The document provides a slide show of construction progress photos from November 1-30, 2013 during the renovation of the first floor of TechTown in Detroit. The photos depict the construction and installation of various areas of the space including the reception desk, meeting rooms, co-working kitchen, cubicles, conference rooms, seating areas, and lobby furniture. The renovation was led by CentricdesignStudio and TechTown planned to have a grand opening for the completed space in January 2014 under the name Junction440.
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
TechTown Construction Slideshow Nov 2013
1. Slide Show of Construction Progress at TechTown - Detroit
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
2. Reception Desk Construction Progress
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
3. Sliding Door Installation at 2 Person Meeting Room
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
4. View Looking at Reception Desk and Co-Working Area
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
5. View Outside of Future TechTown Suite + Video Conf. Rm.
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
6. Future Lobby Waiting Area
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
7. Interior View of Future TechTown Management Suite
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
8. Interior View of Future TechTown Management Suite
TechTown 1st Floor Renovation
Nov. 1 - Nov. 30 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com