the vertical member at the joint A experiences compression forces when load is applied to the design. From the previous design, we analyzed that the jointed members carrying the compressive internal are causing stress to the structure member while connecting to one another. Action is taken to separate the joints and the joining method of two members is designed so that the vertical member is supporting the upper diagonal member and not affecting the internal force of other members. 38 Previous Joint Design Improvised Joint Design Figure 6.3.1 Joint A Connection Amendment
  • 39. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3.2 JOINT B The middle most diagonal members are joined with butt joint, leaning again each other with a fixed angle of 45 degree. The rigidity of the triangle structure provides stability and strength to force acting on it, and distributing evenly from member to members. Reinforcement of the joint is introduced with the use of gusset. The gussets hold the members together to prevent gliding of members due to the brittleness of the adhesive material used when load is added to the structure. 39 45° Figure 6.2.1 Joint B Gusset Reinforcement
  • 40. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3.3 JOINT C The top chord horizontal chords are designed in segments to accommodate the compressive stress of the structure. The segmented members are preferable rather than one long strip of horizontal member. This is because the longer stretched member is more fragile than a shorter one when a load is applied to the structure. The segmented members allow better resistance on compressive stress. The end of the segment members are carefully shaped to sit firmly to the side of the diagonal members. 40 Figure 6.3.3 Top Horizontal Member Connection
  • 41. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3.4 JOINT D T-lock joint is a design connection acting like a steel plate in steel construction. The T-shape member is slotted into the I-beam and holds the beams up right to prevent downward bending force from the load itself. The connection gives better structural strength to connect both vertical and horizontal members perpendicularly. 41 Figure 6.3.4.1 T-lock Connection Figure 6.3.4.1 Example of a slotted steel plate
  • 42. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3.5 JOINT E
 The vertical facing connecting members is one critical design to evenly distribute the load along the entire structure of the bridge. The improvement was made from the very first design of the member, which was attaching to the vertical member. The design was not efficient as it does not spread the load along the bridge but acting as a load itself, giving more stress to the structure. Furthermore the load is actually depending all by the adhesive material (glue) only. The 2nd improvised design was made better because the members lay on the I-beam. But the vertical members joining the vertical facing connecting members are not strong due to its poor 42 Fig 6.3.5.2 Photos of Divergence of the Vertical Facing the Connecting Fig 6.3.5.1 Improvement on Vertical Member 1st Design 2nd Design 3rd Design
  • 43. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report contact surface area of both vertical and vertical facing connecting members. The 3rd design was considered to transfer the vertical facing connecting members to the sides, diverting load stress to the other part of the bridge with less concentration of members. 6.3.6 JOINT F This vertical facing connecting beam is simply laid perpendicularly to the long bottom chord of the I-beams. These short members are glued in stacks and then fixed on top of the stretch. These members function as the load distribution member to channel and balance out downward loads along the stretch of the bridge. 6.3.6 JOINT G 43 Fig'6.3.6''Connec1on'of'ver1cal'facing'connec1ng'members. Fig'6.3.7''Connec1on'of'bracing
  • 44. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report The connection joint G is placed diagonally on the I-beams to resist shear force as well as torsion force acted on the structure by the load. These bracings are fixed in between the vertical facing connecting members at the lower part of the bridge. The bracings rest against the other members to prevent movement and distortion of other structural members of the bridge. 44
  • 45. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.4 FINAL BRIDGE TESTING AND LOAD ANALYSIS The picture below (figure 6.4.1) shows the design our final fettuccine bridge and the load distribution. In this final bridge, the main amendments made are size and height of the bridge (to provide better downward bending resistance and stable force distribution), and the use of diagonal bracing at the bottom chord (to prevent the bridge from torsion). 45 Figure 6.4.1 Design of our final bridge and members in tension and compression diagram Figure 6.4.2 Top view of our previous bridges (without diagonal bracing) Figure 6.4.3 Top view of our final model (with diagonal bracing)
  • 46. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 
 46 Figure 6.4.4 Bridge before testing Figure 6.4.5 Bridge showing torsion at the top chord before breaking Figure 6.4.6 Top chords break and caused the bridge to fail
  • 47. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 
 47 Figure 6.4.7 Bridge before load is applied Figure 6.4.8 Bridge showing downward bending after load is applied Figure 6.4.9 Top chord breaks due to torsion and has caused the whole bridge to fail
  • 48. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report After observing, calculating and analyzing our bridge, we have concluded that in this final design, the failure occurs due to the torsion at the top chord (Figure 6.4.5). When the load is applied, the top chord of the bridge experienced torsion due to the uneven forces distribution caused by the design of the trusses. By referring to Joints E, I, M, E1, I1 (top chord), we can conclude (from observation and calculation) that Joints E, M and E1 are in equilibrium, whereas Joint I and I1 are not in equilibrium. At Joint I and I1 (which their resultant forces are not in equilibrium), they are experiencing a large upward force at their Y-vector, with a magnitude of 204.82N. Whereas the others points are in equilibrium. With this great upward force, they have contributed to the torsion at the top chord in this pattern shown in the figure 6.5.11 and caused failure to the bridge. 
 48 Figure 6.4.10 Picture showing torsion pattern at the top chord Figure 6.4.11 Top view diagram showing torsion and statues of each joints
  • 49. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report The diagram above shows Joints in red bubble (I and I1) experiencing torsion and are not in equilibrium, whereas Joints in blue bubble (E, M and E1) are in equilibrium, thus remained in position. The bridge testing results do tally with the calculation. Other than that, when load is applied, the bridge started to bend downwards due to the uneven force distribution caused by the design of the trusses. By referring to Joint K and Joint C/G (after calculation): In Joint K, it is experiencing a downward force at its Y-vector, with a magnitude of 123.41N. When compared to the adjacent weaker joints, Joint G and C, they experience an equivalent lesser downward force at its Y-vector, a magnitude of 42.09N and 42.17N, The big difference of magnitude between these joints has caused the downward bending of the bridge, and ultimately causing the bridge to fail. 49 Figure 6.4.12 Diagram shows big difference in magnitude of force between the joints, causing downward bending
  • 50. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report Bridge weight: 203g Load: 4170g Efficiency: (4.17)2 = 85.7%
 0.203 The efficiency of the final bridge did not meet our expectation as the bridge should be able to carry more loads and have higher efficiency. Due to the great torsion at the top chord and the adhesive is not fully dry, our final model was only able to have a 86% efficiency. 50 Figure 6.4.14 Failed component Failed Components : Top chords Failing Reasons : Torsion at the top chord, glue is not fully dried
  • 51. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.5 CALCULATIONS$ 4.17 kg= 4.2 = 42N 1) Determine perfect truss 2J = 2(24) = 48 M + 3 = 45+3 =48 Therefore 2J = M + 3, it is a perfect truss 2) Determine reaction force ∑MA= 0 ( 42 x 0.39) - (Ra x 0.78) = 0 16.38 - 0.78Ra = 0 Ra = 21N ∑Fy= 0 42N – 21N- RA = 0 RA = 21 N 51
  • 52. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 3 ) Determine internal forces of main structural member
 At joint A, ∑Fy= 0 21-FAB sin Q = 0 FAB sin 47.12 = 21 FAB = 21/ 0.73 FAB = 28.77 ( C) ∑Fx= 0 FAB cos θ – FAC = 0 -FAC = cos 42.12 x 28.77 FAC = - 19.58 ( T ) tan θ = 0.07/ 0.065 θ = 47.12° At joint C, ∑Fx= 0 -19.58 + FCD = 0 FCD = 19.58 (T) At joint B, ! ∑Fy= 0 (-FBE sin θ ) +(-21) + (+FBC)+ (+21) = 0 F=FBC – FBE sin θ = 0 ° FBC = 42.1697 FBC = 42.17 (C) ∑Fx= 0 52
  • 53. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report (-FBE cos θ) + (+19.58) + (+19.58) = 0 -0.6805 FBE = - 39.16 FBE = 57.5459 = 57.55 (C) At joint D, ∑Fx= 0 (-19.58)+(-21)+(21)+(19.58)=0 ∑Fy= 0 (+19.58)+(-FED) + (+19.58)=0 FED = 39.16 (C) At joint E, ∑Fy= 0 (57.55 sin θ ) + (39.16) + (- FEF sin θ) = 0 42.17 + 39.16 – FEF 0.7328 = 0 FEF = 110.99 ( T) ∑FX= 0 (57.55cos θ) + (- FEI ) + ( FEF cos θ ) = 0 39.1608 + FEI + (110.99 X 0.6805)= 0 FEI = 114.69 (C) At joint F, ∑Fy = 0 (-21) + (81.33)+ (-FFH sin θ ) + ( FFQ) = 0 60.33 – 0.7328 FFH + FFG =0 FFG = 42.09 (C) ∑FX= 0 (-19.58)+(-75.53) + ( FFH cos θ) =0 FFH 0.6805= 95.11 FFH = 139.76 (T)
 53
  • 54. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.6 DESIGN SOLUTIONS 6.6.1 1ST SOLUTION: FINGER JOINTS By using Finger Joints, this maximises the areas to be glued for joining compared to our previous joint which is the Butt Joint. This increases the the strength and durability of the joint as it requires a lot of force to separate the parts. 6.2 2ND SOLUTION: CROSS BRACES Cross braces pushes the the two top chords against one another, thereby increasing the structure’s stability. It also holds the two chords in place by resisting torsion caused by the load. 54 Figure 6.1.1 Proposed improvement on joint method Figure 6.2.1 Proposed addition of strong cross bracing at top chords
  • 55. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 6.3 3RD SOLUTION : LOWER SUPPORT By adding supports below the bridge, the load is distributed to the supporting objects; the table. This also reduces the chance of buckling of the lower chord as it transfers the load away from the vertical hip that is in compression.
 55 Figure 6.3.1 Proposed lower support for bridge
  • 56. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 7.0 CONCLUSION We had constructed a total of 5 fettuccine bridges experimented its efficiency in withstanding loads. The precedent study we chose to study on is Waddell A ‘Truss bridge’. We had concluded on using Waddell A ‘Truss bridge’ because of the single span bridge with a patented design, consisting of triangular ‘A’ trusses and its structural members are pin- connected. Despite its relocation, the bridge retains its integrity of design due to its reliability, ease of erection, cost efficient and structural rigidity in all directions In our final model testing, we achieved the highest efficiency compared to the previous 4 models we have done. Our fettuccine bridge achieved an efficiency of 114.5% withstanding a total of load of 5120g and its weight is only 229g. This project has made us understand load distribution in a structure deeper, compared to the previous semester, as we are now able to calculate the type of force applying in each structure member. We explored different arrangement of structural members and realized it is important to identify the force (tension/ compression/zero/critical) in structural members in order to achieve a high efficient bridge design. We also realized the importance of proper planning, in terms of work delegation and the time interval between completion of bridge and load testing. It is due to the efficiency of completing the bridge on time and giving an adequate time for the adhesives to dry out and maintain its strength until load testing. In conclusion, it has been a great experience working on this project. Using household goods to construct a bridge and gaining so much knowledge after that have amazed us how strong a structure can be if it is properly designed and constructed . As an architecture students, we will be the leader in the construction industry in future, we need to think critically and pay attention to details so that a structure can function efficiently without failure for the safety and well being of the people. 56
  • 57. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 8.0 APPENDIX As for our individual part, we were assigned to further analyse total of 5 trusses. Each were distributed to following : 8.1 FIRST CASE 8.2 SECOND CASE 8.3 THIRD CASE 8.4 FOURTH CASE 8.5 FIFTH CASE The analysis and calculation of trusses are attached after this page. 57
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85. ARCH 2213 BUILDING STRUCTURES PROJECT 1: Fettuccine Truss Bridge Analysis Report 9.0 REFERENCES National Register of Historic Places. (n.d.). Retrieved May 6, 2015, from http:// dnr.mo.gov/shpo/nps-nr/90002173.pdf Patent US529220 - Truss-bridge. (1894, November 13). Retrieved May 6, 2015, from http://www.google.com/patents/US529220 Ching, Francis D.K (2008) Building Construction Illustrated Fourth Edition. New Jersey: John Wiley & Sons, Inc. 58