BUILDING ACT 2006
Quality Control Unit
Outline
 Building Act 2006
 Building Approvals (Building Permit) – assessing
designs
 Background information on Building
Construction Inspection
 Inspection Procedure
 Construction stages
 Issues with current Inspection
 Solution to address/solve issues
 Advantage of proposed inspection procedures
Building Act 2006
 Building Code & Building Act 2006 have been approved in
principle by cabinet and will be enforced by 1st January 2013.
 Building include;
I. A structure on or attached to land, lagoon bed or sea bed
II. A structure attached to a building
III. Part of a building whether the building is completed or not
 Building Act does not include;
I. A bridge
II. A road
III. Retaining wall associated with bridges, or roads
IV. A road traffic sign
V. Electricity network distribution equipment
Building Act 2006
 Assess design proposals to ensure they are
structural sufficient, safe and stable for their
intended use and do not pose a hazard to persons
or property
 Assess Construction work to ensure it directly
complies with the approved design/construction
drawings submitted in the application.
 Violation of the building act
 Imprisonment
 A fine
Building Act 2006
 Building work must not proceed past a stage
without written approval from Building
Inspectors
 Building not to be used until a certificate of
occupancy has been issued. Occupying the
building without occupancy certificate is an
offense and will result in imprisonment for not
more than 1 year and a fine not exceeding
$10,000.00.
Procedure for Building
Approval/Permit
Client MPWU
Registry
Assessment
against
Building
Code
Building Code
compliance MPWU
Director for
final
approval
MPWU
Registry
Client
Alternative
design
Assessment
by
concerned
division
Inspecting Building
Construction Activities
Inspection Procedure
 Construction Working Drawing
 Details & specifications
 Building Construction in the Business
Environment
 Profit
 Control – building codes, act and standards
 Inspections – compliance and quality assurance
 Kiribati
 Increase number of qualify local builders – KIT &
Overseas graduates and MPWU Retirees
 Delegation of construction projects to private sector
–inline with KDP
 Inspection to ensure quality output
Current Inspection Procedure
 Client ministry to MPWU
 Client ministries request for inspection when
the building project is almost completed
 Inspectors carry out inspection and submit
findings & recommendations to client
ministries
 BUILDING CERTIFICATE
Critical construction stages
 Foundation
 compacted
 Correct dimensions
 Correct reinforcement bars
 Sufficient reinforcement cover
 Cement mixing ratio
 Framing
 Timber Frame
 Fasteners
 Studs, dwangs, batten & roof truss es and spacing
 lintel
 Blockwork
 Plumb
 Reinforcements
 Lintel & bond beam
 blockwork
 Plumbing & Electrical (Services)
 Electrical wiring done according to electrical plan
 Plumbing comply with construction drawing
 Finishing
I. Decoration works such as lining, painting, etc
Issues with current inspection
procedure
 Critical construction stages are not
covered/inspected.
 Client ministries are not aware of construction
stages that must be inspected.
 Conducting inspection at final stage is more of
inspecting finishing/decoration work.
Inspecting Critical Construction
Stages
 Foundation Checklist
 DEMOLITION PLAN
 Construction work is executed on site specified in the
site plan submitted in the application for building
permit
 Site clearance; rubbish are well cleared off
construction site
 Dimensions/measurements for footing directly
comply with construction drawing
 Earth foundation is fully compacted (top soil removed
to reach firm foundation. Some working drawing
require foundation to be filled with hardcore, topped
with sand blind and compacted)
 Re-bars/reinforcement bars are of correct specification
and laid at spacing directed in the working drawing
 Stir ups are of correct specification and installed at
spacing detailed in the official construction drawing
 Starter bars are of correct specification and installed
correctly according to requirements of the
construction working drawing.
 Sufficient reinforcement cover (minimum 50mm)
 Underground pipes have been laid according to
specifications of the construction drawing
 Arorae inspetion photo to be installed
Certificate of compliance for Foundation
Framing
 Blockwork wall
 Fittings for electrical work have been installed
 Blockworks were laid at good standard of
workmanship
 Reinforcements for bond beams and lintel have been
installed according to specification of the construction
drawing
 Top ends of vertical reinforcements beside window
and doors are to be left exposed
 Timber frame
 Bottom plates bolted to slab
 Studs, dwangs, lintel, jack studs and top places
installed correctly according to specifications of the
construction drawing
 Roof trusses must be made according to specification of the
construction drawing and installed at spacing directed in
the working drawing
 Batterns/purlins of correct size, spacing and fixings
 Bracing
 Roofing of correct specification, lapping ,fixing & flashings
 External Cladding must be installed as detailed in the
working drawing
 Internal lining must not be installed.
Framing Certificate
Electrical
 Wiring must be laid as detailed in the
electrical plan
 Other requirements of electrical
codes/standard must be fulfilled
 Requirement for circuit diagram must be
fulfilled
Electrical Certificate
Plumbing Certificate
Practical Completion Certificate
 Foundation, framing and electrical certificates
 Building must be structural sound, completely
water tight and in any respect complies with
requirements/specifications of the construction
working drawing
 The certificate must be enclosed with a list of
cosmetic defects.
 Due date for attending cosmetic defects/defect
liability period must be set and agreed by
contractor, inspector, client and/or project
administrator
Final Completion Certificate
Advantage
 Eliminate construction errors
 Alleviate unnecessary construction costs
 Building Certificate
 Structural sound
 Safe to use
 Add value to the building

More Related Content

What's hot

Building permit 2
Building permit 2Building permit 2
Building permit 2
Lumbad 1989
 
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
CSR Consultant and Associates
 
Buildings structural repair consultant within estimated repair & painting sol...
Buildings structural repair consultant within estimated repair & painting sol...Buildings structural repair consultant within estimated repair & painting sol...
Buildings structural repair consultant within estimated repair & painting sol...
CSR Consultant and Associates
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
fady toma
 
Buildings structural audit and Civil repairs painting works
Buildings structural audit and Civil repairs painting worksBuildings structural audit and Civil repairs painting works
Buildings structural audit and Civil repairs painting works
CSR Consultant and Associates
 
Rolando Chico's Resume 022516
Rolando Chico's Resume 022516Rolando Chico's Resume 022516
Rolando Chico's Resume 022516Rolando Chico
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1
roshankr92
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016Tony Rolfe
 
Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)wirethehouse
 
Hoffman Builds 12w
Hoffman Builds 12wHoffman Builds 12w
Hoffman Builds 12w
mark_allen
 
Sm group peb presentation
Sm group peb presentationSm group peb presentation
Sm group peb presentationAamer Pathan
 
Peb presentation
Peb presentation  Peb presentation
Peb presentation
Ranjuunico
 

What's hot (20)

CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Building permit 2
Building permit 2Building permit 2
Building permit 2
 
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
Structural audit fees in Mumbai Thane Navi Mumbai for Building Structural Rep...
 
Buildings structural repair consultant within estimated repair & painting sol...
Buildings structural repair consultant within estimated repair & painting sol...Buildings structural repair consultant within estimated repair & painting sol...
Buildings structural repair consultant within estimated repair & painting sol...
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Buildings structural audit and Civil repairs painting works
Buildings structural audit and Civil repairs painting worksBuildings structural audit and Civil repairs painting works
Buildings structural audit and Civil repairs painting works
 
Linkedin Resume
Linkedin ResumeLinkedin Resume
Linkedin Resume
 
Rolando Chico's Resume 022516
Rolando Chico's Resume 022516Rolando Chico's Resume 022516
Rolando Chico's Resume 022516
 
Daniel McCormick resume 2
Daniel McCormick resume 2Daniel McCormick resume 2
Daniel McCormick resume 2
 
Merik PowerPoint
Merik PowerPointMerik PowerPoint
Merik PowerPoint
 
Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1 Unit 7-Project management(Edexel)-Lesson 1
Unit 7-Project management(Edexel)-Lesson 1
 
CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5CV Rana Tanveer Ahmed rev 1.5
CV Rana Tanveer Ahmed rev 1.5
 
A P Rolfe CV March 2016
A P Rolfe  CV March 2016A P Rolfe  CV March 2016
A P Rolfe CV March 2016
 
Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)Abse lev1 2_104_launch(full permission)
Abse lev1 2_104_launch(full permission)
 
cofieldresume
cofieldresumecofieldresume
cofieldresume
 
Hoffman Builds 12w
Hoffman Builds 12wHoffman Builds 12w
Hoffman Builds 12w
 
James Richard_new
James Richard_newJames Richard_new
James Richard_new
 
CV-lizhihui
CV-lizhihuiCV-lizhihui
CV-lizhihui
 
Sm group peb presentation
Sm group peb presentationSm group peb presentation
Sm group peb presentation
 
Peb presentation
Peb presentation  Peb presentation
Peb presentation
 

Similar to Building act 2006 presentation english version

Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
Ghullam Murtaza Dahri
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERSajjad Ali
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
DougDos
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Codetboyko
 
CV - Burk, Drew
CV - Burk, DrewCV - Burk, Drew
CV - Burk, DrewBilly Burk
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CVRyan Quilala
 
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1Anne Arundel Community College
 
Steel construction -_ce_marking
Steel construction -_ce_markingSteel construction -_ce_marking
Steel construction -_ce_marking
RicardoFernandes317
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 

Similar to Building act 2006 presentation english version (20)

Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
QA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEERQA-QC_CIVIL ENGINEER
QA-QC_CIVIL ENGINEER
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 
Project Specifications and Building Code
Project Specifications and Building CodeProject Specifications and Building Code
Project Specifications and Building Code
 
cv3 of Magripa Tulepova
cv3  of Magripa Tulepovacv3  of Magripa Tulepova
cv3 of Magripa Tulepova
 
CV - Burk, Drew
CV - Burk, DrewCV - Burk, Drew
CV - Burk, Drew
 
malik muhammad.hussain new cv
malik muhammad.hussain new cvmalik muhammad.hussain new cv
malik muhammad.hussain new cv
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Ryan P. Quilala CV
Ryan P. Quilala CVRyan P. Quilala CV
Ryan P. Quilala CV
 
CV
CVCV
CV
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
ACH 231 Lecture 08 (Submittals And Shop Drawings) Part 1
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
Steel construction -_ce_marking
Steel construction -_ce_markingSteel construction -_ce_marking
Steel construction -_ce_marking
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 

Recently uploaded

如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
johnmarimigallon
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
MoffatNyamadzawo2
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 

Recently uploaded (20)

如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
 
Government Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdfGovernment Service OPSI Playbook FINAL.pdf
Government Service OPSI Playbook FINAL.pdf
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 

Building act 2006 presentation english version

  • 1.
  • 2. Agenda  Greetings  Introducing attendees  Irua  MPWU  Presentation – Building Act 2006 & Inspection Procedures  Discussions  Building Act  Inspections  Temporary buildings – two months?  AOB  End
  • 4. Outline  Building Act 2006  Building Approvals (Building Permit) – assessing designs  Background information on Building Construction Inspection  Inspection Procedure  Construction stages  Issues with current Inspection  Solution to address/solve issues  Advantage of proposed inspection procedures
  • 5. Building Act 2006  Building Code & Building Act 2006 have been approved in principle by cabinet and will be enforced by 1st January 2013.  Building include; I. A structure on or attached to land, lagoon bed or sea bed II. A structure attached to a building III. Part of a building whether the building is completed or not  Building Act does not include; I. A bridge II. A road III. Retaining wall associated with bridges, or roads IV. A road traffic sign V. Electricity network distribution equipment
  • 6. Building Act 2006  Assess design proposals to ensure they are structural sufficient, safe and stable for their intended use and do not pose a hazard to persons or property  Assess Construction work to ensure it directly complies with the approved design/construction drawings submitted in the application.  Violation of the building act  Imprisonment  A fine
  • 7. Building Act 2006  Building work must not proceed past a stage without written approval from Building Inspectors  Building not to be used until a certificate of occupancy has been issued. Occupying the building without occupancy certificate is an offense and will result in imprisonment for not more than 1 year and a fine not exceeding $10,000.00.
  • 8. Procedure for Building Approval/Permit Client MPWU Registry Assessment against Building Code Building Code compliance MPWU Director for final approval MPWU Registry Client Alternative design Assessment by concerned division
  • 10. Inspection Procedure  Construction Working Drawing  Details & specifications  Building Construction in the Business Environment  Profit  Control – building codes, act and standards  Inspections – compliance and quality assurance  Kiribati  Increase number of qualify local builders – KIT & Overseas graduates and MPWU Retirees  Delegation of construction projects to private sector –inline with KDP  Inspection to ensure quality output
  • 11. Current Inspection Procedure  Client ministry to MPWU  Client ministries request for inspection when the building project is almost completed  Inspectors carry out inspection and submit findings & recommendations to client ministries  BUILDING CERTIFICATE
  • 12. Critical construction stages  Foundation  compacted  Correct dimensions  Correct reinforcement bars  Sufficient reinforcement cover  Cement mixing ratio  Framing  Timber Frame  Fasteners  Studs, dwangs, batten & roof truss es and spacing  lintel  Blockwork  Plumb  Reinforcements  Lintel & bond beam  blockwork  Plumbing & Electrical (Services)  Electrical wiring done according to electrical plan  Plumbing comply with construction drawing  Finishing I. Decoration works such as lining, painting, etc
  • 13. Issues with current inspection procedure  Critical construction stages are not covered/inspected.  Client ministries are not aware of construction stages that must be inspected.  Conducting inspection at final stage is more of inspecting finishing/decoration work.
  • 14. Inspecting Critical Construction Stages  Foundation Checklist  DEMOLITION PLAN  Construction work is executed on site specified in the site plan submitted in the application for building permit  Site clearance; rubbish are well cleared off construction site  Dimensions/measurements for footing directly comply with construction drawing  Earth foundation is fully compacted (top soil removed to reach firm foundation. Some working drawing require foundation to be filled with hardcore, topped with sand blind and compacted)  Re-bars/reinforcement bars are of correct specification and laid at spacing directed in the working drawing  Stir ups are of correct specification and installed at spacing detailed in the official construction drawing  Starter bars are of correct specification and installed correctly according to requirements of the construction working drawing.  Sufficient reinforcement cover (minimum 50mm)  Underground pipes have been laid according to specifications of the construction drawing  Arorae inspetion photo to be installed
  • 15. Certificate of compliance for Foundation
  • 16. Framing  Blockwork wall  Fittings for electrical work have been installed  Blockworks were laid at good standard of workmanship  Reinforcements for bond beams and lintel have been installed according to specification of the construction drawing  Top ends of vertical reinforcements beside window and doors are to be left exposed  Timber frame  Bottom plates bolted to slab  Studs, dwangs, lintel, jack studs and top places installed correctly according to specifications of the construction drawing  Roof trusses must be made according to specification of the construction drawing and installed at spacing directed in the working drawing  Batterns/purlins of correct size, spacing and fixings  Bracing  Roofing of correct specification, lapping ,fixing & flashings  External Cladding must be installed as detailed in the working drawing  Internal lining must not be installed.
  • 18. Electrical  Wiring must be laid as detailed in the electrical plan  Other requirements of electrical codes/standard must be fulfilled  Requirement for circuit diagram must be fulfilled
  • 20. Practical Completion Certificate  Foundation, framing and electrical certificates  Building must be structural sound, completely water tight and in any respect complies with requirements/specifications of the construction working drawing  The certificate must be enclosed with a list of cosmetic defects.  Due date for attending cosmetic defects/defect liability period must be set and agreed by contractor, inspector, client and/or project administrator
  • 22. Advantage  Eliminate construction errors  Alleviate unnecessary construction costs  Building Certificate  Structural sound  Safe to use  Add value to the building