OHM’s LAW – relationship of EMF, Current, Resistance
Formula: I = V/R V=IR R=V/I
I = Current (Amperes)
V = EMF (Volts)
R = Resistance (Ohms)
• Voltage (Volts) – pressure or force; Voltmeter
• Amperes (Amps) – inherent in wires (conductor); Ammeter
• Ohms – friction; inherent in insulator/Ohmmeter
Other Terminologies
• DEVICE – does not consume electricity
• WATT – rate of power; power consumption;
heat volts + ampere
Watt Meter – any one time
Watt-Hour Meter – periodic; KWH Meter/
Electricity Meter
• ALTERNATOR – AC generator
• GENERATOR – M.E to E.E.
• MOTOR – E.E. to M.E.
• BATTERY – electrochemical; electrolysis
Primary – nonrenewable
Secondary - rechargeable
SYSTEM COMPONENTS OF BUILDING
SYSTEM COMPONENTS OF BUILDING
• 3 CATEGORIES
1. Wirings and Raceways
2. Power Handling Equipment
3. Utilization Equipment – actual use
WIRES AND CABLES
1. FMC/MC/AC – BX; flexible
2. NMC/NM – ROMEX; sheat
3. GENERAL WIRING: THERMOPLASTIC (PEC)
4. MI – jacketed
5. SNM – telecommunication/submarine cable
6. SE/USE – aerial/underground
7. UF – direct burial to ground
8. TC – open wireway/support/tray
9. FC – system furniture application/cable management
10. FCC – general purpose
BUSBAR: Busway, Busduct
CABLEBUS; rounded
1. FMC/MC/AC – BX; flexible
2. NMC/NM – ROMEX; sheat
3. GENERAL WIRING: THERMOPLASTIC (PEC)
4. MI – jacketed
5. SNM – telecommunication/submarine cable
6. SE/USE – aerial/underground
7. UF – direct burial to ground
8. TC – open wireway/support/tray
9. FC – system furniture application/cable management
10. FCC – general purpose
BUSBAR: Busway, Busduct
CABLEBUS; rounded
WIRES AND CABLES
1. TC – open wireway/support/tray
2. FC – system furniture application/cable management
3. FCC – general purpose
BUSBAR: Busway, Busduct
CABLEBUS; rounded
1. TC – open wireway/support/tray
2. FC – system furniture application/cable management
3. FCC – general purpose
BUSBAR: Busway, Busduct
CABLEBUS; rounded
RACEWAYS
1. Floor Raceway
• underfloor raceway – conventional installation
• cellular metal floor raceway – rib decking/raised floor system
• cellular concrete floor raceways – T-joist/ precast concrete
slab with built in pipes
2. Ceiling Raceway
• Power and Control Tray Cable (TC)
• Busbar
• Cablebus
POWER HANDLING EQUIPMENTS
1. TRANSFORMER – voltage to voltage
• Outdoor Transformers
H-frame – 1000 kva
Cluster mounted – 225 kva
Pad mounted – 120V to 240V
POWER HANDLING EQUIPMENTS
1. SWITCHBOARD/SWITCHGEAR – free standing
assemblies of switches, fuses/circuit breakers
• Unit Substations (Transformer Load Center) – large
facility
POWER HANDLING EQUIPMENTS
PANELBOARD – final distribution point; PP/LP
• Main Panelboard
• Distribution Panelboard
POWER HANDLING EQUIPMENTS
3. SERVICE SWITCH – large switch
• disconnecting apparatus
• service disconnecting means
• applied on apartments: meter banks
POWER HANDLING EQUIPMENTS
4. CIRCUIT PROTECTIVE DEVICES – overload/short circuit
• FUSE – alloy link or wire; fusible link; nonrenewable
Plug Fuse – dwelling (5-30 amps)
Cartridge Fuse – (5-60 amps)
Knife Blade Fuse – (61-600 amps); DE/SE
POWER HANDLING EQUIPMENTS
CIRCUIT BREAKERS – electromechanical device
Thermal Pigtail (Copper) – senses heat
Magnetic Pigtail (Copper) – senses load
FIXTURES/LUMINAIRES
INCANDESCENT BULB
1. Filament
2. Gas
3. Lead-in-wires
4. Stem Press
5. Exhaust Tube
6. Base
7. Fuse
8. Mica Disc
9. Button Rod
10. Button
11. Support Wires
12. Soft Glass
Hard Glass
Inside frosted – white silica
FIXTURES/LUMINAIRES
INCANDESCENT BULB
FIXTURES/LUMINAIRES
FLUORESCENT LAMP
Cylindrical Glass Tube – phosphor
Cathode – argon and low pressure
mercury vapor
Ballast – limits current
Starter - switch
TYPES:
• Pre-Heat Starting - CFL
• Instant Start (Slimline) – w/o a starter
• Rapid Start – bi-pins
CONDUITS
pipes, tubings (electrical raceway)
Materials (Metallic or Nonmetallic)
Make
1. Rigid Metal (RSC, EMT)
2. Flexible Metal (BX)
3. Rigid Nonmetal (Plastic, etc.)
4. Flexible Nonmetal (Plastic, etc.)
Condulets
CONDULETS/UNILETS (Conduit Fittings)
• Straight and angle couplings
• Elbow Fittings
• Tee and Cross connections
ELECTRICAL BOXES
• Outlet Box – cable ends
• Utility Box – outlets, switches
• Pull Box – facilitates pulling
• Junction Box – joining, splicing
• Cut-out Box – metal box

More Related Content

Similar to building utilities-electrical introduction

Ppt1
Ppt1Ppt1
Ppt1
v0run
 
Current and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptxCurrent and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptx
rohith650557
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
ASHOK KHOJA
 
A 1 maintain electrical system installation of mechatronics system
A 1  maintain electrical system installation of  mechatronics systemA 1  maintain electrical system installation of  mechatronics system
A 1 maintain electrical system installation of mechatronics system
Syyed Ali
 

Similar to building utilities-electrical introduction (20)

Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
 
Electricitywirings and its component.ppt
Electricitywirings and its component.pptElectricitywirings and its component.ppt
Electricitywirings and its component.ppt
 
Power supply
Power supplyPower supply
Power supply
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Training Presentation 2023 PS EE (1).pptx
Training Presentation 2023 PS EE (1).pptxTraining Presentation 2023 PS EE (1).pptx
Training Presentation 2023 PS EE (1).pptx
 
Ppt1
Ppt1Ppt1
Ppt1
 
RPPT.pptx
RPPT.pptxRPPT.pptx
RPPT.pptx
 
Current and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptxCurrent and Voltage Transformers _23_10_2021.pptx
Current and Voltage Transformers _23_10_2021.pptx
 
Power electronics (III-EEE)
Power electronics (III-EEE)Power electronics (III-EEE)
Power electronics (III-EEE)
 
Vocational training
Vocational trainingVocational training
Vocational training
 
Switchgear, protection and measurement
Switchgear, protection and measurementSwitchgear, protection and measurement
Switchgear, protection and measurement
 
Chapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdfChapter 1 Introduction to power Electronic Devices.pdf
Chapter 1 Introduction to power Electronic Devices.pdf
 
Distribu pQ.pptx
Distribu pQ.pptxDistribu pQ.pptx
Distribu pQ.pptx
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
A 1 maintain electrical system installation of mechatronics system
A 1  maintain electrical system installation of  mechatronics systemA 1  maintain electrical system installation of  mechatronics system
A 1 maintain electrical system installation of mechatronics system
 
10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).ppt10.Electrical and Equipment Safety (1).ppt
10.Electrical and Equipment Safety (1).ppt
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt
 
10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt10.Electrical and Equipment Safety.ppt
10.Electrical and Equipment Safety.ppt
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 

Recently uploaded

ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Recently uploaded (20)

Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Intelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent ActsIntelligent Agents, A discovery on How A Rational Agent Acts
Intelligent Agents, A discovery on How A Rational Agent Acts
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
How to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdfHow to Design and spec harmonic filter.pdf
How to Design and spec harmonic filter.pdf
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 

building utilities-electrical introduction

  • 1. OHM’s LAW – relationship of EMF, Current, Resistance Formula: I = V/R V=IR R=V/I I = Current (Amperes) V = EMF (Volts) R = Resistance (Ohms) • Voltage (Volts) – pressure or force; Voltmeter • Amperes (Amps) – inherent in wires (conductor); Ammeter • Ohms – friction; inherent in insulator/Ohmmeter
  • 2. Other Terminologies • DEVICE – does not consume electricity • WATT – rate of power; power consumption; heat volts + ampere Watt Meter – any one time Watt-Hour Meter – periodic; KWH Meter/ Electricity Meter • ALTERNATOR – AC generator • GENERATOR – M.E to E.E. • MOTOR – E.E. to M.E. • BATTERY – electrochemical; electrolysis Primary – nonrenewable Secondary - rechargeable
  • 4. SYSTEM COMPONENTS OF BUILDING • 3 CATEGORIES 1. Wirings and Raceways 2. Power Handling Equipment 3. Utilization Equipment – actual use
  • 5. WIRES AND CABLES 1. FMC/MC/AC – BX; flexible 2. NMC/NM – ROMEX; sheat 3. GENERAL WIRING: THERMOPLASTIC (PEC) 4. MI – jacketed 5. SNM – telecommunication/submarine cable 6. SE/USE – aerial/underground 7. UF – direct burial to ground 8. TC – open wireway/support/tray 9. FC – system furniture application/cable management 10. FCC – general purpose BUSBAR: Busway, Busduct CABLEBUS; rounded 1. FMC/MC/AC – BX; flexible 2. NMC/NM – ROMEX; sheat 3. GENERAL WIRING: THERMOPLASTIC (PEC) 4. MI – jacketed 5. SNM – telecommunication/submarine cable 6. SE/USE – aerial/underground 7. UF – direct burial to ground 8. TC – open wireway/support/tray 9. FC – system furniture application/cable management 10. FCC – general purpose BUSBAR: Busway, Busduct CABLEBUS; rounded
  • 6. WIRES AND CABLES 1. TC – open wireway/support/tray 2. FC – system furniture application/cable management 3. FCC – general purpose BUSBAR: Busway, Busduct CABLEBUS; rounded 1. TC – open wireway/support/tray 2. FC – system furniture application/cable management 3. FCC – general purpose BUSBAR: Busway, Busduct CABLEBUS; rounded
  • 7. RACEWAYS 1. Floor Raceway • underfloor raceway – conventional installation • cellular metal floor raceway – rib decking/raised floor system • cellular concrete floor raceways – T-joist/ precast concrete slab with built in pipes 2. Ceiling Raceway • Power and Control Tray Cable (TC) • Busbar • Cablebus
  • 8. POWER HANDLING EQUIPMENTS 1. TRANSFORMER – voltage to voltage • Outdoor Transformers H-frame – 1000 kva Cluster mounted – 225 kva Pad mounted – 120V to 240V
  • 9. POWER HANDLING EQUIPMENTS 1. SWITCHBOARD/SWITCHGEAR – free standing assemblies of switches, fuses/circuit breakers • Unit Substations (Transformer Load Center) – large facility
  • 10. POWER HANDLING EQUIPMENTS PANELBOARD – final distribution point; PP/LP • Main Panelboard • Distribution Panelboard
  • 11. POWER HANDLING EQUIPMENTS 3. SERVICE SWITCH – large switch • disconnecting apparatus • service disconnecting means • applied on apartments: meter banks
  • 12. POWER HANDLING EQUIPMENTS 4. CIRCUIT PROTECTIVE DEVICES – overload/short circuit • FUSE – alloy link or wire; fusible link; nonrenewable Plug Fuse – dwelling (5-30 amps) Cartridge Fuse – (5-60 amps) Knife Blade Fuse – (61-600 amps); DE/SE
  • 13. POWER HANDLING EQUIPMENTS CIRCUIT BREAKERS – electromechanical device Thermal Pigtail (Copper) – senses heat Magnetic Pigtail (Copper) – senses load
  • 14. FIXTURES/LUMINAIRES INCANDESCENT BULB 1. Filament 2. Gas 3. Lead-in-wires 4. Stem Press 5. Exhaust Tube 6. Base 7. Fuse 8. Mica Disc 9. Button Rod 10. Button 11. Support Wires 12. Soft Glass Hard Glass Inside frosted – white silica
  • 16. FIXTURES/LUMINAIRES FLUORESCENT LAMP Cylindrical Glass Tube – phosphor Cathode – argon and low pressure mercury vapor Ballast – limits current Starter - switch TYPES: • Pre-Heat Starting - CFL • Instant Start (Slimline) – w/o a starter • Rapid Start – bi-pins
  • 17. CONDUITS pipes, tubings (electrical raceway) Materials (Metallic or Nonmetallic) Make 1. Rigid Metal (RSC, EMT) 2. Flexible Metal (BX) 3. Rigid Nonmetal (Plastic, etc.) 4. Flexible Nonmetal (Plastic, etc.)
  • 18. Condulets CONDULETS/UNILETS (Conduit Fittings) • Straight and angle couplings • Elbow Fittings • Tee and Cross connections
  • 19. ELECTRICAL BOXES • Outlet Box – cable ends • Utility Box – outlets, switches • Pull Box – facilitates pulling • Junction Box – joining, splicing • Cut-out Box – metal box