Equipment Assembly El Segundo Refinery
© ChevronTexaco 2003
Opening and Closing “A” Style
Breech Lock Exchangers
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Agenda
• Opening Up An “A” Style
Breech Lock
• Closing An “A” Style Breech
Lock
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Struthers Type A
Struthers Wells
Breech Lock
Type "A"
Vent
1.
2.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
14.
15.
16.
17.
18.
19.
"B"
"A"
1. TubeSheet to Shell Gasket
2. Tube Sheet
3. Channel Partition Assembly
4. Packing GlandAssembly
5. Packing GlandAssembly Cover
6. Partion Cover Gasket 1/8" Thick Asbestos
7. Partion Cover Plate
8. Internal Flange
9. 3 Piece Split Ring (Key Ring Assembly)
10. Internal Flange Jack Screw
11. Internal Sleeve
12. Diaphragm (Seal Plate) Gasket
13. Diaphragm (Seal Plate)
14. Back Up Ring (Compression)
15. Compression Ring
16. Channel Cover
17. Channel Cover Jacking Screws
18. Threaded Locking Ring
19. Threaded Locking Ring Jack Screw
Outlet
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Meet Jack
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Follow Written Procedure, Which Must Be At
The Exchanger While It Is Being Worked On
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Dedicated Box to Hold Parts
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Record Distance Channel Cover Sticks Out
and Index Mark Lock Ring Location
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Lock Ring Stud Removal
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Channel Cover Stud Removal
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Lock Ring Pill (Push Rod) Removal
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Channel Cover Pill (Push Rod) Removal
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Grease Fitting
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Inject ½ Tube of Grease Per Fitting
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
It takes a lot of Grease to Fill Annulus
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Leave Stud Exposed For Crain Sling
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Connect Jig And Try Unscrewing Lock Ring
By Hand
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Using Crain and Sling to Unscrew Lock Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Using Crain and Sling to Unscrew Lock Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Unscrew the Lock Ring with an Extension Arm
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
If the Extension Arm Wont Work
• Keep Tension On Lock Ring
• Pack the Channel Cover with Ice
• Heat the Channel Rapidly
• Lock Ring Should “Pop” at 400F
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Check To Be Sure The Inner Compression
Ring Sits At Least 1/8 Inch Inside The Groove
Must Not Be Flush
Must Be Recessed
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Protect the ACME Threads with Sheet-Metal
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Compression Ring Set Screws
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Diaphragm
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install a Cover To Protect Bottom Channel
Line
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Record The Average Size Of the Dimples
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Partition Cover Plate and Leak
Check Tubes (If needed)
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
channel gasket retainer plate
d1 – d2 Measurement
Struthers Wells
Breech Lock
Type "A"
Vent
1.
2.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
14.
15.
16.
17.
18.
19.
"B"
"A"
1. TubeSheet to Shell Gasket
2. Tube Sheet
3. Channel Partition Assembly
4. Packing GlandAssembly
5. Packing GlandAssembly Cover
6. Partion Cover Gasket 1/8" Thick Asbestos
7. Partion Cover Plate
8. Internal Flange
9. 3 Piece Split Ring (Key Ring Assembly)
10. Internal Flange Jack Screw
11. Internal Sleeve
12. Diaphragm (Seal Plate) Gasket
13. Diaphragm (Seal Plate)
14. Back Up Ring (Compression)
15. Compression Ring
16. Channel Cover
17. Channel Cover Jacking Screws
18. Threaded Locking Ring
19. Threaded Locking Ring Jack Screw
Outlet
d1
d2
internal ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
d1 – d2 Measurement
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
d1 – d2 Measurement
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
channel gasket retainer plate
d1 – d2 Measurement
Struthers Wells
Breech Lock
Type "A"
Vent
1.
2.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
14.
15.
16.
17.
18.
19.
"B"
"A"
1. TubeSheet to Shell Gasket
2. Tube Sheet
3. Channel Partition Assembly
4. Packing GlandAssembly
5. Packing GlandAssembly Cover
6. Partion Cover Gasket 1/8" Thick Asbestos
7. Partion Cover Plate
8. Internal Flange
9. 3 Piece Split Ring (Key Ring Assembly)
10. Internal Flange Jack Screw
11. Internal Sleeve
12. Diaphragm (Seal Plate) Gasket
13. Diaphragm (Seal Plate)
14. Back Up Ring (Compression)
15. Compression Ring
16. Channel Cover
17. Channel Cover Jacking Screws
18. Threaded Locking Ring
19. Threaded Locking Ring Jack Screw
Outlet
d1
d2
internal ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Record the Height of the Jack Screw Heads
Above the Inner Flange Face
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Jack Screws From Internal Flange
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Push Internal Flange In
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Split Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Internal Flange
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Internal Packing Gland If Possible
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Top of Channel is Smooth
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Internal Partition Assembly
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Lift The Internal Partition Out
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Record The Distance From The Tubesheet
Face to the Channel Face
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Eye In Tubesheet and Pull Bundle
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Protect The Tubes When Lifting The Bundle
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Bundle Extraction Truck
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Clean Parts That Are To Be Re-Used. ALL
Threads MUST BE Chased
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Do Not Use Pliers On Jack Screws
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Clean the ACME Threads
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install The CMG or Kamprofile Tubesheet
Gasket on the Back of the Tubesheet
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Lamaflex Seal Strips and Bend
Towards the Inlet Line
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install The Bundle
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Level The Bundle
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Check Bundle For Level and Measure to
Make Sure It Is In All The Way
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Check Packing Ring To Make Sure It Fits
Easily Up Into Partition
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Partition Assembly
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Partition Inner Flange
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Split Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Internal Flange Jack Screws, Check
Height and Torque per Written Instructions
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Form Packing Ring To Stuffing Box Gland
and Install
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Partition Gasket
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Partition Cover and Inner Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
channel gasket retainer plate
d1 – d2 Measurement
Struthers Wells
Breech Lock
Type "A"
Vent
1.
2.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
14.
15.
16.
17.
18.
19.
"B"
"A"
1. TubeSheet to Shell Gasket
2. Tube Sheet
3. Channel Partition Assembly
4. Packing GlandAssembly
5. Packing GlandAssembly Cover
6. Partion Cover Gasket 1/8" Thick Asbestos
7. Partion Cover Plate
8. Internal Flange
9. 3 Piece Split Ring (Key Ring Assembly)
10. Internal Flange Jack Screw
11. Internal Sleeve
12. Diaphragm (Seal Plate) Gasket
13. Diaphragm (Seal Plate)
14. Back Up Ring (Compression)
15. Compression Ring
16. Channel Cover
17. Channel Cover Jacking Screws
18. Threaded Locking Ring
19. Threaded Locking Ring Jack Screw
Outlet
d1
d2
internal ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
d1 – d2 Measurement
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
d1 – d2 Measurement
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
channel gasket retainer plate
d1 – d2 Measurement
Struthers Wells
Breech Lock
Type "A"
Vent
1.
2.
3.
4.
5.
6.
7.
8. 9.
10.
11.
12. 13.
14.
15.
16.
17.
18.
19.
"B"
"A"
1. TubeSheet to Shell Gasket
2. Tube Sheet
3. Channel Partition Assembly
4. Packing GlandAssembly
5. Packing GlandAssembly Cover
6. Partion Cover Gasket 1/8" Thick Asbestos
7. Partion Cover Plate
8. Internal Flange
9. 3 Piece Split Ring (Key Ring Assembly)
10. Internal Flange Jack Screw
11. Internal Sleeve
12. Diaphragm (Seal Plate) Gasket
13. Diaphragm (Seal Plate)
14. Back Up Ring (Compression)
15. Compression Ring
16. Channel Cover
17. Channel Cover Jacking Screws
18. Threaded Locking Ring
19. Threaded Locking Ring Jack Screw
Outlet
d1
d2
internal ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Attached Diaphragm to Compression Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Diaphragm Gasket Using Spray
Adhesive
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Diaphragm and Compression Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Apply Anti-Seize to the Channel Cover
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Coat Both Sets of AMCE Threads With Anti-
Seize
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Apply Anti-Seize to the ID of the Outer
Compression Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Put Lock Ring Onto Channel Cover
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Install Jig
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Lift Channel Cover and Lock Ring Into Place
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Mark Location Where First Thread Starts
and Install Channel Cover and Lock Ring
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Re-Check Distance Channel Cover Sticks Out
And Check Index Marks For Alignment
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Use Anti-Seize on Push Rods
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Use LOTS of Anti-Seize on Jack Screws
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Stud Can Be Run Down With An Impact As
Long They Are Finger Checked Afterwards
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Remove Jig Studs
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Torquing Pattern
100%
100%
First Pass:
Hand
Tighten All
Studs For
Alignment
Second
Pass:
Torque 4
Studs To
100%
3
2
4
1
Third
Pass:
Torque All
Studs To
100% in
Circular
Pattern
Fourth
Pass:
Torque All
Studs To
100% in
Circular
Pattern
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Torque Lock Ring Studs Using A Circular
Pattern
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Torque Channel Cover Studs Using A
Circular Pattern
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Loosen Jack Screws, Re-Tighten Lock Ring,
Re-tighten Jack Screws in Circular Pattern
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Hot-Torque Lock Ring & Channel Cover
When The Temperature is 250F to 400F
Equipment Assembly El Segundo Refinery
Breech Lock Exchangers, “A” Style
Questions?
David W. Reeves, El Segundo, CA, dree@ChevronTexaco.com

More Related Content

What's hot

Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummiesIvan Garcia
 
[Point] pipe stress analysis by computer-caesar ii
[Point] pipe stress analysis by computer-caesar ii[Point] pipe stress analysis by computer-caesar ii
[Point] pipe stress analysis by computer-caesar iiLuis Luis
 
Piping Drawings Basics.pdf
Piping Drawings Basics.pdfPiping Drawings Basics.pdf
Piping Drawings Basics.pdfRubenAngelFelix1
 
Control Valve and Types of caged trims
Control Valve and Types of caged trimsControl Valve and Types of caged trims
Control Valve and Types of caged trimsnaz4u
 
GE Drilling Systems Brochure
GE Drilling Systems BrochureGE Drilling Systems Brochure
GE Drilling Systems BrochureRosendo Ramirez
 
EXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdfEXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdfZeeshanAlam90
 
Heat-exchanger-manual
Heat-exchanger-manualHeat-exchanger-manual
Heat-exchanger-manualAbdelrhman K.
 
what is process piping
what is process pipingwhat is process piping
what is process pipingVarun Patel
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valvesYoga Sathish
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipeAlireza Niakani
 
Different types of valves used in piping
Different types of valves used in pipingDifferent types of valves used in piping
Different types of valves used in pipingRaslaan Mumtaz
 
B31.3 process piping course 02 metallic pipe & fitting selection
B31.3 process piping course   02 metallic pipe & fitting selectionB31.3 process piping course   02 metallic pipe & fitting selection
B31.3 process piping course 02 metallic pipe & fitting selectionAhmedhelal_Metito Helal
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceAbhishek Srivastav
 

What's hot (20)

Question bank
Question bankQuestion bank
Question bank
 
Piping Design ppt.pdf
Piping Design ppt.pdfPiping Design ppt.pdf
Piping Design ppt.pdf
 
Flanges general-for-dummies
Flanges general-for-dummiesFlanges general-for-dummies
Flanges general-for-dummies
 
[Point] pipe stress analysis by computer-caesar ii
[Point] pipe stress analysis by computer-caesar ii[Point] pipe stress analysis by computer-caesar ii
[Point] pipe stress analysis by computer-caesar ii
 
Valves
ValvesValves
Valves
 
Piping Drawings Basics.pdf
Piping Drawings Basics.pdfPiping Drawings Basics.pdf
Piping Drawings Basics.pdf
 
Tube expansion
Tube expansionTube expansion
Tube expansion
 
Piping presentation part ii 2
Piping presentation part ii 2Piping presentation part ii 2
Piping presentation part ii 2
 
Control Valve and Types of caged trims
Control Valve and Types of caged trimsControl Valve and Types of caged trims
Control Valve and Types of caged trims
 
GE Drilling Systems Brochure
GE Drilling Systems BrochureGE Drilling Systems Brochure
GE Drilling Systems Brochure
 
EXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdfEXH2200 Cooling Tower Design Guidelines.pdf
EXH2200 Cooling Tower Design Guidelines.pdf
 
Heat-exchanger-manual
Heat-exchanger-manualHeat-exchanger-manual
Heat-exchanger-manual
 
what is process piping
what is process pipingwhat is process piping
what is process piping
 
pipes fittings &valves
 pipes fittings &valves pipes fittings &valves
pipes fittings &valves
 
Piping components, materials, codes and standards part 1- pipe
Piping components, materials, codes and standards   part 1- pipePiping components, materials, codes and standards   part 1- pipe
Piping components, materials, codes and standards part 1- pipe
 
Introduction to piping design
Introduction to piping designIntroduction to piping design
Introduction to piping design
 
Different types of valves used in piping
Different types of valves used in pipingDifferent types of valves used in piping
Different types of valves used in piping
 
B31.3 process piping course 02 metallic pipe & fitting selection
B31.3 process piping course   02 metallic pipe & fitting selectionB31.3 process piping course   02 metallic pipe & fitting selection
B31.3 process piping course 02 metallic pipe & fitting selection
 
Control Valves
Control ValvesControl Valves
Control Valves
 
Floating head heat exchanger - Maintainance
Floating head heat exchanger - MaintainanceFloating head heat exchanger - Maintainance
Floating head heat exchanger - Maintainance
 

Similar to Breech Lock A Style Opening and Closing.ppt

Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selectionElsayed Amer
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and typesElsayed Amer
 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESGaurav Dalal
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdfSuad45
 
GWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquiferKeith Carpenter Jr
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquiferDawnLong18
 
TTK 1G Cluch Basics
TTK 1G  Cluch BasicsTTK 1G  Cluch Basics
TTK 1G Cluch Basicsmedinage
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...f8iosedkdm3e
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...ran4gangbi
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...zu0582kui
 

Similar to Breech Lock A Style Opening and Closing.ppt (20)

Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
How to Replace Debooster Seals
How to Replace Debooster SealsHow to Replace Debooster Seals
How to Replace Debooster Seals
 
Production Packer setting and types
Production Packer setting and typesProduction Packer setting and types
Production Packer setting and types
 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVES
 
Stainless Steel Laboratory Storage Equipment
Stainless Steel Laboratory Storage EquipmentStainless Steel Laboratory Storage Equipment
Stainless Steel Laboratory Storage Equipment
 
Stainless Steel Laboratory Storage
Stainless Steel Laboratory StorageStainless Steel Laboratory Storage
Stainless Steel Laboratory Storage
 
Product of the Week Showcase - May
Product of the Week Showcase - MayProduct of the Week Showcase - May
Product of the Week Showcase - May
 
Butterflytraining
ButterflytrainingButterflytraining
Butterflytraining
 
G196 manual
G196 manualG196 manual
G196 manual
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf304372312-Kiln-Miscellaneous.pdf
304372312-Kiln-Miscellaneous.pdf
 
GWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal ValvesGWC Valve International Pressure Seal Valves
GWC Valve International Pressure Seal Valves
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquifer
 
Are you protecting the aquifer
Are you protecting the aquiferAre you protecting the aquifer
Are you protecting the aquifer
 
Production packer
Production packerProduction packer
Production packer
 
TTK 1G Cluch Basics
TTK 1G  Cluch BasicsTTK 1G  Cluch Basics
TTK 1G Cluch Basics
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
 
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
Volvo A40F FS A40FFS Articulated Dump Truck Service Repair Manual Instant Dow...
 

More from SugunaSrinivasan2

More from SugunaSrinivasan2 (6)

PUMP SLIDE - 2.ppt
PUMP SLIDE - 2.pptPUMP SLIDE - 2.ppt
PUMP SLIDE - 2.ppt
 
Refining_Process.ppt
Refining_Process.pptRefining_Process.ppt
Refining_Process.ppt
 
Combined Piping Books.pdf
Combined Piping Books.pdfCombined Piping Books.pdf
Combined Piping Books.pdf
 
control valve handbook.pdf
control valve handbook.pdfcontrol valve handbook.pdf
control valve handbook.pdf
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdf
 
002.pdf
002.pdf002.pdf
002.pdf
 

Recently uploaded

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 

Breech Lock A Style Opening and Closing.ppt

  • 1. Equipment Assembly El Segundo Refinery © ChevronTexaco 2003 Opening and Closing “A” Style Breech Lock Exchangers
  • 2. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Agenda • Opening Up An “A” Style Breech Lock • Closing An “A” Style Breech Lock
  • 3. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Struthers Type A Struthers Wells Breech Lock Type "A" Vent 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. "B" "A" 1. TubeSheet to Shell Gasket 2. Tube Sheet 3. Channel Partition Assembly 4. Packing GlandAssembly 5. Packing GlandAssembly Cover 6. Partion Cover Gasket 1/8" Thick Asbestos 7. Partion Cover Plate 8. Internal Flange 9. 3 Piece Split Ring (Key Ring Assembly) 10. Internal Flange Jack Screw 11. Internal Sleeve 12. Diaphragm (Seal Plate) Gasket 13. Diaphragm (Seal Plate) 14. Back Up Ring (Compression) 15. Compression Ring 16. Channel Cover 17. Channel Cover Jacking Screws 18. Threaded Locking Ring 19. Threaded Locking Ring Jack Screw Outlet
  • 4. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Meet Jack
  • 5. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Follow Written Procedure, Which Must Be At The Exchanger While It Is Being Worked On
  • 6. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Dedicated Box to Hold Parts
  • 7. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Record Distance Channel Cover Sticks Out and Index Mark Lock Ring Location
  • 8. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Lock Ring Stud Removal
  • 9. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Channel Cover Stud Removal
  • 10. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Lock Ring Pill (Push Rod) Removal
  • 11. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Channel Cover Pill (Push Rod) Removal
  • 12. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Grease Fitting
  • 13. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Inject ½ Tube of Grease Per Fitting
  • 14. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style It takes a lot of Grease to Fill Annulus
  • 15. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Leave Stud Exposed For Crain Sling
  • 16. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Connect Jig And Try Unscrewing Lock Ring By Hand
  • 17. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Using Crain and Sling to Unscrew Lock Ring
  • 18. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Using Crain and Sling to Unscrew Lock Ring
  • 19. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Unscrew the Lock Ring with an Extension Arm
  • 20. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style If the Extension Arm Wont Work • Keep Tension On Lock Ring • Pack the Channel Cover with Ice • Heat the Channel Rapidly • Lock Ring Should “Pop” at 400F
  • 21. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Check To Be Sure The Inner Compression Ring Sits At Least 1/8 Inch Inside The Groove Must Not Be Flush Must Be Recessed
  • 22. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Protect the ACME Threads with Sheet-Metal
  • 23. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Compression Ring Set Screws
  • 24. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Diaphragm
  • 25. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install a Cover To Protect Bottom Channel Line
  • 26. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Record The Average Size Of the Dimples
  • 27. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Partition Cover Plate and Leak Check Tubes (If needed)
  • 28. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style channel gasket retainer plate d1 – d2 Measurement Struthers Wells Breech Lock Type "A" Vent 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. "B" "A" 1. TubeSheet to Shell Gasket 2. Tube Sheet 3. Channel Partition Assembly 4. Packing GlandAssembly 5. Packing GlandAssembly Cover 6. Partion Cover Gasket 1/8" Thick Asbestos 7. Partion Cover Plate 8. Internal Flange 9. 3 Piece Split Ring (Key Ring Assembly) 10. Internal Flange Jack Screw 11. Internal Sleeve 12. Diaphragm (Seal Plate) Gasket 13. Diaphragm (Seal Plate) 14. Back Up Ring (Compression) 15. Compression Ring 16. Channel Cover 17. Channel Cover Jacking Screws 18. Threaded Locking Ring 19. Threaded Locking Ring Jack Screw Outlet d1 d2 internal ring
  • 29. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style d1 – d2 Measurement
  • 30. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style d1 – d2 Measurement
  • 31. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style channel gasket retainer plate d1 – d2 Measurement Struthers Wells Breech Lock Type "A" Vent 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. "B" "A" 1. TubeSheet to Shell Gasket 2. Tube Sheet 3. Channel Partition Assembly 4. Packing GlandAssembly 5. Packing GlandAssembly Cover 6. Partion Cover Gasket 1/8" Thick Asbestos 7. Partion Cover Plate 8. Internal Flange 9. 3 Piece Split Ring (Key Ring Assembly) 10. Internal Flange Jack Screw 11. Internal Sleeve 12. Diaphragm (Seal Plate) Gasket 13. Diaphragm (Seal Plate) 14. Back Up Ring (Compression) 15. Compression Ring 16. Channel Cover 17. Channel Cover Jacking Screws 18. Threaded Locking Ring 19. Threaded Locking Ring Jack Screw Outlet d1 d2 internal ring
  • 32. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Record the Height of the Jack Screw Heads Above the Inner Flange Face
  • 33. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Jack Screws From Internal Flange
  • 34. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Push Internal Flange In
  • 35. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Split Ring
  • 36. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Internal Flange
  • 37. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Internal Packing Gland If Possible
  • 38. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Top of Channel is Smooth
  • 39. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Internal Partition Assembly
  • 40. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Lift The Internal Partition Out
  • 41. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Record The Distance From The Tubesheet Face to the Channel Face
  • 42. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Eye In Tubesheet and Pull Bundle
  • 43. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Protect The Tubes When Lifting The Bundle
  • 44. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Bundle Extraction Truck
  • 45. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Clean Parts That Are To Be Re-Used. ALL Threads MUST BE Chased
  • 46. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Do Not Use Pliers On Jack Screws
  • 47. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Clean the ACME Threads
  • 48. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install The CMG or Kamprofile Tubesheet Gasket on the Back of the Tubesheet
  • 49. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Lamaflex Seal Strips and Bend Towards the Inlet Line
  • 50. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install The Bundle
  • 51. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Level The Bundle
  • 52. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Check Bundle For Level and Measure to Make Sure It Is In All The Way
  • 53. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Check Packing Ring To Make Sure It Fits Easily Up Into Partition
  • 54. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Partition Assembly
  • 55. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Partition Inner Flange
  • 56. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Split Ring
  • 57. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Internal Flange Jack Screws, Check Height and Torque per Written Instructions
  • 58. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Form Packing Ring To Stuffing Box Gland and Install
  • 59. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Partition Gasket
  • 60. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Partition Cover and Inner Ring
  • 61. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style channel gasket retainer plate d1 – d2 Measurement Struthers Wells Breech Lock Type "A" Vent 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. "B" "A" 1. TubeSheet to Shell Gasket 2. Tube Sheet 3. Channel Partition Assembly 4. Packing GlandAssembly 5. Packing GlandAssembly Cover 6. Partion Cover Gasket 1/8" Thick Asbestos 7. Partion Cover Plate 8. Internal Flange 9. 3 Piece Split Ring (Key Ring Assembly) 10. Internal Flange Jack Screw 11. Internal Sleeve 12. Diaphragm (Seal Plate) Gasket 13. Diaphragm (Seal Plate) 14. Back Up Ring (Compression) 15. Compression Ring 16. Channel Cover 17. Channel Cover Jacking Screws 18. Threaded Locking Ring 19. Threaded Locking Ring Jack Screw Outlet d1 d2 internal ring
  • 62. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style d1 – d2 Measurement
  • 63. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style d1 – d2 Measurement
  • 64. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style channel gasket retainer plate d1 – d2 Measurement Struthers Wells Breech Lock Type "A" Vent 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. "B" "A" 1. TubeSheet to Shell Gasket 2. Tube Sheet 3. Channel Partition Assembly 4. Packing GlandAssembly 5. Packing GlandAssembly Cover 6. Partion Cover Gasket 1/8" Thick Asbestos 7. Partion Cover Plate 8. Internal Flange 9. 3 Piece Split Ring (Key Ring Assembly) 10. Internal Flange Jack Screw 11. Internal Sleeve 12. Diaphragm (Seal Plate) Gasket 13. Diaphragm (Seal Plate) 14. Back Up Ring (Compression) 15. Compression Ring 16. Channel Cover 17. Channel Cover Jacking Screws 18. Threaded Locking Ring 19. Threaded Locking Ring Jack Screw Outlet d1 d2 internal ring
  • 65. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Attached Diaphragm to Compression Ring
  • 66. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Diaphragm Gasket Using Spray Adhesive
  • 67. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Diaphragm and Compression Ring
  • 68. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Apply Anti-Seize to the Channel Cover
  • 69. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Coat Both Sets of AMCE Threads With Anti- Seize
  • 70. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Apply Anti-Seize to the ID of the Outer Compression Ring
  • 71. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Put Lock Ring Onto Channel Cover
  • 72. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Install Jig
  • 73. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Lift Channel Cover and Lock Ring Into Place
  • 74. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Mark Location Where First Thread Starts and Install Channel Cover and Lock Ring
  • 75. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Re-Check Distance Channel Cover Sticks Out And Check Index Marks For Alignment
  • 76. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Use Anti-Seize on Push Rods
  • 77. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Use LOTS of Anti-Seize on Jack Screws
  • 78. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Stud Can Be Run Down With An Impact As Long They Are Finger Checked Afterwards
  • 79. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Remove Jig Studs
  • 80. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Torquing Pattern 100% 100% First Pass: Hand Tighten All Studs For Alignment Second Pass: Torque 4 Studs To 100% 3 2 4 1 Third Pass: Torque All Studs To 100% in Circular Pattern Fourth Pass: Torque All Studs To 100% in Circular Pattern
  • 81. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Torque Lock Ring Studs Using A Circular Pattern
  • 82. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Torque Channel Cover Studs Using A Circular Pattern
  • 83. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Loosen Jack Screws, Re-Tighten Lock Ring, Re-tighten Jack Screws in Circular Pattern
  • 84. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Hot-Torque Lock Ring & Channel Cover When The Temperature is 250F to 400F
  • 85. Equipment Assembly El Segundo Refinery Breech Lock Exchangers, “A” Style Questions? David W. Reeves, El Segundo, CA, dree@ChevronTexaco.com