ABHINAV KUMAR SINHA
27300313001
Acknowledgement
I acknowledge my gratitude and thank to all the well
knowledge persons for giving me opportunity to avail all the
best facilities available at this telecom centre through which I
have gained knowledge thinking so as too just in the
environment suitable for harmonic adjustment. I am grateful
to the following persons for various help rendered by them
during the training period.
Mr. Visas Mishra (JTO)
finally, a deep thanks to
Mr. Rajaram Yadav
(General Manager)
Last but not the least; I thank my teacher, friends and my
family members for their constant encouragement.
PREFACE
B.TECH program is one of the most reputed professional
courses in the Industry. There is an Industrial Training
as an integral part of B.TECH. As a complementary to
that everyone has to submit a report on the work
conducted in the industry. This report is thus prepared
for the training done at Bharat Sanchar Nigam Limited
(B.S.N.L). The organization shall make all possible
efforts to have a secure and safe domain. The
data/information is very important and most critical to
the business requirements; therefore proper measures
should be adopted so that the information is well
secured and protected.
INTRODUCTION:
 Bharat Sanchar Nigam Limited (BSNL)is an Indian state
owned telecommunications company headquartered in
New Delhi. It is the largest provider of fixed telephony and
fourth largest mobile telephony provider in India, and is
also a provider of broadband services.
 Technological developments in the field
of telecommunication in India have been taking place at
much
faster as per the global trend. Particularly during last three
years.
 There has been a major transformation in the switching
technology.
SERVICES
 BSNL provides almost every telecom service in India. Following are the main telecom
services provided by BSNL:
 Universal Telecom Services : Fixed wireline services & Wireless in Local loop (WLL)
using CDMA Technology called bfone and Tarang respectively. As of December 31, 2007,
BSNL has 81% market share of fixed lines.
 Cellular Mobile Telephone Services: BSNL is major provider of Cellular Mobile Telephone
services using GSM platform under the brand name BSNL Mobile[2]. As of March 31,
2007 BSNL has 17%share of mobile telephony in the country.
 Internet: BSNL provides internet services through dial-up connection (Sancharnet) as
Prepaid, (NetOne) as Postpaid and ADSL broadband (BSNL Broadband). BSNL has
around 50% market share in broadband in India. BSNL has planned aggressive rollout in
broadband for current financial year.
 Intelligent Network (IN): BSNL provides IN services like televoting ,toll free calling,
premium calling etc.
UNIT FOR TRAINING:
JTO(Trans)
JTO(Leased Lines & MLL)
SDE(CM)
JTO(IT,BB &TAX)
TRANSMISSION
CALLER RECEIVER
D.P D.P
PILLER PILLER
MDF MDF
EXCHANGE TAX EXCHANGE
 TRANSMISSION UNITS
 Introduction
 The study of transmission units has a unique importance for communication
 engineer who has to maintain and install telecommunication equipments
 achieving the standards set up by international consultation committees.
 Transmission media are classified as one of the following:
 1. Guided (or bounded)—waves are guided along a solid medium such as a
 transmission line.
 2. Wireless (or unguided)—transmission and reception are achieved by
 means of an antenna.
LEASED LINE
 An Internet leased line is a premium internet
connectivity product, delivered over fiber normally,
which is dedicated and provides uncontended,
symmetrical speeds, full-duplex. It is also known as an
ethernet leased line
BROADBAND
A trend of changes in telecommunication
technology is very fast. The need of hour
is large bandwidth and its optimum
utilization at reasonable cost. Any data
access rate more than 2Mbps is
considered as broadband access . As per
the recent broadband policy of govt. of
India, access rate over 256kbps will come
under category of broadband access.
TAX
(TRUNK AUTO EXCHANGE)
This section deals when a caller picks up the receiver,
gets the dial tone and how the call is made and
processed.
BIBILOGRAPHY
 ATMEGA 328 Data Sheets.
• www.wikipedia.org
• Training faculty
Bsnl (1)

Bsnl (1)

  • 1.
  • 2.
    Acknowledgement I acknowledge mygratitude and thank to all the well knowledge persons for giving me opportunity to avail all the best facilities available at this telecom centre through which I have gained knowledge thinking so as too just in the environment suitable for harmonic adjustment. I am grateful to the following persons for various help rendered by them during the training period. Mr. Visas Mishra (JTO) finally, a deep thanks to Mr. Rajaram Yadav (General Manager) Last but not the least; I thank my teacher, friends and my family members for their constant encouragement.
  • 3.
    PREFACE B.TECH program isone of the most reputed professional courses in the Industry. There is an Industrial Training as an integral part of B.TECH. As a complementary to that everyone has to submit a report on the work conducted in the industry. This report is thus prepared for the training done at Bharat Sanchar Nigam Limited (B.S.N.L). The organization shall make all possible efforts to have a secure and safe domain. The data/information is very important and most critical to the business requirements; therefore proper measures should be adopted so that the information is well secured and protected.
  • 4.
    INTRODUCTION:  Bharat SancharNigam Limited (BSNL)is an Indian state owned telecommunications company headquartered in New Delhi. It is the largest provider of fixed telephony and fourth largest mobile telephony provider in India, and is also a provider of broadband services.  Technological developments in the field of telecommunication in India have been taking place at much faster as per the global trend. Particularly during last three years.  There has been a major transformation in the switching technology.
  • 5.
    SERVICES  BSNL providesalmost every telecom service in India. Following are the main telecom services provided by BSNL:  Universal Telecom Services : Fixed wireline services & Wireless in Local loop (WLL) using CDMA Technology called bfone and Tarang respectively. As of December 31, 2007, BSNL has 81% market share of fixed lines.  Cellular Mobile Telephone Services: BSNL is major provider of Cellular Mobile Telephone services using GSM platform under the brand name BSNL Mobile[2]. As of March 31, 2007 BSNL has 17%share of mobile telephony in the country.  Internet: BSNL provides internet services through dial-up connection (Sancharnet) as Prepaid, (NetOne) as Postpaid and ADSL broadband (BSNL Broadband). BSNL has around 50% market share in broadband in India. BSNL has planned aggressive rollout in broadband for current financial year.  Intelligent Network (IN): BSNL provides IN services like televoting ,toll free calling, premium calling etc.
  • 6.
    UNIT FOR TRAINING: JTO(Trans) JTO(LeasedLines & MLL) SDE(CM) JTO(IT,BB &TAX)
  • 7.
    TRANSMISSION CALLER RECEIVER D.P D.P PILLERPILLER MDF MDF EXCHANGE TAX EXCHANGE
  • 8.
     TRANSMISSION UNITS Introduction  The study of transmission units has a unique importance for communication  engineer who has to maintain and install telecommunication equipments  achieving the standards set up by international consultation committees.  Transmission media are classified as one of the following:  1. Guided (or bounded)—waves are guided along a solid medium such as a  transmission line.  2. Wireless (or unguided)—transmission and reception are achieved by  means of an antenna.
  • 9.
    LEASED LINE  AnInternet leased line is a premium internet connectivity product, delivered over fiber normally, which is dedicated and provides uncontended, symmetrical speeds, full-duplex. It is also known as an ethernet leased line
  • 10.
    BROADBAND A trend ofchanges in telecommunication technology is very fast. The need of hour is large bandwidth and its optimum utilization at reasonable cost. Any data access rate more than 2Mbps is considered as broadband access . As per the recent broadband policy of govt. of India, access rate over 256kbps will come under category of broadband access.
  • 11.
    TAX (TRUNK AUTO EXCHANGE) Thissection deals when a caller picks up the receiver, gets the dial tone and how the call is made and processed.
  • 12.
    BIBILOGRAPHY  ATMEGA 328Data Sheets. • www.wikipedia.org • Training faculty