This is a bi-monthly meeting hosted by Metrolinx and Crosslinx to provide construction and community relations updates to the members of Leaside and Laird Construction Liaison Committee (CLC).

Published in: Government & Nonprofit
  • Be the first to comment

  • Be the first to like this

Leaside Laird CLC November 2019 Presentation

  1. 1. 1 CROSSTOWN LRT Construction Liaison Committee November 2019
  2. 2. 2 Leaside Station Update
  3. 3. 3 Leaside Station: What to Expect Year What to Expect 2019-2020 • Deep excavation, hauling, concrete and material deliveries will continue on the surface through 2020 • Extended construction hours through mid-2020; 5:00 a.m. – 11:00 p.m. • Deep excavation of the station box will continue into early 2020 • Main and secondary entrance sites will continue to be the main access points for the deep excavation underneath Eglinton Avenue • Periodic additional lane closures may be required to facilitate dewatering, deck repair and concrete works • Permanent works have commenced at the main entrance and will continue into late 2020, including waterproofing, formwork, rebar installation and concrete works • Durations of each stage may vary due to work sequencing, weather and unexpected circumstance delays and private agreements
  4. 4. 4 Current Traffic Staging 4 No S/B Right Turn on Red.
  5. 5. 5 Dewatering Works Howard Talbot Park • November 11, 2019 for three (3) weeks • Crews will conduct vertical drilling of wells and trenches to connect to the existing dewatering system • Restoration and reinstatement of landscaping will be done following the completion of the work • A fence will be installed around the work zone for public safety
  6. 6. 6 Decking Repair 7:00 a.m. on Wednesday November 13 to 7:00 p.m. on Thursday November 14th, 2019 there will be new lane and turn restrictions at the Eglinton Avenue East and Bayview Avenue intersection to accommodate urgent decking repairs. *Paid duty officers and flag persons will be onsite to assist with directing traffic and pedestrians for the duration of the work
  7. 7. 7 Leaside Station Progress Photos MAIN ENTRANCE EXCAVATION FOR PLACEMENT OF CORNER BRACE TUNNEL BREAKOUT MAIN ENTRANCE PERMANENT WORKS WATERMAIN SUPPORTED DURING EXCAVATION
  8. 8. 8 Emergency Exit 3 Site (Leaside High School)
  9. 9. 9 Emergency Exit 3 Update • Following this work, the work zone will shift to the middle of the roadway and traffic will be routed north and south of the work zone. • This stage will be in place through to late 2019. • Early 2020, the construction zone will be removed and a small emergency exit building will be permanently in place on the boulevard. Early October, the construction zone shifted to the north side of EglintonAvenue.The new construction zone will allow for the completion of utility relocations, backfill and road restoration.This configuration will remain in place through to late November, 2019.
  10. 10. 10 Laird Station Update
  11. 11. 11 Laird Station: What to Expect Year What to Expect 2019 • Long duration removals are now complete. Periodic removals may for the remainder of 2019 as work transitions to permanent works inside of the completed cavern Permanent Works: • Waterproofing, form and rebar and concrete works will occur completed cavern • During the concrete works, there will be continuous delivery of to the surface sites • The concrete will form parts of the permanent station structure underground 2020 • Utility and road restoration • Permanent works will continue • Overnight works will continue through to summer 2020
  12. 12. 12 Laird StationTraffic Configuration Through 2020
  13. 13. 13 Laird Station Concrete Pour One (1) dayTBD (November 22 – 27, 2019) between 5:00am-11:00pm
  14. 14. 14 Laird Station Progress Photos EAST END OF TUNNEL CONCRETE POUR WEST END OF TUNNEL COMPLETED WATERPROOFING MAIN SHAFT WATERPROOFING OF WALLS

×