CONSTRUCTION DOCUMENTS
STUDENT: KAITLIN MERGLER
INSTRUCTOR: BHAKTI SHARMA
IDE 204 MATERIALS AND COLOR
FALL 2012
THE LAFAYETTE HOTEL
391 WASHINGTON STREET, BUFFALO, NEW YORK, 14203
GENERAL NOTES:
1. WE CERTIFY TO THE BEST OF OUR KNOWLEDGE, INFORMATION AND BELIEF THAT THE DESIGN OF THIS PROJECT COM-
PLIES WITH THE APPLICABLE PROVISIONS OF THE REQUIREMENTS.
2 ALL EXITS ARE TO BE OPERATED FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS FOR SIZE, LOCATION, AND
COMPATIBILITY WITH PROPOSED NEW CONSTRUCTION. IN CASE OF DISCREPANCY, THE ARCHITECT SHOULD BE NOTI-
FIED IMMEDIATELY.
4. UPON COMPLETION OF THE PROJECT, THE REGISTERED ARCHITECT/ ENGINEER SHALL CERTIFY IN WRITING THAT TO
THE BEST OF HIS KNOWLEDGE, THE BUILDING OR STRUCTURE HAS BEEN COMPLETED IN ACCORDANCE WITH THE
DESIGN AND APPLICABLE CODES, OR HE WILL SIGN AN AIA CERTIFICATE OF SUBSTANTIAL COMPLETION, FORM G-704.
5. THE CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES AS ESTABLISHED BY THE ERIE
COUNTY.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES AND METHODS OF CONSTRUCTION AS REQUIRED FOR
COMPLETION OF THIS PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS.
7. EACH SUB CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS AT THE SITE AND BE RESPONSIBLE FOR PROTECT-
ING AND/OR REMOVING AND REPLACING EXISTING SITE IMPROVEMENTS AS REQUIRED TO PERFORM THE INTENDED
WORK.
8. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF ALL UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR
SHALL CAP ALL ABANDONED UTILITIES AND SHALL REPLACE ALL ACTIVE UTILITIES THAT ARE DAMAGED.
9. ALL REMOVED MATERIALS AND ALL CONSTRUCTION DEBRIS SHALL BE LEGALLY DISPOSED OF BY THE CONTRACTOR.
KEEP AREA BRROM CLEAN.
10. AREAS AND ITEMS TO REMAIN THAT ARE DISTURBED/DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO
MATCH ADAJACENT MATERIALS WHETHER OR NOT SPECIFICALLY INDICATED ON THE DOCUMENTS.
11. DIMENSIONS SHOWN ON THE DRAWINGS ARE TAKEN FROM THE PROPERTY LINE, THE FACE OF STREET CURBS, THE
CENTERLINE OF COLUMNS, AND THE FACE OF CONCRETE, MASONRY, OR STUDS UNLESS OTHERWISE NOTED ON THE
DRAWINGS.
CODE STUDY
-CLASSIFICATION ASSEMBLY
- OCCUPANCY A2
TOTAL GROSS AREA 3,357 SF
ALLOWABLE AREA PER OCCUPANT 11 GROSS
MAX TRAVEL DISTANCE 200’
MAX TRAVEL DISTANCE PROVIDED 168’
MIN. DOOR WIDTH 42”
MIN. DOOR WIDTH PROVIDED 60”
NO. OF LAVATORIES REQUIRED 2
NO. OF LAVATORIES PROVIDED 4
NO. OF WC’REQUIRED 4
NO. OF WC’PROVIDED 6
TABLE OF CONTENTS:
TITLE SHEET TI.0
CODE STUDY ID1.0
GROUND FLOOR PLAN ID2.0
TAP ROOM DEMOLITION PLAN ID2.1
TAP ROOM FLOOR PLAN ID2.2
TAP ROOM REFLECTED CEILING PLAN ID2.3
SECTIONS ID4.0
WALL TYPES ID5.0
DOOR SCHEDULE ID6.0
INTERIOR ELEVATIONS ID7.0
TAP ROOM FLOOR PLAN
NOT TO SCALE
N
154
154
42
42
84
84
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TITLE SHEET
SHEET: T1.0
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
GROUND
FLOOR PLAN
SHEET: ID2.0
GENERAL NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR SECTIONING OFF TAP ROOM FROM REST OF
BUILDING DURING AND BEFORE CONSTRUCTION.
2. FOR DEMOLITION PLAN OF SCOPE OF WORK SEE SHEET ID2.1.
1 2 3
16’-10” 21’-6” 17’-7”
4 5 6
13’-0” 19’-10” 17’-8”
7 8
12’-10” 29’-4”
9 10
18’-11” 20’-4”
11 12 13 14 15
16’-0” 19’-2” 22’-8” 18’-6”
A
24’-11”
B
C
D
18’-0”15’-4”
E
F
G
15’-0”15’-3”15’-3”22’-11”20’-0”
H
I
GROUND FLOOR PLAN
SCALE = 1/16”=1’-0”
N
CRYSTAL DINING
ROOM KITCHEN
AUTO CLUB
(ANNEX)
BALLROOM
FOYER
PEACOCK ALLEY
COAT
CHECK
CRYSTAL
DINING ROOM
DUTCH
GRILL
MAIN LOBBY
LOUNGE
FLORIST
TUX
SHOP
MAIN LOBBY
COFFEE SHOP
LAFAYETTE TAP ROOM
1
KEY NOTES:
1. LAFAYETTE TAP ROOM IN SCOPE OF WORK, SEE SHEET
ID2.2 FOR DETAILS.
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
DEMOLITION PLAN
SHEET: ID2.1
KEY NOTES:
1. WALLS AND DOORS TO BE DEMOLISHED.
2. WALLS TO BE BUILT TO CLOSE-OUT GAP FOR DEMOLISHED DOOR.
3. WALLS TO BE DEMOLISHED TO ACCOMMODATE FOR NEW DOUBLE DOOR. REFER SHEETS.
4. NEW DOUBLE DOOR ADDED. REFER SHEETS.
5. SALAVAGE ALL DOORS, WINDOWS AND HARDWARE.
8 9 10 11 12 13 14 15
A
B
1
1
1
5
4 5
2
2
543
4
1
1
1
51
2
29’-4” 18’-11” 20’-4” 16’-0” 19’-2” 22’-8” 18’-6”
24’-11”
TAP ROOM DEMOLITION PLAN
SCALE = 1/8”=1’-0”
N
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
FLOOR PLAN
SHEET: ID2.2
KEY NOTES:
1. 1’-6”CHASE WALL, SEE PLUMBING DRAWINGS FOR DETAIL.
2. FOR WALL TYPES, SEE SHEET ID5.0
3. TILE FLOORING, FOR DETAILS SEE FFE PACKET.
4. TERAZZO FLOORING, FOR DETAILS SEE FFE PACKET
1
3
4 2
GENERAL NOTES:
1. FURNITURE FOR REFERENCE ONLY
2. FOR RESTROOM DETAILS, SEE SHEET 7.0 AND MILLWORK DRAWINGS.
TAP ROOM FLOOR PLAN
SCALE = 1/8”=1’-0”
N
TAP ROOM REFLECTED CEILING PLAN
SCALE = 1/8”= 1’-0”
N
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
REFLECTED CEILING
PLAN
SHEET: ID2.3
GENERAL NOTES:
1. ALL DIMENSIONS ARE CENTER-LIN UNLESS OTHERWISE SPECIFIED.
2. LOCATIONS OF ALL CEILING ACCESS PANELS TO BE APROVED BY DESIGNER PRIOR TO ROUGH-IN.
3. SEE FIXTURE LEGEND FOR PENDANT MOUNTING HEIGHT.
4. CEILING GRIDS ARE CENTERED IN UNLESS OTHERWISE SPECIFIED.
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
SECTIONS
SHEET: ID4.0
14’-0”14’-0”
17’-0”
2’-0”3’-6”9’-0”5’-6”
1’-0”
2’-0”
1’-0”
2’-0”
1
FOR DETAILS SEE
SHEET ID70.
SECTION 1
SCALE = 1/8”=1’-0”
SECTION 2
SCALE = 1/8”=1’-0”
SECTION 3
SCALE = 1/8”=1’-0”
2
KEY NOTES:
1. PORCELAIN TILE, 3’X 2’TILES. FOR MORE DETAIL
REFER TO FFE.
2. NEW GWB ADDED
3. FURNITURE: FOR DETAILS SEE FFE.
GENERAL NOTES:
1. FOR FINISHES REFER TO FFE PACKET.
3
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
WALL
DETAILS
SHEET: ID5.0
TYPE 1 - DRYWALL TYPE 2 - DRYWALL W/ PLASTER TYPE 3- MASONRY WALL W/ DRYWALL
HEAD DETAIL
SCALE = 1/2”=1”
HEAD DETAIL
SCALE = 1/2”=1”
HEAD DETAIL
SCALE = 1/2”=1”
PLAN DETAIL
SCALE = 1/2”=1”
PLAN DETAIL
SCALE = 1/2”=1”
PLAN DETAIL
SCALE = 1/2”=1”
BASE DETAIL
SCALE = 1/2”=1”
BASE DETAIL
SCALE = 1/2”=1”
BASE DETAIL
SCALE = 1/2”=1”
3 5/8”
5/8”
3 5/8”
5/8”
3 5/8”
5/8”
3 5/8”
5/8”
3 5/8”
5/8”
3 5/8”
5/8”
8”
7/8”
8”
8”
16”
7/8”
8”
7/8”
8”
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
DOOR
SCHEDULE
SHEET: ID6.0
DOOR PLAN
SCALE = 1/4”=1’-0”
DOOR ELEVATION
SCALE = 1/4”=1’-0”
DOOR PLAN
SCALE = 1/4”=1’-0”
DOOR ELEVATION
SCALE = 1/4”=1’-0”
D1
D1
D2
D2
TAP ROOM FLOOR PLAN
NOT TO SCALE
FOR REFERENCE ONLY
N
DOOR
NUMBER
DOOR
TYPE
1
2
D1
D2
DOOR FRAME
HEIGHT WIDTH MATERIAL THICKN’S
9’-0”
9’-0”
2 X 3’-0”
2 X 3’-0”
W’D /
GLASS
W’D
1 3/4”
1 3/4”
FINISH MATERIAL
SS
SS
W’D
W’D
HARDWARE
LOCKSET/
CLOSER
LOCKSET/
CLOSER
DOOR SCHEDULE
INSIDE
OUTSIDE
6’-0” 6’-0”
1’-0”
1’-0”
INSIDE
OUTSIDE
9’-0”
8’-6”
6’-0”
9’-0”
8’-6”
8’-0”
D1
D1
D2
BATHROOM FLOOR PLAN
SCALE = 1/4”=1’-0”
N
ELEVATION G
SCALE =1/4”=1’-0”
ELEVATION F
SCALE = 1/4”=1’-0”
ELEVATION E
SCALE = 1/4”=1’-0”
ELEVATION H
SCALE = 1/4”=1’-0”
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
ELEVATIONS
SHEET: ID7.0
MENS RESTROOM
WALL TREATMENT STALL ACCESSORIES
NORTH
SOUTH
EAST
WEST
P.T-1
P.T-1
P.T-1
P.T-1
C.V-1
C.V-1
C.V-1
C.V-1
G.W.B-1
G.W.B-1
G.W.B-1
G.W.B-1
S.T-1
S.T-1
M-1
D-1
L-1
P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM
DALETILE
C.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM
DALETILE
G.W.B-1 = PAINTED GYPBOARD
G.W.B-2 = GYPBOARD
S.T-1 = BATHROOM STALL
M-1 = MIRROR: KOHLER 24”BATHROOM MIRROR
D-1 = DOOR
L-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT,
RUBBED BRONZE
1. MIRROR: KOHLER 24”BATHROOM MIRROR
2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM
DALETILE
3. PAINTED GYPBOARD
4. GRANITE COUNTERTOP
5. TOILET PARTITION
6. COVE BASE: 6”X12”ASIAN BLACK MUSKOGEE PORCELAIN TILE
FROM DALETILE
KEY NOTESKEY LEGEND
BATHROOM FLOOR PLAN
SCALE = 1/4”=1’-0” N
ELEVATION A
SCALE =1/4”=1’-0”
ELEVATION B
SCALE = 1/4”=1’-0”
ELEVATION C
SCALE = 1/4”=1’-0”
ELEVATION D
SCALE = 1/4”=1’-0”
MERGLER
HOTEL
LAFAYETTE
DESIGNER:
KAITLIN MERGLER
INSTRUCTOR:
BHAKTI SHARMA
IDE 204
MATERIALS AND
COLOR
FALL 2012
TAP ROOM
ELEVATIONS
SHEET: ID7.0
WOMENS RESTROOM
WALL TREATMENT STALL ACCESSORIES
NORTH
SOUTH
EAST
WEST
P.T-1
P.T-1
P.T-1
P.T-1
C.V-1
C.V-1
C.V-1
C.V-1
G.W.B-1
G.W.B-1
G.W.B-1
G.W.B-1
S.T-1
S.T-1
M-1
D-1
L-1
KEY LEGEND KEY NOTES
P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM
DALETILE
C.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM
DALETILE
G.W.B-1 = PAINTED GYPBOARD
G.W.B-2 = GYPBOARD
S.T-1 = BATHROOM STALL
M-1 = MIRROR: KOHLER 24”BATHROOM MIRROR
D-1 = DOOR
L-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT,
RUBBED BRONZE
1. MIRROR: KOHLER 24”BATHROOM MIRROR
2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM
DALETILE
3. PAINTED GYPBOARD
4. GRANITE COUNTERTOP
5. TOILET PARTITION
6. COVE BASE: 6”X12”ASIAN BLACK MUSKOGEE PORCELAIN TILE
FROM DALETILE

More Related Content

What's hot

Unitech Crestview Brochure
Unitech Crestview Brochure Unitech Crestview Brochure
Unitech Crestview Brochure
Rohit Yadav
 
ATS Dolce - noida estate
ATS Dolce - noida estateATS Dolce - noida estate
ATS Dolce - noida estate
2Dhruv1
 
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1 Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
Zayed Home
 
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner BuildingCourtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
Zayed Home
 
Trion Towers Semi Furnish Unit
Trion Towers Semi Furnish UnitTrion Towers Semi Furnish Unit
Trion Towers Semi Furnish Unit
Robinsons Land Corporation
 
Ceiling in elevation
Ceiling in elevationCeiling in elevation
Ceiling in elevation
Rashmi Agrawal
 
Reach - Brickell City Centre Floorplans
Reach - Brickell City Centre FloorplansReach - Brickell City Centre Floorplans
Reach - Brickell City Centre Floorplans
Miami Luxury Homes
 
Jacobs I
Jacobs IJacobs I
Jacobs I
ShayneBock
 
Midblock floor plans
Midblock floor plansMidblock floor plans
Midblock floor plans
Lucas Lechuga
 
The Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global CityThe Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global City
Robinsons Land Corporation
 
SIMFONI WEST 2018
SIMFONI WEST 2018SIMFONI WEST 2018
SIMFONI WEST 2018
AMizan Ahmad
 
The Trion Tower
The Trion TowerThe Trion Tower
The Trion Tower
Eric De Leon
 
The Terraces Building 3
The Terraces Building 3The Terraces Building 3
The Terraces Building 3
Zayed Home
 
THE BREEZE LAKEHOME
THE BREEZE LAKEHOME THE BREEZE LAKEHOME
THE BREEZE LAKEHOME
AMizan Ahmad
 

What's hot (14)

Unitech Crestview Brochure
Unitech Crestview Brochure Unitech Crestview Brochure
Unitech Crestview Brochure
 
ATS Dolce - noida estate
ATS Dolce - noida estateATS Dolce - noida estate
ATS Dolce - noida estate
 
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1 Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
Courtyards Phase I , Westown Sodic , Sheikh Zayed City - Building 1
 
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner BuildingCourtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
Courtyards Phase I , Westown Sodic , Sheikh Zayed City ,Corner Building
 
Trion Towers Semi Furnish Unit
Trion Towers Semi Furnish UnitTrion Towers Semi Furnish Unit
Trion Towers Semi Furnish Unit
 
Ceiling in elevation
Ceiling in elevationCeiling in elevation
Ceiling in elevation
 
Reach - Brickell City Centre Floorplans
Reach - Brickell City Centre FloorplansReach - Brickell City Centre Floorplans
Reach - Brickell City Centre Floorplans
 
Jacobs I
Jacobs IJacobs I
Jacobs I
 
Midblock floor plans
Midblock floor plansMidblock floor plans
Midblock floor plans
 
The Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global CityThe Trion Tower at Bonifacio Global City
The Trion Tower at Bonifacio Global City
 
SIMFONI WEST 2018
SIMFONI WEST 2018SIMFONI WEST 2018
SIMFONI WEST 2018
 
The Trion Tower
The Trion TowerThe Trion Tower
The Trion Tower
 
The Terraces Building 3
The Terraces Building 3The Terraces Building 3
The Terraces Building 3
 
THE BREEZE LAKEHOME
THE BREEZE LAKEHOME THE BREEZE LAKEHOME
THE BREEZE LAKEHOME
 

Viewers also liked

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
Udisha15
 
Gyproc
GyprocGyproc
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
gopichand's
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
AMSYSCO Inc.
 
Partitions
PartitionsPartitions
Partitions
Dipesh Patel
 
Partition walls
Partition wallsPartition walls
Partition walls
Harpreet Oberoi
 
Partition wall
Partition wallPartition wall
Partition wall
Kris Kiran
 

Viewers also liked (7)

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Gyproc
GyprocGyproc
Gyproc
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
 
Partitions
PartitionsPartitions
Partitions
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Partition wall
Partition wallPartition wall
Partition wall
 

Similar to Final Construction Documents

DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
RoshelleStahl1
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
Martin Pauly
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
Min Khant Kyaw
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
ETHAN BRUNSON
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
David Renn
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
Sean Roper
 
22
2222
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
ashleyyeap
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
Altamash Khan
 
Plan addendum sheets
Plan addendum  sheetsPlan addendum  sheets
Plan addendum sheets
city of dania beach
 
Plan addendum sheets
Plan addendum sheetsPlan addendum sheets
Plan addendum sheets
city of dania beach
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
Brooke Leigh
 
General structural notes
General structural notesGeneral structural notes
General structural notes
Tony Gravagne, PE
 
INTERNSHIP-PORTFOLIO (shashank)
INTERNSHIP-PORTFOLIO (shashank)INTERNSHIP-PORTFOLIO (shashank)
INTERNSHIP-PORTFOLIO (shashank)
Shashank Patil
 
THE CENTRAL REGENCY
 THE CENTRAL REGENCY THE CENTRAL REGENCY
THE CENTRAL REGENCY
Residential Services
 
THE CENTRAL REGENCY
 THE CENTRAL REGENCY THE CENTRAL REGENCY
THE CENTRAL REGENCY
Residential Services
 
THE CENTRAL REGENCY
THE CENTRAL REGENCYTHE CENTRAL REGENCY
THE CENTRAL REGENCY
Residential Services
 
THE CENTRAL REGENCY BANGALORE
THE CENTRAL REGENCY BANGALORETHE CENTRAL REGENCY BANGALORE
THE CENTRAL REGENCY BANGALORE
Residential Services
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
shensin1015
 
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703CAnthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
Anthony Linka
 

Similar to Final Construction Documents (20)

DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
 
Renn CAD samples 2020
Renn CAD samples 2020Renn CAD samples 2020
Renn CAD samples 2020
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
 
22
2222
22
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
Plan addendum sheets
Plan addendum  sheetsPlan addendum  sheets
Plan addendum sheets
 
Plan addendum sheets
Plan addendum sheetsPlan addendum sheets
Plan addendum sheets
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
 
General structural notes
General structural notesGeneral structural notes
General structural notes
 
INTERNSHIP-PORTFOLIO (shashank)
INTERNSHIP-PORTFOLIO (shashank)INTERNSHIP-PORTFOLIO (shashank)
INTERNSHIP-PORTFOLIO (shashank)
 
THE CENTRAL REGENCY
 THE CENTRAL REGENCY THE CENTRAL REGENCY
THE CENTRAL REGENCY
 
THE CENTRAL REGENCY
 THE CENTRAL REGENCY THE CENTRAL REGENCY
THE CENTRAL REGENCY
 
THE CENTRAL REGENCY
THE CENTRAL REGENCYTHE CENTRAL REGENCY
THE CENTRAL REGENCY
 
THE CENTRAL REGENCY BANGALORE
THE CENTRAL REGENCY BANGALORETHE CENTRAL REGENCY BANGALORE
THE CENTRAL REGENCY BANGALORE
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703CAnthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
Anthony Linka Cherry Creek Feasibility Study Assignment BCN4703C
 

Final Construction Documents

  • 1. CONSTRUCTION DOCUMENTS STUDENT: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 THE LAFAYETTE HOTEL 391 WASHINGTON STREET, BUFFALO, NEW YORK, 14203
  • 2. GENERAL NOTES: 1. WE CERTIFY TO THE BEST OF OUR KNOWLEDGE, INFORMATION AND BELIEF THAT THE DESIGN OF THIS PROJECT COM- PLIES WITH THE APPLICABLE PROVISIONS OF THE REQUIREMENTS. 2 ALL EXITS ARE TO BE OPERATED FROM THE INSIDE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE. 3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS FOR SIZE, LOCATION, AND COMPATIBILITY WITH PROPOSED NEW CONSTRUCTION. IN CASE OF DISCREPANCY, THE ARCHITECT SHOULD BE NOTI- FIED IMMEDIATELY. 4. UPON COMPLETION OF THE PROJECT, THE REGISTERED ARCHITECT/ ENGINEER SHALL CERTIFY IN WRITING THAT TO THE BEST OF HIS KNOWLEDGE, THE BUILDING OR STRUCTURE HAS BEEN COMPLETED IN ACCORDANCE WITH THE DESIGN AND APPLICABLE CODES, OR HE WILL SIGN AN AIA CERTIFICATE OF SUBSTANTIAL COMPLETION, FORM G-704. 5. THE CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES AS ESTABLISHED BY THE ERIE COUNTY. 6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES AND METHODS OF CONSTRUCTION AS REQUIRED FOR COMPLETION OF THIS PROJECT IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. 7. EACH SUB CONTRACTOR IS TO VERIFY ALL EXISTING CONDITIONS AT THE SITE AND BE RESPONSIBLE FOR PROTECT- ING AND/OR REMOVING AND REPLACING EXISTING SITE IMPROVEMENTS AS REQUIRED TO PERFORM THE INTENDED WORK. 8. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF ALL UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR SHALL CAP ALL ABANDONED UTILITIES AND SHALL REPLACE ALL ACTIVE UTILITIES THAT ARE DAMAGED. 9. ALL REMOVED MATERIALS AND ALL CONSTRUCTION DEBRIS SHALL BE LEGALLY DISPOSED OF BY THE CONTRACTOR. KEEP AREA BRROM CLEAN. 10. AREAS AND ITEMS TO REMAIN THAT ARE DISTURBED/DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO MATCH ADAJACENT MATERIALS WHETHER OR NOT SPECIFICALLY INDICATED ON THE DOCUMENTS. 11. DIMENSIONS SHOWN ON THE DRAWINGS ARE TAKEN FROM THE PROPERTY LINE, THE FACE OF STREET CURBS, THE CENTERLINE OF COLUMNS, AND THE FACE OF CONCRETE, MASONRY, OR STUDS UNLESS OTHERWISE NOTED ON THE DRAWINGS. CODE STUDY -CLASSIFICATION ASSEMBLY - OCCUPANCY A2 TOTAL GROSS AREA 3,357 SF ALLOWABLE AREA PER OCCUPANT 11 GROSS MAX TRAVEL DISTANCE 200’ MAX TRAVEL DISTANCE PROVIDED 168’ MIN. DOOR WIDTH 42” MIN. DOOR WIDTH PROVIDED 60” NO. OF LAVATORIES REQUIRED 2 NO. OF LAVATORIES PROVIDED 4 NO. OF WC’REQUIRED 4 NO. OF WC’PROVIDED 6 TABLE OF CONTENTS: TITLE SHEET TI.0 CODE STUDY ID1.0 GROUND FLOOR PLAN ID2.0 TAP ROOM DEMOLITION PLAN ID2.1 TAP ROOM FLOOR PLAN ID2.2 TAP ROOM REFLECTED CEILING PLAN ID2.3 SECTIONS ID4.0 WALL TYPES ID5.0 DOOR SCHEDULE ID6.0 INTERIOR ELEVATIONS ID7.0 TAP ROOM FLOOR PLAN NOT TO SCALE N 154 154 42 42 84 84 MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TITLE SHEET SHEET: T1.0
  • 3. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 GROUND FLOOR PLAN SHEET: ID2.0 GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR SECTIONING OFF TAP ROOM FROM REST OF BUILDING DURING AND BEFORE CONSTRUCTION. 2. FOR DEMOLITION PLAN OF SCOPE OF WORK SEE SHEET ID2.1. 1 2 3 16’-10” 21’-6” 17’-7” 4 5 6 13’-0” 19’-10” 17’-8” 7 8 12’-10” 29’-4” 9 10 18’-11” 20’-4” 11 12 13 14 15 16’-0” 19’-2” 22’-8” 18’-6” A 24’-11” B C D 18’-0”15’-4” E F G 15’-0”15’-3”15’-3”22’-11”20’-0” H I GROUND FLOOR PLAN SCALE = 1/16”=1’-0” N CRYSTAL DINING ROOM KITCHEN AUTO CLUB (ANNEX) BALLROOM FOYER PEACOCK ALLEY COAT CHECK CRYSTAL DINING ROOM DUTCH GRILL MAIN LOBBY LOUNGE FLORIST TUX SHOP MAIN LOBBY COFFEE SHOP LAFAYETTE TAP ROOM 1 KEY NOTES: 1. LAFAYETTE TAP ROOM IN SCOPE OF WORK, SEE SHEET ID2.2 FOR DETAILS.
  • 4. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM DEMOLITION PLAN SHEET: ID2.1 KEY NOTES: 1. WALLS AND DOORS TO BE DEMOLISHED. 2. WALLS TO BE BUILT TO CLOSE-OUT GAP FOR DEMOLISHED DOOR. 3. WALLS TO BE DEMOLISHED TO ACCOMMODATE FOR NEW DOUBLE DOOR. REFER SHEETS. 4. NEW DOUBLE DOOR ADDED. REFER SHEETS. 5. SALAVAGE ALL DOORS, WINDOWS AND HARDWARE. 8 9 10 11 12 13 14 15 A B 1 1 1 5 4 5 2 2 543 4 1 1 1 51 2 29’-4” 18’-11” 20’-4” 16’-0” 19’-2” 22’-8” 18’-6” 24’-11” TAP ROOM DEMOLITION PLAN SCALE = 1/8”=1’-0” N
  • 5. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM FLOOR PLAN SHEET: ID2.2 KEY NOTES: 1. 1’-6”CHASE WALL, SEE PLUMBING DRAWINGS FOR DETAIL. 2. FOR WALL TYPES, SEE SHEET ID5.0 3. TILE FLOORING, FOR DETAILS SEE FFE PACKET. 4. TERAZZO FLOORING, FOR DETAILS SEE FFE PACKET 1 3 4 2 GENERAL NOTES: 1. FURNITURE FOR REFERENCE ONLY 2. FOR RESTROOM DETAILS, SEE SHEET 7.0 AND MILLWORK DRAWINGS. TAP ROOM FLOOR PLAN SCALE = 1/8”=1’-0” N
  • 6. TAP ROOM REFLECTED CEILING PLAN SCALE = 1/8”= 1’-0” N MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM REFLECTED CEILING PLAN SHEET: ID2.3 GENERAL NOTES: 1. ALL DIMENSIONS ARE CENTER-LIN UNLESS OTHERWISE SPECIFIED. 2. LOCATIONS OF ALL CEILING ACCESS PANELS TO BE APROVED BY DESIGNER PRIOR TO ROUGH-IN. 3. SEE FIXTURE LEGEND FOR PENDANT MOUNTING HEIGHT. 4. CEILING GRIDS ARE CENTERED IN UNLESS OTHERWISE SPECIFIED.
  • 7. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM SECTIONS SHEET: ID4.0 14’-0”14’-0” 17’-0” 2’-0”3’-6”9’-0”5’-6” 1’-0” 2’-0” 1’-0” 2’-0” 1 FOR DETAILS SEE SHEET ID70. SECTION 1 SCALE = 1/8”=1’-0” SECTION 2 SCALE = 1/8”=1’-0” SECTION 3 SCALE = 1/8”=1’-0” 2 KEY NOTES: 1. PORCELAIN TILE, 3’X 2’TILES. FOR MORE DETAIL REFER TO FFE. 2. NEW GWB ADDED 3. FURNITURE: FOR DETAILS SEE FFE. GENERAL NOTES: 1. FOR FINISHES REFER TO FFE PACKET. 3
  • 8. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 WALL DETAILS SHEET: ID5.0 TYPE 1 - DRYWALL TYPE 2 - DRYWALL W/ PLASTER TYPE 3- MASONRY WALL W/ DRYWALL HEAD DETAIL SCALE = 1/2”=1” HEAD DETAIL SCALE = 1/2”=1” HEAD DETAIL SCALE = 1/2”=1” PLAN DETAIL SCALE = 1/2”=1” PLAN DETAIL SCALE = 1/2”=1” PLAN DETAIL SCALE = 1/2”=1” BASE DETAIL SCALE = 1/2”=1” BASE DETAIL SCALE = 1/2”=1” BASE DETAIL SCALE = 1/2”=1” 3 5/8” 5/8” 3 5/8” 5/8” 3 5/8” 5/8” 3 5/8” 5/8” 3 5/8” 5/8” 3 5/8” 5/8” 8” 7/8” 8” 8” 16” 7/8” 8” 7/8” 8”
  • 9. MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 DOOR SCHEDULE SHEET: ID6.0 DOOR PLAN SCALE = 1/4”=1’-0” DOOR ELEVATION SCALE = 1/4”=1’-0” DOOR PLAN SCALE = 1/4”=1’-0” DOOR ELEVATION SCALE = 1/4”=1’-0” D1 D1 D2 D2 TAP ROOM FLOOR PLAN NOT TO SCALE FOR REFERENCE ONLY N DOOR NUMBER DOOR TYPE 1 2 D1 D2 DOOR FRAME HEIGHT WIDTH MATERIAL THICKN’S 9’-0” 9’-0” 2 X 3’-0” 2 X 3’-0” W’D / GLASS W’D 1 3/4” 1 3/4” FINISH MATERIAL SS SS W’D W’D HARDWARE LOCKSET/ CLOSER LOCKSET/ CLOSER DOOR SCHEDULE INSIDE OUTSIDE 6’-0” 6’-0” 1’-0” 1’-0” INSIDE OUTSIDE 9’-0” 8’-6” 6’-0” 9’-0” 8’-6” 8’-0” D1 D1 D2
  • 10. BATHROOM FLOOR PLAN SCALE = 1/4”=1’-0” N ELEVATION G SCALE =1/4”=1’-0” ELEVATION F SCALE = 1/4”=1’-0” ELEVATION E SCALE = 1/4”=1’-0” ELEVATION H SCALE = 1/4”=1’-0” MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM ELEVATIONS SHEET: ID7.0 MENS RESTROOM WALL TREATMENT STALL ACCESSORIES NORTH SOUTH EAST WEST P.T-1 P.T-1 P.T-1 P.T-1 C.V-1 C.V-1 C.V-1 C.V-1 G.W.B-1 G.W.B-1 G.W.B-1 G.W.B-1 S.T-1 S.T-1 M-1 D-1 L-1 P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM DALETILE C.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM DALETILE G.W.B-1 = PAINTED GYPBOARD G.W.B-2 = GYPBOARD S.T-1 = BATHROOM STALL M-1 = MIRROR: KOHLER 24”BATHROOM MIRROR D-1 = DOOR L-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT, RUBBED BRONZE 1. MIRROR: KOHLER 24”BATHROOM MIRROR 2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM DALETILE 3. PAINTED GYPBOARD 4. GRANITE COUNTERTOP 5. TOILET PARTITION 6. COVE BASE: 6”X12”ASIAN BLACK MUSKOGEE PORCELAIN TILE FROM DALETILE KEY NOTESKEY LEGEND
  • 11. BATHROOM FLOOR PLAN SCALE = 1/4”=1’-0” N ELEVATION A SCALE =1/4”=1’-0” ELEVATION B SCALE = 1/4”=1’-0” ELEVATION C SCALE = 1/4”=1’-0” ELEVATION D SCALE = 1/4”=1’-0” MERGLER HOTEL LAFAYETTE DESIGNER: KAITLIN MERGLER INSTRUCTOR: BHAKTI SHARMA IDE 204 MATERIALS AND COLOR FALL 2012 TAP ROOM ELEVATIONS SHEET: ID7.0 WOMENS RESTROOM WALL TREATMENT STALL ACCESSORIES NORTH SOUTH EAST WEST P.T-1 P.T-1 P.T-1 P.T-1 C.V-1 C.V-1 C.V-1 C.V-1 G.W.B-1 G.W.B-1 G.W.B-1 G.W.B-1 S.T-1 S.T-1 M-1 D-1 L-1 KEY LEGEND KEY NOTES P.T-1 = PORCELAIN TILE: ASIAN BLACK PORCELAIN TILE FROM DALETILE C.V-1 = COVE BASE: ASIAN BLACK PORCELAIN TILE FROM DALETILE G.W.B-1 = PAINTED GYPBOARD G.W.B-2 = GYPBOARD S.T-1 = BATHROOM STALL M-1 = MIRROR: KOHLER 24”BATHROOM MIRROR D-1 = DOOR L-1 = LIGHTS: 4 LIGHT HOMESTEAD BATHROOM LIGHT, RUBBED BRONZE 1. MIRROR: KOHLER 24”BATHROOM MIRROR 2. PORCELAIN TILE: 6”X6”, ASIAN BLACK MUSKOGEE FROM DALETILE 3. PAINTED GYPBOARD 4. GRANITE COUNTERTOP 5. TOILET PARTITION 6. COVE BASE: 6”X12”ASIAN BLACK MUSKOGEE PORCELAIN TILE FROM DALETILE